CAMP Amnia/mop r4e von' n' 737-72UB3 REVISION 21 S/N 29273 (YG006) VP-BBJ OWNER: PICTON II LTD. OPERATOR: PICTON II LTD. ADDRESS: C/O JET AVIATION ADDRESS: C/O JET AVIATION GENEVA AIRPORT CH-1215 GENEVA AIRPORT CH-1215 PHONE: PHONE: FAX: FAX: ANALYST: DENNIS RUFFINI EMAIL: WWW.CANIPSYSTEMS.COM lr) PLEASE RECORD CHANGES TO ADDRESS, LAST ACTUALS (IF ANY) AND FAX THIS SHEET BACK TO CAMP. AIRCRAFT SERIAL/REGNO: 29273 (YG006)/VP-BBJ MODEL: 737-72UB3 REVISION 21 MANUFACTURER: BOEING COMPANY DATES LAST ACTUALS CURRENT ACTUAL INSERVICE DATE: 08-OCT-1999 3753:19 NC HRS as of 30-JUN-2014 NC HRS as of _i_ii 922 AFL as of 30-JUN-2014 AFL as of _i_t 3455:18 APH as of 30-JUN-2014 APH as of _/_/ APU SERIAL/PART: P-5180/3800702-1 MODEL: 131-9B MANUFACTURER: HONEYWELL INSTALLED ON 25-1UN-2010 LAST ACTUALS CURRENT ACTUAL 3001 AR! HRS 3455:18 APU HRS as of 30-JUN-2014 APU HRS as of _/_/ 2487 APUS 2961 APUS as of 30-JUN-2014 APUS as of _/_/ ENGINE NO. 1 SERIAL/PART: 874437/CFM56-7827/53 MODEL: CFM56-7627/63 MANUFACTURER: CFM INTERNATIONAL S.A. INSTALLED ON 05-MAY-2011 LAST ACTUALS CURRENT ACTUAL 3556:48 ENG. HRS 3525:36 NC HRS 3753:19 ENG. HRS as of 30-JUN-2014 ENG. HRS as of _/_/ 821 ENC 886 ENC as of 30-JUN-2014 ENC as of _/_/ ENGINE NO. 2 SERIAL/PART: 874438/CFM56-7827/B3 MODEL: CFM56-7627/63 MANUFACTURER: CFM INTERNATIONAL S.A. INSTALLED ON 08-OCT-1999 LAST ACTUALS CURRENT ACTUAL 44 ENG. HRS 44 NC HRS 3753:19 ENG. HRS as of 30-JUN-2014 ENG. HRS as of _/_/ 15 ENC 886 ENC as of 30-JUN-2014 ENC as of _i_t BOEING AND BM ME TRADEMARKS OF THE BOEING COMPANY 05-AUG-2014 AD/Service Information Report CAMP SYSTEMS 1 Of 748 EFTA00618292 CAMP AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC COM M-7200-02-01189 EROS CREW OXYGEN MASK. COMMUNIQUE MOS - Is) COM M-7200-02-01290 INSPECT ENGINE STRUT AFT FAIRING FOR WATER ACCUMULATION. COMMUNIQUE MOS AFL 4000 (s) COM M-7200-03-00936 VISUAL INSPECTION FORWARD GRAY WATER DRAIN MAST FOR POSSIBLE FATIGUE CRACKS. COMMUNIQUE MOS 500 (s) MC 737-21-1149 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 SUPERSEDED FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R01 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R02 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R03 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R04 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R05 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 2 Of 748 @ Camp Systems EFTA00618293 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC MC 737-21-1149 R06 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R07 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 ROB AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R09 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 RIO AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FR0M 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R11 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FR0M 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R12 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FR0M 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R13 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FR0M 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R14 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 3 Of 748 @ Camp Systems EFTA00618294 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC MC 737-21-1149 R15 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 RI6 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 RI8 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R19 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R20 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R21 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R22 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-21-1149 R23 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE CABIN ALTITUDE FROM 8000 FEET TO 6500 FEET AT 41.000 FEET FLIGHT ALTITUDE. MASTER CHANGE MOS MC 737-24-1196 RI ELECTRICAL POWER- STANDBY POWER SYSTEM - CHANGE THE ELECTRICAL POWER SYSTEM TO PROVIDE 60 SUPERSEDED MINUTES OF STANDBY POWER FOR THE AIRPLANE BASIC STANDBY LOADS IN UEU OF THE 30 MINUTES (SUPERSEDED BY MC 737-24-1196 R2). MASTER CHANGE MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 4 Of 748 @ Camp Systems EFTA00618295 CAMP fin. thermiewlqi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC MC 737-32-1478 SB -AP737-34-01 SB 01930-38-1 LANDING GEAR - MAIN LANDING GEAR BRAKE - REPLACEMENT OF HONEYWELL STANDARD STEEL BRAKES WITH SUPERSEDED HONEYWELL HIGH CAPACITY STEEL BRAKES (SUPERSEDED BY MC 737-32-1478 RI ). MASTER CHANGE . SERVICE BULLETIN . SERVICE BULLETIN MOS MOS MOS - Is) - (s) 19-DEC-2000 SB 1153154-47-06 R1 ENVIRONMENTAL CONTROL - NITROGEN GENERATION SYSTEM CONTROLLER (NGSC)- OXYGEN SENSOR INTERFACE CHANGE. MODIFICATION OF PN 1153154-4. PN 1153154-5. AND PN 1153154-6. SERVICE BULLETIN MOS 03-FEB-2014 SB 233A3202-28-01 P5-2 FUEL CONTROL MODULE ASSEMBLY MODIFICATION. SERVICE BULLETIN MOS 03-MAY-2001 - (s) SB 233A3202-28-01 R1 P5-2 FUEL CONTROL MODULE ASSEMBLY MODIFICATION. SERVICE BULLETIN MOS SB 233A3202-28-02 - Is) DISTRIBUTION - P5-2 FUEL SYSTEM MODULE - PW ASSEMBLY CIRCUIT BOARD REPLACEMENT. SERVICE BULLETIN MOS SB 233A3202-28-02R1 DISTRIBUTION - P5-2 FUEL SYSTEM MODULE - PW ASSEMBLY CIRCUIT BOARD REPLACEMENT. SERVICE BULLETIN MOS 28-FEB-2002 SB 233A3202-28-03 FUEL - DISTRIBUTION - P5-2 CONTROL SYSTEM MODULE ASSEMBLY- CENTER FUEL TANK BOOST PUMP AUTO SHOTOFF MODIFICATION.. SERVICE BULLETIN MOS I2-JAN-2006 SB 233A3205-24-01 GENERATOR DRIVE AND STANDBY POWER MODULE ASSEMBLY CHANGE. SERVICE BULLETIN MOS 26-JUL-2001 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 5 Of 748 @ Camp Systems EFTA00618296 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 233A3209-31-01 14-NOV-2CO2 SB 2344-5320-100 SB 28-01 SB 28-01 R2 SB 285A1010-27.04 28-JUN-2001 SB 285A1600-32-01 11-MAY-2CCO MODIFICATION OF THE P5-3 FLIGHT CONTROLS MODULE. SERVICE BULLETIN MOS SERVICE BULLETIN MOS (s) x-RAY INSPECTION CRANE HYDRO-AIRE. SERVICE BULLETIN MOS (s) x-RAY INSPECTION CRANE HYDRO-AIRE. SERVICE BULLETIN MOS AFL ELEVATOR AND TAB STALL MANAGEMENT YAW DAMPER SOFTWARE CHANGE - COMPONENT. SERVICE BULLETIN MOS PROXIMITY SENSOR ELECTRONIC UNIT - UPGRADE FROM -2 TO -3 CONFIGURATION. SERVICE BULLETIN MOS COMPLIED WITH SB 285A1600-32-02 25-JUL-2001 PROXIMITY SWITCH ELECTRONICS UNIT CHANGE - COMPONENT. SERVICE BULLETIN MOS SB 285A1840-24-02 MODIFICATION OF THE P5-13 ELECTRIC METERS. BATTERY AND GALLEY POWER MODULE ASSEMBLY. SERVICE BULLETIN MOS 28-AUG-2CO3 SB 285W0024-23-03 Fti CABIN ATTENDANT HANDSET I FLIGHT DECK HANDSET SHELL REPLACEMENT. SERVICE BULLETIN MOS 25-JUL-2001 . SB 321444636.1904 PNEUMATIC - HIGH STAGE VALVE - REWORK THE HIGH STAGE VALVE. PN 3214446-4. SERIES 6 OR PN 3214146-4. CUSTOMER SERIES 7 TO PN 3214446-4. SERIES 8 (CHANGE MOD 9). SERVICE BULLETIN CONVENIENCE MOS 25-JUL-2013 ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 6 Of 748 Camp Systems EFTA00618297 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 3214552-36-1899 R1 PNEUMATIC - PRESSURE REGULATOR AND SHUTOFF VALVE- REWORK PRESSURE REGULATOR AND SHUTOFF RECOMMENDED VALVE. PN 32145524. SERIES 1 TO PN 3214552-6. MOD 1. SERVICE BULLETIN MOS 05-AUG-2013 SB 3214552-36-1905 PNEUMATIC - PRESSURE REGULATOR AND SHUTOFF VALVE- REWORK THE PRESSURE REGULATOR AND SHUTOFF CUSTOMER VALVE. PN 3214552-5. SERIES 5 TO PN 3214552-5. SERIES 6 (CHANGE MOD 5) AND PN 3214552-6. SERIES 1 AND CONVENIENCE SERIES 2 TO PN 3214552-6. SERIES 3 (CHANGE MOD 2). SERVICE BULLETIN MOS 26-JUL-2013 SB 3215618-30-1895 ICE AND RAIN PROTECTION- NOSE COWL ANTI-ICE VALVE- REWORK THE NOSE COWL ANTI-ICE VALVE PN 3215618-4 SUPERSEDED TO PN 3215618-5 (SUPERSEDED BY SB 3215618-30-1895 R1). SERVICE BULLETIN MOS SB 3215618-30-1895 R1 ICE AND RAIN PROTECTION- NOSE COWL ANTI-ICE VALVE- REWORK THE NOSE COWL ANTI-ICE VALVE. PN SUPERSEDED 3215618-4 TO PN 3215618-5 (SUPERSEDED BY SB 3215618-30-1895 R2). SERVICE BULLETIN MOS SB 3215618-30-1895 R2 ICE AND RAIN PROTECTION- NOSE COWL ANTI-ICE VALVE- REWORK THE NOSE COWL ANTI-ICE VALVE. PN OPTIONAL 3215618-4 TO PN 3215618-5. SERVICE BULLETIN MOS 24-JAN-2014 SB 417A6110-23-01 ATTENDANT PANEL INTEGRATED HANDSET CONTROLLER REPLACEMENT. SERVICE BULLETIN MOS 31-MAY-2001 SB 504443-25-01R3 AF1SAFE - INSPECTION OF RESTRAINT SYSTEM END RELEASE BUCKLE. SERVICE BULLETIN NOT APPLICABLE - TO PN NOT INSTALLED ON AIRCRAFT. MOS 18-AUG-2006 2633:50 AFL 633 SB 65-52801-49-08 AUXILIARY POWER CONTROL UNIT ASSEMBLY MODIFICATION, SERVICE BULLETIN MOS - (s) SB 65C16237-32-02 LANDING GEAR, SERVICE BULLETIN MOS 28-MAR-2002 - Is) SB 72-000 COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 SERVICE BULLETINS. SERVICE BULLETIN MOS - Is) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 7 Of 748 @ Camp Systems EFTA00618298 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 734-16100-52-2 RI 18-MAR-2005 SB 737-00-1009 I4-APR-20 I DOORS - AIRSTAIR DOOR LATCH LINEAR ACTUATOR - MODIFY ACTUATOR FROM PM 734-16100-01 TO PIN 734-16103-02. SERVICE BULLETIN MOS AFL 12-N0V-2010 3477:55 848 ADMINISTRATIVE - GENERAL - AIRCRAFT GENERAL- DAMAGE TOLERANCE INSPECTION DATA - MASTER CHANGE RECOMMENDED MODIFICATIONS. SERVICE BULLETIN MOS SB 737-11-1076 PLACARDS AND MARKINGS - EXTERIOR PLACARDS AND MARKINGS - NACELLE AND POWER PLANT - THRUST RECOMMENDED REVERSER MAINTENANCE WARNING PLACARD INSTALLATION. SERVICE BULLETIN MOS 06-MAY-1999 - (s) SB 737-11-1077 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 RI). SERVICE BULLETIN MOS SB 737-11-1077 RI PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R2). SERVICE BULLETIN MOS SB 737-11-1077 RIO PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R11), SERVICE BULLETIN MOS SB 737-11-1077 R11 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R12). SERVICE BULLETIN MOS SB 737-11-1077 R12 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R13). SERVICE BULLETIN MOS SB 737-11-1077 R13 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R14). SERVICE BULLETIN MOS COMPUED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 8 Of 748 @ Camp Systems EFTA00618299 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-11-1077 R14 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SI3 737-11-1077 R15). SERVICE BULLETIN MOS SB 737-11-1077 R15 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R16). SERVICE BULLETIN MOS SB 737-11-1077 R16 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R17). SERVICE BULLETIN MOS SB 737-11-1077 R17 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R18). SERVICE BULLETIN MOS 58 737-11-1077 R18 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R19). SERVICE BULLETIN MOS 58 737-11-1077 R19 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R20). SERVICE BULLETIN MOS 58 737-11-1077 R2 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R3). SERVICE BULLETIN MOS SB 737-11-1077 R20 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R21). SERVICE BULLETIN MOS SB 737-11-1077 R21 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R22). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 9 Of 748 @ Camp Systems EFTA00618300 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-11-1077 R22 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SI3 737-11-1077 R23). SERVICE BULLETIN MOS SB 737-11-1077 R23 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R24). SERVICE BULLETIN MOS SB 737-11-1077 R24 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R25). SERVICE BULLETIN MOS SB 737-11-1077 R25 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R26). SERVICE BULLETIN MOS 58 737-11-1077 R26 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R27). SERVICE BULLETIN MOS 58 737-11-1077 R27 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R28). SERVICE BULLETIN MOS 58 737-11-1077 R28 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R29). SERVICE BULLETIN MOS SB 737-11-1077 R29 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R30). SERVICE BULLETIN MOS SB 737-11-1077 R3 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R4). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 10 Of 748 @ Camp Systems EFTA00618301 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-11-1077 R30 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SI3 737-11-1077 R31). SERVICE BULLETIN MOS SB 737-11-1077 R31 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R32). SERVICE BULLETIN MOS SB 737-11-1077 R32 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R33). SERVICE BULLETIN MOS SB 737-11-1077 R33 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R34). SERVICE BULLETIN MOS 58 737-11-1077 R34 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R35). SERVICE BULLETIN MOS 58 737-11-1077 R35 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R36). SERVICE BULLETIN MOS 58 737-11-1077 R36 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R37). SERVICE BULLETIN MOS SB 737-11-1077 R37 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R38). SERVICE BULLETIN MOS SB 737-11-1077 R38 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R39). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 11 Of 748 @ Camp Systems EFTA00618302 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-11-1077 R39 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R40). SERVICE BULLETIN MOS SB 737-11-1077 R4 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 RS). SERVICE BULLETIN MOS SB 737-11-1077 R40 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R41). SERVICE BULLETIN MOS SB 737-11-1077 R41 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R42). SERVICE BULLETIN MOS 58 737-11-1077 R42 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R43). SERVICE BULLETIN MOS 58 737-11-1077 R43 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R44). SERVICE BULLETIN MOS 58 737-11-1077 R44 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R45). SERVICE BULLETIN MOS SB 737-11-1077 R45 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R46). SERVICE BULLETIN MOS SB 737-11-1077 R46 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R47), SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 12 Of 748 @ Camp Systems EFTA00618303 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-11-1077 R47 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SI3 737-11-1077 R48). SERVICE BULLETIN MOS SB 737-11-1077 R48 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R49). SERVICE BULLETIN MOS SB 737-11-1077 R49 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R50). SERVICE BULLETIN MOS SB 737-11-1077 RS PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R6). SERVICE BULLETIN MOS 58 737-11-1077 R50 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R51). SERVICE BULLETIN MOS 58 737-11-1077 R51 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R52). SERVICE BULLETIN MOS 58 737-11-1077 R52 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R53). SERVICE BULLETIN MOS SB 737-11-1077 R53 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R54). SERVICE BULLETIN MOS SB 737-11-1077 R54 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R55), SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 13 Of 748 @ Camp Systems EFTA00618304 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-11-1077 R55 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SI3 737-11-1077 R56). SERVICE BULLETIN MOS SB 737-11-1077 R56 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R57), SERVICE BULLETIN MOS SB 737-11-1077 R57 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R58). SERVICE BULLETIN MOS SB 737-11-1077 R58 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R59). SERVICE BULLETIN MOS 58 737-11-1077 R59 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R60). SERVICE BULLETIN MOS 58 737-11-1077 R6 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R7). SERVICE BULLETIN MOS 58 737-11-1077 R60 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R61). SERVICE BULLETIN MOS SB 737-11-1077 R61 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R62). SERVICE BULLETIN MOS SB 737-11-1077 R62 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R63), SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 14 Of 748 @ Camp Systems EFTA00618305 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-11-1077 R63 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SI3 737-11-1077 R64). SERVICE BULLETIN MOS SB 737-11-1077 R64 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R65). SERVICE BULLETIN MOS SB 737-11-1077 R65 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R66). SERVICE BULLETIN MOS SB 737-11-1077 R66 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R67). SERVICE BULLETIN MOS 58 737-11-1077 R67 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R68). SERVICE BULLETIN MOS 58 737-11-1077 R68 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY S8 737-11-1077 R69). SERVICE BULLETIN MOS 58 737-11-1077 R69 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R70). SERVICE BULLETIN MOS SB 737-11-1077 R7 PLACARDS AND MARKINGS - INTERIOR PLACARDS- CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R8). SERVICE BULLETIN MOS SB 737-11-1077 R8 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 R9). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 15 Of 748 @ Camp Systems EFTA00618306 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-11-1077 R9 SB 737-11-1125 23-SEP-2004 PLACARDS AND MARKINGS - INTERIOR PLACARDS - CHANGE PLACARD INSTALLATION FOR MAXIMUM TAKEOFF SUPERSEDED WEIGHT (SUPERSEDED BY SB 737-11-1077 RIO). SERVICE BULLETIN MOS PLACARDS AND MARKINGS - EXTERIOR PLACARDS AND MARKINGS - APPLICATION OF EXTERIOR DECORATIVE PAINT RECOMMENDED SYSTEM ON LEFT SIDE AND RIGHT SIDE WINGS. SERVICE BULLETIN MOS SB 737-11-1129 PLACARDS AND MARKINGS - EXTERIOR PLACARDS AND MARKINGS - FORWARD AIRSTAIRDECAL INSTALLATION. SERVICE BULLETIN MOS CO (5) 11-NOV-2CO1 SB 737-11-1129 RI PLACARDS AND MARKINGS - EXTERIOR PLACARDS AND MARKINGS - FORWARD AIRSTAIR DECAL INSTALLATION. SERVICE BULLETIN 11-NOV-2C04 SB 737-11-1156 22-MAR-2007 MOS • SB 737-11-1156R1 PLACARD AND MARKINGS - FLIGHT DECK - CHANGE CONTROL COLUMN CHECKLIST PLACARDS. SERVICE BULLETIN COMPLIED WITH - lAw THE AD MOS 22-AUG-2C08 I6-APR-2008 3260:48 AFL 782 SB 737-11-1179 PLACARDS AND MARKINGS - INTERIOR PLACARDS - ALTERNATE MAXIMUM TAKEOFF WEIGHT PLACARD SUPERSEDED INSTALLATION (SUPERSEDED BY SB 737-11-1179 RI ). SERVICE BULLETIN MOS SB 737-11-1179 R1 PLACARDS AND MARKINGS - INTERIOR PLACARDS - ALTERNATE MAXIMUM TAKEOFF WEIGHT PLACARD SUPERSEDED INSTALLATION (SUPERSEDED BY SB 737-11-1179 R2). SERVICE BULLETIN MOS SB 737-11-1179 R2 PLACARDS AND MARKINGS - INTERIOR PLACARDS - ALTERNATE MAXIMUM TAKEOFF WEIGHT PLACARD RECOMMENDED INSTALLATION. SERVICE BULLETIN MOS 21-DEC-2010 MOS CO (5) PLACARD AND MARKINGS - FLIGHT DECK - CHANGE CONTROL COLUMN CHECKLIST PLACARDS. SERVICE BULLETIN ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 16 Of 748 LI Camp Systems EFTA00618307 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-11-1201 13-JUL-2010 PLACARDS AND MARKINGS - CARGO COMPARTMENT PLACARDS - FORWARD AND AFT CARGO COMPARTMENTS - RECOMMENDED REPLACEMENT OF LOAD LIMIT PLACARDS. SERVICE BULLETIN MOS SB 737-11-1202 13-JUL-2010 PLACARDS AND MARKINGS - CARGO COMPARTMENT PI WARDS - FORWARD AND AFT CARGO COMPARTMENTS - REPLACEMENT OF LOAD LIMIT PLACARDS. SERVICE BULLETIN MOS RECOMMENDED SB 737-11-1207 PLACARDS AND MARKINGS - INTERIOR PLACARDS- REMOVAL OF AIRCRAFT FROM ALTERNATE WEIGHT PROGRAM SUPERSEDED AND CHANGE MAXIMUM TAKEOFF WEIGHT FROM 143.000 POUNDS! 60.863 KILOGRAMS TO 134.000 POUNDS! 60.781 KILOGRAMS (SUPERSEDED BY S/3 737-11-1207 R1). SERVICE BULLETIN MOS 58 737-11-1208 PLACARDS AND MARKINGS - INTERIOR PLACARDS- INSTALLATION OF ALTERNATE MAXIMUM TAKEOFF WEIGHT RECOMMENDED PLACARD AND INCREASE OF MAXIMUM TAKEOFF WEIGHT. SERVICE BULLETIN MOS 14-JAN-2011 58 737-11AI109 PLACARDS AND MARKINGS - INTERIOR PLACARDS- INSTALLATION OF IN-FLIGHT SPEEDBRAKE USAGE LIMITATION SUPERSEDED NOT APPLICABLE - NO ACTION REQUIRED MARKER. SERVICE BULLETIN MOS 22-AUG-2003 28-MAR-2002 - (s) 1342 AFL 351 SB 737-11A1109 R1 PLACARDS AND MARKINGS - INTERIOR PLACARDS- INSTALLATION OF IN-FLIGHT SPEEDBRAKE USAGE LIMITATION RECOMMENDED MARKER. SERVICE BULLETIN MOS 16-JAN-2004 58 737-21-1125 AIR CONDITIONING - DISTRIBUTION - FLIGHT COMPARTMENT CONDITIONED AIR DISTRIBUTION - REPLACE DUCT RECOMMENDED TAPE JOINTS WITH SLEEVES AND CLAMPS. SERVICE BULLETIN MOS 12-APR-2001 - (6) 58 737-21-1125 RI AIR CONDITIONING - DISTRIBUTION - FLIGHT COMPARTMENT CONDITIONED AIR DISTRIBUTION - REPLACE DUCT RECOMMENDED TAPE JOINTS WITH SLEEVES AND CLAMPS. SERVICE BULLETIN MOS 07-MAY-2009 58 737-21-1127 AIR CONDITIONING - MAIN AIR DISTRIBUTION - REPLACEMENT OF BULKHEAD FLEX SEAL CLAMP ON ENVIROMENTAL RECOMMENDED CONTROL SYSTEMS SUPPLY DUCTS. SERVICE BULLETIN MOS 23-AUG-2001 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 17 Of 748 @ Camp Systems EFTA00618308 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-21-1127 RI 27-JUN-2002 SB 737-21-1135 12-DEC-2007 AIR CONDITIONING - MAIN AIR DISTRIBUTION - REPLACEMENT OF BULKHEAD FLEX SEAL CLAMP ON ENVIROMENTAL RECOMMENDED CONTROL SYSTEMS SUPPLY DUCTS. SERVICE BULLETIN MOS - (s) AIR CONDITIONING - PRESSURIZATION CONTROL - PRESSURIZATION CONTROL SYSTEM - CHANGE OF THE CABIN PRESSURE CONTROL SYSTEM FOR 750 FEET PER MINUTE RATE OF DESCENT DURING A CARGO COMPARTMENT SMOKE EVENT SERVICE BULLETIN. SERVICE BULLETIN MOS 72 (s) 58 737-21-1135 RI AIR CONDITIONING - PRESSURIZATION CONTROL- PRESSURIZATION CONTROL SYSTEM - CHANGE OF THE CABIN PRESSURE CONTROL SYSTEM FOR 750 FEET PER MINUTE RATE OF DESCENT DURING A CARGO COMPARTMENT SMOKE EVENT. SERVICE BULLETIN MOS 72 (5) I3-NOV-2008 SB 737-21-1144 I4-APR-2005 AIR CONDITIONING - PASSENGER CABIN CONDITIONED AIR DUSTRIBUTION SYSTEM - TRANSITION DUCT RECOMMENDED ASSEMBLIES AND SIDEWALL RISER DUCTS REPLACEMENT. SERVICE BULLETIN MOS SB 737-21-1148 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS RECOMMENDED INSPECTIION AND REPLACEMENT. SERVICE BULLETIN MOS 28-JUL-2005 SB 737-21-1148 RI AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS INSPECTIION AND REPLACEMENT. SERVICE BULLETIN MOS 26-JAN-2006 SB 737-21-1148 R2 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS INSPECTION AND REPLACEMENT.. SERVICE BULLETIN MOS 27-JUL-2006 SB 737-21-1148 R3 02-NOV-2006 58 737-21-1148 R4 22-AUG-2007 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS INSPECTION AND REPLACEMENT.. SERVICE BULLETIN MOS AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 18 Of 748 @ Camp Systems EFTA00618309 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-21-1148 R5 06-MAY-2008 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM MR INLET SYSTEM COMPONENTS INSPECTION AND REPLACEMENT.. SERVICE BULLETIN MOS SB 737-21-1148 R6 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS INSPECTION AND REPLACEMENT. . SERVICE BULLETIN I I -SEP-2008 MOS SB 737-21-1148 R7 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM - RAM AIR INLET SYSTEM COMPONENTS RECOMMENDED INSPECTION AND REPLACEMENT.. SERVICE BULLETIN MOS 21 -JAN-2010 SB 737-21-1155 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTION AND TAPE INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN MOS SB I0-NOV-2005 737-21-1155 R1 22-DEC-2005 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTION AND TAPE INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN MOS SB 737-21-1155 R2 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTION AND TAPE INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN MOS 20-JUL-2006 SB 737-21-1155 R3 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTION AND TAPE INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN MOS 25-MAR-2008 SB 737-21-1155 R4 AIR CONDITIONING - EQUIPMENT COOLING SYSTEM - EQUIPMENT COOLING DUCT INSPECTIONAND TAPE RECOMMENDED INSTALLATION TO PREVENT A RUB CONDITION. SERVICE BULLETIN MOS 24-SEP-2009 SB 737-21-1163 AIR CONDITIONING - PRESSURIZATION CONTROL - PRESSURIZATION CONTROL SYSTEM - CHANGE OF THE CABIN PRESSURE CONTROLLERS FOR 750 FEET PER MINUTE RATE OF DESCENT DURING A CARGO COMPARTMENT SMOKE EVENT. SERVICE BULLETIN MOS 72 (s) 2-DEC-2007 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 19 Of 748 @ Camp Systems EFTA00618310 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-21-1163 RI AIR CONDITIONING - PRESSURIZATION CONTROL- PRESSURIZATION CONTROL SYSTEM - CHANGE OF THE CABIN RECOMMENDED PRESSURE CONTROLLERS FOR 750 FEET PER MINUTE RATE OF DESCENT DURING A CARGO COMPARTMENT SMOKE EVENT. SERVICE BULLETIN MOS 72 (0) 17-DEC-2009 SB 737-21-1165 AIR CONDITIONING - CABIN PRESSURE INDICATION AND WARNING SYSTEM- REDUNDANT PRESSURE SWITCH SUPERSEDED INSTALLATION (SUPERSEDED BY S8 737-21-1165 RI). SERVICE BULLETIN MOS SB 737-21-1165 RI AIR CONDITIONING - CABIN PRESSURE INDICATION AND WARNING SYSTEM - REDUNDANT PRESSURE SWITCH SUPERSEDED INSTALLATION (SUPERSEDED BY S8 737-21-1165 R2). SERVICE BULLETIN MOS - Is) SB 737-21-1165 R2 AIR CONDITIONING - CABIN PRESSURE INDICATION AND WARNING SYSTEM - REDUNDANT PRESSURE SWITCH SUPERSEDED INSTALLATION (SUPERSEDED BY S8 737-21-1165 R3). SERVICE BULLETIN MOS SB 737-21-1165 R3 AIR CONDITIONING - CABIN PRESSURE INDICATION AND WARNING SYSTEM - REDUNDANT PRESSURE SWITCH RECOMMENDED INSTALLATION. SERVICE BULLETIN MOS 72 (5) 07-NOV-2012 SB 737-21-1170 AIR CONDITIONING - PACK FLOW CONTROL AND PACK COOLING SYSTEM- REPLACEMENT OF SHAFT ASSEMBLIES RECOMMENDED AND LINK ARM ASSEMBLIES TO INCREASE THE CLEARANCE FOR THE RAM AIR INLET ACTUATORS. SERVICE BULLETIN MOS 23-SEP-2010 SB 737-21-1177 AIR CONDITIONING - PRESSURIZATION CONTROL SYSTEM - CHANGE OF THE POWER SOURCE TO THE RECOMMENDED PRESSURIZATION SYSTEM CIRCUIT BREAKER. SERVICE BULLETIN MOS 06-JAN-2011 SB 737-21-1178 AIR CONDITIONING - FUGHT COMPARTMENT CONDITIONED AIR DISTRIBUTION - CHANGE OF THE DUCTS AND RECOMMENDED PLENUMS TO REDUCE NOISE. SERVICE BULLETIN MOS I9-AUG-2013 SB 737-21A1139 AIR CONDITIONING - DISTRIBUTION - INSTALLATION OF THE INSULATION AND TAPE ON THE OVERHEAD DUCTS AND SUPERSEDED PLENUMS (SUPERSEDED BY 737-21A1139 R1). SERVICE BULLETIN MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 20 Of 748 @ Camp Systems EFTA00618311 COMP Atiant.fran Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-21A1I39 RI 28-AUG-2003 AIR CONDITIONING - DISTRIBUTION - INSTALLATION OF THE INSULATION AND TAPE ON THE OVERHEAD DUCTS AND RECOMMENDED PLENUMS. SERVICE BULLETIN MOS SB 737-22-1137 AUTOFLIGHT - AUTOTHROTTLE SYSTEM- ACTIVATION OF FLIGHT MANAGEMENT COMPUTER TRANSITION ALTITUDE RECOMMENDED SELECTION. SERVICE BULLETIN MOS 25-MAY-2000 - (s) SB 737-22-1140 AUTO FLIGHT - AUTOPILOT - AUTOPILOT OPERATION WITH ONE IRU INOPERATIVE RETROFIT, SERVICE BULLETIN RECOMMENDED MOS I5-JUN-2060 - (s) SB 737-22-1153 AUTO FLIGHT - AUTOPILOT - INSTALLATION OF RED NON-DIMMABLE 'AUTOLAND* WARNING LIGHTS. SERVICE RECOMMENDED NOT APPLICABLE - BY EFFECTIVITY - BULLETIN MOS 01-NOV-2001 SB 737-22-1154 AUTO FLIGHT - AUTOPILOT - OPTION/PROGRAM PIN CHANGES TO ACTIVATE FLIGHT CONTROL COMPUTER IMPROVEMENTS, SERVICE BULLETIN MOS 24-JAN-2002 - (s) SB 737-22-1154 RI AUTO FLIGHT - AUTOPILOT - OPTION/PROGRAM PIN CHANGES TO ACTIVATE FLIGHT CONTROL COMPUTER RECOMMENDED IMPROVEMENTS. SERVICE BULLETIN MOS I2-SEP-2002 SB 737-22-1213 AUTOFLIGHT - YAW DAMPER SYSTEM - DELETION OF A YAW DAMPER INDICATOR (SUPERSEDED BY S8737-22-1213 SUPERSEDED Ft1). SERVICE BULLETIN MOS SB 737-22-1213 RI AUTOFLIGHT - YAW DAMPER SYSTEM - DELETION OF A YAW DAMPER INDICATOR. SERVICE BULLETIN RECOMMENDED MOS I2-APR-20 I I SB 737-22-1216 AUTOFLIGHT - DIGITAL FLIGHT CONTROL SYSTEM- FLIGHT CONTROL COMPUTER DIP SWITCH CHANGE. SERVICE RECOMMENDED BULLETIN RECOMMENDED I6-AUG-2010 SB 737-22-1223 25-JAN-2011 MOS AUTOFLIGHT - AUTOPILOT - INSTALLATION OF LATERAL NAVIGATION MODE AS THE DEFAULT ROLL MODE FOR RECOMMENDED GO-AROUND IN LIEU OF TRACK HOLD FOR A MISSED APPROACH. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (0-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 21 Of 748 @ Camp Systems EFTA00618312 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-22A1164 AUTOFLIGHT - DIGITAL FLIGHT CONTROL SYSTEM - FLIGHT CONTROL COMPUTER OPERATIONAL PROGRAM SOFTWARE INSTALLATION - P2.0. SERVICE BULLETIN NOT APPLICABLE MOS 28-APR-2006 20-MAY-2004 - (s) 2606:18 AFL 626 SB 737-22A1211 AUTOFLIGHT - DIGITAL FLIGHT CONTROL SYSTEM - RIGHT CONTROL COMPUTER SOFTWARE CHANGE. SERVICE RECOMMENDED NOT APPLICABLE - BY AIRCRAFT SERIAL BULLETIN NUMBER DAYS 09-AUG-2010 13-APR-2010 3448:31 AFL 841 SB 737-22A1215 AUTOFLIGHT - AUTOTHROTTLE SYSTEM - AUTOTHROTTLE COMPUTER REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 36 (EFF) 22-NOV-2016 22-NOV-20I3 SB 737-22A1224 AUTOFLIGHT - DIGITAL FLIGHT CONTROL SYSTEM - RIGHT CONTROL COMPUTER SOFTWARE CHANGE. SERVICE RECOMMENDED NOT APPLICABLE - N/A BY PN INSTALLED. BULLETIN REFER AD 2012-21-08. MOS I6-NOV-2012 I8-MAY-2012 3670:04 AFL 890 SB 737-23-1135 PASSENGER ADDRESS AND ENTERTAINMENT - ATTENDANT PANEL REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 31-MAY-2001 - (s) SB 737-23-1139 COMMUNICATIONS - PASSENGER ADDRESS AND ENTERTAINMENT. SERVICE BULLETIN RECOMMENDED MOS 08-FEB-2001 - (s) SB 737-23-1139 RI INSTALATION OF THE PASSENGER ADDRESS AMPLIFIER AND IN-FLIGHT ENTERTAINMENT AUDIO CIRCUT BREAKERS. RECOMMENDED SERVICE BULLETIN MOS 03-JUL-2002 - (s) SB 737-23-1172 HF FERRY FLIGHT KIT INSTALLATION/REMOVAL (SUPERSEDED BY SB 737-23-1172 R1). SERVICE BULLETIN MOS SB 737-23-1172 RI HIGH FREQUENCY (HF) COMMUNICATIONS SYSTEM - HF FERRY FLIGHT KIT INSTALLATION/REMOVAL (SUPERSEDED BY SB 737-23-1172 R2). SERVICE BULLETIN MOS SUPERSEDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 22 Of 748 @ Camp Systems EFTA00618313 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-23-1172 R2 01-MAY-2012 SB 737-23-1200 AUDIO SELECTOR PANEL RELOCATION. SERVICE BULLETIN RECOMMENDED COMMUNICATIONS - HIGH FREQUENCY (HF) COMMUNICATIONS SYSTEM - HF FERRY FLIGHT KIT INSTALLATION:REMOVAL. SERVICE BULLETIN MOS RECOMMENDED MOS 01-NOV-2001 • 1.51 SB 737-23-1208 29-SEP-2005 COMMUNICATIONS AIRCRAFT COMMUNICATIONS ADDRESSING AND REPORTING SYSTEM (ACARS) - DATA BUS WIRE CHANGES. SERVICE BULLETIN MOS RECOMMENDED SB 737-23-1266 COMMUNICATIONS - IRIDIUM ANTENNA - INSTALLATION (SUPERSEDED BY SB 737-23-1266 R1). SERVICE BULLETIN SUPERSEDED MOS SB 737-23-1266 RI COMMUNICATIONS - IRIDIUM ANTENNA - INSTALLATION (SUPERSEDED BY SB 737-23-1266 R2) SUPERSEDED . SERVICE BULLETIN MOS SB 737-23-1266 R2 COMMUNICATIONS - IRIDIUM ANTENNA - INSTALLATION (SUPERSEDED BY SB 737-23-1266 R3). SERVICE BULLETIN SUPERSEDED MOS SB 737-23-1266 R3 COMMUNICATIONS - IRIDIUM ANTENNA - INSTALLATION. SERVICE BULLETIN RECOMMENDED C6-JAN-2011 MOS • SB 737-23-1336 1341AY-2010 SB 737-23-1337 C6-AUG-2010 SB 737-23-1342 30-NOV-2010 COMMUNICATIONS - EMERGENCY LOCATOR TRANSMITTER - INSTALLATION OF A GROUND WIRE. SERVICE BULLETIN MOS • COMMUNICATIONS - AUDIO VISUAL MONITORING - COCKPIT DOOR SURVEILLANCE SYSTEM WIRE BUNDLE CHANGE. RECOMMENDED SERVICE BULLETIN MOS COMMUNICATIONS - LAV Al CONNECTOR MATE-WITH TAPE - CHANGE. SERVICE BULLETIN MOS RECOMMENDED ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 23 Of 748 Camp Systems EFTA00618314 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-23-1343 COMMUNICATION - HIGH FREQUENCY COMMUNICATION SYSTEM - INSTALL WIRES BETWEEN THE VERY HIGH RECOMMENDED FREQUENCY TRANSCEIVER 3 AND THE COMMUNICATION MANAGEMENT UNIT OF THE AIRCRAFT COMMUNICATIONS ADDRESSING AND REPORTING SYSTEM. SERVICE BULLETIN MOS 10-JAN-2011 SB 737-23-1397 COMMUNICATIONS - CABIN INTERPHONE SYSTEM - IN-LINE FILTER INSTALLATION, SERVICE BULLETIN RECOMMENDED 06-DEC-2013 SB 737-23-1403 COMMUNICATIONS - SATELLITE COMMUNICATIONS SYSTEM- SATELLITE DATA UNIT REPLACEMENT AND AIR DATA RECOMMENDED INERTIAL REFERENCE UNIT OUTPUT BUS WIRING CHANGES. SERVICE BULLETIN MOS 07-FEB-2013 SB 737-23-1410 04-APR-2013 58 737-23-1419 18-OCT-2013 MOS - Is) COMMUNICATIONS - EMERGENCY EVACUATION SYSTEM - ERRONEOUS ACTIVATION OF CABIN CALL LIGHT IN FLIGHT RECOMMENDED COMPARTMENT CORRECTIVE WIRING CHANGES. SERVICE BULLETIN MOS COMMUNICATIONS - AIRCRAFT COMMUNICATIONS ADDRESSING AND REPORTING SYSTEM (AGARS) - COMMUNICATIONS MANAGEMENT UNIT (CMU) WIRING CHANGE - INSTALL WIRING BETWEEN AGARS CMU AND ENGINE RUNNING SWITCHES. SERVICE BULLETIN MOS RECOMMENDED SB 737-23-1423 COMMUNICATIONS - VOICE RECORDER SYSTEM - INSTALLATION OF THE NEW L-3 COCKPIT VOICE RECORDER (CVR) RECOMMENDED CONTROL PANEL. SERVICE BULLETIN MOS 04-FEB-2014 SB 737-23-1429 COMMUNICATIONS - VOICE RECORDER SYSTEM - INSTALLATION OF THE COCKPIT VOICE RECORDER INDEPENDENT RECOMMENDED POWER SUPPLY (RIPS) AND THE RIPS-COMPATIBLE MANUAL ON/AUTO OFF SWITCH OPTION. SERVICE BULLETIN MOS 13-MAR-2014 SB 737-23A1170 COMMUNICATIONS - VHF-1 AND VHF-2 ANTENNA INTERCHANGE (SUPERSEDED BY SB 737-23A1170 R1). SERVICE SUPERSEDED COMPUED WITH BULLETIN MOS 10-AUG-2000 27-APR-2000 SB 737-23A1170 R1 COMMUNICATIONS - VHF-1 AND VHF-2 ANTENNA INTERCHANGE (SUPERSEDED BY SB 737-23A1170 R2). SERVICE SUPERSEDED BULLETIN MOS 27-JUL-2000 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 24 Of 748 @ Camp Systems EFTA00618315 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-23AI170 RI PART VHF-1 AND VHF-2 ANTENNA INTERCHANGE. SERVICE BULLETIN MOS 27-JUL-2000 SB 737-23A1170 RI PART COMMUNICATIONS - VHF-I AND VHF-2 ANTENNA INTERCHANGE. SERVICE BULLETIN MOS 27-JUL-2000 SB 737-23A1170 R2 COMMUNICATIONS - VHF-I AND VHF-2 ANTENNA INTERCHANGE, SERVICE BULLETIN MOS 02-MAR-2006 I4-SEP-2000 2509:38 RECOMMENDED RECOMMENDED RECOMMENDED COMPLIED WITH - REF: PART I PART II DUE 4000 HRS AFL 609 SB 737-23A1170 R2 PART COMMUNICATIONS - VHF-1 AND VHF-2 ANTENNA INTERCHANGE. SERVICE BULLETIN RECOMMENDED COMPLIED WITH DAYS 10 (s) 02-MAR-2006 I4-SEP-2000 2509:38 AFL 609 SB 737-23A1170 R2 PART COMMUNICATIONS - VHF-I AND VHF-2 ANTENNA INTERCHANGE, SERVICE BULLETIN RECOMMENDED II MOS I4-SEP-2000 4000 4000 4000 SB 737-24-1126 AILERON CONTROL SYSTEM - WIRING BUNDLE SHIELD OVERBRAID INSTALLATION FOR EMI PROTECTION, SERVICE RECOMMENDED BULLETIN MOS 0 I -AUG-2002 - (s) SB 737-24-1126 RI AILERON CONTROL SYSTEM - WIRING BUNDLE SHIELD OVERBRAID INSTALLATION FOR EMI PROTECTION. SERVICE RECOMMENDED BULLETIN MOS I4-NOV-2002 - (s) SB 737-24-1128 POWER DISTRIBUTION PANEL. