From: To: Jeffrey Epstein stjeevacationggmail.corn> Subject: Fwd: Bent rod repair inspection Date: Tue, 03 Jul 2018 01:22:13 +0000 HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 tel 212-971-1306 fax 212-320-0381 cell Begin forwarded message: From: Bill Hague Subject: Re: Bent rod repair inspection Date: Jul 2, 2018 at 9:12:12 PM EDT To: tar ica >, Understood. If the repair can be made in place it's gonna take two days to do it. Lee is scheduled for St Martin on Saturday so if it can be done we are gonna have to deal with two days out of the few we have till the principal arrives, unless the repair, or the visit gets pushed back. The consequences of either are undetermined. On Jul 2, 2018, at 21:08, Ok Will adjust schedule accordingly Please note there maybe a need to work Saturday, please let Karl know Sent from my iPhone > wrote: Begin forwarded message: EFTA00866269 From: LSJ GSJ Date: July 2, 2018 at 9:04:51 PM AST To: Subject: Fwd: Bent rod repair inspection Begin forwarded message: From: Bill Hague Date: July 2 2018 at 8:17:48 PM AST To: " , Rich Kahn Subject: Bent rod repair inspection "michael glidden" Good Evening. Before the 10:00 run with Jonny for the container, Lee Thomas is performing a feasibility study to see if the bent rod can be removed and replaced with the engine installed on its ways or in its present place. If it can't, it's really gonna complicate things... EFTA00866270
