LSI Dock Scope of work: Demo and remove the following 1. Existing Dock Bumpers 2. Existing S/S Fasteners Straighten and or Install New Bumper fasteners where needed Remove all existing Bumpers and Paint Dock siding with Epoxy Grey Paint Replace bumpers. LSJ to provide floating dock to perform work Duration: 22 days, 2 Men JSJ Cottage Bathroom Scope of Work Install New Dura Rock in Staff Cottage Bathroom Duration: 3 Days, 2 Men Labor Cost Brian: $300.00 per day @ 25 days = $7500.00 Buck: $120.00 per day @ $25 days = $3000.00 Total Labor Cost: $10,500.00 All material and tools supplied by Owner. EFTA00804938