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE- TERMINATED PCW MOS 18-AUG-2006 28-APR-1999 2633:50 AFL 633 SB 737-24-1132 ELECTRICAL POWER- DC GENERATION. SERVICE BULLETIN RECOMMENDED MOS 08-JUN-2000 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 25 Of 748 @ Camp Systems EFTA00618316 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-24-1134 22-JUN-2000 STANDBY POWER SYSTEM. SERVICE BULLETIN MOS - (s) SB 737-24-1135 NO.1 AIR TRAFFIC CONTROL SYSTEM. SERVICE BULLETIN MOS 27-APR-2000 - RECOMMENDED RECOMMENDED SB 737-24-1147 20-NOV-2003 INSTALLATION OF THE INFLIGHT ENTERTAINMENT SYSTEM CIRCUIT BREAKER. RELAYS AND WIRING. SERVICE BULLETIN MOS 60 (s) 58 737-24-1147 RI ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF THE INFLIGHT ENTERTAINMENT SYSTEM CIRCUIT BREAKER. RELAYS AND WIRING. SERVICE BULLETIN MOS 60 (s) 01-MAR-2007 SB 737-24-1147 R2 ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF THE INFLIGHT RECOMMENDED ENTERTAINMENT SYSTEM CIRCUIT BREAKER. RELAYS AND WIRING. SERVICE BULLETIN MOS 60 (s) 30-JUL-2009 SB 737-24-1149 CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS (SUPERSEDED BY 737-24-1149 RI), SERVICE SUPERSEDED BULLETIN 01-JAN-2000 DAYS SB 737-24-1109 RI CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL (SUPERSEDED BY SUPERSEDED 737-24-1149 R2). SERVICE BULLETIN MOS 01-JAN-2000 SB 737-24-1149 R2 CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL (SUPERSEDED BY SUPERSEDED 737-24-1149 R3) . SERVICE BULLETIN MOS 01-JAN-2000 SB 737-24-1149 R3 ELECTRICAL POWER - GENERAL - CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN SUPERSEDED WHEEL WELL (SUPERSEDED BY 737-24-1149 R4) . SERVICE BULLETIN MOS 01-JAN-2000 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 26 Of 748 @ Camp Systems EFTA00618317 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-24-1149 R4 07-AUG-2007 SB 737-24-1154 01-MAY-2003 SB 737-24-1155 ELECTRICAL POWER - GENERAL - CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL SERVICE BULLETIN MOS 24 (s) GUARD INSTALLATION FOR THE CIRCUIT BREAKERS FOR THE OVERWING DOOR FLIGHT LOCKS. SERVICE BULLETIN RECOMMENDED MOS STANDBY POWER CONTROL UNIT (SPCU) TRAY BRACE AND TRAY STIFFENER ASSEMBLY INSTALLATION.. SERVICE RECOMMENDED BULLETIN 26-FEB-2004 MOS SB 737-24-1155 RI STANDBY POWER CONTROL UNIT (SPCU) TRAY BRACE AND TRAY STIFFENER ASSEMBLY INSTALLATION. SERVICE RECOMMENDED BULLETIN MOS 16-DEC-2004 SB 737-24-1155 R2 ELECTRICAL POWER- STANDBY POWER CONTROL UNIT (SPCU) TRAY BRACE AND TRAY STIFFENER ASSEMBLY INSTALLATION. SERVICE BULLETIN MOS 08-SEP-2005 SB 737-24-1155 R3 ELECTRICAL POWER - STANDBY POWER CONTROL UNIT (SPCU) TRAY BRACE AND TRAY STIFFENER ASSEMBLY INSTALLATION. SERVICE BULLETIN MOS 23-MAR-2006 SB 737-24-1157 INSTALLATION OF CLAMPS BETWEEN THE WIRE BUNDLES AND THE HYDRAULIC TUBES IN THE LEFT MAIN LANDING RECOMMENDED GEAR WHEEL WELL SERVICE BULLETIN MOS I4-AUG-2003 SB 737-24-1161 ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF PROTECTION GUARDS ON THE P6 AND RECOMMENDED P18 LOAD CONTROL PANELS. SERVICE BULLETIN MOS 24-MAR-2005 SB 737-24-1161 RI ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF PROTECTION GUARDS ON THE P6 AND P18 LOAD CONTROL PANELS. SERVICE BULLETIN MOS 17-NOV-2005 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 27 Of 748 @ Camp Systems EFTA00618318 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-24-1161 R2 24-JAN-2008 SB 737-24-1162 02-JUN-2005 ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSTALLATION OF PROTECTION GUARDS ON THE P6 AND P18 LOAD CONTROL PANELS. SERVICE BULLETIN MOS ELECTRICAL POWER - AC GENERATION SYSTEM - STA 1088 BULKHEAD CATERPILLAR GROMMET. INSPECTION AND INSTALLATION. SERVICE BULLETIN MOS SB 737-24-1165 ELECTRICAL POWER - STANDBY POWER SYSTEM - REMOVAL AND REPLACEMENT OF THE STATIC INVERTER MODULE. SERVICE BULLETIN MOS 42 (s) 28-APR-2005 NOT APPLICABLE SB 737-24-1165 RI ELECTRICAL POWER - STANDBY POWER SYSTEM - REMOVAL AND REPLACEMENT OF THE STATIC INVERTER COMPLIED WITH MODULE. SERVICE BULLETIN MOS 29-AUG-2011 20-OCT-2005 (s) 3533:32 AFL 863 SB 737-24-1167 ELECTRICAL POWER - GENERAL - REPLACEMENT OF ANTISKID SYSTEM ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELLS. SERVICE BULLETIN MOS CE-APR-2006 SB 737-24-1167 RI 13-NOv-2608 ELECTRICAL POWER - GENERAL - REPLACEMENT OF ANTISKID SYSTEM ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELLS. SERVICE BULLETIN MOS SB 737-24-1169 ELECTRICAL POWER - INSPECTION FOR MISSING FILLET SEAL ON RECEPTACLES IN MAIN LANDING GEAR WHEEL WELLS. SERVICE BULLETIN MOS 24 (s) 15-DEC-2006 SB 737-24-1169 R1 CE-AUG-2007 SB 737-24-1169 R2 09-APR-2008 ELECTRICAL POWER - INSPECTION FOR MISSING FILLET SEAL ON RECEPTACLES IN MAIN LANDING GEAR WHEEL WELLS. SERVICE BULLETIN MOS 24 (s) ELECTRICAL POWER - INSPECTION FOR MISSING FILLET SEAL ON RECEPTACLES IN MAIN LANDING GEAR WHEEL WELLS. SERVICE BULLETIN MOS 22-AUG-2608 -(s) 3260:48 AFL 782 RECOMMENDED COMPLIED WITH ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 28 Of 748 1' Camp System s EFTA00618319 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 737-24-1171 26-MAR-2007 SB 737-24-1171 RI 02-JUL-2007 SB 737-24-1171 R2 I8-SEP-2007 SB 737-24-1171 R3 08-MAY-2008 SB 737-24-1171 R4 30-OCT-2008 SB 737-24-1172 I6-MAY-2008 ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION OF PROTECTIVE SLEEVE ON WIRE BUNDLE W0018 IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN MOS 24 (s) ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION OF PROTECTIVE SLEEVE ON WIRE BUNDLE W0018 IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN MOS 24 (s) ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION OF PROTECTIVE SLEEVE ON WIRE BUNDLE W0018 IN THE RIGHT COMPARTMENT. SERVICE BULLETIN MOS 24 (s) ELECTRICAL POWER - ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION OF PROTECTIVE SLEEVE ON WIRE BUNDLE W0018 IN THE RIGHT COMPARTMENT. SERVICE BULLETIN MOS 24 (s) ELECTRICAL LOAD DISTRIBUTION - INSPECTION. REPAIR AND INSTALLATION OF PROTECTIVE SLEEVE ON WIRE BUNDLE W0018 IN THE RIGHT COMPARTMENT. SERVICE BULLETIN MOS 24 (s) ELECTRICAL - ELECTRICAL POWER - INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE AT THE WING-TO-BODY FEED THROUGH RECEPTACLES. SERVICE BULLETIN MOS SB 737-24-1172 RI INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE AT THE WING-TO-BODY FEED THROUGH RECOMMENDED RECEPTACLES. SERVICE BULLETIN MOS 18-NOV-2009 SB 737-24-1172 RI TABLE REPAIR INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE AT THE WING-TO-BODY FEED THROUGH RECOMMENDED 1(A) RECEPTACLES. SERVICE BULLETIN AS GIVEN IN ACCOMPLISHMENT INSTRUCTIONS OPTION 1 MOS 72 (s) 18-NOV-2009 SB 737-24-1172 RI TABLE INSPECTION INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE AT THE WING-TO-BODY FEED RECOMMENDED 1 (B) THROUGH RECEPTACLES. SERVICE BULLETIN OF ELECTRICAL BONDING AS GIVEN IN ACCOMPLISHMENT INSTRUCTIONS OPTION 2 MOS 24 (s) 18-NOV-2009 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 29 Of 748 @ Camp Systems EFTA00618320 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-24-1172 TABLE 1 REPAIR ELECTRICAL - ELECTRICAL POWER - INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE (A) AT THE WING-TO-BODY FEED THROUGH RECEPTACLES. SERVICE BULLETIN AS GIVEN IN ACCOMPLISHMENT INSTRUCTIONS OPTION 1 MOS 72 (s) 16-MAY-2008 58 737-24-1172 TABLE 1 INSPECTION ELECTRICAL - ELECTRICAL POWER - INSPECTION AND REPAIR OF ELECTRICAL BONDING RESISTANCE (8) AT THE WING-TO-BODY FEED THROUGH RECEPTACLES. SERVICE BULLETIN OF ELECTRICAL BONDING AS GIVEN IN ACCOMPLISHMENT INSTRUCTIONS OPTION 2 MOS 24 (s) 16-MAY-2008 SB 737-24-1173 07-NOV-2007 SB 737-24-1173 RI 27-MAR-2008 SB 737-24-1173 R2 23-APR-2009 ELECTRICAL - ELECTRICAL POWER - REPLACEMENT OF WIRE SUPPORT BRACKET AND INSPECTION OF THE ROD END PLATES ON THE RUDDER FEEL AND CENTERING UNIT. SERVICE BULLETIN MOS 72 (s) ELECTRICAL - ELECTRICAL POWER - REPLACEMENT OF WIRE SUPPORT BRACKET AND INSPECTION OF THE ROD END PLATES ON THE RUDDER FEEL AND CENTERING UNIT. SERVICE BULLETIN MOS 72 (s) REPLACEMENT OF WIRE SUPPORT BRACKET AND INSPECTION OF THE ROD END PLATES ON THE RUDDER FEEL AND CENTERING UNIT. SERVICE BULLETIN MOS 72 (s) SB 737-24-1176 ELECTRICAL POWER- AC GENERATION SYSTEM - RE-PIN WIRES AT TWO WING-TO-STRUT ELECTRICAL CONNECTORS AT EACH ENGINE STRUT BRACKET. SERVICE BULLETIN MOS 21-FEB-2008 SB 737-24-1176 RI 22-APR-2008 SB 737-24-1176 R2 06-NOV-2008 SB 737-24-1176 R3 18-DEC-2008 ELECTRICAL POWER - AC GENERATION SYSTEM - RE-PIN WIRES AT TWO WING-TO-STRUT ELECTRICAL CONNECTORS AT EACH ENGINE STRUT BRACKET. SERVICE BULLETIN MOS AC GENERATION SYSTEM - RE-PIN WIRES AT TWO WING-TO-STRUT ELECTRICAL CONNECTORS AT EACH ENGINE STRUT BRACKET. SERVICE BULLETIN MOS AC GENERATION SYSTEM - INSPECTION AND RE-PIN WIRES AT TWO WING-TO-STRUT ELECTRICAL CONNECTORS AT EACH ENGINE STRUT BRACKET. SERVICE BULLETIN MOS RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 30 Of 748 @ Camp Systems EFTA00618321 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-24-1182 20-JAN-2009 INSPECTION AND CHANGE WIRE BUNDLE ROUTING TO PREVENT CONTACT WITH MAIN BATTERY CHARGER. SERVICE BULLETIN MOS SB 737-24-1194 ELECTRICAL POWER - MEDICAL OUTLET SYSTEM- MEDICAL FREQUENCY CONVERTER SUB-TRAY CHANGE. SERVICE RECOMMENDED BULLETIN MOS 14-SEP-2011 SB 737-24-1203 ELECTRICAL POWER- AC EXTERNAL POWER- CHANGE OF THE EXTERNAL POWER RECEPTACLE CONTACTS. RECOMMENDED SERVICE BULLETIN MOS 02-DEC-2013 SB 737-24-1205 ELECTRICAL POWER- STANDBY POWER SYSTEM - REPLACEMENT OF THE M9 STATIC INVERTER TERMINAL LUGS.. RECOMMENDED SERVICE BULLETIN MOS 25-MAR-2014 SB SB 737-24-1206 03-APR-2014 737-24A1141 R1 23-DEC-2004 ELECTRICAL POWER - GENERAL - E8-1 SHELF ASSEMBLY - VINYL MARKER REPLACEMENT. SERVICE BULLETIN MOS PS OVERHEAD PANEL - BRACKET REPLACEMENT AND WIRE INSTALLATION. SERVICE BULLETIN MOS 24 (s) RECOMMENDED - REF: R2 SB 737-24A1141 R2 ELECTRICAL POWER - GENERAL - PS OVERHEAD PANEL - BRACKET REPLACEMENT AND WIRE INSTALLATION. COMPUED WITH SERVICE BULLETIN MOS 18-AUG-2006 01-DEC-2005 -Is) 2633:50 AFL 633 SB 737-24A1141 R3 ELECTRICAL POWER - GENERAL - PS OVERHEAD PANEL - BRACKET REPLACEMENT AND COMPUED WITH - IAW THE AD R2 ALREADY CM WIRE INSTALLATION REVISION. SERVICE BULLETIN GVBBJ122. AUG 18. 2006. MOS 02-DEC-2009 20-FEB-2008 -Is) 3402:19 AFL 824 SB 737-24A1148 CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL (SUPERSEDED BY SUPERSEDED COMPUED WITH - INSPECTED AND CLEANED 737-24A1148 R1). SERVICE BULLETIN CONNECTORS MOS 13-AUG-2004 06-DEC-2001 -(s) 1785:06 AFL 446 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 31 Of 748 @ Camp Systems EFTA00618322 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-24A1148 RI CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL. SERVICE BULLETIN MOS 12 (s) 03-JUL-2013 1O-JUL-2003 3723:21 AFL 908 SB 737-24A1150 INSPECTION OF THE POWER SUPPLY VOLTAGE TO THE CAPTAINS PITOT HEATER. SERVICE BULLETIN DAYS 60 (s) 27-AUG-2002 I I -DEC-2002 1057:48 SB 737-24M193 SB 737-25-1373 24-JUL-I 999 SB 737-25-1376 30-JUL-2009 SB 737-25-1378 08-APR-1999 SB 737-25-1378 RI I2-JAN-2001 SB 737-25-1403 04-MAY-2000 SB 737-25-1403 RI 29-NOV-2001 SB 737-25-1404 25-MAY-2000 AFL 271 ELECTRICAL POWER-AC GENERATOR DRIVE SYSTEM- INCORRECT ELECTRICAL BOND ON GROUND BRACKET FOR LEFT ENGINE GENERATOR. SERVICE BULLETIN MOS OVERHEAD STOWAGE BIN DOOR. SERVICE BULLETIN MOS - (s) LAVATORY COMPARTMENT - CHANGE TO AFT CLEVIS SYSTEM AND AFT WALL ON LAVATORY A. SERVICE BULLETIN MOS CHANGE ESCAPE SLIDE INSTALLATION. SERVICE BULLETIN MOS . SERVICE BULLETIN MOS - (s) - DOOR-MOUNTED ESCAPE SYSTEM, SERVICE BULLETIN MOS - (s) DOOR MOUNTED ESCAPE SYSTEM - INFLATION CYLINDER TRIGGER HOUSING COVER INSTALLATION. SERVICE BULLETIN MOS ESCAPE SLIDE LATCH ASSEMBLY. SERVICE BULLETIN MOS - (s) RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED COMPUED WITH - LAW. AD 2005-18-23 NOT APPLICABLE - BY EFFECTIVITY 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 32 Of 748 @ Camp Systems EFTA00618323 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-25-1404 RI EMERGENCY - DOOR-MOUNTED ESCAPE SYSTEM - LATCH ASSEMBLY MODIFICATION (SUPERSEDED BY SB SUPERSEDED 737-25-1404 R2). SERVICE BULLETIN MOS - (s) SB 737-25-1404 R2 EQUIPMENT/FURNISHINGS - EMERGENCY - DOOR-MOUNTED ESCAPE SYSTEM - LATCH ASSEMBLY MODIFICATION. RECOMMENDED SERVICE BULLETIN MOS 36 (s) 25-MAY-2000 SB 737-25-1439 R3 EQUIPMENT/FURNISHINGS-BUFFET/,ALLEY- GALLEY WIRE BUNDLE PROTECTIVE WRAP REPLACEMENT. SERVICE BULLETIN MOS II -NOV-2004 SB 737-25-1440 REPLACEMENT OF SPARE BULB STOWAGE ASSEMBLY, SERVICE BULLETIN RECOMMENDED 06-DEC-2001 SB 737-25-1447 I8-OCT-2001 SB 737-25-1449 08-NOV-2001 SB 737-25-1449 RI 0I-AUG-2002 SB 737-25-1475 26-NOV-2002 SB 737-25-1477 I4-NOV-2002 SB 737-25-1477 RI 28-AUG-2003 MOS - (s) INSTALL SECOND OBSERVERS STATION, SERVICE BULLETIN MOS - (s) AFT CARGO COMPARTMENT - REPLACE INSULATION SUPPORT TRAYS. SERVICE BULLETIN MOS - (s) REPLACE INSLUATION SUPPORT TRAYS. SERVICE BULLETIN MOS REPLACE TRIGGER HOUSING ON SLIDE REGULATOR VALVE. SERVICE BULLETIN MOS WINDOW NUMBER FOUR SUNSHADE INSTALLATION. SERVICE BULLETIN MOS - (s) WINDOW NUMBER FOUR SUNSHADE INSTALLATION. SERVICE BULLETIN MOS RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 33 Of 748 @ Camp Systems EFTA00618324 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-25-1491 23-APR-2007 SB 737-25-1491 RI 23-APR-2007 SB 737-25-1493 EQUIPMENT/FURNISHINGS - EMERGENCY - DOOR MOUNTED ESCAPE SYSTEM - CHANGE EVACUATION SLIDE INFLATION VALVE REGULATOR. SERVICE BULLETIN MOS 09-AUG-2010 3148:31 AFL PA EMERGENCY - DOOR MOUNTED ESCAPE SYSTEM - CHANGE EVACUATION SLIDE INFLATION VALVE REGULATOR. SERVICE BULLETIN MOS C9-AUG-2010 3448:31 AFL 841 EQUIPMENT/FURNISHINGS- INSULATION BLANKET - MOISTURE REDUCTION OF INSULATION BLANKETS AT THE AUTOMATIC OVERWING EXIT DOORS. SERVICE BULLETIN MOS COMPLIED WITH - PREVIOUSLY RECOMMENDED COMPLIED WITH - PREVIOUSLY 737-25-1491 SLIDE PN INSTALLED: 5A3086-301 02-MAY-2007 SB 737-25-1493 RI INSULATION BLANKET - MOISTURE REDUCTION OF INSULATION RECOMMENDED BLANKETS AT THE AUTOMATIC OVERWING EXIT DOORS. SERVICE BULLETIN MOS 28-JUL-2009 SB 737-25-1523 EQUIPMENT/FURNISHINGS- FORWARD GALLEY DOOR DOORWAY HEADER PANEL - INSTALLATION OF ATTENDANT SUPERSEDED SERVICE UNIT (SUPERSEDED BY SB 737-25.1523 RI ). SERVICE BULLETIN MOS SB 737-25-1523 RI EQUIPMENT/FURNISHINGS- FORWARD GALLEY DOOR DOORWAY HEADER PANEL - INSTALLATION OF ATTENDANT RECOMMENDED SERVICE UNIT. SERVICE BULLETIN MOS 27-JAN-2011 SB 737-25-1543 EQUIPMENT l FURNISHINGS - FLIGHT COMPARTMENT AND FORWARD CARGO COMPARTMENT - FLIGHT DECK NOISE RECOMMENDED REDUCTION CHANGE. SERVICE BULLETIN MOS 09-N0v-2012 SB 737-25-1544 04-OCT-2000 SB 737-25-1544 RI PASSENGER CABIN PARTITIONS AND COMPARTMENTS - SUPPORT FITTING ASSEMBLY AIR CONDITIONING EXTRUSIONS REPLACEMENT. SERVICE BULLETIN MOS 72 (s) AFL 36000 EQUIPMENT/FURNISHING - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - SUPPORT FITTING ASSEMBLY SUPERSEDED AIR CONDITIONING EXTRUSIONS REPLACEMENT (SUPERSEDED BY SB SB 737-25-1544 R2). SERVICE BULLETIN MOS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 34 Of 748 '2 Camp Systems EFTA00618325 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-25-1544 R2 23-MAR-2011 EQUIPMENT/FURNISHING - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - SUPPORT FITTING ASSEMBLY AIR CONDITIONING EXTRUSIONS REPLACEMENT. SERVICE BULLETIN MOS 72 (s) RECOMMENDED SB 737-25-1545 EQUIPMENT AND FURNISHINGS - PASSENGER COMPARTMENT - MODIFICATION OF THE OXYGEN ACTIVATION SUPERSEDED NOT APPLICABLE - PER PN NOT INSTALLED MECHANISM WITHIN THE PASSENGER SERVICE UNITS (SUPERSEDED BY SB 737-25-1545 R1). SERVICE BULLETIN MOS 24-AUG-2007 - (s) 2968:28 AFL 699 SB 737-25-1545 RI EQUIPMENT AND FURNISHINGS - PASSENGER COMPARTMENT - MODIFICATION OF THE OXYGEN ACTIVATION SUPERSEDED NOT APPLICABLE - PER PN NOT INSTALLED MECHANISM WITHIN THE PASSENGER SERVICE UNITS (SUPERSEDED BY SB 737-25-1545 R2). SERVICE BULLETIN MOS 24-AUG-2007 - (s) 2968:28 AFL 699 SB 737-25-1545 R2 EQUIPMENT AND FURNISHINGS - PASSENGER COMPARTMENT - MODIFICATION OF THE OXYGEN ACTIVATION RECOMMENDED MECHANISM WITHIN THE PASSENGER SERVICE UNITS. SERVICE BULLETIN MOS 60 (s) 02-MAY-2007 SB 737-25-1593 EQUIPMENT/FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - INSTALL OVERHEAD STOWAGE BIN DURABILITY PATCH. SERVICE BULLETIN MOS I2-MAR-2008 SB 737-25-1602 SB 737-25-1602 RI I0-DEC-2010 SB 737-25-1617 I I -JUN-2009 SB 737-25-1617 RI 09-NOV-2009 AUTOMATIC OVERWING EXIT DOOR SURROUND STRUCTURE - CHANGE UPPER AND LOWER DOOR SILLS (SUPERSEDED BY SB 737-25-1602 RI). SERVICE BULLETIN MOS SUPERSEDED EQUIPMENT/FURNISHINGS - AUTOMATIC OVERWING EXIT DOOR SURROUND STRUCTURE - CHANGE UPPER AND RECOMMENDED LOWER DOOR SILLS. SERVICE BULLETIN MOS CUP HOLDERS INSTALLATION CHANGE. SERVICE BULLETIN MOS FLIGHT COMPARTMENT - CUP HOLDERS INSTALLATION CHANGE. SERVICE BULLETIN MOS RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 35 Of 748 @ Camp Systems EFTA00618326 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-25-1636 21-MAY-2010 SB 737-25-1639 EQUIPMENT/FURNISHINGS - PASSENGER SEATS - EMERGENCY EXIT DOOR - ARMREST INSTALLATION. SERVICE BULLETIN MOS EQUIPMENT AND FURNISHINGS - PASSENGER COMPARTMENT - INTERIOR RECONFIGURATION - CHANGE FROM 167 RECOMMENDED PASSENGER DUAL CLASS CONFIGURATION TO 176 PASSENGER SINGLE CLASS CONFIGURATION WITH PANASONIC IN-FLIGHT ENTERTAINMENT (SUPERSEDED BY SB 737-25-1639 R1). SERVICE BULLETIN MOS 09-DEC-2010 SB 737-25-1601 EQUIPMENT / FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - CENTER OVERHEAD SUPERSEDED NOT APPLICABLE - BY EFFECTIVITY STOWAGE BOX WITH LIFERAFT PROVISIONS - 9G TIE ROD ATTACHMENT CHANGE (SUPERSEDED BY S8 737-25-1611 R1). SERVICE BULLETIN MOS SB 737-25-1601 RI EQUIPMENT 7 FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - CENTER OVERHEAD SUPERSEDED STOWAGE BOX WITH LIFERAFT PROVISIONS - 9G TIE ROD ATTACHMENT CHANGE (SUPERSEDED BY SB 737-25-1601 R2). SERVICE BULLETIN MOS SB 737-25-1601 R2 EQUIPMENT 7 FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - CENTER OVERHEAD RECOMMENDED STOWAGE BOX WITH LIFERAFT PROVISIONS - 9G TIE ROD ATTACHMENT CHANGE. SERVICE BULLETIN MOS 60 (s) I3-MAY-2011 SB 737-25-1602 EQUIPMENT FURNISHINGS - PASSENGER AND CABIN ATTENDANT ACCOMMODATIONS SAM250 SLIDE COVER RECOMMENDED ASSEMBLY FOR HBL3330 ELECTRICAL OUTLET - CHANGE. SERVICE BULLETIN MOS 22-FEB-20 II SB 737-25-1603 EQUIPMENT/FURNISHINGS - ESCAPE SLIDES. SNAPS AND LANYARDS - CARGO DOOR. PERSONNEL SAFETY NET REPLACEMENT. SERVICE BULLETIN MOS SB 737-25-1605 I I -MAY-2012 EQUIPMENT/FURNISHINGS - PASSENGER CABIN FLOORS - SECTIONS 44 - CHANGE SOUND DAMPING MATERIALS OF RECOMMENDED FLOOR PANELS. SERVICE BULLETIN MOS 12 (s) SB 737-25-1606 EQUIPMENT FURNISHINGS - POWER DISTRIBUTION PANEL P92- CIRCUIT BREAKER C0912. INOP COLLAR AND LABEL RECOMMENDED INSTALLATION. SERVICE BULLETIN MOS 02-AUG-20I2 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 36 Of 748 @ Camp Systems EFTA00618327 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-25-1647 EQUIPMENT FURNISHINGS - PASSENGER SEATS - PALLETIZED SEAT PALLET LATCH REPLACEMENT. SERVICE BULLETIN MOS RECOMMENDED 12-OCT-201 I SB 737-25-1648 EQUIPMENTIFURNISHINGS-BUFFETIGALLEY. GALLEY NUMBER 2. FOLDING TROLLEY INSTALLATION. SERVICE RECOMMENDED BULLETIN 13-MAY-2011 MOS SB 737-25-1651 EOUIPMENTIFURNISHINGS - PASSENGER CABIN LININGS AND PANELS - RIGHT SIDE SIDEWALL AND LITERATURE RECOMMENDED POCKET REPLACEMENT. SERVICE BULLETIN 15-AUG-2011 MOS SB 737-25-1654 EQUIPMENTIFURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - BOEING SKY INTERIOR RECOMMENDED OVERHEAD STOWAGE BINS. INSTALLATION OF FASTER DEPLOYING BIN RATE CONTROLS FOR THE FORWARD AND AFT. LEFT AND RIGHT TERMINATION BINS (SUPERSEDED BY SB 737-25-1654 R1). SERVICE BULLETIN 24-JUL-2012 MOS SB 737-25-1654 RI EOUIPMENTIFURNiSHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - BOEING SKY INTERIOR RECOMMENDED OVERHEAD STOWAGE BINS. INSTALLATION OF FASTER DEPLOYING BIN RATE CONTROLS FOR THE FORWARD AND AFT. LEFT AND RIGHT TERMINATION BINS. SERVICE BULLETIN 07-MAR-2013 MOS SB 737-25-1660 EOUIPMENTIFURNISHINGS- ELECTRICAL EQUIPMENT RACK MOISTURE SHROUD - CHANGE (SUPERSEDED BY SB SUPERSEDED 737-25-1660 RI). SERVICE BULLETIN MOS SB 737-25-1660 RI EQUIPNIENTIFURNIS11INGS- ELECTRICAL EQUIPMENT RACK MOISTURE SHROUD - CHANGE. SERVICE BULLETIN RECOMMENDED 26-SEP-2012 MOS SB 737-25-1661 EQUIPMENT r FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - OUTBOARD STOWAGE RECOMMENDED CLOSET - REPLACEMENT OF FORWARD LEFT FULL HEIGHT CLOSET DOOR ASSEMBLIES. SERVICE BULLETIN MOS 16-OCT-2012 SB 737-25-1663 EQUIPMENTFURNiSHINGS - WINDOW SHADE AND REVEAL ASSEMBLY - BOEING SKY INTERIOR AUTOMATIC SUPERSEDED OVERWING EXIT DOOR WINDOW SHADE AND REVEAL ASSEMBLY REPLACEMENT (SUPERSEDED BY SB 737-25-1663 R1). SERVICE BULLETIN MOS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 37 Of 748 Camp Systems EFTA00618328 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-25-1663 RI EQUIPMENT/FURNISHINGS - WINDOW SHADE AND REVEAL ASSEMBLY - BOEING SKY INTERIOR AUTOMATIC SUPERSEDED OVERWING EXIT DOOR WINDOW SHADE. REVEAL ASSEMBLY. AND INSULATION BLANKET REPLACEMENT (SUPERSEDED BY SB 737-25-1663 R2). SERVICE BULLETIN MOS SB 737-25-1663 R2 EQUIPMENT/FURNISHINGS - WINDOW SHADE AND REVEAL ASSEMBLY - BOEING SKY INTERIOR AUTOMATIC RECOMMENDED OVERWING EXIT DOOR WINDOW SHADE. REVEAL ASSEMBLY. AND INSULATION BLANKET REPLACEMENT. SERVICE BULLETIN MOS 02-DEC-2013 SB 737-25-1665 EQUIPMENT/FURNISHINGS - PASSENGER CABIN LININGS AND PANELS - CHANGE OVERWING EMERGENCY EXIT RECOMMENDED DOOR MOUNTED ARMREST PADS (SUPERSEDED BY SB 737-25-1665 R1). SERVICE BULLETIN MOS 24-APR-20I2 SB 737-25-1665 RI EQUIPMENT/FURNISHINGS - PASSENGER CABIN LININGS AND PANELS - CHANGE OVERWING EMERGENCY EXIT SUPERSEDED DOOR MOUNTED ARMREST PADS (SUPERSEDED BY SB 737-25-1665 R2). SERVICE BULLETIN MOS SB 737-25-1665 R2 EQUIPMENT/FURNISHINGS - PASSENGER CABIN LININGS AND PANELS - CHANGE OVERWING EMERGENCY EXIT NOT APPLICABLE DOOR MOUNTED ARMREST PADS (REPLACED BY SB 737-25-1663 R2). SERVICE BULLETIN MOS 03-DEC-2013 SB 737-25-1667 EQUIPMENT 7 FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - PARTITIONS - PLACARD RECOMMENDED REMOVAL NO CHILDREN THIS ROW. SERVICE BULLETIN MOS I5-AUG-2012 SB 737-25-1668 02-AUG-20I2 SB 737-25-1671 23-MAR-2012 SB 737-25-1672 29-MAR-2013 EQUIPMENT/FURNISHINGS - CABIN ATTENDANT STATIONS- REPLACEMENT OF FORWARD ATTENDANT CONTROL RECOMMENDED PANEL AND SHROUD FOR IMPROVED RELIABILITY - BOEING SKY INTERIOR AIRPLANES. SERVICE BULLETIN MOS EQUIPMENT/FURNISHINGS - PASSENGER CABIN LININGS AND PANELS - SIDEWALL PANEL ASSEMBLY - RECOMMENDED REPLACEMENT OF SIDEWALL PANEL ASSEMBLY AT GALLEY 2 INTERFACE. SERVICE BULLETIN MOS EQUIPMENT/FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - INSTALL MEGAPHONES IN THE RECOMMENDED BOEING SKY INTERIOR LEFT FORWARD AND AFT TERMINATION OVERHEAD STOWAGE BINS. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 38 Of 748 @ Camp Systems EFTA00618329 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-25-1677 EQUIPMENT FURNISHINGS - ATTENDANT SEATS AND PANELS - ATTENDANT PANEL ASSEMBLY -REPLACEMENT, RECOMMENDED SERVICE BULLETIN 04-DEC-2012 MOS SB 737-25-1678 EQUIPMENT! FURNISHINGS - AFT. LEFT SIDE PRIVACY CURTAIN - ENCLOSURE INSTALLATION (SUPERSEDED BY SB SUPERSEDED 737-25-1678 RI), SERVICE BULLETIN MOS SB 737-25-1678 RI EQUIPMENT FURNISHINGS - AFT. LEFT SIDE PRIVACY CURTAIN- ENCLOSURE INSTALLATION. SERVICE BULLETIN OPERATORS DISCRETION MOS 26-AUG-20I3 SB 737-25-1679 EQUIPMENT/FURNISHINGS - PASSENGER SEAT - MOVE THE PASSENGER SEATS. CHANGE CARPETS. SERVICE RECOMMENDED BULLETIN IS-MAR-2013 SB 737-25-1680 08-MAR-2013 SB 737-25-1681 21-SEP-2012 MOS EQUIPMENT FURNISHINGS - PASSENGER CABIN LININGS AND PANELS- WINDOW SHADE AND REVEAL ASSEMBLY - RECOMMENDED CHANGE THE WINDOW SHADES. SERVICE BULLETIN MOS EQUIPMENT/FURNISHING- PASSENGER CABIN UNING AND PANELS - SIDEWALL PANEL ASSEMBLY - CHANGE RECOMMENDED MEDICAL OUTLET PLACARD. SERVICE BULLETIN MOS SB 737-25-1682 EQUIPMENT FURNISHINGS - PASSENGER CABIN LININGS AND PANELS- WINDOW SHADE AND REVEAL ASSEMBLY - RECOMMENDED CHANGE THE WINDOW SHADES. SERVICE BULLETIN MOS 25-MAR-2013 SB 737-25-1680 EQUIPMENT/FURNISHINGS- PASSENGER COMPARTMENT - BOEING SKY INTERIOR OVERWING EXIT DOOR LINER RECOMMENDED REPLACEMENT. SERVICE BULLETIN MOS 14-MAY-2013 SB 737-25-1685 EQUIPMENT/FURNISHINGS- PASSENGER CABIN LININGS AND PANELS - INSTALLATION OF ALUMINUM FOIL TAPE ON RECOMMENDED BACK SIDE OF SIDEWALL PANELS. SERVICE BULLETIN MOS Of-MAR-2013 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 39 Of 748 @ Camp Systems EFTA00618330 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-25-1689 EQUIPMENT / FURNISHINGS - LAVATORIES - MODULAR LAVATORY A- REPLACE LAVATORY A THRESHOLD LIGHT SUPERSEDED WITH STRIKE PLATE (SUPERSEDED BY SB 737-25-1689 R1). SERVICE BULLETIN MOS SB 737-25-1689 RI EQUIPMENT! FURNISHINGS - LAVATORIES - MODULAR LAVATORY A- REPLACE LAVATORY A THRESHOLD LIGHT RECOMMENDED WITH STRIKE PLATE. SERVICE BULLETIN MOS 09-JUL-2014 - (s) SB 737-25-1691 EQUIPMENT/FURNISHINGS - PASSENGER CABIN PARTITIONS AND COMPARTMENTS - BOEING SKY INTERIOR OPERATORS OVERHEAD STOWAGE BINS - INSPECTION AND CHANGE OF THE THRESHOLD TRIM ASSEMBLY. SERVICE BULLETIN DISCRETION MOS 04-SEP-2013 SB 737-25-1693 EQUIPMENT / FURNISHINGS - PARTITIONS - REPLACEMENT OF JOGGLED CLASS DWIDERS. SERVICE BULLETIN RECOMMENDED MOS 28-JUN-20I3 SB 737-25-1702 EQUIPMENT/FURNISHINGS - DETACHABLE EMERGENCY EQUIPMENT - AFT RIGHT SIDE TERMINATION STOWAGE BIN RECOMMENDED CHANGE PORTABLE OXYGEN BOTTLES INSTALLATION. SERVICE BULLETIN MOS 23-JUN-20I4 - (s) SB 737-25-1703 EQUIPMENT! FURNISHINGS- PASSENGER COMPARTMENT- PASSENGER SERVICE UNIT - REPLACE 12 MINUTE RECOMMENDED OXYGEN GENERATORS WITH 22 MINUTE OXYGEN GENERATORS. SERVICE BULLETIN MOS 06-DEC-2013 SB 737-25-1706 EQUIPMENT/FURNISHINGS- PASSENGER COMPARTMENT - SIDEWALL - AFT EMERGENCY EXIT. AUTOMATIC RECOMMENDED OVERWING (AOE) EXIT DOOR - LEFT AND RIGHT SIDE. SEAT INTRUSION CONTROL BLOCK INSTALLATION. SERVICE BULLETIN I3-JUN-2014 MOS SB 737-25A1372 FLIGHT COMPUTER FWD INSTRUMENT PANEL ACCESS PANEL FASTENER INTERFERENCE. SERVICE BULLETIN MOS 20-MAY-1999 - (s) SB 737-25A1383 RI RUDDER PEDAL COVER FASTENER INTERFERENCE. SERVICE BULLETIN RECOMMENDED COMPUED WITH MOS 13-SEP-1999 02-DEC-1999 -(s) SB 737-25A1626 EQUIPMENT/FURNISHINGS- ELECTRICAL EQUIPMENT RACK MOISTURE SHROUD - LIQUID CONTAMINATION RECOMMENDED PROTECTION IMPROVEMENTS ON THE E5 ELECTRONIC RACK DRIPSHIELD EQUIPMENT. SERVICE BULLETIN MOS 60 (EFF) 25-MAR-2015 25-MAR-2015 25-MAR-2010 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 40 Of 748 @ Camp Systems EFTA00618331 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-26-1112 06-DEC-2001 SB 737-26-1112 RI CORROSION PROTECTION OF THE FENWAL CONNECTORS. SERVICE BULLETIN 06-FEB-2003 CORROSION PROTECTION OF THE FENWAL CONNECTORS. SERVICE BULLETIN MOS 6(s) (EFF) MOS 6 (s) SB 737-26-1121 FIRE PROTECTION - LOWER CARGO COMPARTMENT SMOKE DETECTION - INSTALLATION OF FORWARD CARGO SUPERSEDED COMPARTMENT SMOKE PENETRATION SEALING PROVISIONS (SUPERSEDED BY 737-26-1121 R1). SERVICE BULLETIN MOS 13-DEC-2007 - Is) + SB 737-26-1121 RI FIRE PROTECTION - LOWER CARGO COMPARTMENT SMOKE DETECTION - INSTALLATION OF FORWARD CARGO RECOMMENDED COMPARTMENT SMOKE PENETRATION SEALING PROVISIONS. SERVICE BULLETIN MOS 72 (s) I3-DEC-2007 SB 737-26-1122 FIRE PROTECTION- LOWER CARGO COMPARTMENT SMOKE DETECTION- FORWARD CARGO COMPARTMENT SMOKE SUPERSEDED PENETRATION ELECTRICAL CHANGES (SUPERSEDED BY 737-26-1122 R1). SERVICE BULLETIN MOS I3-DEC-2007 - (s) SB 737-26-1122 RI I3-AUG-2009 SB 737-26-1123 I8-JAN-2005 SB 737-26-1123 RI 21-MAR-2005 LOWER CARGO COMPARTMENT SMOKE DETECTION- FORWARD CARGO COMPARTMENT SMOKE PENETRATION ELECTRICAL CHANGES. SERVICE BULLETIN MOS 72 (s) REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE DETECTION HARNESSES. SERVICE BULLETIN MOS FIRE PROTECTION - ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE DETECTION HARNESSES. SERVICE BULLETIN MOS SB 737-26-1123 R2 FIRE PROTECTION - ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE DETECTION HARNESSES. SERVICE BULLETIN MOS I6-AUG-2007 SB 737-26-1123 R3 28-FEB-2008 FIRE PROTECTION - ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE DETECTION HARNESSES. SERVICE BULLETIN MOS RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 41 Of 748 @ Camp Systems EFTA00618332 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-26-1123 R4 20-AUG-2008 ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE DETECTION HARNESSES. SERVICE BULLETIN MOS SB 737-26-1123 RS ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE DETECTION HARNESSES SUPERSEDED (SUPERSEDED BY 737-26-1123 R6), SERVICE BULLETIN MOS 27-APR-2009 SB 737-26-1123 Re FIRE PROTECTION - ENGINE FIRE DETECTION - REPLACEMENT OF THE LEFT AND RIGHT ENGINE CORE FIRE SUPERSEDED DETECTION HARNESSES (SUPERSEDED BY SB 737-26-1123 R7). SERVICE BULLETIN MOS SB 737-26-1124 FIRE PROTECTION- WHEEL WELL. WING AND LOWER AFT BODY OVERHEAT DETECTION SYSTEM- MAIN WHEEL WELL CONNECTOR CORROSION PREVENTION. SERVICE BULLETIN MOS 72-JAN-2006 SB 737-26-1131 FIRE PROTECTION- WHEEL WELL. WING. AND LOWER AFT BODY OVERHEAT DETECTION SYSTEM- DUCT LEAK SUPERSEDED OVERHEAT DETECTOR SUPPORT INSTALLATION (SUPERSEDED BY SB 737-26-1131 R1). SERVICE BULLETIN MOS 58 737-26-1131 RI FIRE PROTECTION - WHEEL WELL. WING. AND LOWER AFT BODY OVERHEAT DETECTION SYSTEM - DUCT LEAK RECOMMENDED OVERHEAT DETECTOR SUPPORT INSTALLATION. SERVICE BULLETIN MOS 14-OCT-2011 58 737-26-1133 FIRE PROTECTION -CARGO FIRE EXTINGUISHING SYSTEM - INSTALLATION OF SECOND FIRE BOTTLE FOR SUPERSEDED EXTENDED RANGE TWIN ENGINE OPERATIONS (SUPERSEDED BY SB 737-26-1133 R1). SERVICE BULLETIN MOS SB 737-26A1099 ENGINE FIRE EXTINGUISHING BOTTLES. SERVICE BULLETIN RECOMMENDED DAYS 90 (s) 17-JAN-2001 01-NOV-2000 634 AFL 175 SB 737-26A1108 RI ENGINES AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES INSPECTION AND REPLACEMENT. RECOMMENDED SERVICE BULLETIN MOS 12 (s) 27-JUN-2002 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 42 Of 748 @ Camp Systems EFTA00618333 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-26A1109 ENGINES. APU AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES AND WING-TO-STRUT ENGINE RECOMMENDED NOT APPLICABLE - BY EFFECTIVITY FUEL SUPPLY HOSES INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS 15-NOV-2001 - (s) SB 737-26A1109 R1 ENGINES. APU AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES AND WING-TO-STRUT ENGINE RECOMMENDED NOT APPLICABLE - BY EFFECTIVITY FUEL SUPPLY HOSES INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS 18 (s) 07-NOV-2002 SB 737-26A1109 R2 ENGINES. APU AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES AND WING-TO-STRUT ENGINE NOT APPLICABLE - BY SERIAL NUMBER FUEL SUPPLY HOSES INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS 30-NOV-2005 15-NOV-2001 -(s) 2338:24 AFL 573 SB 737-26A1109 R3 ENTINGUISHING - ENGINES. APU AND CARGO COMPARTMENT FIRE EXTINGUISHING BOTTLE HOSES AND COMPUED WITH - NO REWORK REQUIRED WING-TO-STRUT ENGINE FUEL SUPPLY HOSES INSPECTION AND REPLACEMENT. SERVICE BULLETIN FOUND S8 737-26A1109 R2 ALREADY COMPUED WITH AS NOT APPLICABLE 30-NOV-2005 (2338:24 HRS. 573 CYC) REF WO GUBBJ111-0202 MOS 05-APR-2007 29-SEP-2005 2871:09 AFL 676 SB 737-26A1118 FIRE PROTECTION-ENGINE FIRE EXTINGUISHING BOTTLES-GROUNDS INSPECTION/CHECK. SERVICE BULLETIN RECOMMENDED DAYS 90 (5) I7-OCT-2002 SB 737-26A1118 R1 FIRE PROTECTION-ENGINE FIRE EXTINGUISHING BOTTLES-GROUNDS INSPECTION/CHECK. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE - BY VARIABLE NUMBER. MOS 22-DEC-2004 08-APR-2004 1951:36 AFL 476 SB 737-26A1137 FIRE PROTECTION -CARGO BAY SMOKE DETECTION - EQUIPMENT COOLING SYSTEM SMOKE CLEARANCE MODE RECOMMENDED OPERATIONAL TEST FOR CARGO SMOKE PROTECTION. SERVICE BULLETIN MOS 22-MAY-2014 - (s) SB 737-26A1137 TABLE PERFORM FIRE PROTECTION- CARGO BAY SMOKE DETECTION - EQUIPMENT COOLING SYSTEM SMOKE RECOMMENDED 1.1 CNF 1 CLEARANCE MODE OPERATIONAL TEST FOR CARGO SMOKE PROTECTION. SERVICE BULLETIN A SMOKE CLEARANCE MODE - OPERATIONAL TEST (GROUP I. CONFIGURATION I AIRPLANES) MOS SI (s) 22-MAY-20I4 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 43 Of 748 @ Camp Systems EFTA00618334 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-26A1137 TABLE PERFORM FIRE PROTECTION - CARGO BAY SMOKE DETECTION - EQUIPMENT COOLING SYSTEM SMOKE 1.2 CNF 2 CLEARANCE MODE OPERATIONAL TEST FOR CARGO SMOKE PROTECTION. SERVICE BULLETIN A SMOKE CLEARANCE MODE - OPERATIONAL TEST (GROUP 1. CONFIGURATION 2. GROUP 2 AND GROUP 3 AIRPLANES) MOS - (s) SB 737-26A1137 TABLE PERFORM FIRE PROTECTION - CARGO BAY SMOKE DETECTION - EQUIPMENT COOLING SYSTEM SMOKE 1.3 CLEARANCE MODE OPERATIONAL TEST FOR CARGO SMOKE PROTECTION. SERVICE BULLETIN A SYSTEM FAULT ISOLATION (IF THE SMOKE CLEARANCE MODE - OPERATIONAL TEST RESULT IS NOT SATISFACTORY) MOS 22-MAY-2014 SB 737-27-1210 28-OCT-1999 BF/F (s) HORIZ STAB-REPLACEMENT OF STAB TRIM ACTUATOR. SERVICE BULLETIN MOS - (s) 22-AUG-2008 3260:48 AFL 782 SB 737-27-1210 RI HORIZONTAL STABILIZER REPLACEMENT OF STABILIZER TRIM ACTUATOR. SERVICE BULLETIN MOS 22-AUG-2008 01 -JUN-2000 4500 (s) 3260:48 RECOMMENDED AFL 782 SB 737-27-1215 FLIGHT CONTROLS- ELEVATOR AND TAB- INSTALLATION OF A 10-SECOND DELAY FOR THE RIGHT ELEVATOR RECOMMENDED ANTI-BALANCE TAB, SERVICE BULLETIN MOS 01-APR-1999 -(s) SB 737-27-1215 RI FLIGHT CONTROLS - ELEVATOR TAB - INSTALLATION OF A 10-SECOND DELAY.RIGHT ELEVATOR ANTI-BALANCE RECOMMENDED TAB. SERVICE BULLETIN MOS 07-DEC-2000 - (s) COMPUED WITH COMPUED WITH - IAW THE 58 SB 737-27-1224 AILERON 8 AILERON TRIM CONTROL SYSTEM. SERVICE BULLETIN RECOMMENDED COMPLIED WITH -Cm MOS 19-JAN-2000 21-OCT-1999 3200 (s) S8 737-27-1232 ELEVATOR AND TAB CONTROL SYSTEM TEST, SERVICE BULLETIN MOS 28-FEB-2002 - (s) S8 737-27-1240 MAIN WHEEL WELL AFT BULKHEAD STANDBY SHUT-OFF VALVE GROUND WIRE INSTALLATION MODIFICATION. RECOMMENDED SERVICE BULLETIN 10-MAY-2001 MOS 18 (s) 6000 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 44 Of 748 @ Camp Systems EFTA00618335 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27-1242 29-MAR-2001 SB 737-27-1242 RI 28-SEP-2002 SB 737-27-1244 I4-JUN-2001 MOS - (s) SB 737-27-1247 RI WIRE PROVISIONS FOR RUDDEER SYSTEM ENHANCEMENT. SERVICE BULLETIN RECOMMENDED COMPUED WITH - IAW THE 58 REV.1 N/A FOR AIRCRAFT REV 00 ALREADY CAN. MOS 13-AUG-2007 25-JUL-2002 - (s) 1785:05 AFL 446 SB 737-27-1247 R2 RUDDER AND RUDDER TRIM CONTROL SYSTEM - WIRE PROVISIONS FOR RECOMMENDED RUDDER SYSTEM ENHANCEMENT. SERVICE BULLETIN MOS 26-NOV-2008 - SB 737-27-1248 FLIGHT CONTROLS - ELEVATOR PITOT-STATIC SYSTEM - TURN THE PITOT PROBE DOWN. SERVICE BULLETIN FLIGHT CONTROLS - LIFT AUGMENTING - LEADING EDGE - CRUISE DEPRESSURIZATION VALVE MODIFICATION. SERVICE BULLETIN MOS - (s) UFT AUGMENTING - LEADING EDGE - CRUISE DEPRESSURIZATION. SERVICE BULLETIN MOS - (s) ELEVATOR FEEL COMPUTER. SERVICE BULLETIN RECOMMENDED RECOMMENDED RECOMMENDED 24-JAN-2002 SB 737-27-1251 II-JUL-2002 SB 737-27-1251 RI 27-FEB-2003 SB 737-27-1253 02-JAN-2003 SB 737-27-1253 RI 27-MAR-2003 MOS - (s) STALL MANAGEMENT YAW DAMPER (SMYD)-REPLACEMENT. SERVICE BULLETIN MOS - (s) STALL MANAGEMENT YAW DAMPERS(SMYD) REPLACEMENT. SERVICE BULLETIN MOS INSTALLATION OF AN ENHANCED RUDDER CONTROL SYSTEM. SERVICE BULLETIN MOS INSTALLATION OF AN ENHANCED RUDDER CONTROL SYSTEM. SERVICE BULLETIN MOS RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 45 Of 748 @ Camp Systems EFTA00618336 flP Megnand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27-1253 R2 07-OCT-2004 INSTALLATION OF AN ENHANCED RUDDER CONTROL SYSTEM (RSEP). SERVICE BULLETIN MOS RECOMMENDED SB 737-27-1253 R3 FLIGHT CONTROLS - RUDDER AND RUDDER TRIM CONTROL SYSTEM - INSTALLATION OF AN ENHANCED RUDDER COMPLIED WITH - IAW THE SB CONTROL SYSTEM (RSEP). SERVICE BULLETIN MOS 22-AUG-2008 12-MAY-2086 - (s) 3260:48 AFL 782 SB 737-27-1253 R4 RUDDER AND RUDDER TRIM CONTROL SYSTEM - INSTALLATION OF AN RECOMMENDED ENHANCED RUDDER CONTROL SYSTEM (RSEP) - TEST. SERVICE BULLETIN MOS 07-MAY-2009 SB 737-27-1254 FLIGHT CONTROLS-CONTROL CABLE ASSEMBLIES WITH "LOW ZINC' COATING (SUPERSEDED BY 737-27-1254 RI ). SUPERSEDED SERVICE BULLETIN 31-OCT-2002 MOS - (s) SB 737-27-1254 E. 1 INSPECT FLIGHT CONTROLS-CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING (SUPERSEDED BY RECOMMENDED 737-27-1254 RI). SERVICE BULLETIN UNPROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING MOS RECURRING 31-OCT-2002 SB 737-27-1254 E. 2 INSPECT FLIGHT CONTROLS-CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING (SUPERSEDED BY RECOMMENDED 737-27-1254 RI). SERVICE BULLETIN PROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING MOS RECURRING 31-OCT-2002 SB 737-27-1254 RI CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING-INSPECTION AND REPLACEMENT (SUPERSEDED BY SUPERSEDED 737-27-1254 R2). SERVICE BULLETIN MOS 14-APR-2003 SB 737-27-1254 RI E.1 INSPECT CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING-INSPECTION AND REPLACEMENT (SUPERSEDED RECOMMENDED BY 737-27-1254 R2), SERVICE BULLETIN UNPROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING MOS RECURRING 14-APR-2003 S8 737-27-1254 RI E. 2 INSPECT CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING-INSPECTION AND REPLACEMENT (SUPERSEDED RECOMMENDED BY 737-27-1254 R2), SERVICE BULLETIN PROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING MOS RECURRING 14-APR-2003 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 46 Of 748 @Camp Systems EFTA00618337 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB SB 737-27-1254 RI E 3 I 7-APR-2003 737-27-1254 R2 02-JUL-2008 REPLACE CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING-INSPECTION AND REPLACEMENT (SUPERSEDED BY 737-27-1254 R2). SERVICE BULLETIN CONTROL CABLE ASSEMBLIES MOS 24 (5) CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING - INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS SB 737-27-1254 R2 El INSPECT CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING- INSPECTION AND REPLACEMENT. SERVICE BULLETIN UNPROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC COATING MOS 9 (s) 02-JUL-2008 S8 737-27-1254 R2 E2 INSPECT CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING- INSPECTION AND REPLACEMENT. SERVICE BULLETIN PROTECTED CONTROL CABLE ASSEMBLIES WITH 'LOW ZINC' COATING MOS 12 (s) 02-JUL-2008 SB 737-27-1254 R2 E3 REPLACE CONTROL CABLE ASSEMBLIES WITH LOW ZINC COATING - INSPECTION AND REPLACEMENT. SERVICE BULLETIN CONTROL CABLE ASSEMBLIES MOS 24 (s) 02-JUL-2008 SB 737-27-1262 RUDDER AND RUDDER TRIM CONTROL SYSTEM-REPLACEMENT OF THE P5-3 PANEL (RSEP).. SERVICE BULLETIN RECOMMENDED COMPLIED WITH - PREVIOUSLY 19-DEC-2002 SB 737-27-1262 RI 07-MAY-2009 SB 737-27-1268 12-OCT-2006 MOS - Is) 22-AUG-2008 3260:48 AFL 782 RUDDER AND RUDDER TRIM CONTROL SYSTEM- REPLACEMENT OF THE P5-3 PANEL (RSEP). SERVICE BULLETIN MOS FLIGHT CONTROLS - HORIZONTAL STABLIZER TRIM CONTROL SYSTEM - STABLIZER TRIM AND LIMIT SWITCHES WIRE BUNDLE PROTECTION. SERVICE BULLETIN MOS SB 737-27-1268 RI HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - STABILIZER TRIM AND UNIT SWITCHES WIRE BUNDLE PROTECTION. SERVICE BULLETIN MOS 29-AUG-2011 26-MAR-2009 3533:32 AFL 863 RECOMMENDED - INFORMATION REF TO RI RECOMMENDED COMPUED WITH - GROUP I A/C WIRE BUNDLES INSPECTED. IAW S8737-27-1268 RI FIGURE 1. GROUP 2 NC WIRE BUNDLES INSPECTED IAW SB 737-27-1268 RI FIGURE 2.. IAW S8 737-27-1268 RI FIGURE 3 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 47 Of 748 @ Camp Systems EFTA00618338 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 737-27-1270 02-OCT-2003 RUDDER FEEL AND CENTERING UNIT-CAM ROLLER BOLT TO FLANGE CLEARANCE-INSPECTION AND REWORK. SERVICE BULLETIN MOS SB 737-27-1273 FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK AND LUBRICATION. SERVICE BULLETIN 29-SEP-2005 MOS 24-AUG-2007 2968:28 RECOMMENDED COMPLIED WITH AFL 699 SB 737-27-1273 PART 1 FLIGHT CONTROLS -AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH AND LUBRICATION. SERVICE BULLETIN MOS 24 (5) 24-AUG-2007 29-SEP-2005 8000 2968:28 AFL 699 SB 737-27-1273 PART 2 FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH AND LUBRICATION. SERVICE BULLETIN MOS 12 (s) 24-AUG-2007 29-SEP-2005 4000 2968:28 AFL 699 SB 737-27-1273 RI FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH AND LUBRICATION. SERVICE BULLETIN MOS 24-AUG-2007 79-DEC-2006 2968:28 AFL 699 SB 737-27-1273 RI PART FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH 1 AND LUBRICATION. SERVICE BULLETIN MOS 24 (5) 24-AUG-2007 19-DEC-2006 8000 2968:28 AFL 699 SB 737-27-1273 RI PART FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK COMPLIED WITH 2 AND LUBRICATION. SERVICE BULLETIN MOS 12 (5) 24-AUG-2007 19-DEC-2006 4000 2968:28 AFL 699 SB 737-27-1273 R2 FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK AND LUBRICATION. SERVICE BULLETIN MOS 03-JUL-2013 23-APR-2007 3723:21 AFL 908 COMPLIED WITH - IA.W. AD 2006-21-01 PART 1 AND PART 2 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time ,i6 Of 748 @ Camp Systems EFTA00618339 COMP Astant.frar• Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27-1273 R2 PART 1 23-APR-2007 SB 737-27-1273 R2 PART 2 23-APR-2007 SB 737-27-1282 15-MAR-2007 SB 737-27-1282 RI 14-JUN-2010 FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK AND LUBRICATION. SERVICE BULLETIN MOS 24 (5) 8000 AFL 03-JUL-2013 3723:21 908 FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - AILERON BALANCE TAB FREEPLAY CHECK AND LUBRICATION. SERVICE BULLETIN MOS 12 (s) 03-JUL-2013 4000 3723:21 AFL 908 FLIGHT CONTROLS - RUDDER AND RUDDER TRIM CONTROL SYSTEM - WIRE BUNDLE W443 AND LEFT FORWARD SUPERSEDED RUDDER QUADRANT CLEARANCE INSPECTION (SUPERSEDED BY 737-27-1282 R1). SERVICE BULLETIN MOS - (s) FLIGHT CONTROLS - RUDDER AND RUDDER TRIM CONTROL SYSTEM- WIRE BUNDLE W443 AND LEFT FORWARD RECOMMENDED RUDDER QUADRANT CLEARANCE INSPECTION. SERVICE BULLETIN MOS 60 (s) SB 737-27-1284 FLIGHT CONTROLS - ELEVATOR AND TAB - LEFT AND RIGHT ELEVATOR TAB PUSHRODS REPLACEMENT. SERVICE BULLETIN MOS 48 (s) 28-NOV-2007 COMPUED WITH - LAW. AD 2006-21-01 PART I COMPUED WITH - IA.W. AD 2006-21-01 PART 2 SB 737-27-1284 RI ELEVATOR AND TAB- LEFT AND RIGHT ELEVATOR TAB PUSHRODS COMPUED WITH REPLACEMENT. SERVICE BULLETIN MOS 29-AUG-2011 28-NOV-2007 - (s) 3533:32 AFL 863 SB 737-27-1289 737 STABILIZER TAKEOFF WARNING SWITCHES - TEST OF THE TAKEOFF WARNING INDICATION. SERVICE BULLETIN RECOMMENDED COMPUED WITH DAYS 29-AUG-2011 RECURRING 07-APR-2010 750 3533:32 4283:32 SB 737-27-1290 AFL 863 TRAILING EDGE FLAP SYSTEM - FLAP UMIT SWITCH AND FLAP LANDING WARNING SWITCH REPLACEMENT (SUPERSEDED BY SB 737-27-1290 RI), SERVICE BULLETIN MOS SUPERSEDED SB 737-27-1290 RI FLIGHT CONTROLS - TRAILING EDGE FLAP SYSTEM - FLAPS UP LIMIT SWITCH AND FLAP LANDING WARNING LIMIT SUPERSEDED SWITCH REPLACEMENT (SUPERSEDED BY SB 737-27-1290 RZ. