Subbase Drydock T:(340) 776-2078 Fax:(340)779-8426 PO Box 4429/ Parcel 162 Subbase Name / Address LSJ,LLC "Big N" Anna: ■ Estimate Date Estimate # 5:3/2017 SS7 Terms Project Upon Comple... "Big N" Description Qty Cost Total Drydock hauling fees I 1,500.00 1,500.00 Blocking Fee I 350.00 350.00 Laydays: per day I 350.00 350.00 Electricity Fee: per day I 50.00 50.00 Sand, prep, paint -- SBDD recommends the anti-fouling during repairs. We will keep the same price as two years ago. Sand, spot prime, apply two coats of antifouling with a third around the waterline: I 7,500.00 7,500.00 Good afternoon Anna, Bosco sent me a picture of the Stbd Shaft and after review I told Bosco that the vessel needs to be hauled and the running gear removed and examined and at that time a determination of the correct repair procedure be presented to you. Please keep in mind that the Stbd engine was removed for repairs and that SBDD was not involved in this project. The correct alignment of the drive train is critical for long service life, every week a thorough check of the vessel should be preformed. As recommended a full time captain should be employed on Big "N" and check list should be followed . The video of the shaft looses in the coupling should never have gotten to this point of neglect. Please advise if you would like to move forward with the estimate. Thank you. Total y),-;o.liti Signature EFTA00801811