arrow_back Search

EFTA00644643

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00644643.pdf description PDF text_fields 248 words · 1.6k chars
open_in_new View original source

From: Daphne Wallace To: Jeffrey Epstein <jeevacation®gmail.com> Cc: Rich Kahn Subject: Fwd: FW: Little St. James Date: Fri, 29 May 2015 20:49:33 +0000 Attachments: A1.0.pdf; C 1.0.pdf Greetings Sir, For your review and comments, the revised drawings of the Maintenance/Workshop Building. Respectfully, Daphne Forwarded message From: John P. Woods, AIA < Date: Fri, May 29, 2015 at 3:45 PM Subject: FW: Little St. James To: Daphne Wallace >, Cecile deJongh < , Ann Rodriquez Daphne, Attached are the revised site and floor plans for the Maintenance/Workshop Building. The changes are based upon the site visit held yesterday with Mr. Epstein. He requested a storage addition to be placed at the northern end of the building. We have placed that addition at the center of the northern façade as the most strategic location for the addition. If we place it further to the west, it will interfere with the access driveway leading to the main residence. If we place it further to the east, it will be too close to the edge of the abutment, in an area where the soil appears to be unstable. Upon approval of the plan, we will finish the drawings for the CZM Permit application. JPW Original Message From: JAREDIAN DESIGN GROUP [mailto Sent: Friday, May 29, 2015 3:11 PM To: John P. Woods Subject: Little St. James JAREDIAN DESIGN GROUP Architects, Engineers and Construction Managers =Tax www.jaredian.com This email is free from viruses and malware because avast! Antivirus protection is active. http://www.avast.com EFTA00644643