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 49 Of 748 @ Camp Systems EFTA00618340 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27-1290 R2 14-OCT-2011 FLIGHT CONTROLS - TRAILING EDGE FLAP SYSTEM - FLAPS UP AND FLAP LANDING WARNING LIMIT SWITCH REPLACEMENT. SERVICE BULLETIN MOS RECOMMENDED SB 737-27-1290 R3 FLIGHT CONTROLS - TRAILING EDGE FLAP SYSTEM - FLAPS UP AND FLAP LANDING WARNING LIMIT SWITCH RECOMMENDED 10-APR-2012 REPLACEMENT. SERVICE BULLETIN MOS SB 737-27-1290 R4 FLIGHT CONTROLS - TRAILING EDGE FLAP SYSTEM - FLAPS UP AND FLAP LANDING WARNING LIMIT SWITCH RECOMMENDED 28-NOV-2012 REPLACEMENT. SERVICE BULLETIN MOS SB 737-27-1291 LEADING EDGE FLAP AND SLAT CONTROL SYSTEM - LEADING EDGE SLATS- TITANIUM PROXIMITY SENSOR SUPERSEDED PROVISIONAL INSTALLATION (SUPERSEDED BY SB 737-27-1291 R1). SERVICE BULLETIN MOS SB 737-27-1291 RI LEADING EDGE FLAP AND SLAT CONTROL SYSTEM - LEADING EDGE SLATS- TITANIUM PROXIMITY SENSOR RECOMMENDED 18-N0V-2010 PROVISIONAL INSTALLATION. SERVICE BULLETIN MOS SB 737-27-1298 FLIGHT CONTROLS - CENTRAL WARNING SYSTEM - SPEEDBRAKE TAKEOFF WARNING SWITCH. 5651 - INSPECTION RECOMMENDED 18-AUG-2010 AND REPLACEMENT. SERVICE BULLETIN MOS SB 737-27-1300 SB 737-27-1300 RI SB 737-27-1303 21-JUN-2012 FLIGHT CONTROLS - ELEVATOR AND TAB - ELEVATOR TAB CONTROL MECHANISM - AFT ATTACH LUG MODIFICATION SUPERSEDED (SUPERSEDED BY S8 737-27-1300 RI). SERVICE BULLETIN MOS - (s) FLIGHT CONTROLS - ELEVATOR AND TAB - ELEVATOR TAB CONTROL MECHANISM - AFT ATTACH LUG MODIFICATION. SERVICE BULLETIN MOS FLIGHT CONTROLS- FLIGHT SPOILER CONTROL SYSTEM- LEFT AND RIGHT WING FLIGHT SPOILERS SHORT FIELD RECOMMENDED PERFORMANCE POWER CONTROL UNIT REPLACEMENT. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 50 Of 748 @ Camp Systems EFTA00618341 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27A1219 11 -SEP-I998 FLAP/SLAT ELECTRONICS UNIT. SERVICE BULLETIN MOS - (s) RECOMMENDED SB 737-27A1222 MAIN RUDDER POWER CONTROL UNIT (SUPERSEDED BY SB 737-27A1222 RI). SERVICE BULLETIN SUPERSEDED COMPUED WITH -CM MOS 13-SEP-1999 - (s) SB 737-27A1222 RI MAIN RUDDER POWER CONTROL UNIT. SERVICE BULLETIN RECOMMENDED COMPUED WITH MOS 13-SEP-1999 28-JAN-I999 - (s) SB 737-27A1228 TRAILING EDGE FLAP AND HORIZONTAL STABILIZER TRIM SYSTEMS (SUPERSEDED BY SB 737-27A1228 R1). SERVICE SUPERSEDED COMPUED WITH BULLETIN MOS 13-SEP-1999 - (s) SB 737-27A1228 RI TRAILING EDGE FLAP AND HORIZONTAL STABILIZER TRIM SYSTEMS (SUPERSEDED BY SI3 737-27A1228 R2). SERVICE SUPERSEDED COMPUED WITH - CM BULLETIN MOS 13-SEP-1999 - (s) SB 737-27A1228 R2 TRAILING EDGE FLAP AND HORIZONTAL STABILIZER TRIM SYSTEMS (SUPERSEDED BY SI3 737-27A1228 R3). SERVICE SUPERSEDED BULLETIN MOS - (s) SB 737-27A1228 R3 TRAILING EDGE FLAP AND HORIZONTAL STABILIZER TRIM SYSTEMS. SERVICE BULLETIN RECOMMENDED COMPUED WITH MOS 13-SEP-1999 18-NOV-1999 300(s) 23:30 AFL 21 SB 737-27A1234 ELEVATOR-PCU RETENTION BRACKET AND BOLT (SUPERSEDED BY SB 737-27A1234 R1). SERVICE BULLETIN SUPERSEDED MOS - (s) SB 737-27A1234 RI ELEVATOR-PCU RETENTION BRACKET AND BOLT. SERVICE BULLETIN RECOMMENDED DAYS 7 (s) 22-NOV-2001 10-AUG-2000 854:54 AFL 225 SB 737-27A1239 FLIGHT CONTROLS - RUDDER AND RUDDER TRIM CONTROL SYSTEM - RELOCATION OF WIRE BUNDLES AWAY FROM RECOMMENDED COMPUED WITH - IAW THE SB THE RUDDER FEEL AND CENTERING UNIT. SERVICE BULLETIN MOS 22-AUG-2008 11 -JAN-2001 -(s) 3260:48 AFL 782 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 51 Of 748 @ Camp Systems EFTA00618342 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27A1245 SB 737-27AI245 RI EXCESSIVE FREEPLAY IN THE TAB CONTROL (SUPERSEDED BY SB 737-27A1245 R1). SERVICE BULLETIN MOS - Is) 26-APR-2001 EXCESSIVE FREEPLAY IN THE TAB CONTROL (SUPERSEDED BY SB 737-27A1245 R2) . SERVICE BULLETIN MOS - Is) SUPERSEDED COMPUED WITH - CM SUPERSEDED SB 737-27A1245 R2 EXCESSIVE FREEPLAY IN THE TAB CONTROL. SERVICE BULLETIN RECOMMENDED MOS 02-AUG-2002 - Is) SB 737-27A1259 RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. SERVICE BULLETIN RECOMMENDED 30-MAY-2002 - Is) MOS SB 737-27A1259 PART A INSPECT/REPLACE RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. RECOMMENDED SERVICE BULLETIN SPRING ASEMBLY DAYS 10 (s) 30-MAY-2002 SB 737-27A1259 PART 8 INSPECT/REPLACE RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. RECOMMENDED SERVICE BULLETIN SPRING ASSEMBLY DAYS 90 (s) 30-MAY-2002 SB 737-27A1259 RI RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. SERVICE BULLETIN RECOMMENDED MOS 19-DEC-2002 SB 737-27A1259 RI PART INSPECT RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. SERVICE RECOMMENDED A BULLETIN DAYS 10 (s) 19-DEC-2002 SB 737-27A1259 RI PART REPLACE RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. SERVICE RECOMMENDED 8 BULLETIN DAYS 90 (s) 19-DEC-2002 SB 737-27A1260 REPLACEMENT OF COMPENSATORS. SERVICE BULLETIN DAYS 180(s) 07-OCT-2002 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 52 Of 748 @ Camp Systems EFTA00618343 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27A1271 SB 737-27A1271 R1 ELEVATOR INPUT TORQUE TUBE MODIFICATION (SUPERSEDED BY SB 737-27A1271 R1). SERVICE BULLETIN MOS 22-AUG-2008 3260:48 AFL 782 FLIGHT CONTROLS - ELEVATOR AND TAB - ELEVATOR INPUT TORQUE TUBE - MODIFICATION. SERVICE BULLETIN MOS SB 737-27A1277 FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT INSPECTION. LUBRICATION AND REPAIR/OVEFtHAUL. SERVICE BULLETIN MOS 24-AUG-2007 2968:28 AFL 699 SB 737-27A1277 PAC 1 (1) DETAILED INSPECTION FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT INSPECTION. LUBRICATION AND REPAIR/OVERHAUL. SERVICE BULLETIN MOS 24 (s) 24-AUG-2007 27 -JUL-2005 2000 2968:28 AFL 699 SB 737-27A1277 PAC 1 (2) LUBRICATE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM- BALLSCREW AND BALL NUT INSPECTION. LUBRICATION AND REPAIR/OVERHAUL. SERVICE BULLETIN MOS 12 (s) 24-AUG-2007 27 -JUL-2005 1600 2968:28 AFL 699 SB 737-27A1277 PAC 2 REPLACE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT INSPECTION. LUBRICATION AND REPAIR/OVERHAUL. SERVICE BULLETIN BALL NUT TUBE RETAINERS MOS 27 -JUL-2005 25000 (s) SUPERSEDED COMPUED WITH - IAW THE SB COMPUED WITH - PREVIOUSLY 737-27A1271 COMPUED WITH - PAC 1(1) INSPECTION - NEX DUE 151AUG/2099 - 9368HRS / PAC 1(2) LUBRICATION NEXT DUE 15/AUG/2008 - 4568 HRS / HSTA REPLACEMENT DUE 25.0000 AFUCYC TO BE ACCOMPLISHED IN REV 1 OF THIS SB COMPUED WITH - PAC 1(1) INSPECTION - NEX DUE 15/AUG/2C09 - 9368HRS IN REV.1 COMPUED WITH - NEXT DUE 15/AUG/2008 - 4568 HRS IN REV 1 OF THIS SB - REF: REV.1 SB 737-27A1277 PAC 3 REPLACE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT - REF: REV.1 INSPECTION. LUBRICATION AND REPAIR/OVERHAUL. SERVICE BULLETIN HORIZONTAL STABILIZER TRIM ACTUATOR MOS 27 -JUL-2005 25000 (s) SB 737-27A1277 RI FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN 25-JUL-2007 MOS 28-SEP-2009 3378:04 AFL 812 COMPLIED WITH - PAC 1 (1) INSPECTION AND PAC 1 (2) LUBERICATION REFER NEXT TO REV.2 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 53 Of 748 @Camp Systems EFTA00618344 COMP Astant.frar• Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27A1277 RI PAC 1 DETAIL INSPECTION FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL (1) 27-JUL-2007 NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN MOS 24 (s) 28-SEP-2009 6400 3378:04 AFL 812 SB 737-27A1277 RI PAC 1 LUBRICATE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM- BALLSCREW AND BALL (2) NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN 25-JUL-2007 MOS 12 (s) 28-SEP-2009 1600 3378:04 COMPLIED WITH - REFER NEXT COMPLIANCE IN REV.2 COMPLIED WITH - REFER NEXT COMPLIANCE IN REV.2 AFL 812 SB 737-27A1277 RI PAC 2 REPLACE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - R0i I cd-REW AND BALL - INFORMATION REFER TO REV2 NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN BALL NUT TUBE RETAINERS MOS 25-JUL-2007 25000 (s) SB 737-27A1277 RI PAC 3 REPLACE FLIGHT CONTROLS - HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL COMPLIED WITH - REPLACEMENT PER NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN HORIZONTAL STABILIZER TRIM 737-27-1210/RI PN 251A4510-6 TSO .O'. ACTUATOR UPDATED COMPONENT TASK 27-108-00 WITH THE COMPLETION DATE OF THIS SB. FURTURE TRACKING OF THIS SB WILL BE ACCOMPLISHED PER 27-108-00 MOS 22-AUG-2008 25-JUL-2007 3260:48 AFL 782 SB 737-27A1277 R2 HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN MOS 03-JUL-2013 08-JAN-2010 3723:21 AFL 908 SB 737-27A1277 R2 PAC 1 DETAIL INSPECTION HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL (I) NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN MOS 24 (s) 03-JUL-2013 08-JAN-2010 6400 3723:21 AFL 908 SB 737-27A1277 R2 PAC 1 LUBRICATE HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL (2) NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN MOS 12 (s) 03-JUL-2013 08-JAN-2010 1600 3723:21 AFL 908 SB 737-27A1277 R2 PAC 2 REPLACE HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN BALL NUT TUBE RETAINERS MOS 19-DEC-2002 25000 (s) RECOMMENDED COMPLIED WITH - INSPECTION AND LUBRICATION LA.W. AD 2011-27-03 RECOMMENDED COMPLIED WITH - IA.W. AD 2011-27-03 RECOMMENDED COMPLIED WITH - IA.W. AD 2011-27-03 RECOMMENDED - INFO REFERENCE TO AD 2011-27-03 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 54 Of 748 @ Camp Systems EFTA00618345 C O Atiant.fran MP Ad-own/lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27A1277 R2 PAC 3 REPLACE HORIZONTAL STABILIZER TRIM CONTROL SYSTEM - BALLSCREW AND BALL NUT INSPECTION . LUBRICATION. AND REPAIR/OVERHAUL. SERVICE BULLETIN HORIZONTAL STABILIZER TRIM ACTUATOR MOS 19-DEC-2002 SB 737-27A1279 RUDDER - RUDDER AND RUDDER TRIM CONTROL SYSTEM - MAIN RUDDER POWER CONTROL UNIT INPUT CONTROL RODS AND STANDBY RUDDER POWER CONTROL UNIT INPUT CONTROL ROD - REPLACEMENT. SERVICE BULLETIN MOS 28-OCT-2007 RECOMMENDED - INFORMATION REFERENCE REV.I PREVIOUSLY CW 22-AUG-2008 REPLACEMENT PER 737-27-1210411 PN 251A4510-6 TSO "0'. UPDATED COMPONENT TASK 27-108-00 WITH THE COMPLETION DATE OF THIS Se. FURTURE TRACKING OF THIS SIB WILL BE ACCOMPLISHED PER 27-108-00 NOT APPLICABLE - BY EFFECTIVITY N/A BY LINE NO. SB 737-27A1279 RI MAIN RUDDER POWER CONTROL UNIT INPUT CONTROL RODS AND STANDBY RUDDER POWER CONTROL UNIT INPUT RECOMMENDED NOT APPLICABLE - BY EFFECTIVITY CONTROL ROD - REPLACEMENT. SERVICE BULLETIN YG091-YG096 EFFECTED AIRCRAFT I I -JAN-2010 SB 737-27A1280 25-MAY-2006 S8 737-27A1280 RI 24-MAY-2007 SB 737-27A1280 RI TABLE 1 24-MAY-2007 SB 737-27A1280 RI TABLE 2 16-FEB-2007 MOS RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY HYDRAULIC ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY CHANGE. SERVICE BULLETIN MOS 08-DEC-2006 2785:43 AFL 661 RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST Of THE STANDBY HYDRAULIC ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY CHANGE. SERVICE BULLETIN MOS 22-AUG-2008 3260:48 AFL 782 MONITOR TEST RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY HYDRAULIC ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY CHANGE. SERVICE BULLETIN RUDDER MAIN POWER CONTROL UNIT (PCU) FORCE FLIGHT DAYS 90 (s) OPERATIONAL TEST RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY HYDRAULIC ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY CHANGE. SERVICE BULLETIN OF THE STANDBY HYDRAULIC ACTUATION SYSTEM DAYS 60 (s) NOT APPLICABLE - NO PCU CONTROL RODS PREVIOUSLY CHANGED. COMPUED WITH - IAW THE SB 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 55 Of 748 @ Camp Systems EFTA00618346 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27A1280 TABLE 1 25-MAY-2006 SB 737-27A1280 TABLE 2 25-MAY-2006 MONITOR TEST RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY HYDRAULIC ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY CHANGE. SERVICE BULLETIN RUDDER MAIN POWER CONTROL UNIT (PCU) FORCE FLIGHT DAYS 08-DEC-2006 6000 (s) 2785:43 AFL 661 OPERATIONAL TEST RUDDER AND RUDDER TRIM CONTROL SYSTEM - OPERATIONAL TEST OF THE STANDBY HYDRAULIC ACTUATION SYSTEM AND RUDDER MAIN POWER CONTROL UNIT FORCE FIGHT MONITOR TEST - TEST FREQUENCY CHANGE. SERVICE BULLETIN OF THE STANDBY HYDRAULIC ACTUATION SYSTEM DAYS 08-DEC-2006 500(s) 2785:43 AFL 661 NOT APPLICABLE - NO PCU CONTROL RODS PREVIOUSLY CHANGED. NOT APPLICABLE - NO PCU CONTROL RODS PREVIOUSLY CHANGED. SB SB 737-27A1283 03-APR-2007 737-27A1287 FLIGHT CONTROLS - SPOILER. DRAG DEVICES. AND VARIABLE AERODYNAMIC FAIRINGS - LEFT AND RIGHT WING FLIGHT SPOILERS SHORT FIELD PERFORMANCE ACTUATOR REPLACEMENT. SERVICE BULLETIN MOS 18-OCT-2007 RUDDER FEEL AND CENTERING UNIT - INSPECTION AND REPLACEMENT OF SPRING ASSEMBLY. SERVICE BULLETIN NOT APPLICABLE - BY EFFECTIVITY APPLICABLE TO 737-800 SERIES AIRCRFAT ONLY. - N/A BY LINE NO. MOS 03-NOV-2009 16-APR-2008 3391 AFL 817 SB 737-27A1296 ELAVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB 737-27A1297 R1). SERVICE SUPERSEDED COMPUED WITH - IAW THE AD BULLETIN MOS I9-MAY-2010 3438:54 AFL 835 SB 737-27A1296 R1 FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB SUPERSEDED 737-27A1297 R1), SERVICE BULLETIN MOS SB 737-27A1297 FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB SUPERSEDED 737-27A1297 R1), SERVICE BULLETIN MOS SB 737-27A1297 RI FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB SUPERSEDED 737-27A1297 R2). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 56 Of 748 @ Camp Systems EFTA00618347 COMP Astant.fran 'Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27A1297 RI TABLE 1.03 02-AUG-2010 DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION RECOMMENDED COMPLIED WITH (SUPERSEDED BY S8 737-27AI297 R2). SERVICE BULLETIN OF THE LEFT SIDE ELEVATOR TAB CONTROL MECHANISM (GROUP 3) DAYS 180(s) 1800 28-FEB-2011 3525:36 AFL 857 SB 737-27A1297 RI REPLACE FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED BY SB RECOMMENDED TABLE 1.04 737-27A1297 R2). SERVICE BULLETIN THE LEFT SIDE ELEVATOR TAB CONTROL MECHANISM AND DO DETAILED INSPECTION BEFORE AND AFTER INSTALLING IT ( IF ELEVATOR TAB CONTROL MECHANISM IS FOUND TO BE DISCREPANT OR REPLACEMENT ELEVATOR TAB CONTROL MECHANISM IS FOUND TO BE DISCREPANT) MOS BF(F SB 737-27A1297 RI DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION RECOMMENDED COMPLIED WITH TABLE 2.03 (SUPERSEDED BY 58 737-27A1297 R2). SERVICE BULLETIN OF THE RIGHT SIDE ELEVATOR TAB CONTROL MECHANISM (GROUP 3) DAYS 180 (5) 28-FEB-2011 02-AUG-2010 1800 3525:36 AFL 857 SB 737-27A1297 RI REPLACE FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION (SUPERSEDED 8Y SB RECOMMENDED TABLE 2.04 737-27A1297 R2). SERVICE BULLETIN THE RIGHT SIDE ELEVATOR TAB CONTROL MECHANISM AND DO DETAILED INSPECTION BEFORE AND AFTER INSTALLING IT ( IF ELEVATOR TAB CONTROL MECHANISM IS FOUND TO BE DISCREPANT OR REPLACEMENT ELEVATOR TAB CONTROL MECHANISM IS FOUND TO BE DISCREPANT) MOS BF(F SB 737-27A1297 R2 FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION. SERVICE BULLETIN RECOMMENDED MOS 16-APR-2012 SB 737-27A1297 R2 DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION. RECOMMENDED TABLE (1) SERVICE BULLETIN OF THE LEFT SIDE ELEVATOR TAB CONTROL MECHANISM MOS RECURRING 1800 (EFF) 5325:36 M SB 737-27A1297 R2 DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION. RECOMMENDED TABLE (2) SERVICE BULLETIN OF THE RIGHT SIDE ELEVATOR TAB CONTROL MECHANISM MOS RECURRING 1800 (EFF) 5325:36 M SB 737-27A1299 FLIGHT CONTROLS- ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND BEARING RETAINER SUPERSEDED INSTALLATION (SUPERSEDED BY SI3 737-27A1299 R1). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 57 Of 748 @ Camp Systems EFTA00618348 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-27A1299 RI 16-APR-20I2 SB 737-27A1299 RI TABLE 1 SB 737-27A1299 RI TABLE 2 INSP FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND BEARING RETAINER INSTALLATION. SERVICE BULLETIN MOS (EFF) RECOMMENDED DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND RECOMMENDED BEARING RETAINER INSTALLATION. SERVICE BULLETIN THE ELEVATOR TAB CONTROL MECHANISM ALL AIRPLANES AND REPORT ALL INITIAL INSPECTION RESULTS AND DATE OF BEARING RETAINER INSTALLATION TO BOEING DAYS 30 (s) DETAILED INSPECTION FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND RECOMMENDED BEARING RETAINER INSTALLATION. SERVICE BULLETIN OF THE BEARING RETAINERS AND THE ELEVATOR TAB CONTROL MECHANISM WITH BEARING RETAINERS INSTALLED. MOS 890 (s) AFL 40O SB 737-27A1299 RI REPORT FLIGHT CONTROLS - ELEVATOR TAB CONTROL MECHANISM DETAILED INSPECTION AND BEARING RECOMMENDED TABLE 2 REPORT RETAINER INSTALLATION. SERVICE BULLETIN ALL DISCREPANT MECHANISM FINDINGS FROM REPEAT INSPECTIONS TO BOEING INCLUDING WHICH REPEAT THE FAILED INSPECTION OCCURRED FOR ALL AIRPLANES: AFTER THE DETAILED INSPECTION DAYS 30 (s) SB 737-28-1152 P5-2 FUEL CONTROL MODULE REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 03-MAY-2001 - (s) SB 737-28-1155 CENTER FUEL TANK SCAVENGE SYSTEM, SERVICE BULLETIN MOS 19-OCT-2000 SB 737-28-1160 SPARE VALVE DUAL WIRE VERIFICATION TEST. SERVICE BULLETIN RECOMMENDED MOS 05-JUN-2000 - (s) SB 737-28-1160 RI ENGINE FUEL FEED SYSTEM, SERVICE BULLETIN RECOMMENDED MOS 6(s) 31-AUG-2001 26-OCT-2000 793:18 SB 737-28-1172 AFL 212 INTEGRAL FUEL TANKS - ALIGNMENT OF CENTER TANK BOOST PUMP INLETS AND FUEL PUMP ALIGNMENT BRACKETRY. SERVICE BULLETIN MOS 18-APR-2002 - (s) RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 58 Of 748 @ Camp Systems EFTA00618349 C O Atiant.fran MP Ad-own/lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-28-1172 RI FUEL - STORAGE - INTEGRAL FUEL TANKS - ALIGNMENT OF CENTER TANK BOOST PUMP INLETS AND FUEL PUMP ALIGNMENT BRACKETRY. SERVICE BULLETIN MOS 04-JUN-2007 SB 737-28-1173 APU FUEL FEED LINE SHROUD. INSPECTION FOR ADEQUATE CLEARANCE AND REPAIR. SERVICE BULLETIN MOS 17-JAN-2002 - SB 737-28-1173 RI APU FUEL FEED LINE SHROUD. INSPECTION FOR ADEQUATE CLEARANCE AND REPAIR. SERVICE BULLETIN MOS 04-NOV-2004 SB 737-28-1173 R2 FUEL SYSTEM - DISTRIBUTION - APU FUEL FEED LINE SHROUD. INSPECTION FOR ADEQUATE CLEARANCE AND REPAIR. SERVICE BULLETIN MOS 23-FEB-2006 RECOMMENDED SB 737-28-1179 P5-2 FUEL SYSTEM MODULE REMOVAL AND REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 27-AUG-2002 31-JAN-2002 1057:50 SB 737-28-1179 RI 28-FEB-2002 SB 737-28-1179 R2 02-DEC-2004 SB 737-28-1190 16-JAN-2003 AFL 271 P5-2 FUEL SYSTEM MODULE REMOVAL AND REPLACEMENT. SERVICE BULLETIN MOS - (s) P5-2 FUEL SYSTEM MODULE REMOVAL AND REPLACEMENT. SERVICE BULLETIN MOS RECOMMENDED FUEL-FUEL QUANTITY INDICATING SYSTEM (FQIS)-CENTER FUEL TANK WIRE SUPPORT BRACKET REPLACEMENT. RECOMMENDED SERVICE BULLETIN MOS 18(s) SB 737-28-1190 RI FUEL-FUEL QUANTITY INDICATING SYSTEM (FQIS)-CENTER FUEL TANK WIRE SUPPORT BRACKET REPLACEMENT. COMPLIED WITH SERVICE BULLETIN MOS 18-AUG-2006 27-MAR-2003 - (s) 2633:50 AFL 633 SB 737-28-1194 RELOCATION OF CONNECTOR PINS. SERVICE BULLETIN RECOMMENDED MOS 20-FEB-2003 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 59 Of 748 @ Camp Systems EFTA00618350 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-28-1194 RI 37 -JUL-2003 RELOCATION OF CONNECTOR PINS AT WING(BODY CONNECTORS. SERVICE BULLETIN MOS SB 737-28-1194 R2 RELOCATION OF CONNECTOR PINS AT VYING/BODY CONNECTORS. SERVICE BULLETIN MOS 08-JAN-2004 SB 737-28-1194 R3 FUEL - FUEL BOOST PUMP - RELOCATION OF CONNECTOR PINS AT VYING/BODY CONNECTORS. SERVICE BULLETIN MOS I8-SEP-2007 RECOMMENDED RECOMMENDED SB 737-28-1199 ENGINE FUEL SHUTOFF VALVE WIRE AND CONDUIT ASSEMBLY REPLACEMENT. SERVICE BULLETIN COMPUED WITH 09-SEP-2004 MOS I8-AUG-2006 - (s) 2633:50 AFL 633 SB 737-28-1199 RI FUEL - ENGINE FUEL FEED SYSTEM - ENGINE FUEL SHOUTOFF VALVE WIRE AND CONDUIT ASSEMBLY COMPUED WITH REPLACEMENT. SERVICE BULLETIN MOS 18-AUG-2086 15-DEC-2005 - (s) 2633:50 AFL 633 SB 737-28-1199 R2 FUEL - ENGINE FUEL FEED SYSTEM - ENGINE FUEL SHUTOFF VALVE WIRE AND CONDUIT ASSEMBLY REPLACEMENT. SERVICE BULLETIN MOS 36 (s) I 7-JUL-2006 SB 737-28-1200 INSPECTION FOR WIRE CHAFING BEHIND P15 REFUEL PANEL. SERVICE BULLETIN COMPUED WITH - NO CHAFING FOUND MOS 24(s) 0I -JUN-2007 I0JUL-2003 2955:24 AFL 691 SB 737-28-1200 RI FUEL - PRESSURE FUELING SYSTEM - INSPECTION FOR WIRE CHAFING BEHIND P15 REFUEL PANEL. SERVICE COMPUED WITH - NO CHAFING FOUND BULLETIN MOS 01-JUN-2007 28-JUL-2005 - (s) 2955:24 AFL 691 SB 737-28-1209 FUEL - INDICATING - WING CENTER TANK WIRE BUNDLES INSTALLATION CHANGE (SUPERSEDED BY SB 737-28-1209 SUPERSEDED COMPLIED WITH R1). SERVICE BULLETIN MOS I8-AUG-2006 -(s) 2633:50 AFL 633 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 60 Of 7,18 @ Camp Systems EFTA00618351 COMP Moan Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-28-1209 RI FUEL - INDICATING - WING CENTER TANK WIRE BUNDLES INSTALLATION CHANGE. SERVICE BULLETIN MOS 60 (s) 21-DEC-2005 58 737-28-1225 FUEL - DISTRIBUTION - ENGINE FUEL FEED SYSTEM - INSPECTION/REPA1R OF THE ELECTRICAL BOND BETWEEN THE BULKHEAD FITTING AND THE WING FRONT SPAR. SERVICE BULLETIN MOS 22-AUG-2008 I2-JAN-2006 - (s) 3260:48 AFL 782 SB 737-28-1225 RI FUEL - DISTRIBUTION - ENGINE FUEL FEED SYSTEM -INSPECTION/REPAIR OF THE ELECTRICAL BOND BETWEEN THE BULKHEAD FITTING AND THE WING FRONT SPAR. SERVICE BULLETIN 30-OCT-2006 MOS 22-AUG-2008 -(s) 3260:48 AFL 782 SB 737-28-1251 FUEL - BOOST PUMP CONTROL RELAY - GROUND MODULE INSPECTION AND REPLACEMENT IF NECESSARY. SERVICE BULLETIN DAYS 90 (s) 20-OCT-2005 SB 737-28-1251 RI FUEL - ENGINE FUEL FEED SYSTEM - GROUND MODULE INSPECTION AND REPLACEMENT. SERVICE BULLETIN DAYS 90 (s) 27-APR-2006 RECOMMENDED NOT APPLICABLE - REF: TO R1 COMPUED WITH - IAW THE SB - INFORMATION REF COMPLIANCE OF 737-28-1257 - INFORMATION REF COMPLIANCE OF 737-28-1257 SB 737-28-1251 R2 FUEL - ENGINE FUEL FEED SYSTEM - GROUND MODULE INSPECTION AND REPLACEMENT. SERVICE BULLETIN - INFORMATION REF COMPLIANCE OF 737-28-1257 DAYS 90 (s) 26-OCT-2006 SB 737-28-1257 FUEL - ENGINE FUEL FEED SYSTEM - BOOST PUMP CONTROL RELAY GROUND LOCATION CHANGE. SERVICE COMPLIED WITH BULLETIN MOS I4-FEB-2008 26-FEB-2007 -(s) 3151:22 AFL 746 58 737-28-1257 RI FUEL - ENGINE FUEL FEED SYSTEM - BOOST PUMP CONTROL RELAY GROUND LOCATION CHANGE. SERVICE COMPUED WITH BULLETIN MOS 14-FEB-2008 28-NOV-2007 - (s) 3151:22 AFL 746 SB 737-28-1272 ENGINE FUEL FEED SYSTEM - MAIN TANKS ENGINE FUEL SPAR VALVE BODY REPLACEMENT (SUPERSEDED BY SB SUPERSEDED 737-28-1272 RI), SERVICE BULLETIN MOS 29-AUG-2011 3533:32 AFL 863 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time @ Camp Systems 61 Of 748 EFTA00618352 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-28-1272 RI FUEL - ENGINE FUEL FEED SYSTEM - MAIN TANKS ENGINE FUEL SPAR VALVE BODY REPLACEMENT. SERVICE BULLETIN MOS 60 (s) RECOMMENDED 18-FEB-2010 SB 737-28-1283 FUEL QUANTITY INDICATING SYSTEM - FUEL QUANTITY PROCESSOR UNIT REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 11-FEB-2009 SB 737-28-1303 FUEL - GENERAL - LEFT ENVIRONMENTAL CONTROL SYSTEMS BAY WIRE CLAMP - INSPECTION AND REPLACEMENT. RECOMMENDED SERVICE BULLETIN 26-APR-2012 MOS 60 (s) SB 737-28-1312 FUEL - GENERAL - LEFT AND RIGHT ENVIRONMENTAL CONTROL SYSTEMS BAY WIRE CLAMP - INSPECTION AND SUPERSEDED REPLACEMENT (SUPERSEDED BY SB 737-28-1312 R1). SERVICE BULLETIN MOS (EFF) SB 737-28-1312 RI FUEL - GENERAL - LEFT AND RIGHT ENVIRONMENTAL CONTROL SYSTEMS BAY WIRE CLAMP - INSPECTION AND RECOMMENDED REPLACEMENT. SERVICE BULLETIN MOS 19-APR-2013 58 737-28-1318 FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. RECOMMENDED SERVICE BULLETIN MOS 03-APR-2014 SB 737-28-1318 TABLE 1.1 DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN A MAINTENANCE RECORDS CHECK TO SEE IF ANY OF THE FOUR FUEL VALVE ADAPTER SHAFT ASSEMBLIES HAVE A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A (ALL AIRPLANES) MOS SB 737-28-1318 TABLE 12 FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. RECOMMENDED SERVICE BULLETIN NO MORE WORK IS NECESSARY IF CONDITION 1: ALL FUEL VALVE ADAPTER SHAFT ASSEMBLIES THAT DO NOT HAVE A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A. MOS 03-APR-2014 58 737-28-1318 TABLE 1.3.1 DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN PART 1: FUEL VALVE ADAPTER SHAFT ASSEMBLY - OPEN ACCESS (IF CONDITION 2: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A) MOS - Is) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 62 Of 748 @ Camp Systems EFTA00618353 C O Atiant.fran MP Meowed lip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-28-1318 TABLE 1.3.2 SB 737-28-1318 TABLE 1.3.3 SB 737-28-1318 TABLE 1.4.1 SB 737-28-1318 TABLE 1.4.2 DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN PART 3: FUEL VALVE ADAPTER SHAFT ASSEMBLY - REPLACEMENT (IF CONDITION 2: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A) MOS - (s) DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN PART 4: FUEL VALVE ADAPTER SHAFT ASSEMBLY - CLOSE ACCESS (IF CONDITION 2: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A) MOS - (s) DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN PART 1: FUEL VALVE ADAPTER SHAFT ASSEMBLY - OPEN ACCESS (IF CONDITION 3: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY WHERE THE SERIAL NUMBER CANNOT BE IDENTIFIED IN THE MAINTENANCE RECORDS) MOS - (s) DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN PART 2: FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION - TO SEE IF THE SERIAL NUMBER IS SPECIFIED IN APPENDIX A (IF CONDITION 3: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY WHERE THE SERIAL NUMBER CANNOT BE IDENTIFIED IN THE MAINTENANCE RECORDS) MOS - (s) SB 737-28-1318 TABLE 1.5 DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN PART 4: FUEL VALVE ADAPTER SHAFT ASSEMBLY - CLOSE ACCESS (IF CONDITION 4: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT DOES NOT HAVE A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A) 03-APR-2014 SB 737-28-1318 TABLE 1.6.1 SB 737-28-1318 TABLE 1.6.2 MOS DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN PART 3: FUEL VALVE ADAPTER SHAFT ASSEMBLY - REPLACEMENT (IF CONDITION 5: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A. OR THAT CANNOT BE DETERMINED) MOS - (s) DO FUEL - ENGINE FUEL FEED SYSTEM - FUEL VALVE ADAPTER SHAFT ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN PART 4: FUEL VALVE ADAPTER SHAFT ASSEMBLY - CLOSE ACCESS (IF CONDITION 5: EACH FUEL VALVE ADAPTER SHAFT ASSEMBLY THAT HAS A SERIAL NUMBER THAT IS SPECIFIED IN APPENDIX A OR THAT CANNOT BE DETERMINED) MOS - (s) RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 63 Of 748 @ Camp Systems EFTA00618354 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 SB 737-28-1323 10-JUL-2014 737-28M142 07-FEB-2002 FUEL - DISTRIBUTION - LEFT WING TANK WATER SCAVENGE SYSTEM - PERFORMANCE IMPROVEMENT EVALUATION. SERVICE BULLETIN MOS IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION, SERVICE BULLETIN MOS 24 (s) RECOMMENDED RECOMMENDED SB 737-28A1142 RI IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION, SERVICE BULLETIN MOS 24 (s) 1 7-JUN-2002 SB 737-28A1142 R2 IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION. SERVICE BULLETIN MOS 24 (s) 21-AUG-2002 07-FEB-2002 1057:48 AFL 271 SB 737-28A1142 R3 IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION, SERVICE BULLETIN MOS 24 (s) 21-AUG-2002 21-AUG-2003 1057:48 AFL 271 SB 737-28A1142 R4 IMPROVED FUEUNG FLOAT SWITCH AND WIRING PROVISION INSTALLATION, SERVICE BULLETIN MOS 24 (s) 21-AUG-2002 15-JUL-200d 1057:48 AFL 271 SB 737-28A1148 TANK FUEL BOOST PUMP. SERVICE BULLETIN COMPUED WITH - PREVIOUSLY REV 2 DOESN7 AFFECT A/C MOS 6 (s) 09-JAN-200d Id-SEP-2000 1547:30 AFL 391 SB 737-28A1148 RI AFT BOOST PUMP WIRING SUPPORT BRACKET INSTALLATION. SERVICE BULLETIN MOS 6 (s) 22-AUG-2002 SB 737-28A1148 R2 AFT BOOST PUMP WIRING SUPPORT BRACKET INSTALLATION (SUPERSEDED BY SB 737-28A1148 R3). SERVICE SUPERSEDED COMPUED WITH - PREVIOUSLY DONE WITH SB BULLETIN 737-28A1148 IN AUG 14.8.01 MOS 16-DEC-2004 - Is) 1951:36 AFL 476 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 64 Of 748 @ Camp Systems EFTA00618355 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-28A1148 R3 13-JUL-2004 ENGINE FUEL FEED SYSTEM - TANK FUEL BOOST PUMP - AFT BOOST PUMP WIRING SUPPORT BRACKET INSTALLATION. SERVICE BULLETIN MOS 6 (s) RECOMMENDED SB 737-28A1184 FUEL BOOST AND OVERRIDE PUMP MOTOR-IMPELLAR REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 14-SEP-2000 SB 737-28A1188 AFT FUEL BOOST PUMP GROUND SHIELD WIRE CHANGE, SERVICE BULLETIN COMPLIED WITH MOS 18 (s) 13-AUG-2004 06-MAR-2003 1785:06 AFL 446 SB 737-28A1188 IN 01 FUEL BOOST PUMP-AFT FUEL BOOST PUMP GROUND SHIELD WIRE CHANGE. SERVICE BULLETIN MOS 12-JUN-2096 SB 737-28A1188 R1 AFT FUEL BOOST PUMP GROUND SHIELD WIRE CHANGE.. SERVICE BULLETIN COMPLIED WITH - PREVIOUSLY MOS 30-NOV-2005 18-MAR-2004 2338:24 AFL 573 SB 737-28A1197 FUEL PUMP MOTOR-IMPELLER INSPECTION (SUPERSEDED BY 737-28A1197 R1), SERVICE BULLETIN SUPERSEDED MOS 23-SEP-2002 - (s) SB 737-28A1197 RI FUEL PUMP MOTOR-IMPELLER INSPECTION (SUPERSEDED BY 737-28A1197 R2), SERVICE BULLETIN SUPERSEDED MOS 01-MAY-2003 SB 737-28A1197 R2 FUEL - DISTRIBUTION - FUEL PUMP MOTOR-IMPELLER INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS 25-AUG-2005 SB 737-28Al201 FUEL - ENGINE FUEL FEED SYSTEM - FUEL PUMP CONTROL GROUND FAULT INTERRUPTER (GFI) RELAY SUPERSEDED INSTALLATION (SUPERSEDED BY 737-28Al201 R1). SERVICE BULLETIN MOS SB 737-28Al201 RI FUEL - ENGINE FUEL FEED SYSTEM - FUEL PUMP CONTROL GROUND FAULT INTERRUPTER (GFI) RELAY RECOMMENDED COMPLIED WITH INSTALLATION. SERVICE BULLETIN MOS 29-AUG-201I 28-MAY-2009 3533:32 AFL 863 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 65 Of 748 @ Camp Systems EFTA00618356 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-28A1206 II -JAN-2006 FUEL - DISTRIBUTION - CENTER FUEL TANK BOOST PUMP AUTO SHUTOFF AND MASTER CAUTION LOGIC CHANGE. SERVICE BULLETIN MOS SB 737-28A1206 RI FUEL - DISTRIBUTION - CENTER FUEL TANK BOOST PUMP AUTO SHUTOFF AND MASTER CAUTION LOGIC CHANGE, SERVICE BULLETIN MOS I I -JAN-2006 SB 737-28A1206 R2 CENTER FUEL TANK BOOST PUMP AUTO SHUTOFF AND MASTER CAUTION LOGIC CHANGE (SUPERSEDED BY SB SUPERSEDED COMPLIED WITH 737-28A1206 R3), SERVICE BULLETIN MOS 29-AUG-2011 3533:32 AFL 863 SB 737-28A1206 R3 FUEL - DISTRIBUTION - CENTER FUEL TANK BOOST PUMP AUTO SHUTOFF AND MASTER CAUTION LOGIC CHANGE. RECOMMENDED SERVICE BULLETIN MOS 36 (EFF) 30-SEP-2014 30-SEP-2014 30-SEP-2011 SB 737-28A1207 FUEL - ENGINE FUEL FEED SYSTEM - MOTOR OPERATED VALVE - ACTUATOR REPLACEMENT (SUPERSEDED BY SUPERSEDED 737-28A1207 RI). SERVICE BULLETIN MOS I5-FEB-2007 SB 737-28A1207 RI FUEL - ENGINE FUEL FEED SYSTEM -MOTOR OPERATED VALVE - ACTUATOR REPLACEMENT. SERVICE BULLETIN RECOMMENDED COMPLIED WITH MOS 29-AUG-201 I I9-APR-2010 - (s) 3533:32 AFL 863 SB 737-28A1221 I4-JAN-2007 SB 737-28A1221 RI 09-NOV-2007 FUEL - INDICATING - HOT SHORT PROTECTOR INSTALLATION FOR MIS FUEL DENSITOMETER. SERVICE BULLETIN MOS 60 (s) FUEL - INDICATING - HOT SHORT PROTECTOR INSTALLATION FOR FOIS FUEL DENSITOMETER (SUPERSEDED BY SB 737-28A1221 R2), SERVICE BULLETIN MOS 29-AUG-201 I -(s) 3533:32 NOT APPLICABLE - N/A BY EFFECTIVITY AFL 863 SB 737-28A1221 R2 FUEL - INDICATING - HOT SHORT PROTECTOR INSTALLATION FOR FOIS FUEL DENSITOMETER. