From: To: Rich Kahn Cc: Jeffrey Epstein <jeevacation@gmail.com>, LSJ GSJ Subject: LSJ SW RO Refurbishment Date: Sat, 05 May 2018 13:02:45 +0000 Attachments: LSJ SW RO Refurb.pdf Rich Attached are proposals from both TSG and GWS (Gemini Water Services) for the refurbishment of the SW RO on LSJ As shown there are Immediate Repairs required Replacement of Control Panels, 75 hp Motor, Pump and Media filter service. This is outside of any work TSG have already been approved for. At this time the RO is operational, but failure of any of the above items would cause the plant to shutdown and the Repair Time would be Lengthy and could lead to water restrictions and or the need to purchase water. The option to Expand the Plant could be done at the same time. My recommendation is to proceed with Gemini Water Services. Can we proceed with finalizing contracts with GWS? regards The Saint .lames Group USVI EFTA00817772
