From: LSJ GSJ To: J Epstein <jeevacation@gmail.com> Cc: John Christensen < >, Ann Rodriquez Subject: Re: LSJ Chillax Office Date: Tue, 04 Apr 2017 20:46:39 +0000 Good Evening Bluewater Construction where on site today Chillax window would be 12'W x 8"H with x 6 (24" x 24") Horizontal Astragals or as Bluewater call them "eyes" & x 4 (24" x 24") Vertical They will estimate out for floor power/ethernet option, but that can be changed if another option is requested. Will review the relocation of outside canister lights when you are on site Expecting completed proposal early next week Warmest regards Karen On Mon, Apr 3, 2017 at 7:21 PM, LSJ GSJ < wrote: Confirming that Bluewater Construction will be on site tomorrow, their electrician will be reviewing projects Reference Chillax Office, just need to confirm location of power/Ethernet etc which will need to be relocated. If your desk is to be in the same location, would you prefer power etc to be placed in the floor? Or do you plan to change furniture configuration Please advise Thank you Warmest regards Karen Sent from my iPhone The St. James Group 6100 Red Hook Quarter Suite B3 St Thomas USVI 00802 EFTA00626397