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE - N/A BY EFFECTIVITY MOS 29-AUG-2011 I4-JAN-2007 - (s) 3533:32 AFL 863 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 66 Of 7,18 @ Camp Systems EFTA00618357 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-28A1248 FUEL - ENGINE FUEL FEED SYSTEM - CENTER FUEL TANK. FUEL PUMPS - POWER FAILED ON PROTECTION SYSTEM (UN-COMMANDED PUMP ON)- RELAYS INSTALLATION (SUPERSEDED BY 737-28A1248 R1). SERVICE BULLETIN MOS SUPERSEDED SB 737-28A1248 RI FUEL - ENGINE FUEL FEED SYSTEM - CENTER FUEL TANK. FUEL PUMPS - POWER FAILED ON PROTECTION SYSTEM SUPERSEDED (UN-COMMANDED PUMP ON)- RELAYS INSTALLATION (SUPERSEDED BY 737-28A1248 R2). SERVICE BULLETIN MOS SB 737-28A1248 R2 ENGINE FUEL FEED SYSTEM - CENTER FUEL TANK. FUEL PUMPS - POWER FAILED ON PROTECTION SYSTEM SUPERSEDED COMPLIED WITH- WO BVBBJ006 (UN-COMMANDED PUMP ON)- RELAYS INSTALLATION (SUPERSEDED BY SB 737-28A1248 R3). SERVICE BULLETIN MOS 29-AUG-2011 3533:32 AFL 863 SB 737-28A1248 R3 FUEL - ENGINE FUEL FEED SYSTEM - CENTER FUEL TANK. FUEL PUMPS -POWER FAILED ON PROTECTION SYSTEM RECOMMENDED (UN-COMMANDED PUMP ON)- RELAYS INSTALLATION. SERVICE BULLETIN MOS 60 (s) 30-SEP-2011 SB 737-29-1077 . SERVICE BULLETIN COMPLIED WITH - CM MOS 23-SEP-1999 - (s) SB 737-29-1083 HYDRAULIC POWER - PARKING BRAKE SHUTOFF VALVE (NON-SENSITIVE LOCATIONS) REPLACEMENT. SERVICE RECOMMENDED BULLETIN MOS 25-JAN-2001 - (s) SB 737-29-1084 HYDRAULIC POWER TRANSFER UNIT SYSTEM. SERVICE BULLETIN RECOMMENDED MOS 01-JUN-2000 - (s) SB 737-29-1090 HYDRAULIC POWER - DC MOTOR OPERATED SHUTOFF VALVE (ALL LOCATIONS) REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 25-JAN-2001 - SB 737-29-1094 MODIFICATION OF THE RESERVOIR PRESSURIZATION MODULE. SERVICE BULLETIN RECOMMENDED MOS I5-MAR-2001 - (s) SB 737-29-1094 RI MODIFICATION OF THE HYDRAULIC RESERVOIR PRESSURIZATION MODULE. SERVICE BULLETIN RECOMMENDED MOS 29-MAR-2001 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 67 Of 748 @ Camp Systems EFTA00618358 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-29-1106 23-DEC-2002 HYDRAULIC POWER-HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM-REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN MOS (s) SB 737-29-1106 RI HYDRAULIC POWER-HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM-REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN MOS 15-MAY-2603 -(s) - REF:REV.4 - REF:REV.4 SB 737-29-1106 R2 05-FEB-2004 REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN MOS - REF: REV.4 SB 737-29-1106 R3 REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN RECOMMENDED - REF:REV.4 MOS 28-JUL-200.5 SB 737-29-1106 R4 REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN COMPLIED WITH MOS 24-AUG-2C07 23-JUN-2066 (s) 29618:28 AFL 699 SB 737-29-1106 RS HYDRAULIC POWER - HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM - REMOVAL OF THE - INFORMATION REFER TO. REv.6 RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN MOS 16-JAN-2008 Is) SB 737-29-1106 R6 HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM - REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND SUPERSEDED COMPLIED WITH DEPRESSURIZATION VALVES (SUPERSEDED BY SB 737-29-1106 R7). SERVICE BULLETIN MOS 28-SEP-2009 - 3378.04 AFL 812 SB 737-29-1106 R7 HYDRAULIC POWER - HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM - REMOVAL OF THE RESERVOIR SUPERSEDED PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES (SUPERSEDED BY SB 737-29-1166 R8). SERVICE BULLETIN MOS SB 737-29-1106 R8 HYDRAULIC POWER - HYDRAULIC RESERVOIR PRESSURIZATION SYSTEM - REMOVAL OF THE RESERVOIR PRESSURIZATION MODULE AND DEPRESSURIZATION VALVES. SERVICE BULLETIN MOS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 68 Of 748 LI Camp Systems EFTA00618359 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-29-1110 HYDRAULIC POWER - HYDRAULIC RESERVOIR - OVERFILL WARNING MARKER INSTALLATION. SERVICE BULLETIN 28-NOV-2007 SB 737-29-1110 RI 30-OCT-2008 SB 737-29-1111 30-JUL-2009 SB 737-29-1113 MOS - (s) 22-AUG-2008 3260:48 AFL 782 HYDRAULIC RESERVOIR - OVERFILL WARNING MARKER INSTALLATION. SERVICE BULLETIN MOS 60 (s) HYDRAULIC SYSTEMS A AND B ENGINE DRIVEN PUMP - SUPPORT BRACKET CHANGE FOR THE HYDRAULIC PRESSURE HOSE. SERVICE BULLETIN MOS HYDRAULIC POWER - RIGHT MAIN LANDING GEAR WHEEL WELL - WIRE BUNDLE AND HYDRAULIC TUBING - INSPECTION. REPAIR AND NEW CLAMPS INSTALLATION (SUPERSEDED BY SB 737-29-1113 R1). SERVICE BULLETIN RECOMMENDED RECOMMENDED COMPLIED WITH SB 23-MAR-2011 737-29-1113 RI MOS 24 (s) HYDRAULIC POWER - RIGHT MAIN LANDING GEAR WHEEL WELL - WIRE BUNDLE AND HYDRAULIC TUBING - INSPECTION. REPAIR AND NEW CLAMPS INSTALLATION. SERVICE BULLETIN MOS SB 737-29-1114 HYDRAULIC POWER - MAIN - HYDRAULIC SYSTEMS A AND B PRESSURE MODULE CHECK VALVE INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS - (s) SB 737-29-1114 RI HYDRAULIC POWER - MAIN - HYDRAULIC SYSTEMS A AND B PRESSURE MODULE CHECK VALVE INSPECTION AND RECOMMENDED REPLACEMENT. SERVICE BULLETIN MOS 24 (s) (EFF) 10-SEP-2012 SB 737-29A1073 HYD POWER - DC MOTOR OPERATED 5/0 INSP.. SERVICE BULLETIN RECOMMENDED MOS 01-MAY-1997 -(s) SB 737-29A1073 R2 DC MOTOR OPERATED SHUTOFF VALVE. SERVICE BULLETIN RECOMMENDED MOS 6 (s) 08-OCT-1999 OI -JUL-1999 SB 737-29A1073 R3 HYDRAULIC POWER - DC MOTOR OPERATED SHUTOFF VALVE INSPECTION. SERVICE BULLETIN MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 69 Of 748 @ Camp Systems EFTA00618360 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-29A1077 SB 737-29A1077 RI SB 737-29A1077 R2 HYDRAULIC SYSTEM B ELECTRIC MOTOR-DRIVEN PUMP CASE DRAIN HOSE AND WIRE BUNDLE CLAMP INSTALLATION (SUPERSEDED BY SB 737-29A1077 R1). SERVICE BULLETIN MOS - (s) SUPERSEDED MAIN - HYDRAULIC SYSTEM B ELECTRIC MOTOR-DRIVEN PUMP (SUPERSEDED BY SB 737-29A1077 R2). SERVICE SUPERSEDED COMPLIED WITH BULLETIN MOS 09-SEP-1999 - (s) HYDRAULIC POWER -MAIN - HYDRAUUC SYSTEM B ELECTRIC MOTOR-DRIVEN PUMP CASE DRAIN HOSE. PRESSURE SUPERSEDED HOSE AND WIRE BUNDLE INSPECTION AND CLAMP INSTALLATION (SUPERSEDED BY SB 737-29A1077 R3). SERVICE BULLETIN MOS SB 737-29A1077 R3 HYDRAULIC POWER - MAIN - HYDRAUUC SYSTEM 8 ELECTRIC MOTOR-DRIVEN PUMP CASE DRAIN HOSE. PRESSURE RECOMMENDED HOSE AND WIRE BUNDLE INSPECTION AND CLAMP INSTALLATION. SERVICE BULLETIN MOS 07-APR-2010 SB 737-29A1078 DC MOTOR OPERATED SHUTOFF VALVE (SENSITIVE LOCATIONS) REPLACEMENT. SERVICE BULLETIN MOS - (s) SB 737-29A1081 DC MOTOR OPERATED SHUTOFF VALVE. SERVICE BULLETIN MOS 6 (s) 02-DEC-1999 SB 737-29A1081 RI 01-NOV-2001 822:06 AFL 220 HYDRAULIC POWER - DC MOTOR OPERATED SHUTOFF VALVE INSPECTION. SERVICE BULLETIN MOS 6(s) 01-NOV-2001 11-OCT-2001 822:06 AFL 220 SB 737-29A1082 HYDRAULIC POWER - DC MOTOR OPERATED SHUTOFF VALVE (SENSITIVE LOCATIONS) REPLACEMENT. SERVICE BULLETIN MOS 01-NOV-2001 07-DEC-2000 - (s) 822:06 AFL 220 SB 737-30-1050 WINDSHIELD WIPER MOTOR REPLACEMENT. SERVICE BULLETIN MOS 18-AUG-2006 09-MAY-2002 - (s) 2633:50 AFL 633 RECOMMENDED COMPLIED WITH RECOMMENDED COMPLIED WITH RECOMMENDED COMPLIED WITH RECOMMENDED COMPLIED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 70 Of 748 @ Camp Systems EFTA00618361 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-30-1054 RI C6-MAR-2003 SB 737-30-1056 28-FEB-2007 WINDSHIELD WIPER MOTOR REPLACEMENT. SERVICE BULLETIN MOS 18-AUG-2006 2633:50 AFL 633 ICE AND RAIN PROTECTION - WATER AND DRAIN LINE HEATERS - CHANGE - GRAY WATER COMPOSITE DRAIN MAST BONDING JUMPER INSTALLATION. SERVICE BULLETIN MOS CO (5) SB 737-30-1056 RI ICE AND RAIN PROTECTION - WATER AND DRAIN LINE HEATERS - CHANGE - GRAY WATER COMPOSITE DRAIN MAST BONDING JUMPER INSTALLATION. SERVICE BULLETIN 25-OCT-2007 MOS 22-AUG-2C08 (s) 3260:48 RECOMMENDED COMPLIED WITH AFL 782 SB 737-30-1056 R2 ICE AND RAIN PROTECTION - WATER AND DRAIN LINE HEATERS - CHANGE - GRAY WATER COMPOSITE DRAIN MAST RECOMMENDED BONDING JUMPER INSTALLATION. SERVICE BULLETIN MOS CO (s) 27-MAY-2008 SB 737-30-1056 R3 WATER AND DRAIN LINE HEATERS - CHANGE - GRAY WATER COMPOSITE DRAIN MAST BONDING JUMPER INSTALLATION. SERVICE BULLETIN MOS CO (5) 27-MAY-2008 SB 737-30-1058 ICE AND RAIN PROTECTION - CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN MOS 27-JUL-2000 SB 737-30-1058 RI ICE AND RAIN PROTECTION - CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN MOS 18-JUN-2007 SB 737-30-1058 R2 13-FEB-2009 CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT 9SUPERSEDED BY 737-30-1058 R3). SERVICE BULLETIN MOS RECOMMENDED SUPERSEDED SB 737-30-1058 R3 ICE AND RAIN PROTECTION - CONTROL CABIN' INDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT SUPERSEDED ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT (SUPERSEDED BY SB 737-30-1058 R4). SERVICE BULLETIN MOS COMPLIED WITH ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 71 Of 748 Camp Systems EFTA00618362 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-30-1058 R4 ICE AND RAIN PROTECTION - CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT (SUPERSEDED BY SB 737-30-1058 R5). SERVICE BULLETIN MOS SUPERSEDED - Is) SB 737-30-1058 RS ICE AND RAIN PROTECTION- CONTROL CABIN WINDOW ANTI-ICING SYSTEM - COIL CORD ASSEMBLY REPLACEMENT RECOMMENDED ON THE NUMBER 2 WINDOWS IN THE FLIGHT COMPARTMENT. SERVICE BULLETIN MOS 24-APR-20I3 - Is) SB 737-30-1070 ICE AND RAIN PROTECTION - PITOT AND STATIC - POLARITY STANDARDIZATION TO ADDRESS UN-ANNUNCIATED SUPERSEDED FAILURE OF PITOT PROBE HEATERS (SUPERSEDED BY SB 737-30-1070 R1). SERVICE BULLETIN MOS 58 737-30-1070 RI ICE AND RAIN PROTECTION - PITOT AND STATIC - POLARITY STANDARDIZATION TO ADDRESS UN-ANNUNCIATED RECOMMENDED FAILURE OF PITOT PROBE HEATERS. SERVICE BULLETIN MOS 04-JUN-2014 - (6) SB 737-30A1049 WINDOWS. WINDSHIELDS AND DOORS. WINDSHIELD WIPER SYSTEM. WIRING CHANGE. SERVICE BULLETIN RECOMMENDED COMPLIED WITH -CM MOS 10-AUG-2000 01 -JUN-2000 - (s) SB 737-30A1049 RI WINDOWS. WINDSHIELDS AND DOORS. WINDSHIELD WIPER SYSTEM. SERVICE BULLETIN RECOMMENDED MOS 12-OCT-2000 - (s) SB 737-30A1049 RI LEFT CHANGE WINDOWS. WINDSHIELDS AND DOORS. WINDSHIELD WIPER SYSTEM. SERVICE BULLETIN WIRING RECOMMENDED SIDE DAYS 90 (s) 12-OCT-2000 SB 737-30A1049 RI CHANGE WINDOWS. WINDSHIELDS AND DOORS. WINDSHIELD WIPER SYSTEM. SERVICE BULLETIN WIRING RECOMMENDED RIGHT SIDE MOS 12-OCT-2000 5000 (s) SB 737-30A1057 ICE AND RAIN PROTECTION - WINDSHIELD WIPER SYSTEM - CHANGE THE WINSHIELD WIPER MOTOR (SUPERSEDED SUPERSEDED - INFORMATION REFER TO REV.1 IA.W. AD BY 737-30A1057 RI. SERVICE BULLETIN 2008-24-05 MOS 06-OCT-2006 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 72 Of 748 @ Camp Systems EFTA00618363 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-30A1057 RI SB 737-30A1057 R2 SB 737-30A1057 R3 31-OCT-2011 SB 737-30A1057 R3 TABLE 1 (001.1) 30-DEC-2008 SB 737-30A1057 R3 TABLE 1 (001.2) ICE AND RAIN PROTECTION - WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR (SUPERSEDED BY 88 737-30A1057 R2). SERVICE BULLETIN MOS - (s) ICE AND RAIN PROTECTION- WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR (SUPERSEDED BY 737-30A1057 R3), SERVICE BULLETIN MOS - (0 SUPERSEDED SUPERSEDED ICE AND RAIN PROTECTION- WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR. SERVICE COMPLIED WITH- IAW. AD 2008-24-05 BULLETIN MOS I I -SEP-2013 VERIFY ICE AND RAIN PROTECTION - WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR. SERVICE BULLETIN THE LH WINDSHIELD WIPER MOTOR PART NUMBER AND SERIAL NUMBER (REFERRED TO AS'MODEL NUMBER' IN THE GOODRICH SERVICE BULLETIN 2313M-347/2313M-348-30-01) OF THE WINDSHIELD WIPER MOTORS AS GIVEN IN WORK PACKAGE 1 OF THE ACCOMPLISHMENT INSTRUCTIONS FOR ALL AIRPLANES! REPLACE OR CHANGE GOODRICH PART NUMBER AS NEEDED. MOS If -SEP-2013 VERIFY ICE AND RAIN PROTECTION - WINDSHIELD WIPER SYSTEM - CHANGE THE WINDSHIELD WIPER MOTOR. SERVICE BULLETIN THE RH WINDSHIELD WIPER MOTOR PART NUMBER AND SERIAL NUMBER (REFERRED TO AS'MODEL NUMBER' IN THE GOODRICH SERVICE BULLETIN 2313M-347/2313M-348-30-01) OF THE WINDSHIELD WIPER MOTORS AS GIVEN IN WORK PACKAGE 1 OF THE ACCOMPLISHMENT INSTRUCTIONS FOR ALL AIRPLANES! REPLACE OR CHANGE GOODRICH PART NUMBER AS NEEDED. MOS f f -SEP-2013 RECOMMENDED COMPUED WITH -CHANGE LH: PN 10-61329-39 TO P/N 10-1329-41 RECOMMENDED COMPLIED WITH - CHANGE PN TO 231351348-4 / SN 00338 30-DEC-2008 SB 737-30A1063 ICE AND RAIN PROTECTION - PITOT AND STATIC - AIR DATA PROBE ANTI-ICING SYSTEM - AIR DATA PROBE HEAT SUPERSEDED AUTOMATION INSTALLATION (SUPERSEDED BY SB 737-30A1063 R1). SERVICE BULLETIN MOS (EFF) SB 737-30A1063 RI ICE AND RAIN PROTECTION - PITOT AND STATIC - AIR DATA PROBE ANTI-ICING SYSTEM - AIR DATA PROBE HEAT SUPERSEDED AUTOMATION INSTALLATION (SUPERSEDED BY SB 737-30A1063 R2). SERVICE BULLETIN MOS (EFF) SB 737-30A1063 R2 ICE AND RAIN PROTECTION - PITOT AND STATIC - AIR DATA PROBE ANTI-ICING SYSTEM - AIR DATA PROBE HEAT MANDATORY 14-JAN-2013 AUTOMATION INSTALLATION. SERVICE BULLETIN MOS 24 (EFF) 14-JAN-2015 SB 737-31-1124 ADDITION OF THE RUDDER PEDAL FORCE TRANSDUCER. SERVICE BULLETIN RECOMMENDED MOS 20-MAY-1999 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (0-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time @ Camp Systems 73 Of 748 EFTA00618364 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-31-1124 RI 22-JUN-2000 SB 737-31-1150 06-APR-2000 SB 737-31-1153 I3-JAN-2000 SB 737-31-1153 RI OI -JUN-2000 SB 737-31-1153 R2 I0-AUG-2000 SB 737-31-1169 08-JUN-2000 SB 737-31-1169 R3 02-MAY-2002 ADDITION OF THE RUDDER PEDAL FORCE TRANSDUCER. SERVICE BULLETIN MOS - Is) INDICATING/RECORDING SYSTEMS - CENTRAL DISPLAY SYSTEM. SERVICE BULLETIN MOS - Is) RECOMMENDED RECOMMENDED OPERATIONAL PROGRAM CONFIGURATION (OPC) SOFTWARE UPGRADE REPLACEMENT. SERVICE BULLETIN RECOMMENDED - (s) . SERVICE BULLETIN RECOMMENDED MOS MOS - (s) INDICATING AND RECORDING SYSTEM - COMMON DISPLAY SYSTEMS. SERVICE BULLETIN RECOMMENDED MOS - (s) SOFTWARE CHANGE TO DISPLAY THE FLIGHT DIRECTOR COMMAND AS SPLIT AXIS COMMAND BARS. SERVICE RECOMMENDED BULLETIN MOS SOFTWARE CHANGE TO DISPLAY THE FLIGHT DIRECTOR COMMAND AS SPLIT AXIS COMMAND BARS. SERVICE RECOMMENDED BULLETIN MOS SB 737-31-1170 INDICATING/RECORDING - RIGHT DATA RECORDER SYSTEM - PARAMETER ADDITION TO RECORD STANDBY RUDDER SYSTEM ENGAGED (ON-OFF) STATUS. SERVICE BULLETIN MOS 21-MAR-2002 - (s) SB 737-31-1170 RI INDICATING/RECORDING - RIGHT DATA RECORDER SYSTEM - PARAMETER ADDITION TO RECORD STANDBY RUDDER SYSTEM ENGAGED (ON-OFF) STATUS. SERVICE BULLETIN MOS I8-SEP-2007 SB 737-31-1205 OPERATIONAL PROGRAM SOFTWARE (OPS) UPGRADE. SERVICE BULLETIN RECOMMENDED MOS 20-FEB-2003 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 74 Of 748 @ Camp Systems EFTA00618365 C O A.m." MPvgnie• Megnund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-31-1246 05-MAY-2005 INDICATING AND RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - DISPLAY ELECTRONIC UNIT OPERATIONAL PROGRAM SOFTWARE CHANGE. SERVICE BULLETIN MOS SB 737-31-1284 INDICATING/RECORDING SYSTEMS - MASTER CAUTION - ADDITION OF QUICK DISCONNECTS TO THE MASTER CAUTION AND FIRE WARNING SWITCHLIGHT WIRES. SERVICE BULLETIN MOS 23-FEB-2006 SB 737-31-1284 RI INDICATING/RECORDING SYSTEMS - MASTER CAUTION - ADDITION OF QUICK DISCONNECTS TO THE MASTER CAUTION AND FIRE WARNING SWITCHLIGHT WIRES. SERVICE BULLETIN MOS 01-MAR-2007 SB 737-31-1293 06-AUG-2009 SB 737-31-1295 27-OCT-2005 COMMON DISPLAY SYSTEM - UPDATED PHASE 3 DISPLAY UNIT DATABASE INSTALLATION. SERVICE BULLETIN MOS INDICATING AND RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - DISPLAY ELECTRONIC UNIT OPERATIONAL PROGRAM SOFTWARE CHANGE. SERVICE BULLETIN MOS SB 737-31-1327 INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM (CDS)- CHANGE THE OPERATIONAL PROGRAM SOFTWARE (OPS) FOR THE CDS DISPLAY ELECTRONIC UNIT (DEU). SERVICE BULLETIN 14-DEC-2006 SB 737-31-1327 RI I0-OCT-2007 SB 737-31-1449 SB 737-31-1449 RI MOS INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM (CDS) - CHANGE THE OPERATIONAL PROGRAM SOFTWARE (OPS) FOR THE CDS DISPLAY ELECTRONIC UNIT (DEU). SERVICE BULLETIN MOS 22-AUG-2008 3260:48 RECOMMENDED AFL 782 INDICATING/RECORDING SYSTEMS- FLIGHT DATA RECORDER SYSTEM- GROUND WIRE CHANGE (SUPERSEDED BY SUPERSEDED SB 737-31-1449 RI), SERVICE BULLETIN MOS INDICATING/RECORDING SYSTEMS - FLIGHT DATA RECORDER SYSTEM- GROUND WIRE CHANGE (SUPERSEDED BY SUPERSEDED SB 737-31-1449 R3). SERVICE BULLETIN MOS COMPLIED WITH - IAW THE 58 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 75 Of 748 @ Camp Systems EFTA00618366 C O A.m." MPvgnie• Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-31-1449 R2 INDICATING/RECORDING SYSTEMS - FLIGHT DATA RECORDER SYSTEM - GROUND WIRE CHANGE (SUPERSEDED BY SUPERSEDED SB 737-31-1449 R3). SERVICE BULLETIN MOS SB 737-31-1449 R3 INDICATING/RECORDING SYSTEMS- FLIGHT DATA RECORDER SYSTEM- GROUND WIRE CHANGE. SERVICE RECOMMENDED BULLETIN MOS 23-JUL-2013 SB 737-31-1471 INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - INSTALLATION OF PHASE 3A DISPLAY UNIT AND SUPERSEDED DATABASE SOFTWARE (SUPERSEDED BY SB 737-31-1471 R1). SERVICE BULLETIN MOS - SB 737-31-1471 RI INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - INSTALLATION OF PHASE 3A DISPLAY UNIT AND RECOMMENDED DATABASE SOFTWARE. SERVICE BULLETIN MOS 60 (s) 29-NOV-2012 SB 737-31-1472 INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - INSTALLATION OF FLIGHT DIRECTOR COMMAND RECOMMENDED DISPLAY AS A SPLIT AXIS COMMAND BAR. SERVICE BULLETIN MOS 12-JAN-2011 SB 737-31-1475 INDICATING / RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - REMOVAL OF OPTIONS. SERVICE BULLETIN RECOMMENDED MOS 21-JAN-2011 SB 737-31-1506 INDICATING/RECORDING SYSTEMS - FLIGHT DATA RECORDER SYSTEM- DIGITAL FLIGHT DATA ACQUISITION UNIT RECOMMENDED LOADABLE SOFTWARE CHANGE. SERVICE BULLETIN MOS 04-OCT-2011 SB 737-31-1552 INDICATING/RECORDING SYSTEMS - COMMON DISPLAY SYSTEM - SOFTWARE CHANGE. SERVICE BULLETIN RECOMMENDED MOS 08-MAR-2013 SB 737-31A1332 INDICATING / RECORDING SYSTEMS - AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING SUPERSEDED SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS (SUPERSEDED BY SB 737-31A1332 R1). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 76 Of 748 @ Camp Systems EFTA00618367 C O A.m." MPvgnie• Megnundop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-31A1332 R1 INDICATING / RECORDING SYSTEMS - AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING SUPERSEDED SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS (SUPERSEDED BY SB 737-31A1332 R2). SERVICE BULLETIN MOS (EFF) SB 737-31A1332 R2 INDICATING / RECORDING SYSTEMS - AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING SUPERSEDED SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS (SUPERSEDED BY SB 737-31A1332 R3). SERVICE BULLETIN MOS (EFF) SB 737-31A1332 R3 INDICATING / RECORDING SYSTEMS - AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING SUPERSEDED SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS (SUPERSEDED BY SB 737-31A1332 R4). SERVICE BULLETIN MOS (EFF) SB 737-31A1332 R4 INDICATING / RECORDING SYSTEMS -AURAL WARNING SYSTEM - INSTALLATION OF THE CABIN ALTITUDE WARNING RECOMMENDED 06-MAR-2013 SYSTEM AND TAKEOFF CONFIGURATION WARNING SYSTEM LIGHTS. SERVICE BULLETIN MOS 36 (EFF) 06-MAR-2016 06-MAR-2016 SB 737-32-1305 NOSE LANDING GEAR AFT LOCK LINK REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS - (s) SB 737-32-1305 RI NOSE LANDING GEAR AFT LOCK LINK REPLACEMENT. SERVICE BULLETIN RECOMMENDED I3-MAR-2003 MOS SB 737-32-1311 LANDING GEAR- WHEELS AND BRAKES - HYDRAULIC BRAKE SYSTEM. SERVICE BULLETIN RECOMMENDED MOS I9-AUG-1999 - (s) SB 737-32-1312 SHIMMY DAMPER ADDITION. SERVICE BULLETIN MOS 24-FEB-1999 - Is/ SB 737-32-1312 RI SHIMMY DAMPER ADDITION. SERVICE BULLETIN MOS 0I-APR-1999 - Is/ SB 737-32-1312 R2 MLG SHIMMY DAMPER ADDITION. SERVICE BULLETIN MOS IS-JUL-1999 - (s) RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 77 Of 748 @ Camp Systems EFTA00618368 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32-1312 R3 27 -SEP-2000 SHIMMY DAMPER ADDITION. SERVICE BULLETIN MOS - (s) SB 737-32-1317 LANDING GEAR - POSITION AND WARNING. SERVICE BULLETIN MOS 09-SEP-I999 - (s) SB 737-32-1317 RI LANDING GEAR- POSITION AND WARNING. SERVICE BULLETIN MOS I8-JAN-2001 - (s) SB 737-32-1330 MAIN LANDING GEAR (STRUCTURE). SERVICE BULLETIN MOS 08-JUN-2000 - (s) SB 737-32-1332 NOSE GEAR EXTENSION AND RETRACTION. SERVICE BULLETIN RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED COMPUED WITH - PREVIOUSLY NO WORK NECCESSARY REF: GVBBJ039-0220 -2 KIT USED FOR ORIGINAL COMPLIANCE 07-FEB-2000 MOS 24-AUG-2007 - (s) 2968:28 AFL 699 SB 737-32-1332 RI LANDING GEAR. NOSE GEAR EXTENSION 8 RETRACTION. RELOCATION OF THE NOSE GEAR EXTEND FUSE. SERVICE RECOMMENDED - REF: RO BULLETIN MOS 08-JUN-2000 - (s) SB 737-32-1332 R2 RELOCATION OF THE NOSE GEAR EXTEND FUSE, SERVICE BULLETIN - REF: RO MOS 28-FEB-2002 - (s) SB 737-32-1342 LANDING GEAR-STEERING-INSPECTION AND MODIFICATION TO THE NOSE LANDING GEAR STEERING COLLAR AND RECOMMENDED STEERING PLATE. SERVICE BULLETIN MOS I I -MAY-2000 SB 737-32-1342 RI 01-MAY-2001 SB 737-32-1362 07-FEB-2000 - Is) LANDING GEAR - STEERING - INSPECTION AND MODIFICATION TO THE NOSE LANDING GEAR STEERING COLLAR AND RECOMMENDED STEERING PLATE. SERVICE BULLETIN MOS CHANGE THE LOWER BEARING SEAL RETAINER, SERVICE BULLETIN RECOMMENDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 78 Of 748 @ Camp Systems EFTA00618369 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32-1362 RI 26-JAN-2006 SB 737-32-1368 09-SEP-2004 LANDING GEAR - NOSE LANDING GEAR - CHANGE THE LOWER BEARING SEAL RETAINER.. SERVICE BULLETIN MOS LEFT AND RIGHT MAIN LANDING GEAR SHIMMY DAMPER ASSEMBLY REPAIRS AND SEALS REPLACEMENT. SERVICE RECOMMENDED BULLETIN MOS SB 737-32-1368 RI LEFT AND RIGHT MAIN LANDING GEAR SHIMMY DAMPER ASSEMBLY REPAIRS AND SEALS REPLACEMENT. SERVICE RECOMMENDED BULLETIN 25-JUN-2009 SB 737-32-1369 SB 01-APR-2004 737-32-1369 RI MOS AFL 3000(s) LANDING GEAR - MAIN LANDING GEAR EXTENSION AND RETRACTION - RETRACT ACTUATOR CYLINDER ASSEMBLY MODIFICATION OR REPLACEMENT. SERVICE BULLETIN MOS 09-AUG-20C6 AFL 3000 (s) SB 737-32-1369 R2 LANDING GEAR - MAIN LANDING GEAR EXTENSION AND RETRACTION - RETRACT ACTUATOR CYLINDER ASSEMBLY MODIFICATION OR REPLACEMENT. SERVICE BULLETIN MOS I6-AUG-2007 AFL 3000 (s) SB 737-32-1369 R3 LANDING GEAR - MAIN LANDING GEAR EXTENSION AND RETRACTION - RETRACT ACTUATOR CYLINDER ASSEMBLY SUPERSEDED MODIFICATION OR REPLACEMENT (SUPERSEDED BY SB 737-32-1369 R4). SERVICE BULLETIN MOS - (s) SB 737-32-1369 R4 LANDING GEAR - MAIN LANDING GEAR EXTENSION AND RETRACTION- RETRACT ACTUATOR CYLINDER ASSEMBLY RECOMMENDED MODIFICATION OR REPLACEMENT. SERVICE BULLETIN MOS AFL 1000 (s) SB 737-32-1376 INSPECT. LUBRICATE. REPAIR OR REPLACE MAIN LANDING GEAR-FORWARD TRUNION PIN INSPECTION AND NOT APPLICABLE - BY EFFECTIVITY REPLACEMENT. SERVICE BULLETIN MOS I2-MAY-2005 - (s) MOS RETRACT ACTUATOR CYLINDER ASSEMBLY MODIFICATION OR REPLACEMENT. SERVICE BULLETIN 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 79 Of 748 @ Camp Systems EFTA00618370 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32-1376 RI INSPECT. LUBRICATE. REPAIR OR REPLACE MAIN LANDING GEAR- FORWARD TRUNION PIN INSPECTION AND NOT APPLICABLE - BY EFFECTIVITY REPLACEMENT.. SERVICE BULLETIN MOS - (s) SB 737-32-1376 R2 MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND NOT APPLICABLE - BY EFFECTIVITY REPLACEMENT. SERVICE BULLETIN MOS I6-FEB-2010 06-AUG-2008 3417:51 AFL 829 58 737-32-1393 LANDING GEAR - MAIN GEAR AND DOORS - OUTER CYLINDER WALKING BEAM CLEVIS BUSHING AND RETRACT ACTUATOR CLEVIS BUSHING REPLACEMENT. SERVICE BULLETIN MOS 02-JUL-2007 58 737-32-1393 RI MAIN GEAR AND DOORS - OUTER CYLINDER WALKING BEAM CLEVIS BUSHING RECOMMENDED AND RETRACT ACTUATOR CLEVIS BUSHING REPLACEMENT. SERVICE BULLETIN MOS 05-JAN-2010 SB 737-32-1394 LANDING GEAR - NOSE LANDING GEAR EXTENSION AND RETRACTION - GEAR LOCK ACTUATOR TRUNNION SEALS REPLACEMENT. SERVICE BULLETIN MOS I6-NOV-2006 SB 737-32-1402 MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT (SUPERSEDED BY SB 737-32-1402 R1). SERVICE BULLETIN MOS 02-FEB-2010 06-AUG-2008 3411:56 AFL 827 SB 737-32-1402 RI LANDING GEAR - MAIN LANDING GEAR- FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. SERVICE RECOMMENDED BULLETIN MOS 07-FEB-20I3 - (s) SB 737-32-1402 RI TABLE LUBRICATE LANDING GEAR - MAIN LANDING GEAR- FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. RECOMMENDED 1.1 & 1.2 SERVICE BULLETIN THE MLG FORWARD TRUNNION PIN DAYS 30 (s) 07-FEB-20I3 SB 737-32-1402 RI TABLE DETAILED INSPECTION LANDING GEAR - MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND RECOMMENDED 1.3 81.4 REPLACEMENT. SERVICE BULLETIN OF THE TRANSITION RADIUS LOCATION (IN-SITU) MOS 6 (s) 07-FEB-20I3 NOT APPLICABLE - BY EFFECTIVITY 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 80 Of 748 @ Camp Systems EFTA00618371 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32-1402 RI TABLE REPAIR LANDING GEAR - MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. 1.5 SERVICE BULLETIN THE FINISH FOR AIRPLANES WITH FINISH DAMAGE (SCRAPES OR SCRATCHES THROUGH THE FULL THICKNESS OF THE PRIMER OR AREAS OF MISSING PRIMER) FOUND IN THE TRANSITION RADIUS LOCATION. AND NO CORROSION. NO PITTING. AND NO B SF METAL SCRATCHES 8 DO A DETAILED INSPECTION OF THE TRANSITION RADIUS LOCATION (IN-SITU) MOS BFIF (s) SB 737-32-1402 RI TABLE LUBRICATE LANDING GEAR - MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. 2.1 & 2.2 SERVICE BULLETIN LUBRICATE THE MLG FOR WARD TRUNNION PIN DAYS 30 (s) 07-FEB-2013 SB 737-32-1402 RI TABLE DETAILED INSPECTION LANDING GEAR - MAIN LANDING GEAR - FORWARD TRUNNION PIN INSPECTION AND 2.3 & 2.4 REPLACEMENT. SERVICE BULLETIN OF THE TRANSITION RADIUS LOCATION (IN-SITU) MOS 6 (s) 07-FEB-2013 SB 737-32-1402 RI TABLE REPAIR LANDING GEAR - MAIN LANDING GEAR- FORWARD TRUNNION PIN INSPECTION AND REPLACEMENT. 2.5 SERVICE BULLETIN THE FINISH FOR AIRPLANES WITH FINISH DAMAGE (SCRAPES OR SCRATCHES THROUGH THE FULL THICKNESS OF THE PRIMER OR AREAS OF MISSING PRIMER) FOUND IN THE TRANSITION RADIUS LOCATION AND NO CORROSION. NO PITTING. AND NO BASE METAL SCRATCHES 8 DO DETAILED INSPECTION OF THE TRANSITION RADIUS LOCATION (IN-SITU) SB 737-32-1408 09-SEP-2009 SB 737-32-1408 RI SB 737-32-1408 R2 24-JUN-2011 SB 737-32-1410 20-FEB-2008 MOS BFIF (s) RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON BRAKES AND SUPERSEDED WHEELS (SUPERSEDED BY 737-32-1408 RI). SERVICE BULLETIN MOS LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON SUPERSEDED BRAKES AND WHEELS FOR 737-700 AIRPLANES (SUPERSEDED BY SB 737-32-1408 R2). SERVICE BULLETIN MOS LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON RECOMMENDED BRAKES AND WHEELS FOR 737-700 AIRPLANES. SERVICE BULLETIN MOS LANDING GEAR - MAIN LANDING GEAR - WIRE BUNDLE AND HANGER LINK ASSEMBLY COMPLIED WITH INSPECTION. REPAIR AND MODIFICATION. SERVICE BULLETIN MOS 22-AUG-2008 3260:48 AFL 782 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 81 Of 748 @ Camp Systems EFTA00618372 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32-1410 RI 20-NOV-2008 MAIN LANDING GEAR - WIRE BUNDLE AND HANGER LINK ASSEMBLY INSPECTION. REPAIR AND MODIFICATION. SERVICE BULLETIN MOS SB 737-32-1410 R2 MAIN LANDING GEAR - WIRE BUNDLE AND HANGER LINK ASSEMBLY RECOMMENDED INSPECTION. REPAIR AND MODIFICATION. SERVICE BULLETIN 29-SEP-2009 MOS SB 737-32-1418 LANDING GEAR - EXTENSION AND RETRACTION- MAIN LANDING GEAR RETRACT ACTUATOR CHANGE OR RECOMMENDED REPLACEMENT (SUPERSEDED BY SB 737-32-1418 RI). SERVICE BULLETIN MOS I3-JUL-2010 SB 737-32-1418 RI LANDING GEAR - EXTENSION AND RETRACTION- MAIN LANDING GEAR RETRACT ACTUATOR CHANGE OR RECOMMENDED REPLACEMENT. SERVICE BULLETIN MOS 05-APR-20I3 SB 737-32-1422 LANDING GEAR- EXTENSION AND RETRACTION- CONTROL SYSTEM AFT CONTROL QUADRANT CLEARANCE RECOMMENDED MEASUREMENT AND REPLACEMENT. SERVICE BULLETIN MOS 29-JAN-2010 SB 737-32-1429 REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON BRAKES AND WHEELS FOR 737-800 SUPERSEDED AIRPLANES (SUPERSEDED BY SB 737-32-1429 RI). SERVICE BULLETIN MOS SB 737-32-1429 RI LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI CARBON SUPERSEDED BRAKES AND WHEELS FOR 737-800 AIRPLANES (SUPERSEDED BY SB 737-32-1429 R2). SERVICE BULLETIN MOS SB 737-32-1429 R2 LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI-DOWTY SUPERSEDED CARBON BRAKES AND WHEELS FOR 737-800 AIRPLANES (SUPERSEDED BY SB 737-32-1429 R3). SERVICE BULLETIN MOS SB 737-32-1429 R3 LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH MESSIER-BUGATTI-DOWTY RECOMMENDED CARBON BRAKES AND WHEELS FOR 737-803 AIRPLANES. SERVICE BULLETIN MOS 09-AUG-20I2 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 82 Of 748 @ Camp Systems EFTA00618373 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32-1430 LANDING GEAR - WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO SUPERSEDED MESSIER-SUGATTI CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900ER AIRPLANES (SUPERSEDED BY SS 737-32-1430 R1). SERVICE BULLETIN MOS 58 737-32-1430 RI LANDING GEAR - WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO SUPERSEDED MESSIER-BUGATTI CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900ER AIRPLANES (SUPERSEDED BY S8 737-32-1430 R2). SERVICE BULLETIN MOS SB 737-32-1430 R2 LANDING GEAR - WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO RECOMMENDED MESSIER-BUGATTI-DOWTY CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900ER AIRPLANES. SERVICE BULLETIN MOS 09-JAN-2012 SB 737-32-1433 LANDING GEAR - WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED AND WHEELS FOR 737-700 AIRPLANES (SUPERSEDED BY SB 737-32-1433 R1). SERVICE BULLETIN MOS SB 737-32-1433 RI LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED AND WHEELS FOR 737-700 AIRPLANES (SUPERSEDED BY SB 737-32-1433 R2). SERVICE BULLETIN MOS SB 737-32-1433 R2 LANDING GEAR- WHEELS AND BRAKES -REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES RECOMMENDED AND WHEELS FOR 737-700 AIRPLANES. SERVICE BULLETIN MOS I9-APR-2012 58 737-32-1440 LANDING GEAR- EXTENSION AND RETRACTION- NOSE LANDING GEAR RETRACT ACTUATOR CHANGE OR RECOMMENDED REPLACEMENT. SERVICE BULLETIN MOS 14-JUL-2011 SB 737-32-1441 LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED AND WHEELS FOR 737-800 AIRPLANES (SUPERSEDED BY SB 737-32-1441 R1). SERVICE BULLETIN MOS SB 737-32-1441 RI LANDING GEAR - WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED AND WHEELS FOR 737-800 AIRPLANES (SUPERSEDED BY S8 737-32-1441 R2). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 83 Of 748 @ Camp Systems EFTA00618374 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32-1441 R2 06-AUG-2012 LANDING GEAR - WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES AND WHEELS FOR 737400 AIRPLANES. SERVICE BULLETIN MOS RECOMMENDED SB 737-32-1442 LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE (SUPERSEDED SUPERSEDED BY SB SB 737-32-1442 RI), SERVICE BULLETIN MOS SB 737-32-1442 RI LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE (SUPERSEDED SUPERSEDED BY SB 737-32-1442 R2). SERVICE BULLETIN MOS SB 737-32-1442 R2 LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE (SUPERSEDED RECOMMENDED 15-AUG-2011 BY SB 737-32-1442 R3). SERVICE BULLETIN MOS SB 737-32-1442 R3 LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE. SERVICE RECOMMENDED 11-MAR-2013 BULLETIN MOS 58 737-32-1442 R4 LANDING GEAR - STEERING - NOSE WHEEL STEERING SYSTEM MECHANISM COMPONENT CHANGE. SERVICE RECOMMENDED 29-JUL-2013 BULLETIN MOS 58 737-32-1443 LANDING GEAR- EXTENSION AND RETRACTION - MANUAL EXTENSION CONTROL MECHANISM ACCESS DOOR RECOMMENDED 18-N0V-2011 SWITCH REPLACEMENT. SERVICE BULLETIN MOS SB 737-32-1443 RI LANDING GEAR- EXTENSION AND RETRACTION - MANUAL EXTENSION CONTROL MECHANISM ACCESS DOOR RECOMMENDED 16-AUG-2013 SWITCH REPLACEMENT. SERVICE BULLETIN MOS SB 737-32-1444 LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR INBOARD WHEEL HALF INSPECTION. SERVICE BULLETIN RECOMMENDED MOS 08-APR-2010 SB 737-32-1445 LANDING GEAR - MAIN LANDING GEAR GLAND NUT INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks %Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 84 Of 748 @ Camp Systems EFTA00618375 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32-1448 LANDING GEAR - MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION AND CHANGE. SERVICE BULLETIN MOS SB 737-32-1448 TABLE 1.1 LUBRICATE LANDING GEAR - MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION RECOMMENDED COMPUED WITH AND CHANGE. SERVICE BULLETIN THE MLG FORWARD AND AFT TRUNNION PIN ASSEMBLIES FOR ALL AIRPLANES DAYS 30 (s) 13-JUN-2014 19-MAY-2011 3749:42 AFL 920 SB 737-32-1448 TABLE INSTALL LANDING GEAR- MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION AND RECOMMENDED 1.10 CHANGE. SERVICE BULLETIN IMPROVED MLG OUTER CYLINDER TRUNNION BUSHINGS. IMPROVED AFT TRUNNION BEARING ASSEMBLY. NEW FORWARD TRUNNION PIN CROSS BOLT BUSHINGS (GROUP 1 ONLY) AND AFT TRUNNION PIN CROSS BOLT BUSHINGS FOR ALL AIRPLANES SB MOS 120(s) 19-MAY-2011 737-32-1448 TABLE 1.2 PERFORM LANDING GEAR - MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION AND CHANGE. SERVICE BULLETIN A GENERAL VISUAL INSPECTION OF THE MLG FORWARD AND AFT TRUNNION PIN ASSEMBLIES WITH THE MLG NOT REMOVED FOR SIGNS OF CORROSION AND/OR CHROME PLATING DAMAGE FOR ALL AIRPLANES RECOMMENDED COMPUED WITH MOS 18 09-AUG-2011 09-FEB-2013 RECURRING 19-MAY-2011 3533:32 AFL 863 SB 737-32-1449 LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES SUPERSEDED AND WHEELS FOR 737-900ER AIRPLANES (SUPERSEDED BY SB 737-32-1449 RI). SERVICE BULLETIN MOS SB 737-32-1449 RI LANDING GEAR- WHEELS AND BRAKES - REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES RECOMMENDED AND WHEELS FOR 737-900ER AIRPLANES. SERVICE BULLETIN MOS 15-SEP-2011 SB 737-32-1449 R2 LANDING GEAR- WHEELS AND BRAKES- REPLACE STEEL BRAKES AND WHEELS WITH GOODRICH CARBON BRAKES RECOMMENDED AND WHEELS FOR 737-900ER AIRPLANES. SERVICE BULLETIN MOS 08-AUG-2012 SB 737-32-1456 LANDING GEAR- WHEELS AND BRAKES- MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO RECOMMENDED MESSIER-BUGATTI CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900 AIRPLANES. SERVICE BULLETIN MOS 13-JUN-2011 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 85 Of 748 @ Camp Systems EFTA00618376 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32-1457 LANDING GEAR - WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO GOODRICH RECOMMENDED CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900 AIRPLANES (SUPERSEDED BY SB 737-32-1457 R1). SERVICE BULLETIN SB 03-OCT-2011 737-32-1457 RI 01-FEB-2013 MOS LANDING GEAR- WHEELS AND BRAKES - MAIN LANDING GEAR STEEL BRAKES AND RELATED WHEELS TO GOODRICH RECOMMENDED CARBON BRAKES AND RELATED WHEELS REPLACEMENT FOR 737-900 AIRPLANES. SERVICE BULLETIN MOS SB 737-32-1458 LANDING GEAR- TIRES AND WHEELS - REPLACEMENT OF WHEEL WELL BLADE SEALS. LOWER FAIRING SUPERSEDED ASSEMBLIES. AND 43.5 INCH DIAMETER TIRES WITH 44.5 INCH DIAMETER TIRES (SUPERSEDED BY SB 737-32-1458 R1). SERVICE BULLETIN MOS SB 737-32-1470 LANDING GEAR - TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR SUPERSEDED AIRPLANES WITH GOODRICH CARBON BRAKES (SUPERSEDED BY SB 737-32-1470 R1), SERVICE BULLETIN MOS SB 737-32-1470 RI LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR RECOMMENDED 13-AUG-2013 AIRPLANES WITH GOODRICH CARBON BRAKES. SERVICE BULLETIN MOS SB 737-32-1471 LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR SUPERSEDED AIRPLANES WITH MESSIER-BUGATTI-DOWTY CARBON BRAKES (SUPERSEDED BY SB 737-32-1471 R1). SERVICE BULLETIN MOS SB 737-32-1471 RI LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR SUPERSEDED AIRPLANES WITH MESSIER-BUGATTI-DOWTY CARBON BRAKES (SUPERSEDED BY SB 737-32-1471 R2). SERVICE BULLETIN MOS SB 737-32-1471 R2 LANDING GEAR- TIRES AND WHEELS - MAIN LANDING GEAR RADIAL PLY TIRES IN SERVICE EVALUATION FOR RECOMMENDED 15-JUL-2013 AIRPLANES WITH MESSIER-BUGATTI-DOWTY CARBON BRAKES. