arrow_back Search

EFTA00731692

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00731692.pdf description PDF text_fields 199 words · 1.2k chars
open_in_new View original source

3B's LLC 6023 Osuna NE Albuquerque, NM 87109 Lic. # 83498 Invoice (updated) 42 Zorro Ranch Road Stanley, New Mexico Brice Gordon Brice, Here is the invoice for the work done on the Estancia Fountain and the Stoops Original price $18,400 plus tax $1,196.00 = $19,596.00 Received $15,676.80 Balance on original contract = $ 3,919.20 paid Additional costs for piecing the fountain together prior to final installation inside the estancia as per your request. There were pieces that were damaged and needed attention, Raphael has pictures and did some of the repairs at his shop. Many of the pieces were shown on the drawing as square when they were in fact rectangular, these pieces needed to be modified to fit. 6 guys 2 supervisor x 16 hours (2days) = $3,600.00 plus tax (252.00) = $ 3,852.00 Outside fountain Install high density epoxy cement Additional cement to match grade and be flush with lights on the floor (250.00) Install 5 coats of neo guard coating syste $ 3,450.00 plus 241.00 tax = 3,691.00 Total due for both fountains $ 3,691.00 plus $ 3,852.00 = $ 7,543.00 Please call me if you have any questions at Thank you, JJ Blea EFTA00731692