arrow_back Search

EFTA00764070

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00764070.pdf description PDF text_fields 200 words · 1.2k chars
open_in_new View original source

From: "Stephen Caplinger" <I To: "'Jeffrey Epstein"' czi Cc: :G 1 ar Ken Subject: Office Pavilion Entry Site Plan Date: Mon, 22 Feb 2010 17:38:20 +0000 Attachments: scan_20100222_0001.PDF Inline-Images: image00 1 jpg , "'Andrew Levy" Attached is an updated site plan for the Office/Master Bedroom area. This plan does not have a roadway connection all the way around as in the previous plans. This is a "flat terrace" plan and the main terrace area is the same width as the master bedroom building. The stairway has been moved more to the west. The lower courtyard in front of the office breezeway has been enlarged and the walls are approximately 6' ht. All walls are flat & stepped instead of being sloped. Also, I have shown the new stair & walk connection from the kitchen. Please review and let me know if you have any thoughts. also sending to Andrew and he can do a SketchUp 3D drawing if you think it's ready for that step. We also will stake it out in the field for your next visit. Regards, aft STEPHEN M. CAPLINGER Vice President Design & Planning LANDMARK LAND COMPANY 4908 Brooksview Circle New Albany, Ohio 43054 EFTA00764070 EFTA00764071