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 86 Of 748 @ Camp Systems EFTA00618377 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-32A1343 26-JUL-2001 SB 737-33-1116 I6-DEC-1999 REPLACEMENT OF THE PROXIMITY SWITCH ELECTRONICS. SERVICE BULLETIN MOS 09-NOV-2005 2281 AFL 563 PASSENGER SERVICE UNIT NO-SMOKING FASTEN SEAT BELT SIGN-WIRING CHANGE. SERVICE BULLETIN MOS RECOMMENDED COMPUED WITH - PREVIOUSLY UNK - PART INSTALLED: P/N 285A1600-4 SN 001197 REF: COMPONENT CODE 311051 RECOMMENDED SB 737-33-1121 R2 LIGHTS - FLIGHT COMPARTMENTS- AUDIO CONTROL PANEL LAMP TEST WIRING INSTALLATION. SERVICE BULLETIN RECOMMENDED MOS 30-MAR-2011 SB 737-33-1128 LIGHTS - EXTERIOR - REPLACE POSITION LIGHT TRANSFORMERS. SERVICE BULLETIN RECOMMENDED MOS I8-JAN-2001 - SB 737-33-1130 PASSENGER COMPARTMENT LIGHTS - REPLACE THE 115VAC ATM CONNECTORS. SERVICE BULLETIN RECOMMENDED MOS 24-JAN-2002 - SB 737-33-1130 RI LIGHTS - PASSENGER COMPARTMENT LIGHTS - REPLACE THE 115VAC ATM CONNECTORS. SERVICE BULLETIN MOS 02-MAR-2006 SB 737-33-1133 MASTER DIMMER AND TEST- SUPPLY TEST GROUND SIGNAL WIRING SEPERATION. SERVICE BULLETIN MOS 12 (s) I9-DEC-2002 SB 737-33-1133 RI MASTER DIMMER AND TEST- SUPPLY TEST GROUND SIGNAL WIRING SEPERATION. SERVICE BULLETIN MOS 12 (s) 17-APR-2003 SB 737-33-1133 R2 MASTER DIMMER AND TEST- SUPPLY TEST GROUND SIGNAL WIRING SEPERATION. SERVICE BULLETIN MOS 30 (s) 04-DEC-2003 SB 737-33-1133 R3 LIGHTS - MASTER DIM AND TEST - SUPPLY TEST GROUND SIGNAL WIRING SEPARATION. SERVICE BULLETIN COMPUED WITH - IAW THE AD AD 2006-15-18 MOS 09-AUG-2010 08-SEP-2005 - (s) 3448:31 AFL 841 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 87 Of 748 @ Camp Systems EFTA00618378 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-33-1133 R0 MASTER DIM AND TEST - SUPPLY TEST GROUND SIGNAL WIRING SEPARATION (SUPERSEDED BY SB 737-33-1133 R5). SUPERSEDED - INFORMATION NO MORE WORK IS SERVICE BULLETIN NECESSARY ON AIRPLANES CHANGED AS SHOWN IN THE REVISION 3 OF THIS SERVICE BULLETIN MOS - Is) SB 737-33-1133 RS UGHTS - MASTER DIM AND TEST- SUPPLY TEST GROUND SIGNAL WIRING SEPARATION. SERVICE BULLETIN RECOMMENDED MOS 48 (s) 05-SEP-2006 SB 737-33-1146 UGHTS - STROBE POSITION UGHTS - LIGHTNING PROTECTION OF THE TAIL STROBE UGHT SYSTEM WIRING SUPERSEDED (SUPERSEDED BY SB 737-33-1146 RI). SERVICE BULLETIN MOS - (s) SB 737-33-1146 RI UGHTS - STROBE POSITION UGHTS - LIGHTNING PROTECTION OF THE TAIL STROBE UGHT AND SYSTEM WIRING. RECOMMENDED SERVICE BULLETIN MOS 72 (s) 02-NOV-2011 S8 737-33-1151 LIGHTS - EMERGENCY LIGHTING - MID-CABIN CENTER-AISLE EXIT SIGN INSTALLATION. SERVICE BULLETIN RECOMMENDED MOS 27-JAN-2011 SB 737-33-1152 UGHTS - RETRACTABLE LANDING LIGHT - REPLACEMENT OF RETRACTABLE LANDING LIGHTS AND WIRE RECOMMENDED CONNECTORS. SERVICE BULLETIN MOS 29-AUG-201 I SB 737-33-1153 UGHTS - FLIGHT CREW LIGHTS - CAPTAINS AND FIRST OFFICERS UTILITY LIGHT LOCATION CHANGES. SERVICE RECOMMENDED BULLETIN MOS 13-OCT-2011 SB 737-34-1496 NAVIGATION-HEAD UP DISPLAY SYSTEM. SERVICE BULLETIN RECOMMENDED MOS 01 -JUL-1999 - (s) SB 737-34-1496 RI NAVIGATION-HEAD UP DISPLAY SYSTEM. SERVICE BULLETIN RECOMMENDED MOS 30-SEP-1999 - Is) SB 737-34-1503 FLIGHT MANAGEMENT COMPUTER SYSTEM SOFTWARE VERSION U10.3 UPDATE. SERVICE BULLETIN RECOMMENDED COMPLIED WITH -CM MOS 08-NOV-2000 27-JUL-2000 - (s) 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 88 Of 748 @ Camp Systems EFTA00618379 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-34-1503 RI I8-JAN-2001 SB 737-34-1522 03-JUN-1999 SB 737-34-1538 II -NOV-1999 SB 737-34-1539 27-JUL-2000 FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN MOS - (s) FLIGHT MANAGEMENT COMPUTING - UPDATE SOFTWARE. SERVICE BULLETIN MOS I3-SEP-1999 - (s) FLIGHT MANAGEMENT COMPUTING-DUST COVER. SERVICE BULLETIN RECOMMENDED RECOMMENDED COMPUED WITH - CM RECOMMENDED MOS - COLLISION AVOIDANCE-TCAS WIRING CHANGE. SERVICE BULLETIN RECOMMENDED MOS - (s) SB 737-34-1540 27-JUL-I 999 ALTERNATE NAVIGATION SYSTEM. SERVICE BULLETIN MOS - (s) RECOMMENDED SB 737-34-1540 RI ALTERNATE NAVIGATION SYSTEM. SERVICE BULLETIN RECOMMENDED 23-SEP-I999 MOS - (s) SB 737-34-1540 R2 ALTERNATE NAVIGATION SYSTEM. SERVICE BULLETIN RECOMMENDED 07-DEC-2000 MOS - (s) SB 737-34-1545 R7 REPLACEMENT OF THE ROCKWELUCOLLINS TCAS COMPUTER, SERVICE BULLETIN RECOMMENDED 08-NOV-2001 MOS - (s) SB 737-34-1545 R8 REPLACEMENT OF THE ROCKWELUCOLLINS TCAS COMPUTER, SERVICE BULLETIN RECOMMENDED I4-FEB-2002 MOS SB 737-34-1545 R9 REPLACEMENT OF ROCKWELL/COLLINS TCAS COMPUTER, SERVICE BULLETIN RECOMMENDED 06-MAY-2004 MOS SB 737-34-1551 UPGRADE DATA LINK-NAVIGATION SYSTEM. SERVICE BULLETIN RECOMMENDED MOS 10-AUG-200O - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 89 Of 748 @ Camp Systems EFTA00618380 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-34-1551 RI 05-OCT-2000 UPGRADE DATA LINK-NAVIGATION SYSTEM. SERVICE BULLETIN MOS - Is) SB 737-34-1551 R2 UPGRADE DATA LINK-NAVIGATION SYSTEM. SERVICE BULLETIN MOS 07-DEC-2000 - (s) SB 737-34-1562 FLIGHT MANAGEMENT COMPUTING - UPGRADE SOFTWARE. SERVICE BULLETIN MOS 21-OCT-1999 - (s) SB 737-34-1566 FLIGHT MANAGEMENT COMPUTER-SOFTWARE CHANGE. SERVICE BULLETIN MOS 08-NOV-2000 03-AUG-2000 - (s) SB 737-34-1567 GROUND PROXIMITY WARNING SYSTEM. SERVICE BULLETIN MOS 20-APR-2000 - (s) SB 737-34-1572 FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN MOS 09-NOV-2000 - (s) SB 737-34-1572 RI FLIGHT MANAGEMENT COMPUTER SYSTEM INSTALLATION OF HEADING REFERENCE SWITCH FOR POLAR NAVIGATION. SERVICE BULLETIN 25-JAN-2001 SB 737-34-1607 20-SEP-2001 SB 737-34-1616 MOS - Is) UPDATE FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN MOS - Is) NAVIGATION - INDEPENDENT POSITION DETERMINING - ENHANCED GROUND PROXIMITY WARNING COMPUTER REPLACEMENT. SERVICE BULLETIN MOS I8-JAN-2001 - (s) SB 737-34-1634 RI INSTALLATION OF AN ALTERNATE NAVIGATION SYSTEM AND DATA LINK SERVICE BULLETIN MOS 15-NOV-2001 - (s) RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED COMPUED WITH -Cm RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 90 Of 748 @ Camp Systems EFTA00618381 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-34-1650 06-FEB-2003 SB 737-34-1650 RI 27-FEB-2003 SB 737-34-1652 18-OCT-2001 SB 737-34-1656 23-MAY-2002 SB 737-34-1666 I I -APR-2002 SB 737-34-1672 I9-DEC-2002 SB 737-34-1720 I 7-APR-2003 SB 737-34-1721 03-APR-2003 SB 737-34-1762 R3 27-JAN-2005 NAVIGATION-FLIGHT MANAGEMENT COMPUTER (FMC) SYSTEM- UPDATE THE FMC SOFTWARE TO VERSION 10.5. RECOMMENDED SERVICE BULLETIN RECOMMENDED MOS UPDATE THE FMC SOFTWARE TO VERSION 10.5. SERVICE BULLETIN MOS SOFTWARE CHANGE TO ACTWATE FMCS AND DEU FEATURES.. SERVICE BULLETIN RECOMMENDED MOS - (s) FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN RECOMMENDED MOS - (s) NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - UPDATE THE FMC SOFTWARE TO VERSION 10.4A. RECOMMENDED SERVICE BULLETIN RECOMMENDED MOS - (s) INSTALL FMC OPC SOFTWARE FOR THE 'MISSED APPROACH ON MAP IN CYAN' OPTION. SERVICE BULLETIN MOS INTEGRATED STANDBY FLIGHT DISPLAY (ISFD) REPLACEMENT. SERVICE BULLETIN MOS RECOMMENDED AIR DATA INERTIAL REFERENCE SYSTEM (ADIRS)-WIRING CHANGE TO ACTIVATE 2005 MAGVAR TABLE. SERVICE RECOMMENDED BULLETIN MOS REPLACEMENT OF ATC TRANSPONDERS. AND ACTWATION OF ELEMENTARY SURVEILLANCE (ELS). ENHANCED RECOMMENDED SURVEILLANCE (EHS) AND EXTENDED SOUITTER (ES) PARAMETERS. SERVICE BULLETIN MOS SB 737-34-1768 NAVIGATION - FLIGHT MANAGEMENT COMPUTER (FMC) SYSTEM - UPDATE THE FMC SOFTWARE TO VERSION 10.6. SERVICE BULLETIN MOS I I -MAY-2006 I I -AUG-2005 2619:10 AFL 629 COMPLIED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 91 Of 748 @ Camp Systems EFTA00618382 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-34-1811 SB 737-34-1811 RI 05-OCT-2006 SB 737-34-1811 RI El 05-OC-1-2006 SB 737-34-1811 RI E3 OS-OCT-200G NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING PLATE INSTALLATION. SERVICE BULLETIN MOS 24 (5) NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING PLATE INSTALLATION. SERVICE BULLETIN MOS INSTALL NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING PLATE INSTALLATION. SERVICE BULLETIN GROUND PLATE. STUD. AND JUMPER AS SHOWN IN WORK PACKAGE 1 OF THIS SERVICE BULLETIN. MOS 30 (5) REPLACE NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING PLATE INSTALLATION. SERVICE BULLETIN THE NUTPLATES WITH CRES NUTPLATES AND SOLID ALUMINUM RIVETS AS SHOWN IN WORK PACKAGE 2 OF THIS SERVICE BULLETIN. MOS 60 (5) SB 737-34-1811EI 25-AUG-2005 MEASURE NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING PLATE INSTALLATION. SERVICE BULLETIN PITOT PROBE RESISTANCE AS SHOWN IN WORK PACKAGE 1 MOS 18 (s) SB 737-34-1811E2 GENERAL VISUAL INSPECTION NAVIGATION - FLIGHT ENVIRONMENT DATA- PITOT STATIC PROBE BOND 25-AUG-2005 INSPECTION AND GROUNDING PLATE INSTALLATION. SERVICE BULLETIN OF THE PITOT PROBE MOUNTING PLATE NUTPLATES FOR PULL-TYPEA-IOLLOW RIVETS AND CORROSION ON THE FASTNER THREADS MD IN THE NUTPLATES. MOS 30 (5) SB 737-34-1811E3 INSTALL NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING 25-AUG-2005 PLATE INSTALLATION. SERVICE BULLETIN GROUND PLATE. STUD AND JUMPER AS SHOWN IN WORK PACKAGE 3 MOS 30 (s) SB 737-34-1811E4 REPLACE NAVIGATION - FLIGHT ENVIRONMENT DATA - PITOT STATIC PROBE BOND INSPECTION AND GROUNDING 25-AUG-2005 PLATE INSTALLATION. SERVICE BULLETIN THE NUTPLATES WITH CRES NUTPLATES AND SOLID ALUMINUM RIVETS AS SHOWN IN WORK PACKAGE 4 MOS 72 (5) SB 737-34-1844 WIRING PROVISIONS FOR FUTURE ACTIVATION OF ELEMENTARY SURVEILLANCE. ENHANCED SURVEILLANCE AND RECOMMENDED 29-NOv-200.1 EXTENDED SOUITTER PARAMETERS. SERVICE BULLETIN MOS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAV (EBT)-Estimated Base Time 92 Of 748 Camp Systems EFTA00618383 C O Mien MPwinin Mernund up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-34-1875 22-SEP-2005 SB 737-34-1885 09-JUN-2005 NAVIGATION - INDEPENDENT POSITION DETERMINING - ENHANCED GROUND PROXIMITY WARNING SYSTEM COMPUTER CHANGE. SERVICE BULLETIN MOS ANTENNA WATER WICKING. SERVICE BULLETIN MOS RECOMMENDED SB SB 737-34-1918 27-MAR-2007 737-34-1918 RI 14-MAR-2008 FLIGHT MANAGEMENT COMPUTER (FMC) SYSTEM - UPDATE THE FMC SOFTWARE TO VERSION 10.7. SERVICE BULLETIN MOS NAVIGATION- FLIGHT MANAGEMENT COMPUTER (FMC) SYSTEM - UPDATE THE FMC SOFTWARE TO VERSION 10.7. SERVICE BULLETIN MOS SB 737-34-2138 AIR DATA INERTIAL REFERENCE UNIT - STATIC SOURCE ERROR CORRECTION TABLE WIRING CHANGE SUPERSEDED (SUPERSEDED BY SB 737-34-2138 RI), SERVICE BULLETIN MOS SB 737-34-2138 RI NAVIGATION -AIR DATA INERTIAL REFERENCE UNIT - STATIC SOURCE ERROR CORRECTION TABLE WIRING CHANGE. RECOMMENDED 06-FEB-2014 SERVICE BULLETIN MOS SB 737-34-2155 NAVIGATION - HEAD-UP DISPLAY (HUD) SYSTEM - COMBINER MOUNTING BRACKET CHANGE (SUPERSEDED BY SB SUPERSEDED 737-34-2155 R1). SERVICE BULLETIN MOS SB 737-34-2155 RI NAVIGATION - HEAD-UP DISPLAY (HUD) SYSTEM - COMBINER MOUNTING BRACKET CHANGE. SERVICE BULLETIN RECOMMENDED 08-AUG-2011 MOS SB 737-34-2284 NAVIGATION- GROUND PROXIMITY WARNING SYSTEM - ENHANCED GROUND PROXIMITY WARNING SYSTEM SUPERSEDED ALTITUDE CALLOUTS MENU ID 23. SMART 500 CALLOUT. LOW VOLUME FOR ALTITUDE CALLOUTS. AND PEAKS AND OBSTACLES SELECTION CHANGE (SUPERSEDED BY SB 737-34-2284 R1). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 93 Of 748 @ Camp Systems EFTA00618384 C O Mien MPwinin Mernund up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SS 737-34-2284 RI SB 737-34-2286 21 -JAN-2011 58 737-34-2287 RI 27-JAN-2011 SB 737-34-2290 7-DEC-2010 SB 737-34-2293 10-DEC-2010 SB 737-34-2294 SB 737-34-2296 28-JAN-2011 NAVIGATION - GROUND PROXIMITY WARNING SYSTEM - ENHANCED GROUND PROXIMITY WARNING SYSTEM ALTITUDE CALLOUTS MENU ID 23. SMART 500 CALLOUT. LOW VOLUME FOR ALTITUDE CALLOUTS. AND PEAKS AND OBSTACLES SELECTION CHANGE (SUPERSEDED BY SB 737-34-2284 R2). SERVICE BULLETIN MOS SUPERSEDED NAVIGATION - GLOBAL POSITIONING SYSTEM - CHANGE AND DEACTIVATION OF CATEGORY I APPROACH CAPABILITY RECOMMENDED OF THE GLOBAL NAVIGATION SATELLITE SYSTEM LANDING SYSTEM. SERVICE BULLETIN MOS NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM- AUTOFLIGHT. RIGHT MANAGEMENT COMPUTER RECOMMENDED SYSTEM. COMMON DISPLAY SYSTEM. FUEL QUANTITY INDICATION SYSTEM - CHANGE OPTIONS. SERVICE BULLETIN MOS NAVIGATION - AUTOMATIC DIRECTION FINDER SYSTEM - INSTALLATION OF SECOND AUTOMATIC DIRECTION FINDER RECOMMENDED INTO EXISTING PROVISIONS. SERVICE BULLETIN MOS NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE OPERATION FROM FAA TO JAPJEASA FLIGHT RECOMMENDED RULES. SERVICE BULLETIN MOS NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE OPERATION FROM FAA TO JAA/EASA FLIGHT SUPERSEDED RULES (SUPERSEDED BY SB 737-34-2294 R1). SERVICE BULLETIN MOS NAVIGATION - AUTOMATIC DIRECTION FINDER SYSTEM - INSTALLATION OF SECOND AUTOMATIC DIRECTION FINDER RECOMMENDED INTO EXISTING PROVISIONS. SERVICE BULLETIN MOS SB 737-34-2297 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE OPERATION FROM FEDERAL AVIATION RECOMMENDED ADMINISTRATION TO JOINT AVIATION AUTHORITIES/EUROPEAN AVIATION SAFETY AGENCY FLIGHT RULES. SERVICE BULLETIN 20-JAN-2011 SB 737-34-2298 04-JAN-2011 MOS NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE FROM JOINT AVIATION AUTHORITIES TO RECOMMENDED FEDERAL AVIATION ADMINISTRATION FLIGHT RULES AND DUAL AIRPLANE FLIGHT MANUAL FORMAT SERVICE BULLETIN. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 94 Of 748 @ Camp Systems EFTA00618385 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SS 737-34-2300 27-JAN-2011 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - CHANGE OPERATION FROM JOINT AVIATION AUTHORITIES/EUROPEAN AVIATION SAFETY AGENCY TO FEDERAL AVIATION ADMINISTRATION FLIGHT RULES (SUPERSEDED BY SB 737-34-2300 RI). SERVICE BULLETIN MOS RECOMMENDED SS 737-34-2327 NAVIGATION - FLIGHT MANAGEMENT COMPUTING - DIP SWITCH POSITION CHANGE. SERVICE BULLETIN RECOMMENDED MOS 05-DEC-2011 SS 737-34-2384 NAVIGATION - WEATHER RADAR SYSTEM - INSPECTION AND REPLACEMENT OF WEATHER RADAR ANTENNA WIRE RECOMMENDED BUNDLE W8489. SERVICE BULLETIN MOS 27-NOV-2012 SS 737-34-2395 NAVIGATION- LOW RANGE RADIO ALTIMETER - INSTALLATION OF THE ANTENNA GASKETS (SUPERSEDED BY SB SUPERSEDED 737-34-2395 RI). SERVICE BULLETIN MOS SS 737-34-2395 RI NAVIGATION- LOW RANGE RADIO ALTIMETER - INSTALLATION OF THE ANTENNA GASKETS. SERVICE BULLETIN RECOMMENDED MOS 17-OCT-2013 SS 737-34-2413 NAVIGATION- STANDBY ATTITUDE REFERENCE SYSTEM - INTEGRATED STANDBY FLIGHT DISPLAY BACK COURSE RECOMMENDED PROGRAM PIN CHANGE. SERVICE BULLETIN MOS I0-OCT-2012 SS 737-34-2432 NAVIGATION- GROUND PROXIMITY WARNING SYSTEM - INTEGRATED AREA NAVIGATION TURNED OFF BY WIRING RECOMMENDED CHANGE. SERVICE BULLETIN MOS 28-NOV-20I2 SB 737-34-2454 NAVIGATION- AIR DATA SYSTEM - ALTIMETRY SYSTEM TEST. SERVICE BULLETIN MOS SS 737-34-2461 NAVIGATION- ATC SYSTEM- ROCKWELL COLLINS AIR TRAFFIC CONTROL TRANSPONDER REPLACEMENT. SERVICE RECOMMENDED BULLETIN MOS 17-MAY-2013 SS 737-34A1502 FLIGHT MANAGEMENT COMPUTER SYSTEM (SUPERSEDED BY SB 737-34A1502 RI). SERVICE BULLETIN SUPERSEDED MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 95 Of 748 @ Camp Systems EFTA00618386 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB SB 737-34A1502 RI 20-MAY-1999 737-34A1801 FLIGHT MANAGEMENT COMPUTER SYSTEM. SERVICE BULLETIN MOS - (s) CHANGE THE OPERATIONAL PROGRAM SOFTWARE TO VERSION 10.5A. SERVICE BULLETIN RECOMMENDED COMPUED WITH DAYS 1 1 -MAY-2006 15-JUL-2004 2619:10 AFL 629 SB 737-34A2104 FLIGHT MANAGEMENT COMPUTER SYSTEM - RIGHT MANAGEMENT COMPUTER OPERATIONAL PROGRAM SUPERSEDED - INFO: THIS SOFTWARE WAS SUPERSEDED BY SOFTWARE U10.8 INSTALLATION (SUSPENDED BY 737-34A2104 N1). SERVICE BULLETIN U10.8A SOFTWARE WHICH WAS RECENTLY INSTALLED. MOS SB 737-34A2216 NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - FLIGHT MANAGEMENT COMPUTER OPERATIONAL SUPERSEDED PROGRAM SOFTWARE U10.8A SOFTWARE INSTALLATION (SUPERSEDED BY SB 737-34A2216 R1). SERVICE BULLETIN MOS SB 737-34A2216 RI NAVIGATION - FLIGHT MANAGEMENT COMPUTER SYSTEM - FLIGHT MANAGEMENT COMPUTER OPERATIONAL RECOMMENDED COMPUED WITH PROGRAM SOFTWARE U10.8A SOFTWARE INSTALLATION . SERVICE BULLETIN MOS 16-MAY-2012 09-JUN-2010 3634:25 AFL 882 SB 737-34A2292 NAVIGATION - ENHANCED GROUND PROXIMITY WARNING SYSTEM - AIR SPEED LOW ALERT CHANGES. SERVICE RECOMMENDED BULLETIN MOS 12 (s) 27-APR-20I2 SB 737-35-1049 PURITAN-BENETT OXYGEN MASKS. SERVICE BULLETIN NOT APPLICABLE - BY EFFECTIVITY MOS 06-JAN-2007 - (s) SB 737-35-1077 OXYGEN GENERATOR FIRING PIN LOCATION. SERVICE BULLETIN RECOMMENDED DAYS 90 (s) 01-MAR-2001 SB 737-35-1080 OXYGEN - FLIGHT CREW OXYGEN SYSTEM - INSTALLATION OF HOSE SEPARATION SUPPORT FOR REMOTE FILL RECOMMENDED NOT APPLICABLE TUBING. SERVICE BULLETIN MOS 07-JUL-2005 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 96 Of 748 @ Camp Systems EFTA00618387 C O Atiant.fran MP Ad-own/lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB SB 737-35-1107 04-JAN-2008 737-35A1058 OXYGEN - PASSENGER OXYGEN SYSTEM - CHANGE 22 MINUTE OXYGEN GENERATOR RETENTION IN THE PASSENGER SERVICE UNITS. SERVICE BULLETIN MOS 60 (s) CREW OXYGEN - HOSE REPLACEMENT (SUPERSEDED BY SB 737-35A1058 RI ). SERVICE BULLETIN MOS - (s) SUPERSEDED SB 737-35A1058 RI CREW OXYGEN - HOSE REPLACEMENT (SUPERSEDED BY SB 737-35A1058 R2). SERVICE BULLETIN SUPERSEDED COMPUED WITH - AND REPLACED PARTS I.A.W. AD 2010-16-06 MOS 27-AUG-2010 - (s) 3448:31 AFL 841 SB 737-35A1058 R2 OXYGEN - CREW OXYGEN - CREW OXYGEN SYSTEM LOW PRESSURE FLEX HOSE REPLACEMENT. SERVICE BULLETIN RECOMMENDED COMPUED WITH - DURING COMPLIED WITH 737-35A1058 RI REPLACED PILOT a CO PILOT FLEX HOSES BY PM 60850059-618. REPLACED FIRST OBSERVER FLEX HOSE BY P/N 60850056-614 NO MORE ACTION REQUIRED MOS 21-FEB-2013 09-SEP-2010 3702:13 AFL 897 SB 737-35A1121 CREW OXYGEN MASK STOWAGE BOX UNIT -INSPECT/REPLACE (SUPERSEDED BY SB 737-35A1121 R1). SERVICE SUPERSEDED BULLETIN MOS (EFF) SB 737-35A1121 Ft1 OXYGEN - CREW OXYGEN SYSTEM - CREW OXYGEN MASK STOWAGE BOX UNIT - INSPECT/REPLACE. SERVICE RECOMMENDED NOT APPLICABLE - DUE TO VARIABLE NUMBER BULLETIN OF THE A/C YG006 MOS 19-JAN-2012 I4-DEC-2009 3609:52 AFL 879 SB 737-35A1126 CREW AND PASSENGER GASEOUS OXYGEN SYSTEMS - OXYGEN CYLINDER RECOMMENDED NOT APPLICABLE - BY SERIAL NUMBER INSPECTION/REPLACEMENT. SERVICE BULLETIN INSTALLED DAYS I6-FEB-2010 29-OCT-2009 3417:51 AFL 829 SB 737-36-1019 ENGINE BLEED AIR DISTRIBUTION SYSTEM - CLAMP INSTALLATION ON ENGINE RECOMMENDED SENSE TUBES FOR THE PNEUMATIC SYSTEM FLEX LINES. SERVICE BULLETIN MOS 14-SEP-2009 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 97 Of 748 @ Camp Systems EFTA00618388 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-36-1019 RI 16-FEB-2010 SB 737-36-1020 CLAMP INSTALLATION ON ENGINE SENSE TUBES FOR THE PNEUMATIC SYSTEM FLEX LINES. SERVICE BULLETIN RECOMMENDED MOS DISTRIBUTION- PNEUMATIC MANIFOLD SYSTEM - REPLACEMENT OF AUXILIARY POWER UNIT PNEUMATIC DUCTS. RECOMMENDED SERVICE BULLETIN 27-JAN-2011 MOS SB 737-36-1021 PNEUMATIC - BLEED AIR PRECOOLER SYSTEM- CHANGE TO THE AIRCRAFT CONDITION MONITORING SYSTEM TO SUPERSEDED GIVE MORE INPUTS TO THE DIGITAL FLIGHT DATA ACQUISITION UNIT FOR EASIER ENVIRONMENTAL CONTROL SYSTEM TROUBLESHOOTING (SUPERSEDED BY S8 737-36-1021 R1). SERVICE BULLETIN MOS SB 737-36-1021 RI PNEUMATIC - BLEED AIR PRECOOLER SYSTEM- CHANGE TO THE AIRCRAFT CONDITION MONITORING SYSTEM TO SUPERSEDED GIVE MORE INPUTS TO THE DIGITAL FLIGHT DATA ACQUISITION UNIT FOR EASIER ENVIRONMENTAL CONTROL SYSTEM TROUBLESHOOTING (SUPERSEDED BY SB 737-36-1021 R2). SERVICE BULLETIN MOS SB 737-36-1021 R2 PNEUMATIC - BLEED AIR PRECOOLER SYSTEM - CHANGE TO THE AIRCRAFT CONDITION MONITORING SYSTEM TO SUPERSEDED GIVE MORE INPUTS TO THE DIGITAL FLIGHT DATA ACQUISITION UNIT FOR EASIER ENVIRONMENTAL CONTROL SYSTEM TROUBLESHOOTING (SUPERSEDED BY SEI 737-36-1021 R3). SERVICE BULLETIN MOS SB 737-36-1021 R3 PNEUMATIC - BLEED AIR PRECOOLER SYSTEM - CHANGE TO THE AIRCRAFT CONDITION MONITORING SYSTEM TO RECOMMENDED GIVE MORE INPUTS TO THE DIGITAL FLIGHT DATA ACQUISITION UNIT FOR EASIER ENVIRONMENTAL CONTROL SYSTEM TROUBLESHOOTING. SERVICE BULLETIN MOS 03-OCT-2013 SB 737-38-1046 POTABLE WATER - ADDITION OF INSULATION TO THE WATER SUPPLY LINES. SERVICE BULLETIN MOS 07-MAR-2002 - (s) SB 737-38-1048 WATERAMASTE-WASTE DISPOSAL-DRAIN MAST-INSPECTION FOR FATIGUE CRACKS/REPLACEMENT OF A CRACKED RECOMMENDED - SUPERSEDED BY S/B 737-38-1053 FORWARD DRAIN MAST ASSEMBLY (REPLACED BY 737-38-1053). SERVICE BULLETIN MOS I6-JAN-2003 SOO (s) SB 737-38-1048 RI WATER/WASTE - WASTE DISPOSAL - DRAIN MAST - INSPECTION FOR FATIGUE CRACKS/REPLACEMENT OF A SUPERSEDED CRACKED FORWARD DRAIN MAST ASSEMBLY (SUPERSEDED BY 737-38-1053). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 98 Of 748 @ Camp Systems EFTA00618389 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-38-1053 15-SEP-2005 WATERIWASTE - WASTE DISPOSAL - DRAIN MAST - INSPECTION FOR FATIGUE CRACKS/REPLACEMENT OF A CRACKED FORWARD DRAIN MAST ASSEMBLY. SERVICE BULLETIN MOS 560 (s) SB 737-38-1053 RI WASTE DISPOSAL - DRAIN MAST - INSPECTION FOR FATIGUE 14-SEP-2009 RECOMMENDED CRACKS/REPLACEMENT OF A CRACKED FORWARD DRAIN MAST ASSEMBLY. SERVICE BULLETIN MOS SB 737-38-1053 R1.1 GENERAL VISUAL INSPECTION WASTE DISPOSAL- DRAIN MAST - INSPECTION FOR FATIGUE RECOMMENDED CRACKS/REPLACEMENT OF A CRACKED FORWARD DRAIN MAST ASSEMBLY. SERVICE BULLETIN OF THE FORWARD DRAIN MAST ASSEMBLY MOS 14-SEP-2009 500 (s) SB 737-38-1053 RI .2 REPLACE WASTE DISPOSAL - DRAIN MAST - INSPECTION FOR FATIGUE RECOMMENDED CRACKS/REPLACEMENT OF A CRACKED FORWARD DRAIN MAST ASSEMBLY. SERVICE BULLETIN WITH ALUMINUM DRAIN MAST ASSEMBLY 14-SEP-2009 SB 737-38-1057 19-FEB-2010 MOS 60 (s) POTABLE WATER - PASSENGER WATER SYSTEM - HOSE AND FITTING REPLACEMENT. FITTING HEATER AND RECOMMENDED SHROUD INSTALLATION. SERVICE BULLETIN MOS SB 737-44-1001 CABIN SYSTEMS - INFLIGHT ENTERTAINMENT SYSTEM - INSTALLATION OF LATCH PLATES ON THE AFT AUDIO DISTRIBUTION BOX. SERVICE BULLETIN MOS 07-JUN-2010 SB 737-44-1006 03-JUL-2013 SB 737-04-1007 03-DEC-2013 SB 737-06-1009 08-JAN-2009 CABIN SYSTEMS - PASSENGER AUDIONIDEO ENTERTAINMENT SYSTEM - IN-FLIGHT ENTERTAINMENT SYSTEM AUDIO RECOMMENDED HUM NOISE CORRECTIVE WIRING CHANGES. SERVICE BULLETIN MOS CABIN SYSTEMS- CREW PANELS - GROMMET INSTALLATION FOR IN-FLIGHT ENTERTAINMENT SYSTEM CONTROL RECOMMENDED PANEL STOWAGE BOX. SERVICE BULLETIN MOS CREW INFORMATION SYSTEM - ELECTRONIC FLIGHT BAG HARDWARE AND SOFTWARE REPLACEMENT. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 99 Of 748 @ Camp Systems EFTA00618390 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73746-1011 20-OCT-2010 SB 737-46-1013 INFORMATION SYSTEMS - CREW INFORMATION SYSTEM - ELECTRONIC FLIGHT BAG HARDWARE AND SOFTWARE RECOMMENDED REPLACEMENT. SERVICE BULLETIN MOS INFORMATION SYSTEMS - CREW INFORMATION SYSTEM - ELECTRONIC FLIGHT BAG SOFTWARE REPLACEMENT. RECOMMENDED SERVICE BULLETIN 29-NOv-2012 MOS SB 73747-1002 INERT GAS SYSTEM - INSTALLATION OF THE PROVISIONS FOR NITROGEN GENERATION SYSTEM (SUPERSEDED BY SUPERSEDED SB 73747-1002 RI). SERVICE BULLETIN MOS SB 73747-1002 RI INERT GAS SYSTEM - INSTALLATION OF THE PROVISIONS FOR NITROGEN GENERATION SYSTEM (SUPERSEDED BY SUPERSEDED SB 73747-1002 R2). SERVICE BULLETIN MOS SB 73747-1002 R2 INERT GAS SYSTEM - INSTALLATION OF THE PROVISIONS FOR NITROGEN GENERATION SYSTEM. SERVICE BULLETIN RECOMMENDED 14-NOv-2013 MOS SB 73747-1003 INERT GAS SYSTEM - INSTALLATION OF THE NITROGEN GENERATION SYSTEM (SUPERSEDED BY SB 73747-1003 RN. SUPERSEDED SERVICE BULLETIN MOS SB 73747-1003 RI INERT GAS SYSTEM - INSTALLATION OF THE NITROGEN GENERATION SYSTEM (SUPERSEDED BY SB 73747-1003 R2). SUPERSEDED SERVICE BULLETIN MOS SB 73747-1003 R2 INERT GAS SYSTEM - INSTALLATION OF THE NITROGEN GENERATION SYSTEM. SERVICE BULLETIN RECOMMENDED 27-SEP-2013 MOS SB 73747-10as NITROGEN GENERATION SYSTEM - INSTALLATION OF OXYGEN SENSOR. REPLACEMENT OF EQUIPMENT AND WIRE RECOMMENDED BUNDLES. SERVICE BULLETIN MOS 02-FEB-2010 SB 73747-1011 INERT GAS SYSTEM - AIR SEPARATION UNIT - AIR SEPARATION MODULE HIGH FLOW VALVE CONNECTOR RECOMMENDED REPLACEMENT. SERVICE BULLETIN MOS 14-OCT.20 1 u ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 100 Of 748 Camp Systems EFTA00618391 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-07-1012 INERT GAS SYSTEM - AIR SEPARATION UNIT - INSPECTION OF TUBES AND CLAMP INSTALLATION. SERVICE BULLETIN RECOMMENDED MOS 12-APR-2012 SB 737-09-1119 APU - ELECTRONIC CONTROL UNIT. SERVICE BULLETIN 10-JUN-1999 MOS - (s) SB 737-09-1133 AIRBORNE AUXILIARY POWER- AUXILARY POWER UNIT AIR INLET - AUXILARY POWER UNIT FLAP AND VORTEX GENERATOR ASSEMBLY MOSIFICATION. SERVICE BULLETIN MOS 22-SEP-2005 SB 737-09-1133 RI 21-SEP-2007 SB 737-09-1133 R2 26-JAN-2009 SB 737-09-1130 16-OCT-2007 MOS SB 737-09-1139 AIRBORNE AUXILIARY POWER - COWL DOOR INSULATION PANEL AND AFT BULKHEAD SEAL REPLACEMENT SUPERSEDED (SUPERSEDED BY S8 737-09-1139 RI). SERVICE BULLETIN MOS SB 737-09-1139 RI AIRBORNE AUXILIARY POWER -COWL DOOR INSULATION PANEL AND AFT BULKHEAD SEAL REPLACEMENT. SERVICE RECOMMENDED 04-OCT-2012 BULLETIN MOS SB 737-51-1017 RI EVES MOISTURE SHROUD SEAL INSTALLATION, SERVICE BULLETIN RECOMMENDED 28-MAR-2002 MOS SB 737-51-1018 CARGO DOORWAY STOP PAD REPLACEMENT. SERVICE BULLETIN RECOMMENDED AIRBORNE AUXILIARY POWER - AUXILIARY POWER UNIT AIR INLET - AUXILIARY POWER UNIT FLAP AND VORTEX GENERATOR ASSEMBLY MODIFICATION. SERVICE BULLETIN MOS AUXILIARY POWER UNIT FLAP AND VORTEX GENERATOR ASSEMBLY MODIFICATION. SERVICE BULLETIN MOS AIRBORNE AUXILIARY POWER - APU AIR INLET - INLET PLENUM REPLACEMENT. SERVICE BULLETIN RECOMMENDED I I -APR-2002 MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 101 Of 748 @ Camp Systems EFTA00618392 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-51-1019 25-APR-2002 STRUCTURES - WIRE SHIELD ASSEMBLY INSTALLATION UNDER THE E5-2 SHELF. SERVICE BULLETIN MOS SB 737-51-1019 RI STRUCTURES - WIRE SHIELD ASSEMBLY INSTALLATION UNDER THE E5-2 SHELF. SERVICE BULLETIN MOS 18-DEC-2003 SB 737-52-1136 EMERGENCY EXIT. SERVICE BULLETIN MOS 22-JUN-2000 - (s) SB 737-52-1137 DOORS - CONTROL CABIN EMERGENCY EXIT PANEL. SERVICE BULLETIN MOS - (s) SB 737-52-1138 ELECTRONIC EQUIPMENT ACCESS DOOR, SERVICE BULLETIN MOS 29-JUL-1999 - (s) SB 737-52-1140 FORWARD ENTRY - UPPER AFT CORNER DOOR STOP REPLACEMENT. SERVICE BULLETIN MOS 20-AUG-2001 RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED AFL 18000 (s) SB 737-52-1142 AFT GALLEY SERVICE DOOR, SERVICE BULLETIN RECOMMENDED MOS 4 (s) 22-FEB-2001 SB 737-52-1148 HORIZONTAL AIRSTAIRS MOISTURE SHROUD INSTALATION SUPPORT RAIL REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 12-DEC-2002 SB 737-52-1148 RI FUSELAGE - HORIZONTAL AIRSTAIRS MOISTURE SHROUD INSTALLATION - SUPPORT RAIL REPLACEMENT. SERVICE BULLETIN MOS 11-MAY-2006 SB 737-52-1152 DOORS - FORWARD AIRSTAIR DOOR RELIABILITY IMPROVEMENT - REPLACE DOOR LOCKPIN ACTUATORS. OPEN UMITAMARNING SWITCH BRACKETS. AND RACEWAY COVER ASSEMBLY. SERVICE BULLETIN MOS 08-SEP-2005 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 102 Of 748 @ Camp Systems EFTA00618393 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-52-1156 01-DEC-2005 DOORS - FORWARD AIRSTAIR AND DOOR - FORWARD AIRSTAIR SPEEDUP AND SLOWDOWN SYSTEM DELETION. SERVICE BULLETIN MOS SB 737-52-1157 ENTRANCE STAIRS - FORWARD AIRSTAIR - AIRSTAIR HANDRAIL SAFETY IMPROVEMENTS (SUPERSEDED BY SB SUPERSEDED 737-52-1157 RI). SERVICE BULLETIN MOS SB 737-52-1157 RI DOORS - ENTRANCE STAIRS - FORWARD AIRSTAIR AIRSTAIR HANDRAIL SAFETY IMPROVEMENTS. SERVICE BULLETIN SB 737-52-1159 26-NOV-2C07 SB 737-52-1159 RI 21-SEP-2009 SB 737-52-1164 20-JAN-2009 SB 737-52-1165 29-JUL-2008 SB 737-52-1165 RI 15-JAN-2009 SB 737-52-1169 13-DEC-201 I MOS DOORS - DOOR WARNING SYSTEM - FORWARD ENTRY DOOR LATCH SWITCH AND WIRING INSTALLATION AND MODIFICATION. SERVICE BULLETIN MOS DOOR WARNING SYSTEM - FORWARD ENTRY DOOR LATCH SWITCH AND WIRING INSTALLATION AND MODIFICATION. SERVICE BULLETIN MOS FORWARD AND AFT CARGO DOORS - LANYARD ASSEMBLY REPLACEMENT. SERVICE BULLETIN MOS AFT ENTRY AND AFT GALLEY SERVICE DOOR - DOOR SNUBBER STOP LINK ASSEMBLY CHANGE. SERVICE BULLETIN MOS AFT ENTRY AND AFT GALLEY SERVICE DOOR - DOOR SNUBBER STOP LINK ASSEMBLY CHANGE. SERVICE BULLETIN MOS DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. SERVICE BULLETIN MOS RECOMMENDED SB 737-52-1169 TABLE 1 PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED SERVICE BULLETIN A GENERAL VISUAL INSPECTION OF THE INBOARD MLG DOOR FOR IDENTIFICATION MOS 13-DEC-2011 AFL 51)03(s1 ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 103 Of 748 Camp Systems EFTA00618394 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-52-1169 TABLE 2.1L 13-DEC-2011 PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED SERVICE BULLETIN A DETAILED INSPECTION OF THE LEFT INBOARD MLG DOOR FOR ANY CRACKS MOS AFL 5500(s) SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 2.1R SERVICE BULLETIN A DETAILED INSPECTION OF THE RIGHT INBOARD MLG DOOR FOR ANY CRACKS MOS 13-DEC-2011 AFL 5500 (5) SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 2.2L SERVICE BULLETIN APPLICABLE SRM REPAIR WITHIN THE ALLOWABLE DAMAGE 1 LIMITS ( ANY PART-THROUGH CRACK IS FOUND.) LEFT MLG INBOARD DOOR MOS BF,'F (5) SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 2.2R SERVICE BULLETIN APPLICABLE SRM REPAIR WITHIN THE ALLOWABLE DAMAGE I LIMITS ( ANY PART-THROUGH CRACK IS FOUND.) RIGHT MLG INBOARD DOOR MOS BF,F (so SB 737-52-1169 TABLE REPLACE DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 2.3L SERVICE BULLETIN THE LEFT INBOARD MLG DOOR AND PREFORM A DETAILED INSPECTION OF THE INBOARD MLG DOOR FOR ANY CRACKS MOS BF,F (so SB 737-52-1169 TABLE REPLACE DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 2.3R SERVICE BULLETIN THE RIGHT INBOARD MLG DOOR AND PREFORM A DETAILED INSPECTION OF THE INBOARD MLG DOOR FOR ANY CRACKS MOS BF,F (so SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 3.1L SERVICE BULLETIN A DETAILED INSPECTION OF THE LEFT INBOARD MLG DOOR FOR ANY CRACKS MOS 13-DEC-2011 AFL 5503 (5) SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 3.1R SERVICE BULLETIN A DETAILED INSPECTION OF THE RIGHT INBOARD MLG DOOR FOR ANY CRACKS MOS 31-DEC-2011 AFL 5503 (5) ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 104 Of 748 Camp Systems EFTA00618395 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 3.2L SERVICE BULLETIN APPLICABLE SRM REPAIR WITHIN THE ALLOWABLE DAMAGE 1 LIMITS AND DETAILED INSPECTION OF THE LEFT INBOARD MLG DOOR MOS BFIF (s) SB 737-52-1169 TABLE PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 3.2R SERVICE BULLETIN APPLICABLE SRM REPAIR WITHIN THE ALLOWABLE DAMAGE 1 LIMITS AND DETAILED INSPECTION OF THE RIGHT INBOARD MLG DOOR MOS BF/F (s) SB 737-52-1169 TABLE REPLACE DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 3.3L SERVICE BULLETIN THE LEFT INBOARD MLG DOOR DOOR WITH INBOARD MLG DOOR MADE FROM MACHINED ALUMINUM. 113A8335-( ). OR INBOARD MLG DOOR MADE FROM CAST ALUMINUM. 113A8331-( ). AND DETAILED INSPECTION MOS BFIF (s) SB 737-52-1169 TABLE REPLACE DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOORS - INSPECTION AND REPAIR. RECOMMENDED 3.3R SERVICE BULLETIN THE RIGHT INBOARD MLG DOOR DOOR WITH INBOARD MLG DOOR MADE FROM MACHINED ALUMINUM. 113A8335-( ). OR INBOARD MLG DOOR MADE FROM CAST ALUMINUM. 113A8331- ). AND DETAILED INSPECTION SB 737-52-1170 29-JUL-2014 MOS BFIF (s) DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED SERVICE BULLETIN MOS SB 737-52-1170 T84. 1.1 DETAILED INSPECTION DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR RECOMMENDED AND MODIFICATION. SERVICE BULLETIN OF MLG CENTER DOOR ASSEMBLY ATTACHMENTS (PART 2) FOR ANY LOOSE. MISSING. DAMAGED OR BOTTOMED OUT BOLTS. OR ANY WEAR TO THE RETENTION CLIP ASSEMBLIES. OR IF RETENTION CLIP ASSEMBLIES ARE NOT INSTALLED. FOR ANY LOOSE. MISSING OR DAMAGED BOLTS (ALL AIRPLANES) MOS AFL 12000 (s) SB 737-52-1170 TB1 1.2 DO DOORS -LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED SERVICE BULLETIN PART 4: MLG CENTER DOOR ASSEMBLY ATTACHMENTS - REMOVAL! PART 5: MLG CENTER DOOR ASSEMBLY RETENTION CLIP ASSEMBLIES - MODIFICATION f REPEAT PART -2 (IF CONDITION 1: NO LOOSE. MISSING. DAMAGED OR BOTTOMED OUT BOLTS AND NO WEAR TO THE RETENTION CLIP ASSEMBLIES) MOS 29-JUL-2014 BFIF 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 105 Of 748 @ Camp Systems EFTA00618396 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-52-1170 TBL 1.3 DO DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED SERVICE BULLETIN PART 3 MLG CENTER DOOR ASSEMBLY ATTACHMENTS - REMOVAL AND BUSHING DETAILED INSPECTION MEASUREMENT FOR EXCESSIVE WEAR. GALLING AND CRACKS (IF CONDITION 2: ANY LOOSE. MISSING. DAMAGED OR BOTTOMED OUT BOLTS. OR ANY WEAR TO THE RETENTION CLIP ASSEMBLIES) MOS 29-JUL-2014 BPIF SB 737-52-1170 TBL 1.4 DO DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED SERVICE BULLETIN PART 7: BUSHING REMOVAL/ REPAIR. LUG MAGNETIC PARTICLE INSPECTION' REPAIR PART 5: MLG CENTER DOOR ASSEMBLY RETENTION CLIP ASSEMBLIES - MODIFICATION PART 7: BUSHING REMOVAL] REPAIR. LUG MAGNETIC PARTICLE INSPECTION' REPAIR PART 6: MLG CENTER DOOR ASSEMBLY BOLTS AND RETENTION CLIP ASSEMBLIES - REPLACEMENT REPEAT PART 2 (IF CONDITION 3: ANY EXCESSIVE WEAR FOUND IN THE INTERNAL DIAMETER OF THE BUSHING OR ANY GALLING FOUND OR ANY CRACK FOUND) MOS 29-JUL-2014 BPIF SB 737-52-1170 TBL 1.5 DO DOORS - LANDING GEAR CENTER DOOR ASSEMBLY ATTACHMENTS - INSPECTION. REPAIR AND MODIFICATION. RECOMMENDED SERVICE BULLETIN PART 5 MLG CENTER DOOR RETENTION CLIP ASSEMBLIES - MODIFICATION / PART 6: MLG CENTER DOOR ASSEMBLY BOLTS AND RETENTION CLIP ASSEMBLIES - REPLACEMENT I REPEAT PART 2 (IF CONDITION 4: NO EXCESSIVE WEAR FOUND IN THE INTERNAL DIAMETER OF THE BUSHING AND NO GALLING AND NO CRACKS FOUND) MOS 29-JUL-2014 BF.'F SB 737-52-1173 FORWARD AIRSTAIR - STAIR TREAD - ANTI-SLIP MATERIAL EDGE SEAL MODIFICATION. SERVICE BULLETIN RECOMMENDED MOS 24-JUN-201•I • (s) SB 737-52A1167 DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOOR HINGE FITTINGS - INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS (EFF) 01-DEC-201I SB 737-52A1167 TABLE 1 PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOOR HINGE FITTINGS - INSPECTION RECOMMENDED LMLG AND REPLACEMENT. SERVICE BULLETIN DETAILED INSPECTION OR HFEC INSPECTION OF THE LEFT INBOARD MLG DOOR HINGE FITTINGS FOR CRACKS FOR AIRPLANES MOS AFL 1C000 10000 SB 737-52A1167 TABLE 1 PERFORM DOORS - LANDING GEAR DOORS - INBOARD MAIN LANDING GEAR DOOR HINGE FITTINGS INSPECTION RECOMMENDED RMLG AND REPLACEMENT. SERVICE BULLETIN DETAILED INSPECTION OR SURFACE HFEC INSPECTION OF THE RIGHT INBOARD MLG DOOR HINGE FITTINGS FOR CRACKS MOS AFL 1C000 10000 ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 106 Of 748 Camp Systems EFTA00618397 CAMP MionistAlmthermumlitli AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1217 SECTION 43 AND SECTION 47 - STIR 17 SKIN CRACKS AT STA 364-371 AND STA 890-900. SERVICE BULLETIN MOS 09-AUG-2001 RECOMMENDED AFL 36000 (s) SS 737-53-1219 FUSELAGE SECTION 44- S18A WEB FITTING FLANGE CRACKS. INSPECTION AND REPAIR, SERVICE BULLETIN RECOMMENDED MOS I6-AUG-2001 AFL 30000 30000 SS 737-53-1222 FUSELAGE - SECTION 41 CAB - POINT D SPLICE FITTING REPLACEMENT (SUPERSEDED BY 737-53A1222 R1). SERVICE SUPERSEDED BULLETIN MOS 06-JUN-2002 SS 737-53-1223 29-NOV-2001 SS 737-53-1227 03-OCT-2002 SS 737-53-1227 RI 26-AUG-2006 SS 737-53-1227 R2 MAIN LANDING GEAR FAIRING REPLACEMENT. SERVICE BULLETIN MOS - Is) NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN MOS - (s) NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN MOS FUSELAGE - WHEEL WELLS - NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN MOS 22-AUG-2008 Id-NOV-2007 3260:48 RECOMMENDED RECERTIFY - INFORMATION REF TO R2 - INFORMATION REF TO R2 COMPUED WITH - TERMINATED AFL 782 SB 737-53-1227 R2 PARA REPLACE FUSELAGE - WHEEL WELLS - NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACE COMPUED WITH - REPLACEMENT 0 REPLACEMENT. SERVICE BULLETIN BUSHINGS MOS 22-AUG-2008 Id-NOV-2007 3260:48 AFL 782 SS 737-53-1227 R2 PARA INSPECT FUSELAGE - WHEEL WELLS - NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING COMPUED WITH - MIGRATION FOUND / E REPLACEMENT. SERVICE BULLETIN REPLACEMENT PERFORMED TERMINATING ACTION MOS 22-AUG-2008 3260:48 AFL 782 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 107 Of 748 @ Camp Systems EFTA00618398 CAMP Mianistfrn• thermiewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1227 R3 18-NOV-2009 SB 737-53-1227 R3 PARA DETAILED INSPECTION NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN E (DT INS) FOR CORROSION OF THE FITTINGS MOS 3 (s) NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN MOS RECOMMENDED SB 737-53-1227 R3 PARA INITIAL INSPECTION NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN RECOMMENDED E (I INSP) MOS 18-NOV-2009 AFL 2000(s) SB 737-53-1227 R3 PARA REPLACE NOSE WHEEL DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN BUSHING REPLACE E (RPL) 18-NOV-2009 SB 737-53-1232 SB 737-53-1232 RI SB 737-53-1232 RI TABLE SB 737-53-1232 R2 26-JUL-2013 SB 737-53-1232 R2 TABLE MOS 12 (s) FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTATIVE MODIFICATION (SUPERSEDED BY 737-53-1232 R1). SERVICE BULLETIN MOS SUPERSEDED FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTATIVE MODIFICATION SUPERSEDED (SUPERSEDED BY SB 737-53-1232 R2). SERVICE BULLETIN MOS DETAILED INSPECTION FUSELAGE - SKIN - CHEMICALLY MILLED STEPS- INSPECTION. REPAIR AND PREVENTATIVE RECOMMENDED MODIFICATION (SUPERSEDED BY SB 737-53-1232 R2). SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKS IN THE FUSELAGE SKIN AT THE CHEM-MILLED STEPS AT SPECIFIED LOCATIONS MOS AFL 35000 35000 FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE RECOMMENDED BULLETIN MOS EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND 1.01 PREVENTIVE MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NDI (EXT.MFECMCWC-SCAN/EXT.UTPA) FOR CRACKS IN THE FUSELAGE SKIN AT THE CHEM-MILLED STEPS AT SPECIFIED LOCATIONS (FOR AIRPLANES WITHOUT THE PREVENTATIVE MODIFICATION. TIME-LIMITED REPAIR OR PERMANENT REPAIR INSTALLED IN ACCORDANCE WITH THIS SB) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 108 Of 748 @ Camp Systems EFTA00618399 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 737-53-1232 R2 TABLE REPAIR FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 1.02 SERVICE BULLETIN ANY CRACK THAT IS FOUND IN THE SKIN MOS SB 737-53-1232 R2 TABLE INSPECT FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 1A.01 SERVICE BULLETIN FOR CRACKS IN THE FUSELAGE SKIN AT THE CHEM-MILLED STEPS AT THE SPECIFIED LOCATIONS (FOR AIRPLANES WITH PREVENTATIVE MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SB AT OR BEFORE 30.000 TOTAL FC) MOS AFL SB 737-53-1232 R2 TABLE INSPECT FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 1A.02 SERVICE BULLETIN FOR CRACKS IN THE FUSELAGE SKIN AT THE CHEM-MILLED STEPS AT THE SPECIFIED LOCATIONS (FOR AIRPLANES WITH PREVENTATIVE MODIFICATION THAT WERE INSTALLED IN ACCORDANCE WITH THIS SB AFTER 30.000 TOTAL FC) MOS AFL 58 737-53-1232 R2 TABLE CONTACT FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 1A.03 SERVICE BULLETIN BOEING AND ACCOMPLISH THE WORK INSTRUCTED (IF ANY CRACK IS FOUND IN THE SKIN) MOS 58 737-53-1232 R2 TABLE HFEC FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 18.01.1 SERVICE BULLETIN INSPECTION FOR CRACKS (IF PREVENTATIVE MODIFICATION INSTALLED IN ACCORDANCE WITH THIS SB) MOS AFL 58 737-53-1232 R2 TABLE DEATILED INSPECTION FUSELAGE - SKIN - CHEMICALLY MILLED STEPS- INSPECTION. REPAIR AND PREVENTIVE 18.01.2 MODIFICATION. SERVICE BULLETIN FOR CRACKS AND ANY LOOSE OR MISSING FASTENERS (IF PREVENTATIVE MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS 58) MOS AFL SB 737-53-1232 R2 TABLE CONTACT FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 18.02 SERVICE BULLETIN BOEING AND ACCOMPLISH THE WORK INSTRUCTED (IF ANY CRACK FOUND IN THE SKIN) MOS SB 737-53-1232 R2 TABLE REPLACE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 18.03 SERVICE BULLETIN THE LOOSE OR MISSING FASTENER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 109 Of 748 @ Camp Systems EFTA00618400 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE 2.01.1.1 BULLETIN SKIN INSPECTION OPTION 1 - EXTERNAL LFEC FOR CRACKS (FOR AIRPLANES WITH THE PERMANENT REPAIR INSTALLED IN ACCORDANCE WITH THIS SB) MOS AFL SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE 2.01.1.2 BULLETIN SKIN INSPECTION OPTION 1 - DOUBLER INSPECTION: EXTERNAL LFEC FOR CRACKS AND AN EXTERNAL DETAILED INSPECTION FOR CRACKS AND LOOSE/MISSING FASTENERS (FOR AIRPLANES WITH THE PERMANENT REPAIR INSTALLED IN ACCORDANCE WITH THIS SB) MOS AFL SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION, SERVICE 2.01.2.1 BULLETIN SKIN INSPECTION OPTION 2 - EXTERNAL LFEC FOR CRACKS (FOR AIRPLANES WITH THE PERMANENT REPAIR INSTALLED IN ACCORDANCE WITH THIS SB) MOS AFL SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE 2.01.2.2 BULLETIN SKIN INSPECTION OPTION 2 - INTERNAL MFEC FOR CRACKS (FOR AIRPLANES WITH THE PERMANENT REPAIR INSTALLED IN ACCORDANCE WITH THIS SB) MOS AFL SB 737-53-1232 R2 TABLE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE 2.01.2.3 BULLETIN SKIN INSPECTION OPTION 2 - DOUBLER INSPECTION: EXTERNAL LFEC FOR CRACKS AND AN EXTERNAL DETAILED INSPECTION FOR CRACKS AND LOOSE/MISSING FASTENERS (FOR AIRPLANES WITH THE PERMANENT REPAIR INSTALLED IN ACCORDANCE WITH THIS SB) MOS AFL SB 737-53-1232 R2 TABLE REPAIR FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 2.02 SERVICE BULLETIN ANY CRACK FOUND (IF ANY CRACK IS FOUND IN THE SKIN) MOS SB 737-53-1232 R2 TABLE REPLACE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 2.03 SERVICE BULLETIN LOOSE AND MISSING FASTENERS (IF ANY LOOSE OR MISSING FASTENER) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 110 Of 748 @ Camp Systems EFTA00618401 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SS 737-53-1232 R2 TABLE INTERNAL FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 3.01.1 SERVICE BULLETIN / EXTERNAL DETAILED INSPECTION OF A TIME-LIMITED REPAIR FOR CRACKS AND LOOSE OR MISSING FASTENERS (FOR AIRPLANES WITH THE TIME-LIMITED REPAIR INSTALLED IN ACCORDANCE WITH THIS SB) MOS AFL SB 737-53-1232 R2 TABLE REPLACE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 3.01.2 SERVICE BULLETIN THE TIME-LIMITED REPAIR WITH THE PERMANENT REPAIR (FOR AIRPLANES WITH THE TIME-LIMITED REPAIR INSTALLED IN ACCORDANCE WITH THIS SB) MOS AFL SB 737-53-1232 R2 TABLE REPAIR FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 3.02 SERVICE BULLETIN ANY CRACK FOUND IN THE SKIN MOS SB 737-53-1232 R2 TABLE REPLACE FUSELAGE - SKIN - CHEMICALLY MILLED STEPS - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. 3.03 SERVICE BULLETIN LOOSE AND MISSING FASTENERS MOS SB 737-53-1232 TABLE 1 AIRPLANES WITHMJTHOUT THE PREVENTATIVE MODIFICATION INSTALLED. (SUPERSEDED BY 737-53-1232 RI). SUPERSEDED SERVICE BULLETIN MOS - (s) SB 737-53-1232 TABLE 2 AIRPLANES WITH THE PERMANENT REPAIR INSTALLED. (SUPERSEDED BY 737-53-1232 RI). SERVICE BULLETIN SUPERSEDED NOT APPLICABLE MOS - (s) SB 737-53-1232 TABLE 3 AIRPLANES WITH THE TIME-LIMITED REPAIR INSTALLED. INTERNAUEXTEFtNAL DETAILED INSPECTION OF A NOT APPLICABLE TIME-LIMITED REPAIR FOR CRACKS AND LOOSE OR MISSING FASTENERS AS GIVEN IN -PART IV - TIME-LIMITED REPAIR'.. SERVICE BULLETIN MOS 02-APR-2007 AFL 2500 (s) SB 737-53-1233 INSPECTION AND REPLACEMENT OF KEEL BEAM LOWER CHORD FORWARD SPLICE AT STATION 535. SERVICE BULLETIN DAYS 30 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 111 Of 748 @ Camp Systems EFTA00618402 C O Mien MPwinin Mernund up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1233 RI 28-FEB-2002 SB 737-53-1236 I I -JUL-2002 INSPECTION AND REPLACEMENT OF KEEL BEAM LOWER CHORD FORWARD SPLICE AT STATION 535. SERVICE BULLETIN MOS 18 (s) 25-JUL-2002 1057:48 AFL 271 AIRSTAIR DOORSTOP INTERCOSTAL - INSPECTION AND FASTENER REPLACEMENT. SERVICE BULLETIN MOS AFL 24000 (0 SB 737-53-1236 RI FUSELAGE - AIRSTAIR DOORSTOP INTERCOSTAL - INSPECTION AND FASTENER REPLACEMENT. SERVICE BULLETIN 10-NOV-2005 SB 737-53-1237 04-DEC-2003 SB 737-53-1237 RI 07-DEC-2006 SB 737-53-1239 22-AUG-2002 SB 737-53-1239 RI I4-AUG-2003 SB 737-53-1239 R2 28-APR-2005 SB 737-53-1239(A) 22-AUG-2002 SB 737-53-1239(E) 22-AUG-2002 MOS 29-AUG-2011 -(s) 3533:32 AFL FASTENER REPLACEMENT. SERVICE BULLETIN MOS 863 FUSELAGE - WING TO BODY FAIRING - WHEEL WELL - BONDED PANEL (BOW-TIE PANEL) - FASTENER REPLACEMENT. SERVICE BULLETIN MOS KEEL CHORD SPLICE WASHERS. BOLTS AND NUTS REPLACEMENT. SERVICE BULLETIN MOS KEEL CHORD SPLICE WASHERS. BOLTS. AND NUTS REPLACEMENT. SERVICE BULLETIN MOS 6 (s) FUSELAGE - KEEL BEAM LOWER CHORDS - FORWARD AND AFT SPLICES AT STATIONS 540 AND 727 - KEEL CHORD SPLICE WASHERS. BOLTS. AND NUTS REPLACEMENT. SERVICE BULLETIN MOS 6 (s) INSPECT KEEL CHORD SPLICE WASHERS. BOLTS AND NUTS REPLACEMENT. SERVICE BULLETIN MOS 6 (s) REPLACE KEEL CHORD SPLICE WASHERS. BOLTS AND NUTS REPLACEMENT. SERVICE BULLETIN MOS 6 (s) RECOMMENDED RECOMMENDED COMPUED WITH - REPLACEMENT COMPUED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 112 Of 748 @ Camp Systems EFTA00618403 COMP up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1243 AUTOMATIC OVERWING EXIT DOUBLERS (BEARSTRAPS) INSPECTION INTERVAL CHANGE. SERVICE BULLETIN MOS SB 26-SEP-2002 737-53-1244 AFL 75000 (s) PIVOT LINK ASSEMBLY REPAIR/REPLACE, SERVICE BULLETIN MOS SB 737-53-1244 RI PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE BULLETIN MOS SB 737-53-1244 RI (8)2 REPLACE PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE BULLETIN BLIND FASTENERS MOS AFL 10000 (s) SB 737-53-1244 R2 PIVOT LINK ASSEMBLY REPAIRIREPLACE. SERVICE BULLETIN MOS 12 (s) 15-MAR-2007 SB 737-53-1244 R2 (8)1 INSPECT PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE BULLETIN BLIND FASTNERS MOS 15-MAR-2007 AFL WOO (s) SB 737-53-1244 R2 (8)2 REPLACE PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE BULLETIN BLIND FASTNERS MOS 15-MAR-2007 AFL 10000 (s) SB 737-53-1244 R4 FUSELAGE - PASSENGER CABIN FLOORS - STATION 520 TO 540 - PIVOT LINK ASSEMBLY REPAIR/REPLACE SUPERSEDED (SUPERSEDED BY S8 737-53-1244 R5), SERVICE BULLETIN MOS SB 737-53-1244 RS FUSELAGE - PASSENGER CABIN FLOORS - STATION 520 TO 540 - PIVOT LINK ASSEMBLY REPAIR/REPLACE. SERVICE BULLETIN MOS 27-JUL-2011 SB 737-53-1244 R5 TABLE INSTALL FUSELAGE - PASSENGER CABIN FLOORS - STATION 520 TO 540- PIVOT LINK ASSEMBLY REPAIR/REPLACE. RECOMMENDED 1.1 SERVICE BULLETIN NEW PIVOT LINK - NO CHANGES TO PIVOT LINK STRUCTURE AND PASSENGER SEATS HAVE NOT BEEN MOVED AFTER AIRPLANE DELIVERY MOS 12(s) I 7-APR-2003 RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time @ Camp Systems 113 Of 748 EFTA00618404 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1244 R5 TABLE ACCOMPLISH FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540- PIVOT LINK ASSEMBLY RECOMMENDED 1.2 REPAIR/REPLACE. SERVICE BULLETIN MOVE THE SEATS - NO CHANGES TO PIVOT LINK STRUCTURE AND I 7-APR-2003 PASSENGER SEATS HAVE NOT BEEN MOVED AFTER AIRPLANE DELIVERY MOS 12 (s) 58 737-53-1244 RS TABLE INSTALL FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540- PIVOT LINK ASSEMBLY FtEPAIRJREPLACE. RECOMMENDED 1.3 SERVICE BULLETIN BLIND CENTERLINE FASTNERS IN THE SEAT TRACK 17-APR-2003 MOS 12 (s) SB 737-53-1244 R5 TABLE INSPECT FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540 - PIVOT UNK ASSEMBLY REPAIR/REPLACE. RECOMMENDED 1.3.1 SERVICE BULLETIN BLIND FASTENERS MOS AFL 3800 (s) SB 737-53-1244 RS TABLE REPLACE FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540- PIVOT LINK ASSEMBLY REPAIR/REPLACE. RECOMMENDED 1.3.2 SERVICE BULLETIN BLIND FASTENERS WITH SOLID FASTENERS MOS AFL 10000 (s) 58 737-53-1244 R5 TABLE INSTALL FUSELAGE - PASSENGER CABIN FLOORS- STATION 520 TO 540- PIVOT LINK ASSEMBLY REPAIR/REPLACE. RECOMMENDED 1.4 SERVICE BULLETIN SOLID CENTERLINE FASTNERS IN THE SEAT TRACK 17-APR-2003 MOS 12 (s) 58 737-53-1244 R5 TABLE INSTALL FUSELAGE - PASSENGER CABIN FLOORS - STATION 520 TO 540- PIVOT LINK ASSEMBLY REPAIR/REPLACE. RECOMMENDED 1.5 SERVICE BULLETIN NEW PIVOT LINK 27-JUL-2011 MOS 60 (s) SB 737-53-1245 HIGH PRESSURE DOOR AND DOUBLER-REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 05-AUG-2004 SB 737-53-1249 FUSELAGE - FRAMES AND BULKHEADS - BODY STATION 1016 AFT PRESSURE BULKHEAD - VERTICAL FIN ATTACHMENT FITTINGS -BOLT HOLE INSPECTION AND REPAIR. SERVICE BULLETIN MOS 16-NOV-2006 AFL 36000 (s) SB 737-53-1251 AFT PRESSURE BULKHEAD APEX INSPECTION. SERVICE BULLETIN MOS 22-AUG-2008 03-JUN-2004 3260:48 AFL 4000 (s) 782 COMPUED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 114 Of 748 @ Camp Systems EFTA00618405 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1252 13-OCT-2005 FUSELAGE - STABILIZER CENTER SECTION FRONT SPAR - SLIDING SEAL AND TRACK MODIFICATION. SERVICE BULLETIN MOS SB 737-53-1252 RI FUSELAGE - STABILIZER CENTER SECTION FRONT SPAR - SLIDING SEAL AND TRACK MODIFICATION.. SERVICE BULLETIN MOS 15-FEB-2007 SB 737-53-1256 CHEMICAL MILL PITTING AT S-4 LAP SPLICE. SERVICE BULLETIN MOS 18-SEP-2003 RECOMMENDED SB SB 737-53-1264 04-MAY-2006 737-53-1264 RI 24-JAN-2008 FUSELAGE - FILLET FAIRINGS - AFT WING-TO-BODY FAIRING - INBOARD FLAP PRIMARY TORQUE TUBE INSPECTION/REPAIR AND AFT WING-TO-BODY FAIRING MODIFICATION. SERVICE BULLETIN MOS FUSELAGE - FILLET FAIRINGS - AFT WING-TO-BODY FAIRING - INBOARD FLAP PRIMARY TORQUE TUBE INSPECTION/REPAIR AND AFT WING-TO-BODY FAIRING MODIFICATION, SERVICE BULLETIN MOS SB 737-53-1276 FUSELAGE - FORWARD AND AFT CARGO COMPARTMENT- CORROSION PREVENTION MODIFICATION (SUPERSEDED SUPERSEDED BY SB 737-53-1276 RI), SERVICE BULLETIN MOS SB 737-53-1276 RI FUSELAGE - FORWARD AND AFT CARGO COMPARTMENT - CORROSION PREVENTION MODIFICATION. SERVICE RECOMMENDED 01-AUG-2014 BULLETIN MOS - SB 737-53-1277 FUSELAGE - STRUCTURE ATTACHMENT FITTINGS - NOSE WHEEL WELL RETRACT ACTUATOR SUPPORT FITTING SUPERSEDED INSPECTION AND MODIFICATION (SUPERSEDED BY 737-53-1277 R1). SERVICE BULLETIN MOS 14-NOV-2007 SB 737-53-1277 RI FUSELAGE - STRUCTURE ATTACHMENT FITTINGS - NOSE WHEEL WELL RETRACT ACTUATOR SUPPORT FITTING INSPECTION AND MODIFICATION. SERVICE BULLETIN MOS 14-MAY-2010 SB 737-53-1280 22-MAY-2008 FUSELAGE - FILLET FAIRINGS - AFT OUTBOARD WING TO BODY FAIRING MODIFICATION. SERVICE BULLETIN MOS 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 115 Of 748 @ Camp Systems EFTA00618406 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1280 OPTION 1 INSTALL FUSELAGE - FILLET FAIRINGS - AFT OUTBOARD WING TO BODY FAIRING MODIFICATION. SERVICE BULLETIN MODIFICATION AS GIVEN IN PARAGRAPH 3.8.. WORK INSTRUCTIONS MOS 24 (s) 22-MAY-2008 SB 737-53-1280 OPTION 2 INSPECT FUSELAGE- FILLET FAIRINGS - AFT OUTBOARD WING TO BODY FAIRING MODIFICATION. SERVICE (A) BULLETIN AS GWEN IN PARAGRAPH 3.8.. WORK INSTRUCTIONS MOS 24 (5) 22-MAY-2008 SB 737-53-1280 OPTION 2 INSTALL FUSELAGE - FILLET FAIRINGS - AFT OUTBOARD WING TO BODY FAIRING MODIFICATION. SERVICE BULLETIN (3) MODIFICATION AS GIVEN IN PARAGRAPH 3.8., WORK INSTRUCTIONS MOS 72 (s) 22-MAY-2008 SB 737-53-1282 FUSELAGE - WHEEL WELL - NOSE WHEEL UPPER DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN MOS 14-NOV-2007 SB 737-53-1282 RI 14-MAR-2008 SB 737-53-1285 58 737-53-1285 RI 23-JUL-2014 FUSELAGE - WHEEL WELL - NOSE WHEEL UPPER DRAG BRACE AND TRUNNION BUSHING REPLACEMENT. SERVICE BULLETIN 61OS 22-AUG-2008 3260:48 AFL 782 FUSELAGE - PASSENGER CABIN FLOORS - SECTIONS 41 AND 47 - ADDITION OF GEL TAPE TO PREVENT CORROSION SUPERSEDED OF PASSENGER CABIN FLOOR PANEL SUPPORT STRUCTURE (SUPERSEDED BY SB 737-53-1285 RI ). SERVICE BULLETIN MOS FUSELAGE - PASSENGER CABIN FLOORS - SECTIONS 41 AND 47 - ADDITION OF GEL TAPE TO PREVENT CORROSION RECOMMENDED OF PASSENGER CABIN FLOOR PANEL SUPPORT STRUCTURE. SERVICE BULLETIN MOS 58 737-53-1294 FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SI3 737-53-1294 RI ). SERVICE BULLETIN MOS 58 737-53-1294 RI 12-JUN-2013 FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN MOS (EFF) SUPERSEDED RECOMMENDED COMPLIED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 116 Of 748 @ Camp Systems EFTA00618407 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1294 RI TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. 1.1 CHORD SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN AND A HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION OF THE SKIN FOR CRACKS IN THE AREA AROUND THE EIGHT FASTENERS SECURING THE STA 540 BULKHEAD CHORDS BETWEEN STRINGER S-22 AND S-23 (AIRPLANES WITH LESS THAN 27.500 TOTAL FLIGHT CYCLES AS OF THE ORIGINAL ISSUE DATE OF THIS SERVICE BULLETIN) MOS SB 737-53-1294 RI TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. 1.2 CHORD SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN AND A HFEC INSPECTION OF THE SKIN FOR CRACKS IN THE AREA AROUND THE EIGHT FASTENERS SECURING THE STA 540 BULKHEAD CHORDS BETWEEN STRINGER S-22 AND S-23 (AIRPLANES WITH 27.500 OR MORE TOTAL FLIGHT CYCLES AS OF THE ORIGINAL ISSUE DATE OF THIS SERVICE BULLETIN) MOS 58 737-53-1294 RI TABLE REPAIR FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE 1.3 INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN THE CRACKING ON LEFT SIDE (AND) DO THE PREVENTIVE MODIFICATION ON THE RIGHT SIDE (IF ANY CRACK IS FOUND IN THE SKIN ON THE LEFT SIDE OF THE AIRPLANE AND NO CRACK IS FOUND ON THE RIGHT SIDE OF THE AIRPLANE) MOS SB 737-53-1294 RI TABLE REPAIR FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPLICE 1.4 INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN THE CRACKING ON RIGHT SIDE (AND) DO THE PREVENTIVE MODIFICATION ON THE LEFT SIDE (IF ANY CRACK IS FOUND IN THE SKIN ON THE RIGHT SIDE OF THE AIRPLANE AND NO CRACK IS FOUND ON THE LEFT SIDE OF THE AIRPLANE) MOS SB 737-53-1294 RI TABLE REPAIR FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE 1.5 INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN THE CRACKS (IF ANY CRACK IS FOUND IN THE SKIN ON BOTH SIDES OF THE AIRPLANE) MOS 58 737-53-1294 RI TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. 2.1.1 CHORD SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN OF THE SKIN SURROUNDING THE FILLER UNDER THE DRAG LINK ASSEMBLY FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE) MOS SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD 2.1.2 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN EXTERNAL LOW FREQUENCY EDDY CURRENT (LFEC) INSPECTION OF THE SKIN AND DOUBLER AND AN EXTERNAL HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION OF THE TRIPLER FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 117 Of 748 @ Camp Systems EFTA00618408 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD 2.1.3 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN INTERNAL HFEC INSPECTION OF THE SKIN FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE) MOS SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD 2.1.4 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN INTERNAL HFEC INSPECTION OF THE SPLICE PLATE AND STA 540 BULKHEAD OUTER CHORD FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE) MOS SB 737-53-1294 RI TABLE DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. 2.2.1 CHORD SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN OF THE SKIN SURROUNDING THE FILLER UNDER THE DRAG LINK ASSEMBLY FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE) MOS SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD 2.2.2 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN EXTERNAL LFEC INSPECTION OF THE SKIN AND DOUBLER AND AN EXTERNAL HFEC INSPECTION OF THE TRIPLER FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE) MOS SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD 2.2.3 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN INTERNAL HFEC INSPECTION OF THE SKIN FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE) MOS SB 737-53-1294 RI TABLE ACCOMPLISH FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD 2.2.4 SPLICE INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN INTERNAL HFEC INSPECTION OF THE SPLICE PLATE AND STA 540 BULKHEAD OUTER CHORD FOR CRACKING (ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE) MOS SB 737-53-1294 RI TABLE CONTACT FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPUCE 2.3 INSTALLATION AND SKIN REPAIR. SERVICE BULLETIN BOEING FOR INSTRUCTIONS AND DO THE WORK (ANY CRACK IS FOUND) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 118 Of 748 @ Camp Systems EFTA00618409 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1294 TABLE 1.1 DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. RECOMMENDED CHORD SPLICE INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN AND A HFEC INSPECTION OF THE SKIN FOR CRACKS IN THE AREA AROUND THE EIGHT FASTENERS SECURING THE STA 540 BULKHEAD CHORDS BETWEEN STRINGER S-22 AND S-23 FOR AIRPLANES WITH LESS THAN 27.500 TOTAL FLIGHT CYCLES AS OF THE ORIGINAL ISSUE DATE OF THIS SERVICE BULLETIN MOS 31-MAR-2011 AFL 2000 (s) SB 737-53-1294 TABLE 1.2 DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. RECOMMENDED CHORD SPLICE INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN AND A HFEC INSPECTION OF THE SKIN FOR CRACKS IN THE AREA AROUND THE EIGHT FASTENERS SECURING THE STA 540 BULKHEAD CHORDS BETWEEN STRINGER S-22 AND S-23 FOR AIRPLANES WITH 27.500 OR MORE TOTAL FLIGHT CYCLES AS OF THE ORIGINAL ISSUE DATE OF THIS SERVICE BULLETIN. MOS 31-MAR-2011 SB 737-53-1294 TABLE 2.1.1 SB 737-53-1294 TABLE 2.1.2 SB 737-53-1294 TABLE 2.1.3 SB 737-53-1294 TABLE 2.1.4 AFL 750(s) DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. RECOMMENDED CHORD SPLICE INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN OF THE SKIN SURROUNDING THE FILLER UNDER THE DRAG LINK ASSEMBLY FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE MOS AFL 2500 (s) HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE RECOMMENDED INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 RI). SERVICE BULLETIN EXTERNAL INSPECTION OF THE SKIN AND DOUBLER AND AN EXTERNAL HFEC INSPECTION OF THE TRIFLER FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE MOS AFL SCO0 (s) HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE RECOMMENDED INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN INTERNAL INSPECTION OF THE SKIN FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE MOS AFL 5000 (s) HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPLICE RECOMMENDED INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 RI). SERVICE BULLETIN INTERNAL INSPECTION OF THE SPLICE PLATE AND STA 540 BULKHEAD OUTER CHORD FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE LEFT SIDE OF THE AIRPLANE MOS AFL 5000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 119 Of 748 @ Camp Systems EFTA00618410 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1294 TABLE 2.2.1 DETAILED INSPECTION FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPLICE INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN OF THE SKIN SURROUNDING THE FILLER UNDER THE DRAG LINK ASSEMBLY FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE MOS RECOMMENDED AFL 2500 (5) SB 737-53-1294 TABLE LFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE RECOMMENDED 2.2.2 INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 RI). SERVICE BULLETIN EXTERNAL INSPECTION OF THE SKIN AND DOUBLER AND AN EXTERNAL HFEC INSPECTION OF THE TRIPLER FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE SB 737-53-1294 TABLE 2.2.3 SB 737-53-1294 TABLE 2.2.4 SB 737-53-1295 RI SB 737-53-1295 R2 18-JUN-20I3 SB 737-53-1295 R2 TABLE MOS AFL 5000 (s) HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540- SKIN INSPECTION. CHORD SPLICE RECOMMENDED INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 R1). SERVICE BULLETIN INTERNAL INSPECTION OF THE SKIN FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE MOS AFL 5000 (s) HFEC FUSELAGE - SKIN - LOWER BULKHEAD CHORDS AT BODY STATION 540 - SKIN INSPECTION. CHORD SPLICE RECOMMENDED INSTALLATION AND SKIN REPAIR (SUPERSEDED BY SB 737-53-1294 RI). SERVICE BULLETIN INTERNAL INSPECTION OF THE SPLICE PLATE AND STA 540 BULKHEAD OUTER CHORD FOR CRACKING FOR ALL AIRPLANES THAT HAVE DONE THE SKIN REPAIR ON THE RIGHT SIDE OF THE AIRPLANE MOS AFL 5000(s) FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY REPLACEMENT SUPERSEDED (SUPERSEDED BY 93 737-53-1295 R2). SERVICE BULLETIN MOS FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY REPLACEMENT. RECOMMENDED SERVICE BULLETIN MOS EXTERNAL - DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER I WINDOW FRAME AND 1.1.1 WINDSHIELD ASSEMBLY REPLACEMENT. SERVICE BULLETIN OF THE CROWN SKIN FOR CORROSION (GROUP 1. CONFIGURATION 6: GROUP 2. CONFIGURATION 4) (ALL AIRPLANES) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 120 Of 748 @ Camp Systems EFTA00618411 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1295 R2 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD 1.1.2 ASSEMBLY REPLACEMENT. SERVICE BULLETIN FOR CORROSION AND INSTALL NEW FASTENERS (GROUP 1. CONFIGURATION 6: GROUP 2. CONFIGURATION 4) (ALL AIRPLANES) MOS - (s) SB 737-53-1295 R2 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY 1.2 REPLACEMENT. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED (IF CORROSION IS FOUND) MOS SB 737-53-1295 R2 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD 2.1 ASSEMBLY REPLACEMENT. SERVICE BULLETIN FOR CORROSION AND INSTALL NEW FASTENERS (ALL AIRPLANES) MOS - Is) SB 737-53-1295 R2 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY 2.2 REPLACEMENT. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED (IF CORROSION IS FOUND) SB 737-53-1296 11-JAN-2011 MOS FUSELAGE - PASSENGER CABIN FLOORS - STATION 7278 SPLICE STRAP INSTALLATION. SERVICE BULLETIN MOS SB 737-53-1296 TABLE 1.1 REPLACE FUSELAGE - PASSENGER CABIN FLOORS - STATION 727B SPLICE STRAP INSTALLATION. SERVICE RECOMMENDED BULLETIN SEAT TRACK BOLTS FOR ALL AIRPLANES MOS 24 (s) 11-JAN-2011 SB 737-53-1296 TABLE 1.2 DETAILED INSPECTION FUSELAGE - PASSENGER CABIN FLOORS - STATION 7278 SPLICE STRAP INSTALLATION. RECOMMENDED SERVICE BULLETIN AND HFEC INSPECTION OF SPLICE STRAP AND FORWARD SEAT TRACK FOR ALL AIRPLANES MOS 24 (s) 11-JAN-2011 SB 737-53-1297 FUSELAGE - EQUIPMENT ATTACHMENT FITTINGS- AFT CARGO WASTE TANK ENCLOSURE - STANCHION RECOMMENDED MODIFICATION. SERVICE BULLETIN MOS 03-SEP-2010 SB 737-53-1298 FUSELAGE - SKIN - DORSAL FIN SEAL RETAINER AND FUSELAGE SKIN STATION 847 TO 1007- INSPECTION. SERVICE BULLETIN MOS 27-AUG-2010 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 121 Of 748 @ Camp Systems EFTA00618412 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1298 TABLE 1.1/2 27-AUG-2010 INSPECTION FUSELAGE - SKIN - DORSAL FIN SEAL RETAINER AND FUSELAGE SKIN STATION 847 TO 1007- RECOMMENDED INSPECTION. SERVICE BULLETIN OF THE DORSAL FIN LOWER SEAL RETAINERS FOR CONTACT WITH THE FUSELAGE SKIN BETWEEN STA 847 AND STA 1007 IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 1 FOR ALL AIRPLANES MOS 24 (s) AFL 4000 SB 737-53-1298 TABLE 1.6 MODIFY FUSELAGE - SKIN - DORSAL FIN SEAL RETAINER AND FUSELAGE SKIN STATION 847 TO 1007 - INSPECTION. RECOMMENDED SERVICE BULLETIN THE LOWER AND VERTICAL SEALS IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5 FOR AIRPLANES THAT HAVE NOT MODIFIED THE LOWER AND VERTICAL SEALS OR. REPLACED THE LOWER SEAL IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 4. MOS 24 (s) 27-AUG-20I0 SB 737-53-1303 513 737-53-1303 RI 06-MAY-2014 513 737-53-1303 RI TBL 1.1 513 737-53-1303 RI TBL 1.2 06-MAY-2014 SB 737-53-1303 RI TBL AFL 4000 FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG SUPERSEDED INSTALLATION (SUPERSEDED BY SB 737-53-1303 RI). SERVICE BULLETIN MOS FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG RECOMMENDED INSTALLATION. SERVICE BULLETIN MOS HIGH FREQUENCY EDDY CURRENT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG INSTALLATION. SERVICE BULLETIN (HFEC) INSPECTION OF THE AFFECTED NUMBER 3 WINDOW FRAME FASTENER HOLES FOR CRACKS. COLD WORK AND INSTALL FREEZE PLUGS IN AFFECTED NUMBER 3 WINDOW FRAME HOLES MOS AFL INSTALL FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE RECOMMENDED PLUG INSTALLATION. SERVICE BULLETIN TEMPORARY REPAIR STRAP OR INSTALL THE NUMBER 3 WINDOW FRAME PERMANENT REPAIR (ANY CRACK INDICATION FOUND) MOS BFIF REPLACE FUSELAGE- STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME- INSPECTION AND FREEZE RECOMMENDED 1.3 PLUG INSTALLATION. SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME OR INSTALL THE NUMBER 3 WINDOW FRAME PERMANENT REPAIR (IF ANY CRACK FOUND BEYOND THE TEMPORARY REPAIR STRAP INSTALLATION UMITS) MOS 06-MAY-2014 BF/F 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 122 Of 748 @ Camp Systems EFTA00618413 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1303 RI TBL EXTERNAL - DETAILED INSPECTION FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG INSTALLATION. SERVICE BULLETIN OF THE TEMPORARY REPAIR STRAP FOR CORROSION AND ANY OTHER NICKS. GAPS. LOOSE FASTENERS OR MISSING SEALANT (IF TEMPORARY REPAIR STRAP INSTALLED) MOS - (s) SB 737-53-1303 RI TBL REPLACE FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE 1.4.2 PLUG INSTALLATION. SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME (IF TEMPORARY REPAIR STRAP INSTALLED) MOS - Is) SB 737-53-1303 RI TBL EXTERNAL - DETAILED INSPECTION FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - 1.5.1 INSPECTION AND FREEZE PLUG INSTALLATION. SERVICE BULLETIN OF THE TEMPORARY REPAIR STRAP FOR CORROSION AND ANY OTHER NICKS. GAPS. LOOSE FASTENERS OR MISSING SEALANT (IF TEMPORARY REPAIR STRAP OPTION 2 WITH STRAIGHT LINE FASTENER PATTERN INSTALLED) MOS - (s) SB 737-53-1303 RI TBL INSTALL FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE 1.5.2 PLUG INSTALLATION. SERVICE BULLETIN THE NUMBER 3 WINOW FRAME PERMANENT REPAIR OR REPLACE THE NUMBER 3 WINDOW FRAME (IF TEMPORARY REPAIR STRAP OPTION 2 WITH STRAIGHT LINE FASTENER PATTERN INSTALLED) MOS - (s) SB 737-53-1303 RI TBL REPLACE FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE RECOMMENDED 1.6 PLUG INSTALLATION. SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME OR INSTALL THE NUMBER 3 WINDOW FRAME PERMANENT REPAIR (IF ANY CRACK FOUND AROUND THE NUMBER 3 WINDOW FRAME REPAIR FASTENERS COMMON TO THE TEMPORARY REPAIR STRAP) MOS OS-MAY-20M BF/F SB 737-53-1303 TABLE 1.1 HFEC FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG SUPERSEDED INSTALLATION (SUPERSEDED BY SB 737-53-1303 R1). SERVICE BULLETIN INSPECTION OF THE AFFECTED NUMBER 3 WINDOW FRAME FASTENER HOLES FOR CRACKS. COLD WORK AND INSTALL FREEZE PLUGS IN AFFECTED NUMBER 3 WINDOW FRAME HOLES FOR ALL AIRPLANES SB 737-53-1303 TABLE 1.4.1 MOS - Is) HFEC FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE PLUG SUPERSEDED INSTALLATION (SUPERSEDED BY SB 737-53-1303 R1). SERVICE BULLETIN - INTERNAL INSPECTION OF THE NUMBER 3 WINDOW FRAME MOUND THE REPAIR FASTENERS COMMON TO THE TEMPORARY REPAIR STRAP FOR CRACKS AND DO A GENERAL VISUAL INSPECTION OF THE TEMPORARY REPAIR STRAP FOR TEMPORARY REPAIR STRAP INSTALLED AIRPLANES MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 123 Of 748 @ Camp Systems EFTA00618414 COMP Mien winin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1303 TABLE REPLACE FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - INSPECTION AND FREEZE SUPERSEDED 1.4.2 PLUG INSTALLATION (SUPERSEDED BY SB 737-53-1303 RI). SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME MOS - S8 737-53-1307 FUSELAGE - FILLET FAIRINGS - AFT WING TO BODY FAIRING - PANEL 194E AND AFT CENTER WHEEL WELL PANEL RECOMMENDED 193D - INSPECTION AND REWORK. SERVICE BULLETIN 12-JAN-2012 MOS SB 737-53-1307 TABLE 1.1 PERFORM FUSELAGE - FILLET FAIRINGS - AFT WING TO BODY FAIRING - PANEL 194E AND AFT CENTER WHEEL WELL RECOMMENDED PANEL 193D - INSPECTION AND REWORK. SERVICE BULLETIN A GENERAL VISUAL INSPECTION OF THE LOWER AFT WING TO BODY FAIRING PANEL AND SUPPORT STRUCTURE MOS 24 (s) 12-JAN-2012 SB 737-53-1307 TABLE 1.4 PERFORM FUSELAGE - FILLET FAIRINGS -AFT WING TO BODY FAIRING -PANEL 194E AND AFT CENTER WHEEL WELL RECOMMENDED PANEL 193D - INSPECTION AND REWORK. SERVICE BULLETIN THE PANEL AND SUPPORT STRUCTURE REWORK MOS 72 (s) 12-JAN-2012 SB 737-53-1310 FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND MODIFICATION RECOMMENDED . SERVICE BULLETIN MOS 20-OCT-2011 SB 737-53-1310 TABLE 1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL DETAILED INSPECTION AND AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEPS AT SPECIFIED LOCATIONS OPTION 1 OR OPTION 2 FOR ALL AIRPLANES MOS 20-OCT-2011 AFL 1500(s) SB 737-53-1310 TABLE 2.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF FASTENERS COMMON TO THE MODIFICATION DOUBLER OPTION 1 OR OPTION 2 FOR AU. EXTERNAL MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN MOS AFL 50000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 124 Of 748 @ Camp Systems EFTA00618415 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1310 TABLE 2.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF FASTENERS COMMON TO THE MODIFICATION FILLER OPTION 1 OR OPTION 2 FOR ALL INTERNAL MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN MOS AFL 50000 (s) SB 737-53-1310 TABLE 3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF FASTENERS COMMON TO THE MODIFICATION FILLER OPTION 1 OR OPTION 2 FOR ALL INTERNAL MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN MOS AFL 50000 (s) SB 737-53-1310 TABLE 4 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF FASTENERS COMMON TO THE MODIFICATION FILLER OPTION 1 OR OPTION 2 FOR ALL INTERNAL MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN MOS AFL 50000 (s) 58 737-53-1310 TABLE 5.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN BEFORE 32.000 TOTAL FLIGHT CYCLES MOS AFL 50000 (s) SB 737-53-1310 TABLE 5.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43.000 TOTAL FLIGHT CYCLES MOS AFL 43000 (s) SB 737-53-1310 TABLE 5.3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL NDI - FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES MOS AFL 5500 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 125 Of 748 @ Camp Systems EFTA00618416 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1310 TABLE 6.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN BEFORE 32.000 TOTAL FLIGHT CYCLES MOS AFL 50000 (s) 513 737-53-1310 TABLE 6.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43.000 TOTAL FLIGHT CYCLES MOS AFL 5500 (s) SB 737-53-1310 TABLE 6.3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN DO AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES MOS AFL 5500(s) 513 737-53-1310 TABLE 7.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN BEFORE 32.000 TOTAL FLIGHT CYCLES MOS AFL 50000 (s) SB 737-53-1310 TABLE 7.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43.000 TOTAL FLIGHT CYCLES MOS AFL 5500(s) SB 737-53-1310 TABLE 7.3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED MODIFICATION . SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES MOS AFL 5500 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 126 Of 748 @ Camp Systems EFTA00618417 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1311 21-OCT-201 I FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN MOS AFL 28-MAY-20I3 3714:04 900 NOT APPLICABLE - N/A BY AIRCRAFT MODEL SB 737-53-1311 TABLE 1 EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEK1-MILL STEPS IN CROWN SKINS AT SPECIFIED RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEPS AT SPECIFIED LOCATIONS FOR ALL AIRPLANES MOS 21-OCT-2011 - (s) 28-MAY-20I3 3714:04 AFL 900 SB 737-53-1311 TABLE 2 EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) OF THE FUSELAGE SKIN FOR CRACKING AT THE CHEM-MILL STEPS COMMON TO SHEAR WRINKLE AREAS FOR ALL AIRPLANES. GROUP 2.5-6 MOS 28-MAY-2013 21-OCT-2011 -(s) 3714:04 AFL 900 SB 737-53-1311 TABLE 3.1 NON DESTRUCTIVE FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL AND MODIFICATION. SERVICE BULLETIN INSPECTION OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF FASTENERS COMMON TO THE MODIFICATION DOUBLER FOR ALL EXTERNAL MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN MOS - (s) 28-MAY-2013 3714:04 AFL 900 SB 737-53-1311 TABLE 3.2 EXTERNAL INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL INSPECTION AND MODIFICATION. SERVICE BULLETIN OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF FASTENERS COMMON TO THE MODIFICATION FILLER FOR ALL INTERNAL MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN MOS 28-MAY-2013 - (s) 3714:04 AFL 900 SB 737-53-1311 TABLE 4.1 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL MODIFICATION. SERVICE BULLETIN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN BEFORE 32.000 TOTAL FLIGHT CYCLES MOS 28-MAY-2013 3714:04 AFL 5500 (s) 900 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 127 Of 748 @ Camp Systems EFTA00618418 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1311 TABLE 4.2 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL MODIFICATION. SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43,000 TOTAL FLIGHT CYCLES MOS 28-MAY-2013 3714:04 AFL 5500 (s) 900 SB 737-53-1311 TABLE 4.3 PERFORM FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL MODIFICATION. SERVICE BULLETIN AN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES MOS 28-MAY-2013 3714:04 AFL 5500 (s) 900 SB 737-53-1312 FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN MOS 28-MAY-2013 21-OCT-2011 3714:04 NOT APPLICABLE - N/A BY AIRCRAFT MODEL AFL 900 SB 737-53-1312 RI FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS- INSPECTION AND MODIFICATION. RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL SERVICE BULLETIN MOS 28-MAY-2013 I4-MAR-2012 3714:04 AFL 900 SB 737-53-1312 TABLE 1 EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEPS AT SPECIFIED LOCATIONS AND OPTION 1 (OR) OPTION 2 FOR ALL AIRPLANES MOS 28-MAY-2013 21-OCT-2011 -(s) 3714:04 AFL 900 SB 737-53-1312 TABLE 2 EXTERNAL - DETAILED INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL LOCATIONS - INSPECTION AND MODIFICATION. SERVICE BULLETIN AND AN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) OF THE FUSELAGE SKIN FOR CRACKING AT THE CHEM-MILL STEPS AT SPECIFIED LOCATIONS AND OPTION 1 (OR) OPTION 2 FOR ALL AIRPLANES MOS 28-MAY-2013 21-OCT-2011 -(s) 3714:04 AFL 900 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 128 Of 748 @ Camp Systems EFTA00618419 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1312 TABLE 3 EXTERNAL INSPECTION FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONSINSPECTION AND MODIFICATION. SERVICE BULLETIN OF THE FUSELAGE SKIN FOR CRACKING AT THE OUTER ROW OF FASTENERS COMMON TO THE MODIFICATION FILLER AND OPTION 1 (OR) OPTION 2 FOR ALL INTERNAL MODIFICATIONS INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN MOS - (s) 28-MAY-2013 3714:04 RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL AFL 900 SB 737-53-1312 TABLE 4.1 ACCOMPLISH FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL MODIFICATION. SERVICE BULLETIN EXTERNAL NON DESTRUCTIVE INSPECTION (NDI) FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN BEFORE 32.000 TOTAL FLIGHT CYCLES MOS 28-MAY-2013 3714:04 AFL 5500 (s) 900 SB 737-53-1312 TABLE 4.2 ACCOMPLISH FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL MODIFICATION. SERVICE BULLETIN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 31.999 TOTAL FLIGHT CYCLES BUT BEFORE 43.000 TOTAL FLIGHT CYCLES MOS 28-MAY-2013 3714:04 AFL 5500 (s) 900 SB 737-53-1312 TABLE 4.3 ACCOMPLISH FUSELAGE - SKIN - CHEM-MILL STEPS IN CROWN SKINS AT SPECIFIED LOCATIONS - INSPECTION AND RECOMMENDED NOT APPLICABLE - N/A BY AIRCRAFT MODEL MODIFICATION. SERVICE BULLETIN EXTERNAL NDI FOR CRACKING IN THE FUSELAGE SKIN AT THE CHEM-MILL STEP AT THE SPECIFIED LOCATIONS FOR ALL INTERNAL MODIFICATIONS THAT WERE INSTALLED IN ACCORDANCE WITH THIS SERVICE BULLETIN AFTER 42.999 TOTAL FLIGHT CYCLES MOS 28-MAY-2013 3714:04 SB 737-53-1316 SB 737-53-1316 RI 03-JUL-2013 SB 737-53-1316 RI TABLE AFL 5500 (s) 900 FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY REPLACEMENT SUPERSEDED AND HEAD UP DISPLAY REALIGNMENT (SUPERSEDED BY SB 737-53-1316 R1). SERVICE BULLETIN MOS FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY REPLACEMENT RECOMMENDED AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN MOS EXTERNAL - DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND 1.1.1 WINDSHIELD ASSEMBLY REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN OF THE CROWN SKIN FOR CORROSION FOR ALL AIRPLANES (GROUP 1. CONFIGURATION 6) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 129 Of 748 @ Camp Systems EFTA00618420 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1316 R1 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD 1.1.2 ASSEMBLY REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN FOR CORROSION AND INSTALL NEW FASTENERS FOR ALL AIRPLANES (GROUP 1. CONFIGURATION 6) MOS SB 737-53-1316 RI TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY 1.2 REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IF CORROSION IS FOUND (GROUP 1. CONFIGURATION 6) MOS SB 737-53-1316 RI TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD 2.1 ASSEMBLY REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN FOR CORROSION AND INSTALL NEW FASTENERS FOR ALL AIRPLANES (GROUP 1. CONFIGURATION 5) MOS SB 737-53-1316 RI TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - NUMBER 1 WINDOW FRAME AND WINDSHIELD ASSEMBLY 2.2 REPLACEMENT AND HEAD UP DISPLAY REALIGNMENT. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IF CORROSION IS FOUND (GROUP 1. CONFIGURATION 5) MOS SB 737-53-1326 FUSELAGE - CARGO COMPARTMENT SIDEWALL LININGS - INSPECTION AND REPAIR. SERVICE BULLETIN MOS 26-OCT-2012 RECOMMENDED SB 737-53-1326 TABLE 1.1 INSPECTION FUSELAGE - CARGO COMPARTMENT SIDEWALL LININGS - INSPECTION AND REPAIR. SERVICE BULLETIN RECOMMENDED OF THE FORWARD AND AFT CARGO COMPARTMENTS SIDEWALL PANELS FOR ALL AIRPLANES MOS 24 (5) 26-OCT-2012 SB 737-53-1326 TABLE 1.2 REMOVE FUSELAGE - CARGO COMPARTMENT SIDEWALL LININGS - INSPECTION AND REPAIR. SERVICE BULLETIN RECOMMENDED AND REPLACE ALUMINUM SIDEWALL LININGS MOS 60 (s) 26-OCT-2012 SB 737-53-1330 FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED SERVICE BULLETIN MOS 26-FEB-2013 SB 737-53-1330 RI FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED SERVICE BULLETIN MOS 10-JUN-2013 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 130 Of 748 @ Camp Systems EFTA00618421 C O Atiant.fran MP Meowed lip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1330 TABLE 1 (1.1.1) DO FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. SERVICE BULLETIN A HFEC INSPECTION OF THE CRACK IN THE NUMBER 1 WINDOW FRAME TO DETERMINE IF THE CRACK HAS GROWN BEYOND THE ALLOWABLE STOP DRILL REGION AND STOP DRILL THE CRACK IF WITHIN THE ALLOWABLE STOP DRILL REGION MOS BF/F RECOMMENDED SB 737-53-1330 TABLE 1 OO FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED (1.1.2) SERVICE BULLETIN A HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION ABOVE AND BELOW THE CRACKED NUMBER 1 WINDOW FRAME AROUND THE FASTENERS THAT HOLD THE NUMBER 1 AND NUMBER 2 WINDOW FRAMES TOGETHER MOS BF/F SB 737-53-1330 TABLE 1 OO FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED (1.1.3) SERVICE BULLETIN A DETAILED INSPECTION OF THE AREA TWO INCHES ABOVE AND BELOW THE CRACK MOS BF/F SB 737-53-1330 TABLE 1 INSTALL FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY RECOMMENDED (1.1.4) REPAIR. SERVICE BULLETIN THE TEMPORARY REPAIR DOUBLER ON THE NUMBER 1 WINDOW FRAME MOS BF/F SB 737-53-1330 TABLE 1 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY RECOMMENDED (1.2) REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING. FOR CRACK FOUND OUTSIDE OF THE UPPER AFT CORNER AREA OF THE NUMBER 1 WINDOW FRAME MOS BF1F SB 737-53-1330 TABLE 1 OO FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY REPAIR. RECOMMENDED (1.3.1) SERVICE BULLETIN AN EXTERNAL DETAILED INSPECTION FOR CORROSION AND ANY OTHER NICKS. GAPS. LOOSE FASTENERS OR MISSING SF41 ANT FOR TEMPORARY REPAIR DOUBLER INSTALLED MOS 6 (s) SB 737-53-1330 TABLE 1 REPLACE FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER I WINDOW FRAME CRACKING - TEMPORARY RECOMMENDED (1.3.2) REPAIR. SERVICE BULLETIN THE NUMBER 1 WINDOW FRAME FOR TEMPORARY REPAIR DOUBLER INSTALLED MOS 24 (s) AFL 6000 SB 737-53-1330 TABLE 1 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME CRACKING - TEMPORARY RECOMMENDED (1.4) REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING FOR ANY CRACK FOUND AROUND THE NUMBER 1 WINDOW FRAME FASTENERS COMMON TO THE TEMPORARY REPAIR DOUBLER MOS BF/F 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 131 Of 748 @ Camp Systems EFTA00618422 CAMP Mianistfrn• thermiewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1334 04-AUG-2014 SB 737-53-1334 TBL 1.1.1 SB 737-53-1334 TBL 1.1.2 SB 737-53-1334 TBL 1.3 04-AUG-2014 SB 737-53-1334 TBL 1.5 04-AUG-2014 SB 737-53-1334 TBL 2.1.1 SB 737-53-1334 T/31. 2.12 FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN MOS - (s) RECOMMENDED OO FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN PART 2: CROWN RECOMMENDED SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - HIGHER STRESS LOCATIONS (ALL AIRPLANES) (GROUP 1-5) MOS AFL 7500 (s) OO FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN PART 3: CROWN RECOMMENDED SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - LOWER STRESS LOCATIONS (ALL AIRPLANES) (GROUP 1-5) MOS AFL 10000 (s) CONTACT FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN THE BOEING RECOMMENDED COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR! REPEAT PART 2: CROWN SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - HIGHER STRESS LOCATIONS (IF CONDITION 2: ANY CRACK FOUND (DURING PART 2 MFEC INSPECTION OF HIGHER STRESS LOCATIONS)) (GROUP 1-5) MOS BFIF (s) CONTACT FUSELAGE -CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN THE BOEING RECOMMENDED COMPANY FOR REPAIR INSTRUCTIONS AND OO THE REPAIR! REPEAT PART 3: CROWN SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - LOWER STRESS LOCATIONS (IF CONDITION 2 ANY CRACK FOUND (DURING PART 3 MFEC INSPECTION OF LOWER STRESS LOCATIONS)) (GROUP 1-5) MOS BFIF (s) OO FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN PART 2: CROWN RECOMMENDED SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - HIGHER STRESS LOCATIONS (ALL AIRPLANES) (GROUP 6) MOS AFL 7500 (s) OO FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN PART 3: CROWN RECOMMENDED SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - LOWER STRESS LOCATIONS (ALL AIRPLANES) (GROUP 6) MOS AFL 20O00 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 132 Of 748 @ Camp Systems EFTA00618423 CAMP Aiont.inn• AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1334 TBL 2.3 CONTACT FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN THE BOEING RECOMMENDED COMPANY REPAIR INSTRUCTIONS AND DO THE REPAIR/REPEAT PART 2: CROWN SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC)INSPECTION - HIGHER STRESS LOCATIONS (B) MOS 04-AUG-2014 BF/F (s) SB 737-53-1334 TBL 2.5 CONTACT FUSELAGE - CROWN SKIN - CHEM MILL POCKET TROUGH INSPECTIONS. SERVICE BULLETIN THE BOEING RECOMMENDED COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR/ REPEAT PART 3: CROWN SKIN PANEL ASSEMBLY - EXTERNAL MEDIUM FREQUENCY EDDY CURRENT (MFEC) INSPECTION - LOWER STRESS LOCATIONS (IF CONDITION 3: ANY CRACK FOUND (DURING PART 3 MFEC INSPECTION OF LOWER STRESS LOCATIONS)) (GROUP 6) MOS 04-AUG-2014 SB 737-53-1335 31-JUL-2013 BF/F (s) FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE BULLETIN RECOMMENDED MOS SB 737-53-1335 TABLE 11 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE BULLETIN NUMBER 1 WINDOW FRAME DETAILED AND HFEC INSPECTION FOR ANY CRACK INDICATION (FOR ALL AIRPLANES) (GROUP 1. CONFIGURATION 1-3) MOS AFL SB 737-53-1335 TABLE 1.2 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE BULLETIN NUMBER 1 WINDOW FRAME PREVENTIVE MODIFICATION DOUBLER INSTALLATION (IF NO CRACK INDICATION FOUND) (GROUP 1. CONFIGURATION 1-3) MOS AFL SB 737-53-1335 TABLE 1.3 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE BULLETIN NUMBER 1 WINDOW FRAME TEMPORARY REPAIR INSTALLATION OR REPLACEMENT (IF ANY CRACK INDICATION FOUND) (GROUP 1. CONFIGURATION 1-3) MOS SB 737-53-1335 TABLE 2.1 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE BULLETIN POST PREVENTIVE MODIFICATION DOUBLER INSTALLATION SEALANT INSPECTION (FOR AIRPLANES WITH THE PREVENTIVE MODIFICATION DOUBLER INSTALLED) (GROUP 1. CONFIGURATION 1-3) MOS AFL SB 737-53-1335 TABLE 2.3 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE BULLETIN SEALANT APPLICATION (IF SEALANT CRACKS. EROSION. SPLITS. LOOSE BEADS OR MISSING SECTIONS FOUND) (GROUP I. CONFIGURATION 1-3) MOS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 133 Of 748 '2 Camp Systems EFTA00618424 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1335 TABLE 3.1 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER I WINDOW FRAME - MODIFICATION. SERVICE BULLETIN POST PREVENTIVE MODIFICATION DOUBLER INSTALLATION WINDOW FRAME DETAILED AND HFEC INSPECTION (FOR AIRPLANES WITH THE PREVENTIVE MODIFICATION DOUBLER INSTALLED) (GROUP 1. CONFIGURATION 1-3) MOS AFL SB 737-53-1335 TABLE 3.3 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - MODIFICATION. SERVICE BULLETIN BOEING (IF ANY CRACK INDICATION FOUND) (GROUP 1. CONFIGURATION 1-3) SB 737-53-1336 23-OCT-2013 MOS FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 11MNDOW FRAME - PERMANENT REPAIR. SERVICE RECOMMENDED BULLETIN MOS SB 737-53-1336 TABLE 1.1 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR. SERVICE BULLETIN PART 12: POST PERMANENT REPAIR INSTALLATION NUMBER 1 WINDOW FRAME AND PERMANENT REPAIR TRIPLER HFEC INSPECTION (AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND TRIPLER INSTALLED) MOS AFL SB 737-53-1336 TABLE 1.2 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR. SERVICE BULLETIN PART 12: POST PERMANENT REPAIR INSTALLATION NUMBER 1 WINDOW FRAME AND PERMANENT REPAIR TRIPLER HFEC INSPECTION (CONDITION 1: NO CRACK INDICATION FOUND) MOS AFL SB 737-53-1336 TABLE 1.3 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR. SERVICE BULLETIN THE BOEING COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (CONDITION 2: ANY CRACK INDICATION FOUND) MOS SB 737-53-1336 TABLE 2.1 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR. SERVICE BULLETIN PART 13: POST PERMANENT REPAIR INSTALLATION FUSELAGE SKIN LFEC INSPECTION (AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND TRIPLER INSTALLED) MOS AFL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 134 Of 748 @ Camp Systems EFTA00618425 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1336 TABLE 2.2 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR. SERVICE BULLETIN PART 13: POST PERMANENT REPAIR INSTALLATION FUSELAGE SKIN LFEC INSPECTION (CONDITION 1: NO CRACK INDICATION FOUND) MOS AFL SB 737-53-1336 TABLE 2.3 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 1 WINDOW FRAME - PERMANENT REPAIR. SERVICE BULLETIN THE BOEING COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (CONDITION 2: ANY CRACK INDICATION FOUND) MOS SB 737-53-1341 FUSELAGE - MISCELLANEOUS EXTERIOR SERVICE DOORS - EXTERNAL POWER RECEPTACLE DOOR - BONDING SUPERSEDED JUMPER INSPECTION AND REPLACEMENT (SUPERSEDED BY SB 737-53-1341 R1). SERVICE BULLETIN MOS SB 737-53-1341 RI FUSELAGE - MISCELLANEOUS EXTERIOR SERVICE DOORS - EXTERNAL POWER RECEPTACLE DOOR - BONDING RECOMMENDED JUMPER INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS 11-APR-2014 SB 737-53-1345 FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR RECOMMENDED . SERVICE BULLETIN MOS 05-NOV-2013 SB 737-53-1345 TABLE 1.1 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 1 NUMBER 3 WINDOW FRAME INSPECTION. COLD WORKING AND FREEZE PLUG INSTALLATION (AIRPLANES THAT COULD NOT BE REPAIRED WITH THE MAXIMUM FREEZE PLUG DIAMETER ALLOWED IN ACCORDANCE WITH BOEING SERVICE BULLETIN 737-53.1303) MOS SB 737-53-1345 TABLE 1.2.1 SB 737-53-1345 TABLE 1.2 .2 AFL ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 2: NUMBER 3 WINDOW FRAME SEPARATION (CONDITION 1: CRACK IN SECOND LOWER CORNER FASTENER HOLE THAT CANNOT BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE PLUG) MOS ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 3: NUMBER 3 WINDOW FRAME CUTTING (CONDITION 1 CRACK IN SECOND LOWER CORNER FASTENER HOLE THAT CANNOT BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE PLUG) MOS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 135 Of 748 Camp Systems EFTA00618426 C O Mien MPwinin Mernund up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1345 TABLE 1.2.3 SB 737-53-1345 TABLE 1.2.4 ACCOMPLISH FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 4: NUMBER 3 WINDOW FRAME PERMANENT REPAIR INSTALLATION (CONDITION 1: CRACK IN SECOND LOWER CORNER FASTENER HOLE THAT CANNOT BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE PLUG) MOS REPLACE FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN THE NUMBER 3 WINDOW FRAME (CONDITION 1: CRACK IN SECOND LOWER CORNER FASTENER HOLE THAT CANNOT BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE PLUG) MOS SB 737-53-1345 TABLE 1.3 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 4: NUMBER 3 WINDOW FRAME PERMANENT REPAIR INSTALLATION (CONDITION 2: CRACK IN SECOND LOWER CORNER FASTENER HOLE THAT CAN BE REMOVED WITH A 0.450 INCH DIAMETER FREEZE PLUG) MOS SB 737-53-1345 TABLE 2.1.1 SB 737-53-1345 TABLE 2.1.2 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 5: POST PERMANENT REPAIR INSTALLATION PERMANENT REPAIR TRIPLER HFEC INSPECTION (AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND TRIPLER INSTALLED) MOS AFL ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 6: POST PERMANENT REPAIR INSTALLATION NUMBER 3 WINDOW FRAME HFEC INSPECTION (AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND TRIPLER INSTALLED) MOS AFL SB 737-53-1345 TABLE ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR 2.2.1 . SERVICE BULLETIN PART 5: POST PERMANENT REPAIR INSTALLATION PERMANENT REPAIR TRIPLER HFEC INSPECTION (CONDITION 1: NO CRACK INDICATION FOUND) MOS SB 737-53-1345 TABLE 2.2.2 AFL ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 6: POST PERMANENT REPAIR INSTALLATION NUMBER 3 WINDOW FRAME HFEC INSPECTION (CONDITION 1: NO CRACK INDICATION FOUND) MOS AFL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 136 Of 748 @ Camp Systems EFTA00618427 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53-1345 TABLE 2.3 CONTACT FUSELAGE - STRUCTURE AROUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN THE BOEING COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (CONDITION 2: ANY CRACK INDICATION FOUND) MOS SB 737-53-1345 TABLE 3.1 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 7: POST PERMANENT REPAIR INSTALLATION REPAIR DOUBLER LFEC INSPECTION (AIRPLANES WITH THE PERMANENT REPAIR DOUBLER AND TRIPLER INSTALLED) MOS AFL SB 737-53-1345 TABLE 3.2 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN PART 7: POST PERMANENT REPAIR INSTALLATION REPAIR DOUBLER LFEC INSPECTION (CONDITION 1: NO CRACK INDICATION FOUND) MOS AFL SB 737-53-1345 TABLE 3.3 ACCOMPLISH FUSELAGE - STRUCTURE MOUND OPENINGS - NUMBER 3 WINDOW FRAME - PERMANENT REPAIR . SERVICE BULLETIN THE BOEING COMPANY FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (CONDITION 2: ANY CRACK INDICATION FOUND) MOS SB 737-53A1222 R1 POINT D SPLICE FITTING REPLACEMENT (SUPERSEDED BY 737-53A1222 R2). SERVICE BULLETIN SUPERSEDED MOS SB 737-53A1222 R2 FUSELAGE - SECTION 41 CAB - POINT D SPLICE FITTING REPLACEMENT (SUPERSEDED BY 737-53A1222 R3). SERVICE SUPERSEDED BULLETIN MOS SB 737-53A1222 R3 FUSELAGE - SECTION 41 CAB - POINT D SPLICE FITTING REPLACEMENT (SUPERSEDED BY 737-53A1222 R4). SERVICE SUPERSEDED BULLETIN MOS SB 737-53A1222 R4 FUSELAGE - SECTION 41 CAB - POINT D SPLICE FITTING REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 20-OCT-2005 AFL 13500 (s) SB 737-53A1238 FUSELAGE - SECTION 08 - STRUCTURE - INSPECTION (SUPERSEDED BY SS 737-53A1238 R1). SERVICE BULLETIN SUPERSEDED MOS - (s) 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 137 Of 748 @ Camp Systems EFTA00618428 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1238 RI FUSELAGE - SECTION 48 - STRUCTURE - INSPECTION. SERVICE BULLETIN RECOMMENDED DAYS 30 (s) 10-OCT-2002 SB 737-53A1242 SEALING AROUND VERTICAL FIN LUGS. SERVICE BULLETIN MOS 18 (s) I 7-OCT-2002 AFL 2500 SB 737-53A1242 RI FUSELAGE - STRUCTURE ATTACHMENT FITTINGS - INADEQUATE SEALING AROUND VERTICAL FIN LUGS. SERVICE COMPUED WITH - PREVIOUSLY BULLETIN MOS )8 (s) 13-OCT-2006 28-APR-2005 2686:29 AFL 2500 644 SB 737-53A1242 R2 FUSELAGE - STRUCTURE ATTACHMENT FITTINGS-INADEQUATE SEALING AROUND VERTICAL FIN LUGS. SERVICE COMPUED WITH - IAW THE AD BULLETIN MOS 22-AUG-2008 23-APR-2007 -(s) 3260:48 AFL 782 SB 737-53A1248 NDT INSPECTION OF WEB AT "r CHORD-ABOVE STR 15L AND ISR (STR SL TO 7L AND STR SR TO 9R). SERVICE RECOMMENDED BULLETIN MOS 09-SEP-2004 S8 737-53A1248 E(A)1 INSPECT (NON-DESTRUCTIVE TEST) NDT INSPECTION OF WEB AT 'r CHORD-ABOVE STR ISL AND 15R (STR 5L TO 7L RECOMMENDED AND STR 5R TO 9R). SERVICE BULLETIN (STR SL TO 7L AND STR SR TO 9R) MOS 09-SEP-2004 AFL 25000 (s) SB 737-53A1248 E(A)2 INSPECT (NON-DESTRUCTIVE TEST) NDT INSPECTION OF WEB AT 'r CHORD-ABOVE STR 15L AND 15R (STR 5L TO 7L RECOMMENDED AND STR 5R TO 9R). SERVICE BULLETIN (ABOVE STR 15L AND 15R EXCEPT 5L TO 7L AND 5R TO BR) MOS 09-SEP-2004 AFL 25000 (s) SB 737-53A1248 E(B) INSPECT (NON-DESTRUCTIVE TEST) NDT INSPECTION OF WEB AT -NT CHORD-ABOVE STR 15L AND 15R (STR 5L TO 7L RECOMMENDED AND STR 5R TO 9R). SERVICE BULLETIN 'Y-CHORD BELOW S-15UR MOS 09-SEP-2004 AFL 66000 (s) SB 737-53A1248 RI FUSELAGE - BODY STATION 1016 AFT PRESSURE BULKHEAD WEB - INSPECTION FOR WEB CRACKS AT THE Y-CHORD. SERVICE BULLETIN MOS 10-SEP-2007 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 138 Of 748 @ Camp Systems EFTA00618429 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1248 R1 E (A) INSPECTION FUSELAGE - BODY STATION 1016 AFT PRESSURE BULKHEAD WEB - INSPECTION FOR WEB 1 CRACKS AT THE Y-CHORD. SERVICE BULLETIN - NDT - OF WEB AT 1Y" CHORD STR 15L AND 15R (STR 5L TO 7L AND STR 5R TO 9R) MOS 10-SEP-2007 AFL 25000 (s) SB 737-53A1248 RI E (A) INSPECTION FUSELAGE - BODY STATION 1016 AFT PRESSURE BULKHEAD WEB- INSPECTION FOR WEB 2 CRACKS AT THE Y-CHORD. SERVICE BULLETIN - NDT - OF WEB AT'Y" CHORD (ABOVE STR 15L AND 15R EXCEPT 5L TO 7L AND 5R TO 9R) 10-SEP-2007 SB 737-53A1248 RI E (B) 10-SEP-2007 SB 737-53A1253 SB 737-53A1253 RI 13-MAY-2011 MOS AFL 25000 (s) INSPECTION FUSELAGE - BODY STATION 1016 AFT PRESSURE BULKHEAD WEB - INSPECTION FOR WEB CRACKS AT THE Y-CHORD. SERVICE BULLETIN - NDT - OF WEB ATI"' CHORD -BELOW S-15UR MOS AFL 66000 (s) FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR WEB OIL CANNING (SUPERSEDED BY SB 737-53A1253 R1). SERVICE BULLETIN MOS 22-AUG-2008 3260:48 AFL 782 FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR WEB OIL CANNING. SERVICE BULLETIN MOS (EFF) SUPERSEDED COMPUED WITH - TABLE 1 I.A.W. AD 2007-25-03 / TABLE 2 8 3 ARE N/A TO At SB 737-53A1253 RI GENERAL VISUAL INSPECTION FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR MANDATORY TABLE 1.1 WEB OIL CANNING. SERVICE BULLETIN FOR OIL CAN CONDITIONS OR BULGES FOR ALL AIRPLANES MOS RECURRING SB 737-53A1253 RI TABLE 1.2 SB 737-53A1253 RI TABLE 2.1 AFL 15000 15000 PERFORM FUSELAGE - GENERAL - STATION 1016 Af T PRESSURE BULKHEAD - INSPECTION FOR WEB OIL CANNING. MANDATORY SERVICE BULLETIN OPTION A: STEP 1 OF 2 OR STEP 2 OF 2 OR OPTION B MOS BF/F (s) GENERAL VISUAL INSPECTION FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR MANDATORY WEB OIL CANNING. SERVICE BULLETIN TO IDENTIFY REPAIRS TO THE GORE WEB 8 VERIFY THAT THEY HAVE FOLLOW-ON INSPECTIONS (SRM SECTION 53-80-08-2R) FOR ALL AIRPLANES MOS AFL 15000 15000 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 139 Of 748 @ Camp Systems EFTA00618430 COMP Astant.fran 'Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1253 RI TABLE 2.2 DETERMINE FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR WEB OIL CANNING. SERVICE BULLETIN FAA APPROVED FOLLOW-ON INSPECTION PROCEDURES. THRESHOLDS. AND REPEAT INTERVALS AND INCORPORATE INTO MAINTENANCE PROGRAM IF A REPAIR IS FOUND THAT DOES NOT HAVE FOLLOW-ON SUPPLEMENTAL INSPECTIONS MOS 12(s) MANDATORY SB 737-53A1253 RI FM FUSELAGE - GENERAL - STATION 1016 AFT PRESSURE BULKHEAD - INSPECTION FOR WEB OIL CANNING. MANDATORY TABLE 3 SERVICE BULLETIN APPROVED REPAIR INSPECTION PROCEDURES MOS AFL 36000 (s) SB 737-53A1253 TABLE 1 PERFORM A GENERAL VISUAL INSPECTION FOR OIL CAN CONDITIONS OR BULGES AS GIVEN IN ACCOMPLISHMENT INSTRUCTIONS. 3.8.2 OR 3.8.3. SERVICE BULLETIN MOS 22-AUG-2008 I8-MAY-2007 3260:48 AFL 10000 (s) 782 SB 737-53A1253 TABLE 2 GENERAL VISUAL INSPECTION TO IDENTIFY REPAIRS TO THE GORE WEB 8 VERIFY THAT THEY HAVE FOLLOW-ON INSPECTIONS (SRM SECTION 53-80-08-2R). SERVICE BULLETIN MOS 22-AUG-2008 I8-MAY-2007 - (s) 3260:48 AFL 782 SB 737-53A1253 TABLE 3 FM APPROVED REPAIR INSPECTION PROCEDURES. SERVICE BULLETIN MOS 22-AUG-2008 I8-MAY-2007 3260:48 SB 737-53A1289 SB 737-53A1289 R1 I8-NOV-2009 SB 737-53A1289R1 TABLE (1.1) I8-NOV-2009 AFL 24000 (s) 782 INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN MOS AFL INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN MOS SUPERSEDED RECOMMENDED EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED SCRIBE LINE FOR ANY SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.6.1. PART 1 -SKIN LAP JOINT - ZONE 1 INSPECTION (GROUP 1-5) MOS AFL 4000 (s) COMPLIED WITH NOT APPLICABLE NOT APPLICABLE 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 140 Of 748 @ Camp Systems EFTA00618431 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1289 RI TABLE (1.10) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN . HFEC INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10.A. PART 10 - LRTS PROGRAM INSPECTION.IN ZONE 17 (GROUP 1-5) MOS RECOMMENDED AFL 40O00 (s) SS 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED TABLE (1.11) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.6.10.8. PART 10 -LRTS PROGRAM INSPECTION. IN ZONE 18 (GROUP 1-5) MOS AFL 50000 (s) S8 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED TABLE (1.12) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.6.10.C. PART 10 -LRTS PROGRAM INSPECTION. IN ZONE 19 (GROUP 1-5) SB 737-53A1289 RI TABLE (1.14) S8 737-53A1289 RI TABLE (1.2) I8-NOV-2009 MOS AFL 50000 (s) CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR ADDITIONAL INSPECTIONS OR REPAIR (GROUP 1-5) MOS RECOMMENDED AFL 75000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.2. PART 2 -SKIN LAP JOINT - ZONE 2 INSPECTION (GROUP 1-5) MOS AFL 40O0 (s) SS 737-53A1289 RI PERFORM INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN INSPECTIONS AS NEEDED IF ANY RECOMMENDED TABLE (1.4) SCRIBE LINE IS FOUND (GROUP 1-5) S8 737-53AI289 RI TABLE (1.7) MOS BF/F (s) HFEC INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AND UT INSPECTION OF THE SCRIBE LINE RECOMMENDED FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.9. PART 9 - SCRIBE UNE INSPECTION. IN ZONE 1 (GROUP 1-5) MOS AFL 40000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 141 Of 748 @ Camp Systems EFTA00618432 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 737-53A1289 RI TABLE (1.8) SS 737-53A1289 Ft1 TABLE (10.1) HFEC INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN INSPECTION AND UT INSPECTION OF THE RECOMMENDED SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.9. PART 9 - SCRIBE LINE IN ZONE 2 (GROUP 1-5) INSPECTION. MOS AFL 50000 (s) DETERMINE INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN THE THICKNESS OF THE PARENT RECOMMENDED SKIN IN THE AREA OF THE EXTERNAL APPROVED REPAIR BETWEEN STA 360 AND STA 1016 AND BELOW S-10L AND 5-10R WHICH IS 20 INCHES OR LONGER IN THE FORE AND AFT DIRECTION WITH NO CIRCUMFERENTIAL LIMITATIONS MOS AFL 40O0 (s) SS 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED TABLE (10.11) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM EXTERNAL APPROVED REPAIR REPEAT INSPECTION.(G) SCRIBE LINE IS FOUND COMMON TO EXTERNAL APPROVED REPAIR WITH PARENT SKIN THICKNESS 0.040 - 0.044 INCH AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION MOS AFL 1500 (s) SS 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED TABLE (10.12) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM EXTERNAL APPROVED REPAIR REPEAT INSPECTION.(G) SCRIBE LINE IS FOUND COMMON TO EXTERNAL APPROVED REPAIR WITH PARENT SKIN THICKNESS 0.045 - 0.049 INCH AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION 61OS AFL 2000 (s) SS 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED TABLE (10.13) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM EXTERNAL APPROVED REPAIR REPEAT INSPECTION.(G) SCRIBE LINE IS FOUND COMMON TO EXTERNAL APPROVED REPAIR WITH PARENT SKIN THICKNESS 0.050 - 0.055 INCH AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION. S8 737-53A1289 RI TABLE (10.15) MOS AFL 3000(s) CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR ADDITIONAL INSPECTIONS OR REPAIR ALL AIRPLANES WITH SCRIBE LINE USING A LRTS PROGRAM INSPECTION MOS AFL 75000 (s) RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 142 Of 748 @ Camp Systems EFTA00618433 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1289 RI TABLE (10.2) SB 737-53AI289 RI TABLE (10.3) SB 737-53A1289 R1 TABLE (10.4) I8-NOV-2009 SB 737-53AI289 RI TABLE (10.5) I8-NOV-2009 SB 737-53A1289 RI TABLE (11.1) 18-N0V-2809 DETERMINE INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN THE THICKNESS OF THE PARENT RECOMMENDED SKIN IN THE AREA OF THE EXTERNAL APPROVED REPAIR EXISTING EXTERNAL APPROVED REPAIR LOCATED BETWEEN STA 360 AND STA 1016 AND ABOVE S-10L AND S-10R WHICH IS 20 INCHES OR LONGER IN THE FORE AND AFT DIRECTION OR WIDER THAN 12 INCHES CIRCUMFERENTIALLY. (B) MOS AFL 4000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED SCRIBE LINE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.5. PART 5 - EXTERNAL APPROVED REPAIR - INSPECTION PARENT SKIN THICKNESS 0.040 - 0.044 INCH IN THE AREA OF THE EXTERNAL APPROVED REPAIR MOS AFL 4000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED SCRIBE LINE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.5. PART 5 - EXTERNAL APPROVED REPAIR - INSPECTION PARENT SKIN THICKNESS 0.045 - 0.049 INCH IN THE AREA OF THE EXTERNAL APPROVED REPAIR. MOS AFL 4000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED SCRIBE LINE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 32.5. PART 5 - EXTERNAL APPROVED REPAIR - INSPECTION (AXB) PARENT SKIN THICKNESS 0.050 - 0.055 INCH IN THE AREA OF THE EXTERNAL APPROVED REPAIR MOS AFL 4000 (s) DETERMINE INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN THE THICKNESS OF THE PARENT RECOMMENDED SKIN IN THE AREA OF THE INTERNAL APPROVED REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.6. PART 6- INTERNAL APPROVED REPAIR - INSPECTION.EXISTING INTERNAL APPROVED REPAIR LOCATED BETWEEN STA 360 AND STA 1016 AND BELOW 5-10L AND 5-10R AND THE SKIN CUTOUT IS GREATER THAN 20 INCHES LONG IN THE FORE AND AFT DIRECTION WITH NO CIRCUMFERENTIAL LIMITATIONS. MOS AFL 4000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 143 Of 748 @ Camp Systems EFTA00618434 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 737-53A1289 R1 TABLE (11.10) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM INTERNAL APPROVED REPAIR REPEAT INSPECTION SCRIBE LINE IS FOUND COMMON TO INTERNAL APPROVED REPAIR WITH PARENT SKIN THICKNESS 0.040 - 0.044 INCH AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION MOS RECOMMENDED AFL 2600 (s) SB 737-53A1289 RI EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN HFEC RECOMMENDED TABLE (11.11) INSPECTION AND UT INSPECTION OR UT PHASED ARRAY INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10- LRTS PROGRAM INTERNAL APPROVED REPAIR REPEAT INSPECTION SCRIBE LINE IS FOUND COMMON TO INTERNAL APPROVED REPAIR WITH PARENT SKIN THICKNESS 0.045 - 0.049 INCH AND WITHIN THE LIMITS OF A TYPICAL SCRIBE LINE WITH NO CRACK INDICATION SB 737-53A1289 RI TABLE (11.12) SB 737-53A1289 RI TABLE (11.2) I8-NOV-2009 S8 737-53A1289 RI TABLE (11.3) I8-NOV-2009 MOS AFL 2500 (s) CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR ADDITIONAL INSPECTIONS OR REPAIR. ALL AIRPLANES WITH SCRIBE LINE USING A LRTS PROGRAM INSPECTION MOS RECOMMENDED AFL 75000 (s) DETERMINE INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN THE THICKNESS OF THE PARENT RECOMMENDED SKIN IN THE AREA OF THE INTERNAL APPROVED REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.6. PART 6- INTERNAL APPROVED REPAIR - INSPECTION EXISTING INTERNAL APPROVED REPAIR LOCATED BETWEEN STA 360 AND STA 1016 AND ABOVE S-10L AND S-10R AND THE SKIN CUTOUT IS GREATER THAN 20 INCHES LONG IN THE FORE AND AFT DIRECTION OR WIDER THAN 12 INCHES CIRCUMFERENTIALLY MOS AFL 4000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN ANY SCRIBE RECOMMENDED UNE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.6. PART 6 - INTERNAL APPROVED REPAIR - INSPECTION PARENT SKIN THICKNESS 0.040 - 0.044 INCH INCHES IN THE AREA OF THE INTERNAL APPROVED REPAIR. MOS AFL 4000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 144 Of 748 @ Camp Systems EFTA00618435 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1289 RI TABLE (11.4) I8-NOV-20D9 SB 737-53AI289 RI TABLE (3.1) SB 737-53A1289 RI TABLE (3.11) SB 737-53A1289 RI TABLE (3.2) SB 737-53A1289 RI TABLE (3.4) SB 737-53A1289 RI TABLE (3.8) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED SCRIBE LINE AROUND THE EDGE OF THE REPAIR IN ACCORDANCE WITH ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.6. PART 6 - INTERNAL APPROVED REPAIR - INSPECTION PARENT SKIN THICKNESS 0.045 - 0.049 INCH IN THE AREA OF THE INTERNAL APPROVED REPAIR MOS AFL 4000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN OF CIRCUMFERENTIAL BUTT JOINT STA 887 BETWEEN S-10L AND 5-10R FOR ANY SCRIBE LINE IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.3. PART 3-CIRCUMFERENTIAL BUTT JOINT -INSPECTION. (GROUP 1-3.5-8.10) MOS AFL 40000 (s) CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR ADDITIONAL INSPECTIONS OR REPAIR FOR ALL AIRPLANES WITH SCRIBE LINE USING A LRTS PROGRAM INSPECTION. (GROUP 1-3.5-8. 10) MOS AFL 75000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN OF CIRCUMFERENTIAL BUTT JOINT STA 360 BETWEEN S-10L AND S-1 0R FOR ANY SCRIBE LINE IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.3. PART 3 -CIRCUMFERENTIAL BUTT JOINT -INSPECTION. (GROUP 1-3.5-8.10) MOS RECOMMENDED RECOMMENDED RECOMMENDED AFL 45000 (s) ACCOMPLISH INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN INSPECTIONS AS NEED FOR ANY RECOMMENDED SCRIBE LINE FOUND MOS BF/F (s) LFEC INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN - EXTERNAL - SLIDING PROBE INSPECTION RECOMMENDED OR AN INTERNAL MFEC INSPECTION OR AN EXTERNAL HFEC PENCIL PROBE INSPECTION OR AN INTERNAL HFEC INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS (GROUP 1-3.5-8. 10) PARAGRAPH 3.6.10.D. PART 10 - LRTS PROGRAM CIRCUMFERENTIAL BUTT JOINT - REPEAT INSPECTION STATION 360 (GROUP 1-3.5-8.10) MOS AFL 45000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 145 Of 748 @ Camp Systems EFTA00618436 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1289 RI TABLE (3.9) SB 737-53A1289 RI TABLE (6.1) 18-NOV-2009 SB 737-53A1289 RI TABLE (6.12) SB 737-53A1289 RI TABLE (6.13) SB 737-53A1289 RI TABLE (6.14) LFEC INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN - EXTERNAL - SLIDING PROBE INSPECTION RECOMMENDED OR AN INTERNAL MFEC INSPECTION OR AN EXTERNAL HFEC PENCIL PROBE INSPECTION OR AN INTERNAL HFEC INSPECTION OF THE SCRIBE LINE FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10.D. PART 10 - LRTS PROGRAM CIRCUMFERENTIAL BUTT JOINT -REPEAT INSPECTION. STATION 887 (GROUP 1-3.5-8. 10) MOS AFL 40000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 32.4. PART 4 -DECAL - INSPECTION. IN ZONE 6 (GROUP 2.7) MOS AFL 4000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AND HFEC RECOMMENDED INSPECTION OF THE SCRIBE LINES FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.6.10. PART 10 - LRTS PROGRAM REPEAT INSPECTION. (A)IN ZONE 6 (GROUP 2. 7) MOS AFL 10000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AND HFEC RECOMMENDED INSPECTION OF THE SCRIBE LINES FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.8.10. PART 10 - LRTS PROGRAM REPEAT INSPECTION. IN ZONE 7 (GROUP 2.7) MOS AFL WOO (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AND HFEC RECOMMENDED INSPECTION OF THE SCRIBE LINES FOR ANY CRACK IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.6.10. PART 10 - LRTS PROGRAM REPEAT INSPECTION IN ZONE 8 (GROUP 2.7) MOS AFL 2500 (s) SB 737-53A1289 RI CONTACT INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN BOEING FOR FOR ADDITIONAL RECOMMENDED TABLE (6.16) INSPECTIONS OR REPAIRALL AIRPLANES WITH SCRIBE LINE USING A LRTS PROGRAM INSPECTION (GROUP 2. 7) MOS AFL 75000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 146 Of 748 @ Camp Systems EFTA00618437 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1289 RI TABLE (6.2) I8-NOV-2009 SB 737-53A1289 RI TABLE (6.3) I8-NOV-2009 ACCOMPLISH INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN EXTERNAL GENERAL VISUAL INSPECTIONFOR ANY SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.4. PART 4 - DECAL - INSPECTIONIN ZONE 6 (GROUP 2. 7) MOS RECOMMENDED AFL 4000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.4. PART 4 - DECAL - INSPECTION. IN ZONE 7 (GROUP 2. 7) MOS AFL 4000 (s) SB 737-53A1289 RI PERFORM INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN AN EXTERNAL GENERAL VISUAL RECOMMENDED TABLE (6.4) INSPECTION FOR ANY SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 32.4. PART 4 - DECAL -INSPECTION. IN ZONE 7 (GROUP 2.7) I8-NOV-2009 SB 737-53A1289 RI TABLE (6.5) I8-NOV-2009 MOS AFL 4000 (s) EXTERNAL - DETAILED INSPECTION INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN FOR ANY RECOMMENDED SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.4. PART 4 -DECAL - INSPECTION. IN ZONE 8 (GROUP 2.7) MOS AFL 4000 (s) SB 737-53A1289 Ft1 ACCOMPLISH INSPECTION OF THE SKIN FOR SCRIBE LINES. SERVICE BULLETIN EXTERNAL GENERAL VISUAL RECOMMENDED TABLE (6.6) INSPECTION FOR ANY SCRIBE LINE AT THE LOCATIONS IN ACCORDANCE WITH THE ACCOMPLISHMENT INSTRUCTIONS PARAGRAPH 3.B.4. PART 4 - DECAL -INSPECTION IN ZONE 8 (GROUP 2.7) I8-NOV-2009 SB 737-53A1325 03-DEC-2013 MOS AFL 4000 (s) FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER MANDATORY CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN MOS SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME 1.01 LH WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE LEFT SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE LEFT SIDE LOWER FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1 (FOR ALL AIRPLANES) (GROUP 1) MOS AFL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 147 Of 748 @ Camp Systems EFTA00618438 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1325 TABLE 1.01 RH DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1 (FOR ALL AIRPLANES) (GROUP 1) MOS AFL SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME 1.02 LH WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE LEFT SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE LEFT SIDE LOWER FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.J. (IF NO CRACK FOUND ON BOTH THE LEFT AND RIGHT SIDES) (GROUP 1) MOS - Is) SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME 1.02 RH WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.J. (IF NO CRACK FOUND ON BOTH THE LEFT AND RIGHT SIDES) (GROUP 1) MOS - (s) SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 1.03 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 1 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP IA. (IF ANY CRACK FOUND. ON THE LEFT SIDE. LESS THAN OR EQUAL TO 0.18 INCHES) (GROUP 1) MOS SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 1.04 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 1 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.8. (ANY CRACK FOUND. ON THE RIGHT SIDE. LESS THAN OR EQUAL TO 0.18 INCHES) (GROUP 1) MOS SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 1.05 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 2 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.0 (IF ANY CRACK FOUND. ON THE LEFT SIDE. GREATER THAN 0.18 INCHES AND LESS THAN OR EQUAL TO 1.50 INCHES IN LENGTH. THAT DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 1) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 148 Of 748 @ Camp Systems EFTA00618439 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 1.06 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 2 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.0. (IF ANY CRACK FOUND. ON THE RIGHT SIDE. GREATER THAN 0.18 INCHES AND LESS THAN OR EQUAL TO 1.50 INCHES IN LENGTH. THAT DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 1) MOS SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 1.07 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 3 IN ACCOR DANCE WITH PARAGRAPH 3.B..WORK INSTRUCTIONS. PART 2. STEP 1.E. (IF ANY CRACK FOUND. ON THE LEFT SIDE. GREATER THAN 0.18 INCHES. THAT EXTENDS INTO THE FLANGE OF THE INNER CHORD) (GROUP 1) MOS SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 1.08 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 3 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP IF. (IF ANY CRACK FOUND. ON THE RIGHT SIDE. GREATER THAN 0.18 INCHES. THAT EXTENDS INTO THE FLANGE OF THE INNER CHORD) (GROUP 1) MOS SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 1.09 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING. (IF ANY CRACK FOUND GREATER THAN 1.50 INCHES IN LENGTH AND DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 1) MOS SB 737-53A1325 TABLE ACCOMPLISH FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB 1.10 AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN PREVENTIVE MODIFICATION ON THE LEFT SIDE IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.H. (IF NO CRACK FOUND ON THE LEFT SIDE AND A REPAIR WAS ACCOMPLISHED ON THE RIGHT SIDE) (GROUP 1) MOS SB 737-53A1325 TABLE ACCOMPLISH FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB 1.11 AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN PREVENTIVE MODIFICATION ON THE RIGHT SIDE IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 1.1. (IF NO CRACK FOUND ON THE RIGHT SIDE AND A REPAIR WAS ACCOMPLISHED ON THE LEFT SIDE) (GROUP 1) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 149 Of 748 @ Camp Systems EFTA00618440 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1325 TABLE 2.01 DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2 (ALL AIRPLANES) (GROUP 2) MOS AFL SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME 2.02 WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.E. (NO CRACK FOUND ON THE RIGHT SIDE) (GROUP 2) MOS - Is) SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 2.03 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 1 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.A. (ANY CRACK FOUND LESS THAN OR EQUAL TO 0.18 INCHES) (GROUP 2) MOS SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 2.04 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 2 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.8. (ANY CRACK FOUND GREATER THAN 0.18 INCHES AND LESS THAN OR EQUAL TO 1.50 INCHES IN LENGTH. THAT DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 2) MOS SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 2.05 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 3 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.C. (ANY CRACK FOUND GREATER THAN 0.18 INCHES. THAT EXTENDS INTO THE FLANGE OF THE INNER CHORD) (GROUP 2) MOS SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 2.06 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND GREATER THAN 1.50 INCHES IN LENGTH AND DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 2) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 150 Of 748 @ Camp Systems EFTA00618441 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 2.07 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR LEFT SIDE INSPECTION AND MODIFICATION INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ALL AIRPLANES) (GROUP 2) MOS AFL SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME 3.01 WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2 (ALL AIRPLANES) (GROUP 3) MOS AFL SB 737-53A1325 TABLE DETAILED INSPECTION FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME 3.02 WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN OF THE RIGHT SIDE LOWER FRAME WEB AND INNER CHORD AND AN OPEN HOLE HFEC INSPECTION OF THE RIGHT SIDE LOWER FRAME WEB IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2. (NO CRACK FOUND) (GROUP 3) MOS - (s) SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 3.03 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 1 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.A. (ANY CRACK FOUND LESS THAN OR EQUAL TO 0.18 INCHES) (GROUP 3) MOS SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 3.04 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 2 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.8. (ANY CRACK FOUND GREATER THAN 0.18 INCHES AND LESS THAN OR EQUAL TO 1.50 INCHES IN LENGTH. THAT DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 3) MOS SB 737-53A1325 TABLE REPAIR FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 3.05 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN 3 IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 2. STEP 2.C. (ANY CRACK FOUND GREATER THAN 0.18 INCHES. THAT EXTENDS INTO THE FLANGE OF INNER CHORD) (GROUP 3) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 151 Of 748 @ Camp Systems EFTA00618442 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 3.06 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND GREATER THAN 1.50 INCHES IN LENGTH AND DOES NOT EXTEND INTO THE FLANGE OF THE INNER CHORD) (GROUP 3) MOS SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.01.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4. STEP 2.A. (AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 1) MOS - Is) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.01.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4. STEP 2.8. (AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.02.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4. STEP 5.A. (AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.02.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4. STEP 5.8. (AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.03.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.A. (AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1) MOS - Is) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.03.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.8. (AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1) MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 152 Of 748 @ Camp Systems EFTA00618443 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1325 TABLE 4.04.1 HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.A. (AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 1) MOS - Is) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.04.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.8. (AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPUSHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1) MOS - Is) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.05 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 4. STEP 3. (AIRPLANES WITH REPAIR 2 ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.06 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 3. (AIRPLANES WITH REPAIR 2 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1) MOS - Is) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.07 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 4. STEP 4. (AIRPLANES WITH REPAIR 3 ACCOMPLISHED. ON THE LEFT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 1) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 4.08 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 4. (AIRPLANES WITH REPAIR 3 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 1) MOS - (s) SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 4.09 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND) (GROUP 1) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 153 Of 748 @ Camp Systems EFTA00618444 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1325 TABLE 5.01.1 HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.A. (AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 2) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 5.01.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.8. (AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 2) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 5.02.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.A. (AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 2) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 5.02.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.8. (AIRPLANES WITH THE PREVENTNE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 2) MOS - Is) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 5.03 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 3. (AIRPLANES WITH REPAIR 2 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 2) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 5.04 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 4. (AIRPLANES WITH REPAIR 3 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 2) MOS - (s) SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 5.05 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND) (GROUP 2) MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 154 Of 748 @ Camp Systems EFTA00618445 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1325 TABLE 6.01.1 HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE LEFT SIDE FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 4. STEP 6.A. (ALL AIRPLANES) (GROUP 3) MOS AFL SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 6.01.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE LEFT SIDE INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 4. STEP 6.8. (ALL AIRPLANES) (GROUP 3) MOS AFL SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 802.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.A. (AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 3) MOS - SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 802.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 2.8. (AIRPLANES WITH THE REPAIR 1 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 3) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 803.1 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF FRAME WEB AND FRAME INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.A. (AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 3) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 803.2 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 5. STEP 5.8. (AIRPLANES WITH THE PREVENTIVE MODIFICATION ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 3) MOS - (s) SB 737-53A1325 TABLE HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER 6.04 CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 3. (AIRPLANES WITH REPAIR 2 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS S8) (GROUP 3) MOS - Is) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 155 Of 748 @ Camp Systems EFTA00618446 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-53A1325 TABLE 6.05 HFEC FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN INSPECTION OF THE FRAME WEB AND INNER CHORD IN ACCORDANCE WITH PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 5. STEP 4. (AIRPLANES WITH REPAIR 3 ACCOMPLISHED. ON THE RIGHT SIDE. IN ACCORDANCE WITH THIS SB) (GROUP 3) MOS - (s) SB 737-53A1325 TABLE CONTACT FUSELAGE - FRAMES AND BULKHEADS - BODY STATION (STA) 727 BULKHEAD LOWER FRAME WEB AND 6.06 INNER CHORD - INSPECTION. PREVENTIVE MODIFICATION AND REPAIR. SERVICE BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING (ANY CRACK FOUND) (GROUP 3) MOS SB 737-54-1039 STRUT -APPLICATION OF °saki ANT AT BULKHEAD/DIAGONAL BRACE INTERFACE. SERVICE BULLETIN 13-JUN-2002 MOS 18 (5) 800 SB 737-54-1039 RI APPLICATION OF SEALANT AT BULKHEAD/DIAGONAL BRACE INTERFACE, SERVICE BULLETIN COMPLIED WITH MOS 18(s) 11-MAY-2006 IO-OCT-2002 2619:10 AFL 3500 629 SB 737-54-1040 14-NOV-2002 GENERAL VISUAL INSPECTION OF SEALANT ON ENGINE STRUT STRUCTURE. SERVICE BULLETIN MOS 18 (s) AFL 3500 SB 737-54-1040 RI APPLICATION OF SEALANT ON ENGINE STRUT STRUCTURE. SERVICE BULLETIN COMPLIED WITH MOS 18 (s) 18-AUG-2006 14-NOV-2002 2633:50 AFL 3500 633 SB 737-54-1040 R2 APPLICATION OF SEALANT ON ENGINE STRUT STRUCTURE. SERVICE BULLETIN MOS 18 (5) 07-NOV-2006 AFL 3500 SB 737-54-1040 R3 APPLICATION OF SEALANT ON ENGINE STRUT STRUCTURE. SERVICE BULLETIN MOS 18 (5) 14-NOV-2002 AFL 3500 SB 737-54-1041 ENGINE STRUT AFT FAIRING. SERVICE BULLETIN COMPLIED WITH 22,JAN-2004 MOS AR 24-AUG-2007 2968:28 AFL 699 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 156 Of 748 @ Camp Systems EFTA00618447 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-54-1041 PART 1811 INSPECT ENGINE STRUT AFT FAIRING. SERVICE BULLETIN FOR FLUID ACCUMULATION MOS 30 (s) 22-JAN-2004 24-AUG-2007 2968:28 AFL 4000 699 SB 737-54-1041 PART MODIFY ENGINE STRUT AFT FAIRING. SERVICE BULLETIN SEALS IIIBN 22-JAN-2004 MOS 24-AUG-2007 2968:28 AFL 9000 (s) 699 SB 737-54-1041 RI ENGINE STRUT AFT FAIRING. SERVICE BULLETIN MOS 24-AUG-2007 OI -DEC-2005 2968:28 COMPUED WITH COMPUED WITH RECOMMENDED COMPUED WITH - IAW THE AD AD 2006-07-04 /MARTS 1.11 AND III MOD SB 737-54-1041R1 REF (R2) - IN 02) AFL 699 SB 737-54-1041 RI PART INSPECT ENGINE STRUT AFT FAIRING. SERVICE BULLETIN FOR FLUID ACCUMULATION COMPUED WITH 18.11 MOS 30 (s) 24-AUG-2007 OI -DEC-2005 2968:28 AFL 4000 699 SB 737-54-1041 RI PART MODIFY ENGINE STRUT AFT FAIRING. SERVICE BULLETIN SEALS RECOMMENDED COMPUED WITH IIIBN MOS 24-AUG-2007 12-JAN-2005 - (s) 2968:28 AFL 699 SB 737-54-1041 R2 NACELLES / PYLONS - AFT FAIRING - FLUID ACCUMULATION IN ENGINE STRUT AFT FAIRING -INSTALLATION OF NEW ENGINE STRUT AFT FAIRING SEALS. SERVICE BULLETIN MOS 03-OCT-2007 SB 737-54-1041 R2 PART INSPECT NACELLES / PYLONS - AFT FAIRING - FLUID ACCUMULATION IN ENGINE STRUT AFT FAIRING -INSTALLATION 1811 OF NEW ENGINE STRUT AFT FAIRING SEALS. SERVICE BULLETIN FOR FLUID ACCUMULATION MOS 30 (s) 03-OCT-2007 AFL 4000 SB 737-54-1041 R2 PART MODIFY NACELLES / PYLONS - AFT FAIRING - FLUID ACCUMULATION IN ENGINE STRUT AFT FAIRING -INSTALLATION III & IV OF NEW ENGINE STRUT AFT FAIRING SEALS. SERVICE BULLETIN SEALS 03-OCT-2007 MOS AFL 9000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 157 Of 748 @ Camp Systems EFTA00618448 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-54-1042 I2-FEB-2004 SB 737-54-1042 RI ENGINE STRUT UPPER LINK - INSPECTION / MODIFICATION. SERVICE BULLETIN 30-JUL-2009 SB 737-54-1043 NACELLES/PYLONS - STRUT DRAINS AND SEALS - AFT FAIRING DRAIN TUBE ASSEMBLY REPLACEMENT.. SERVICE BULLETIN 02-MAY-2007 ENGINE STRUT UPPER LINK-INSPECTION MODIFICATION. SERVICE BULLETIN MOS 30 (s) MOS 30 (s) MOS 60 (s) RECOMMENDED SB 737-54-1043 RI STRUT DRAINS AND SEALS - AFT FAIRING DRAIN TUBE ASSEMBLY SUPERSEDED REPLACEMENT.(SUPPERSEDED BY 737-54-1043 R2). SERVICE BULLETIN MOS - Is) SB 737-54-1043 R2 NACELLES/PYLONS- STRUT DRAINS AND SEALS- AFT FAIRING DRAIN TUBE ASSEMBLY REPLACEMENT SUPERSEDED (SUPERSEDED BY SB 737-54-1043 R3). SERVICE BULLETIN MOS - Is) SB 737-54-1043 R3 NACELLES/PYLONS - STRUT DRAINS AND SEALS - AFT FAIRING DRAIN TUBE ASSEMBLY REPLACEMENT. SERVICE RECOMMENDED BULLETIN MOS 60 (s) 31-DEC-2012 SB 737-54-1045 NACELLES/PYLONS - HEAT INSULATION BLANKETS - REPLACEMENT. SERVICE BULLETIN MOS 29-AUG-2011 25-JUL-2007 - (s) 3533:32 SB 737-54-1046 SB 737-54-1046 RI AFL 863 NACELLES/PYLONS -STRUT TO WING FAIRINGS - THUMBNAIL FAIRING EDGE SEAL REPLACEMENT (SUPERSEDED BY SUPERSEDED SB 737-54-1046 RI), SERVICE BULLETIN MOS - (s) NACELLES/PYLONS - STRUT TO WING FAIRINGS - THUMBNAIL FAIRING EDGE SEAL REPLACEMENT. SERVICE BULLETIN MOS SB 737-54-1047 NACELLES/PYLONS - STRUT AFT FAIRING HEAT SHIELD ASSEMBLY AND INSULATION BLANKET INSTALLATION. RECOMMENDED SERVICE BULLETIN MOS 14-SEP-2012 COMPLIED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 158 Of 748 @ Camp Systems EFTA00618449 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SS 737-54-1049 13-SEP-2012 NACELLES/PYLONS- STRUT DRAINS AND SEALS - STRUT SEAL PLANE ACCESS PANELS LEAK INSPECTION. SERVICE RECOMMENDED BULLETIN MOS SB 737-54-1049 TABLE 1.1 DETAILED INSPECTION NACELLES/PYLONS- STRUT DRAINS AND SEALS - STRUT SEAL PLANE ACCESS PANELS LEAK RECOMMENDED INSPECTION. SERVICE BULLETIN OF THE STRUT SEAL PLANE ACCESS PANELS FOR ANY LEAK (GROUP 1 AIRPLANES) MOS 30 (s) AFL 9000 SB 737-54-1049 TABLE 1.2 DETAILED INSPECTION NACELLES/PYLONS- STRUT DRAINS AND SEALS - STRUT SEAL PLANE ACCESS PANELS LEAK INSPECTION. SERVICE BULLETIN OF THE STRUT SEAL PLANE ACCESS PANELS FOR ANY LEAK (GROUP 2 AIRPLANES) MOS 36 (s) RECOMMENDED SB 737-55-1062 LEADING EDGE RIB. SERVICE BULLETIN RECOMMENDED MOS 10-AUG-2000 - (s) SB 737-55-1063 TAB MAST FITTING. SERVICE BULLETIN RECOMMENDED COMPLIED WITH - CM MOS 13-SEP-1999 01 -JUL-1999 - SB 737-55-1063 RI TAB MAST FITTING. SERVICE BULLETIN RECOMMENDED MOS 18 (s) 14-SEP-2000 AFL 4000 SB 737-55-1067 ELEVATOR HINGE PLATES. SERVICE BULLETIN NOT APPLICABLE - NO ACTION REQUIRED MOS 22-AUG-2003 1342 AFL 351 SB 737-55-1069 LOWER CLOSURE RIB & RUDDER HINGE PLATE NUT. SERVICE BULLETIN RECOMMENDED MOS 31-AUG-2000 - (s) SB 737-55-1074 INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS. SERVICE BULLETIN RECOMMENDED COMPLIED WITH - PERMANENT REPAIR. PART 3 OF SB. MOS 09-AUG-2010 15-AUG-2000 3448:31 AFL 841 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 159 Of 748 @ Camp Systems EFTA00618450 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-55-1074 PART 1 ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS. SERVICE BULLETIN INSPECTION MOS 18 (s) IS-AUG-2002 09-AUG-20I0 3448:31 AFL 841 SB 737-55-1074 PART 2 ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS. SERVICE BULLETIN INTERIM REPAIR MOS 18 (s) 22-AUG-2008 3260:48 COMPLIED WITH - PERMANENT REPAIR. PART 3 OF SB. COMPLIED WITH AFL 782 SB 737-55-1074 PART 3 ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS. SERVICE BULLETIN PERMANENT REPAIR COMPLIED WITH - PERMANENT REPAIR. PART 3 OF SB. MOS 09-AUG-2010 - (s) 3448:31 AFL 841 SB 737-55-1074 RI INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS BETWEEN THE HORIZONTAL STABILIZERS AND THE RECOMMENDED COMPLIED WITH - PERMANENT REPAIR HORIZONTAL STABILIZER CENTER SECTION. SERVICE BULLETIN MOS 29-AUG-2011 18-DEC-2003 3533:32 AFL 863 SB 737-55-1074 RI PART ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS BETWEEN THE HORIZONTAL STABILIZERS COMPLIED WITH 1 AND THE HORIZONTAL STABILIZER CENTER SECTION. SERVICE BULLETIN INSPECTION MOS 18 (5) 29-AUG-20I I 18-DEC-2003 3533:32 AFL 863 SB 737-55-1074 RI PART ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS BETWEEN THE HORIZONTAL STABILIZERS RECOMMENDED 2 AND THE HORIZONTAL STABILIZER CENTER SECTION, SERVICE BULLETIN INTERIM REPAIR MOS 18 (5) 12-DEC-2003 SB 737-55-1074 RI PART ACCOMPLISH INSPECTION AND REPAIR OF THE INTERFACE BUSHINGS BETWEEN THE HORIZONTAL STABILIZERS RECOMMENDED COMPLIED WITH 3 AND THE HORIZONTAL STABILIZER CENTER SECTION. SERVICE BULLETIN PERMANENT REPAIR MOS 29-AUG-2011 09-SEP-2004 - (s) 3533:32 AFL 863 SB 737-55-1086 INSPECTION OF THE PINS AND BOLTS THAT ATTACH THE HORIZONTAL STABILIZER TO THE HORIZONTAL STABLIZER - IAW THE SB CENTER SECTION (SUPERSEDED BY SB 737-55-1086 RI). SERVICE BULLETIN MOS 22-AUG-2008 II-DEC-2003 3260:48 AFL 782 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 160 Of 748 © Camp Systems EFTA00618451 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB SB 737-55-1086 RI 16-DEC-2004 737-55-1086 R2 INSPECTION OF THE PINS AND BOLTS THAT ATTACH THE HORIZONTAL STABILIZER TO THE HORIZONTAL STABLIZER CENTER SECTION (SUPERSEDED BY SB 737-55-1086 R2). SERVICE BULLETIN MOS STABILIZERS - HORIZONTAL STABILIER - INSPECTION OF THE PINS AND BOLTS THAT ATTACH THE HORIZONTAL STABILIZER TO THE HORIZONTAL STABILIZER CENTER SECTION (SUPERSEDED BY SB 737-55-1086 R3). SERVICE BULLETIN - INFORMATION REF TO IR AND REV.2 (REPLACEMENT) SUPERSEDED COMPLIED WITH MOS 29-AUG-20m 3533:32 AFL 863 SB 737-55-1086 R3 STABILIZERS - HORIZONTAL STABILIZER - INSPECTION OF THE PINS AND BOLTS THAT ATTACH THE HORIZONTAL RECOMMENDED STABILIZER TO THE HORIZONTAL STABILIZER CENTER SECTION. SERVICE BULLETIN DAYS 90 (5) 13-JUN-2012 SB 737-55-1089 HORIZONTAL STABILIZER - TRAILING EDGE PANEL. CONDUCTIVE STRIP AND TIP CAP ASSEMBLY - CHANGE SUPERSEDED (SUPERSEDED BY SB 737-55-1089 R1). SERVICE BULLETIN MOS SB 737-55-1089 RI STABILIZERS - HORIZONTAL STABILIZER - TRAILING EDGE PANEL. CONDUCTIVE STRIP AND TIP CAP ASSEMBLY - RECOMMENDED CHANGE. SERVICE BULLETIN MOS 09-SEP-201 SB 737-55-1090 STABILIZERS - HORIZONTAL STABILIZER - REAR SPAR TERMINATION FITTING- INSPECTION. SERVICE BULLETIN MANDATORY MOS 30-MAR-201 I SB 737-55-1090 TABLE 1 INSPECTION STABILIZERS - HORIZONTAL STABILIZER - REAR SPAR TERMINATION FITTING - INSPECTION. SERVICE MANDATORY BULLETIN OF THE LEFT AND RIGHT SIDE HORIZONTAL STABILIZER IDENTIFICATION PLATE FOR A SERIAL NUMBER THAT START WITH SAX FOR ALL AIRPLANES MOS 12 (5) 30-MAR-201 I SB 737-55-1090 TABLE 1.2 DETAILED INSPECTION STABILIZERS - HORIZONTAL STABILIZER - REAR SPAR TERMINATION FITTING - INSPECTION. MANDATORY SERVICE BULLETIN OF THE HORIZONTAL STABILIZER TERMINATION FITTING FASTENERS FOR INCORRECT BOLT PROTRUSION AND CHAMFER FOR HORIZONTAL STABILIZERS IDENTIFICATION PLATES WHICH HAVE A SERIAL NUMBER STARTING WITH SAIC. MOS 12 (5) 30-MAR-201 I SB 737-55-1090 TABLE 1.6 HFEC STABILIZERS - HORIZONTAL STABILIZER - REAR SPAR TERMINATION FITTING - INSPECTION. SERVICE BULLETIN AND UT INSPECTIONS OF THE TERMINATION FITTING FOR CRACKS FOR NEW BACB30US14K( ) BOLT IS INSTALLED MOS 12 (5) 3C-MAR-201I MANDATORY ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time Camp Systems 161 Of 748 EFTA00618452 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-55-1093 09-APR-2012 SB 737-55-1096 22-MAR-2013 STABILIZERS - HORIZONTAL STABILIZER - REPLACEMENT OF REAR SPAR ATTACH PINS WITH UNAPPROVED SURFACE COATING. SERVICE BULLETIN MOS AFL 3000(s) STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN MOS SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN DO A 1(01.1) DETAILED INSPECTION OF THE SKIN. MODIFICATION SKIN AND SPAR DOUBLERS FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN AN 1(01.2) EDDY CURRENT INSPECTION OF THE SKIN. MODIFICATION SKIN. SPLICE DOUBLERS AND SPAR LOWER CHORDS FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL 58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(01.3) LOW FREQUENCY EDDY CURRENT (LFEC) INSPECTION OF THE FRONT SPAR UPPER CHORD AFT FLANGE. FROM STAB STA 66.50 TO STAB TIP. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(01.4) HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION OF THE FRONT SPAR UPPER CHORD FORWARD FLANGE. FROM STAB STA 66.50 TO STAB TIP. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(01.5) LFEC INSPECTION OF THE FRONT SPAR UPPER CHORD WEB FLANGE. FROM STAB STA 66.50 TO STAB STA 175.5 AND FROM STAB STA 258.28 TO STAB TIP. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 162 Of 748 @ Camp Systems EFTA00618453 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-55-1096 TABLE 1(01.6) DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD WEB FLANGE. FROM STAB STA 66.50 TO STAB STA 175.5 AND FROM STAB STA 258.28 TO STAB TIP. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(01.7) HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD FORWARD FLANGE. FROM STAB STA 175.5 TO STAB STA 258.28. FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL RIGHT CYCLES MOS AFL SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE 1(02.1) BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IN ANY CRACK FOUND IN THE SKIN. MODIFICATION SKIN. SPAR DOUBLERS. SPLICE DOUBLERS OR SPAR LOWER CHORDS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS SB 737-55-1096 TABLE REMOVE STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN 1(03.1) THE CRACK DAMAGE IF ANY CRACK FOUND IN THE FRONT SPAR UPPER CHORD FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS 58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(00.1) DETAILED INSPECTION OF THE SKIN. MODIFICATION SKIN AND SPAR DOUBLERS FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN AN 1(00.2) EDDY CURRENT INSPECTION OF THE SKIN. MODIFICATION SKIN. SPLICE DOUBLERS AND SPAR LOWER CHORDS FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 163 Of 748 @ Camp Systems EFTA00618454 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-55-1096 TABLE 1(04.3) DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A LFEC INSPECTION OF THE FRONT SPAR UPPER CHORD AFT FLANGE. FROM STAB STA 66.50 TO STAB TIP. FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(04.4) HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD FORWARD FLANGE. FROM STAB STA 66.50 TO STAB TIP. FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(04.5) LFEC INSPECTION OF THE FRONT SPAR UPPER CHORD WEB FLANGE. FROM STAB STA 66.50 TO STAB STA 175.5 AND FROM STAB STA 258.28 TO STAB TIP. FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL 58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(04.6) HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD WEB FLANGE. FROM STAB STA 66.50 TO STAB STA 175.5 AND FROM STAB STA 258.28 TO STAB TIP. FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL 58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(04.7) HFEC INSPECTION OF THE FRONT SPAR UPPER CHORD FORWARD FLANGE. FROM STAB STA 175.5 TO STAB STA 258.28. FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE 1(05.1) BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IF ANY CRACK FOUND IN THE SKIN. MODIFICATION SKIN. SPAR DOUBLERS. SPLICE DOUBLERS OR SPAR LOWER CHORDS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 164 Of 748 @ Camp Systems EFTA00618455 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-55-1096 TABLE REMOVE STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN THE CRACK DAMAGE IF ANY CRACK FOUND IN THE FRONT SPAR UPPER CHORD FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED BEFORE 56.000 TOTAL FLIGHT CYCLES 1(06.1) MOS SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(07.1) DETAILED INSPECTION OF THE SKIN. MODIFICATION SKIN AND SPAR DOUBLERS FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES MOS AFL 58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN AN 1(07.2) EDDY CURRENT INSPECTION OF THE SKIN. MODIFICATION SKIN. SPLICE DOUBLERS AND SPAR LOWER CHORDS FOR CRACKS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE RECOMMENDED 1(07.3) BULLETIN BOEING FOR ADDITIONAL POST MODIFICATION INSPECTIONS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES MOS SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE 1(08.1) BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IF ANY CRACK FOUND IN THE SKIN. MODIFICATION SKIN. SPAR DOUBLERS. SPLICE DOUBLERS OR SPAR LOWER CHORDS FOR LEFT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES MOS 58 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN A 1(09.1) DETAILED INSPECTION OF THE SKIN. MODIFICATION SKIN AND SPAR DOUBLERS FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES MOS AFL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 165 Of 748 @ Camp Systems EFTA00618456 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-55-1096 TABLE DO STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE BULLETIN AN 1(09.2) EDDY CURRENT INSPECTION OF THE SKIN. MODIFICATION SKIN. SPLICE DOUBLERS AND SPAR LOWER CHORDS FOR CRACKS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES MOS AFL SB 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE RECOMMENDED 1(09.3) BULLETIN BOEING FOR ADDITIONAL POST MODIFICATION INSPECTIONS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES MOS 58 737-55-1096 TABLE CONTACT STABILIZERS - HORIZONTAL STABILIZER - LOWER SKIN CRACKING AND MODIFICATION. SERVICE 1(10.1) BULLETIN BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK INSTRUCTED BY BOEING IF ANY CRACK FOUND IN THE SKIN. MODIFICATION SKIN. SPAR DOUBLERS. SPLICE DOUBLERS OR SPAR LOWER CHORDS FOR RIGHT SIDE HORIZONTAL STABILIZER LOWER SKIN MODIFICATION INSTALLED AT OR AFTER 56.000 TOTAL FLIGHT CYCLES SB 737-55A1064 I5-OCT-1998 MOS ELEVATOR BALANCE PANEL ASSEMBLIES. SERVICE BULLETIN MOS 250(s) 44 RECOMMENDED SB 737-55A1064 R1 ELEVATOR BALANCE PANEL ASSEMBLIES. SERVICE BULLETIN RECOMMENDED NOT APPLICABLE - BY SERIAL NUMBER MOS 20-APR-2001 07-DEC-2000 - (s) 697:54 AFL 188 SB 737-55A1066 FRONT SPAR HINGE FITTING REPLACEMENT-HINGE 3-8. SERVICE BULLETIN NOT APPLICABLE - NO ACTION REQUIRED MOS 24 (s) 22-AUG-2003 19-SEP-2002 1342 AFL 18000 351 SB 737-55A1066 RI FRONT SPAR HINGE FITTING REPLACEMENT-HINGES 3-8. SERVICE BULLETIN - 737-55A1080R1 MOS 24 (s) 19-SEP-2002 AFL 18000 SB 737-55A1068 ELEVATOR TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED COMPLIED WITH -OW MOS I3-SEP-1999 09-JUN-1999 - Is) SB 737-55A1068 R1 ELEVATOR TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED MOS 11-JUN-1999 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 166 Of 748 @ Camp Systems EFTA00618457 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-55A1068 R2 ELEVATOR TAB ASSEMBLY. SERVICE BULLETIN DAYS 15 (s) 24-FEB-2000 AFL 100 SB 737-55A1072 PKG 1 STABILIZERS - ELEVATOR - TAB ASSEMBLY - INSPECTION OF ELEVATOR TAB HINGE AND ELEVATOR TAB CONTROL MECHANISM. SERVICE BULLETIN MOS 28-DEC-2000 - Is) RECOMMENDED SB 737-55A1072 PKG 2 STABILIZERS - ELEVATOR - TAB ASSEMBLY- INSPECTION OF ELEVATOR TAB HINGE AND ELEVATOR TAB CONTROL RECOMMENDED MECHANISM. SERVICE BULLETIN MOS 28-DEC-2000 AFL 750(s) SB 737-55A1072 PKG 3 STABILIZERS - ELEVATOR - TAB ASSEMBLY- INSPECTION OF ELEVATOR TAB HINGE AND ELEVATOR TAB CONTROL RECOMMENDED MECHANISM. SERVICE BULLETIN MOS 28-DEC-2000 1500 (s) AFL 750 SB 737-55A1072 RI ELEVATOR HINGE AND TAB ASSEMBLY. SERVICE BULLETIN RECOMMENDED MOS 11 -JAN-2001 - (s) SB 737-55A1072 RI PKG 1 INSPECT ELEVATOR HINGE AND TAB ASSEMBLY. SERVICE BULLETIN MOS 20-APR-2001 11 -JAN-2001 702:24 AFL 250(s) 188 SB 737-55A1072 RI PKG 2 INSPECT ELEVATOR HINGE AND TAB ASSEMBLY. SERVICE BULLETIN MOS IWAN-2001 AFL 750(s) SB 737-55A1072 RI PKG 3 INSPECT ELEVATOR HINGE AND TAB ASSEMBLY. SERVICE BULLETIN MOS I I -JAN-2001 1500 (s) SB 737-55A1076 AFL 750 ELEVATOR TAB HINGE FASTNER REPLACEMENT. SERVICE BULLETIN MOS 24 (s) AFL 4500 RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 167 Of 748 @ Camp Systems EFTA00618458 Aseant.ftne MPtAernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-55A1079 19-JUL-2001 ELEVATOR TAB. SPEEDBRAKE RESTRICTION. PLACARD INSTALLATION. SERVICE BULLETIN MOS 1 (s) SB 737-55A1079 RI ELEVATOR TAB. SPEEDBREAK RESTRICTION, PLACARD INSTALLATION. SERVICE BULLETIN RECOMMENDED MOS I (s) 16-MAY-2002 SB 737-55A1080 ELEVATOR AND ELEVATOR TAB REPLACEMENT. SERVICE BULLETIN COMPUED WITH - PREVIOUSLY REF. AD 2003-03-22 / 737-55A1080R1 MOS 24 (s) 18-AUG-2006 19-SEP-2002 2633:50 AFL 18000 633 SB 737-55A1080 RI ELEVATOR AND ELEVATOR TAB REPLACEMENT, SERVICE BULLETIN COMPUED WITH MOS 22-AUG-2003 19-SEP-2002 1342 AFL 351 SB 737-55A1082 ELEVATOR MODIFICATION. SERVICE BULLETIN COMPLIED WITH - PREVIOUSLY MOS 24 (s) 22-AUG-2003 19-SEP-2002 1342 AFL 18000 351 SB 737-55A1082 RI MODIFICATION TO IMPROVE THE STRUCTURAL DAMPING CHARACTERISTICS AND ENHANCE THE WEAR - 737-55A1080RI CHARACTERISTICS OF THE ELEVATOR TAB. SERVICE BULLETIN MOS 24 (s) 19-SEP-2002 AFL 18000 SB 737-55A1084 HORIZONTAL STABILIZER - TRAILING EDGE - ELEVATOR BALANCE BAY PANEL SEAL TRIM. SERVICE BULLETIN RECOMMENDED MOS 07-MAR-2002 - (s) SB 737-55A1084 RI HORIZONTAL STABILIZER - ELEVATOR BALANCE BAY PANEL SEAL TRIM. SERVICE BULLETIN RECOMMENDED MOS 20-JUN-2002 - (s) SB 737-56-1011 DRAIN OPENABLE WINDOWS INSTALLATIONS. SERVICE BULLETIN RECOMMENDED MOS 19-NOV-1998 - (s) SB 737-56-1011 RI DRAIN OPENABLE WINDOWS INSTALLATIONS. SERVICE BULLETIN RECOMMENDED MOS 29-JUN-2000 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 168 Of 748 @Camp Systems EFTA00618459 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-56-1014 INSPECTION AND REPLACEMENT OF NO. 3 FLIGHT COMPARTMENT WINDOWS. SERVICE BULLETIN MOS 26-APR-2001 SB 737-56-1016 -AUG-2005 SB 737-56-1017 I7-MAY-2006 SB 737-56-1017 RI AFL 2000 (s) WINDOWS - CONTROL CABIN SLIDING WINDOWS - NUMBER 2 OPENABLE WINDOW - HOLD OPEN LATCH ASSEMBLY - INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS WINDOWS - FLIGHT COMPARTMENT - CONTROL CABIN FIXED WINDOWS - DELEATION OF NUMBER 4 AND NUMBER 5 WINDOWS (SUPERSEDED BY 737-56-1017 R1). SERVICE BULLETIN MOS WINDOWS - FLIGHT COMPARTMENT - CONTROL CABIN FIXED WINDOWS - DELETION OF NUMBER 4 AND NUMBER 5 SUPERSEDED WINDOWS. (SUPERSEDED BY SB 737-56-1017 R2). SERVICE BULLETIN MOS SB 737-56-1017 R2 WINDOWS - FLIGHT COMPARTMENT - CONTROL CABIN FIXED WINDOWS - DELETION OF NUMBER 4 AND NUMBER 5 RECOMMENDED WINDOWS.. SERVICE BULLETIN MOS 28-JAN-2011 SB 737-56-1024 WINDOWS - CONTROL CABIN SLIDING WINDOWS - LEFT SIDE AND RIGHT SIDE NUMBER 2 WINDOW FRAME REPAIR AND MODIFICATION. SERVICE BULLETIN MOS 21 -SEP-2007 SB 737-56-1025 20-JAN-2010 SB 737-56-1025 (LH) SB 737-56-1025 (RH) FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2 WINDOW PANE - REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS REPLACE FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2 WINDOW PANE- REPLACEMENT. SERVICE BULLETIN RECOMMENDED LEFT FLIGHT DECK NUMBER 2 (SLIDING) WINDOW MOS REPLACE FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2 WINDOW PANE - REPLACEMENT. SERVICE BULLETIN RECOMMENDED RIGHT FLIGHT DECK NUMBER 2 (SLIDING) WINDOW MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 169 Of 748 @ Camp Systems EFTA00618460 C O &Wiwi's. MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-56A1022 WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - INSPECTION SUPERSEDED COMPUED WITH - INSPECTIONS TABLES 2 & 3 (SUPERSEDED BY 737-56A1022 RI). SERVICE BULLETIN FOR THE 114 AND #5 WINDOWS ONLY LA.W. AD 2008-11-08 FOUND SATSFACTORY MOS 16-FEB-20I0 18-JUL-2007 3417:51 AFL 829 SB 737-56A1022 RI WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - INSPECTION. RECOMMENDED COMPUED WITH - DETAIL INSPECTION I.A.W. AD SERVICE BULLETIN 2008-11-08 (F) FLIGHT DECK NO2. NO.4 AND NO.5 WINDOWS MOS 12-FEB-2014 12-MAR-2010 3743:34 AFL 917 SB 737-56A1022 RI DETAILED INSPECTION WINDOWS - RIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 RECOMMENDED COMPUED WITH - DETAIL INSPECTION TABLE 1.01 12-MAR-2010 SB 737-56A1022 RI TABLE 1.02 12-MAR-2010 SB 737-56A1022 RI TABLE 2.01 12-MAR-2010 SB 737-56A1022 RI TABLE 2.02 12-MAR-2010 SB 737-56A1022 RI TABLE 3.01 12-MAR-2010 SB 737-56A1022 RI TABLE 3.02 WINDOWS - INSPECTION. SERVICE BULLETIN OF THE LEFT AND RIGHT FLIGHT DECK NUMBER 2 WINDOW (GROUP 1-2) MOS 36 (s) 12-FEB-2014 7500 3743:34 AFL 917 REPLACE WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - RECOMMENDED INSPECTION. SERVICE BULLETIN THE LEFT AND RIGHT FLIGHT DECK NUMBER 2 WINDOW AND PERFORM A DETAILED INSPECTION (GROUP 1-2) MOS DETAILED INSPECTION WINDOWS - RIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 RECOMMENDED COMPUED WITH - DETAIL INSPECTION WINDOWS - INSPECTION. SERVICE BULLETIN OF FLIGHT DECK NUMBER 4 WINDOW (GROUP 1. CONFIGURATION 1) MOS 24 (s) I2-FEB-2014 6000 3743:34 AFL 917 REPLACE WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - RECOMMENDED INSPECTION. SERVICE BULLETIN THE FLIGHT DECK NUMBER 4 WINDOW AND PERFORM DETAILED INSPECTION (GROUP 1. CONFIGURATION 1) MOS BFIF (s) DETAILED INSPECTION WINDOWS - RIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 RECOMMENDED COMPUED WITH - DETAIL INSPECTION WINDOWS - INSPECTION. SERVICE BULLETIN OF THE FLIGHT DECK NUMBER 5 WINDOW (GROUP 1. CONFIGURATION 1) MOS 24 (s) 6000 I2-FEB-2014 3743:34 AFL 917 REPLACE WINDOWS - FLIGHT COMPARTMENT - FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - RECOMMENDED INSPECTION. SERVICE BULLETIN THE FLIGHT DECK NUMBER 5 WINDOW (GROUP 1. CONFIGURATION 1) MOS I2-MAR-2010 BFIF (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 170 Of 748 @ Camp Systems EFTA00618461 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-56A1022 TABLE 1 18-JUL-2007 SB 737-56A1022 TABLE 2 18-JUL-2007 SB 737-56A1022 TABLE 3 18-JUL-2007 SB 737-57-1250 07-FEB-2002 DETAIL INSPECTION WINDOWS - FLIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - INSPECTION (SUPERSEDED BY 737-56A1022 RI). SERVICE BULLETIN OF FLIGHT DECK NUMBER 2 WINDOW FOR GROUP 1 AND 2 MOS 36 (5) 7500 14-FEB-2008 3151:22 AFL 746 DETAIL INSPECTION WINDOWS- FLIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - INSPECTION (SUPERSEDED BY 737-56A1022 R1). SERVICE BULLETIN OF FLIGHT DECK NUMBER 4 WINDOW FOR GROUP 1 CONFIGURATION 1 MOS 24 (s) I6-FEB-2010 6000 3417:51 AFL 829 DETAIL INSPECTION WINDOWS - FLIGHT COMPARTMENT- FLIGHT DECK NUMBER 2. NUMBER 4 AND NUMBER 5 WINDOWS - INSPECTION (SUPERSEDED BY 737-56A1022 RI). SERVICE BULLETIN OF FLIGHT DECK NUMBER 5 WINDOW FOR GROUP 1 CONFIGURATION 1 MOS 24 (5) I6-FEB-2010 6000 3417:51 AFL 829 INSPECTION OF SECONDARY FUEL VAPOR-BARRIER APPLICATION ON THE WING CENTER SECTION. SERVICE BULLETIN MOS 48 (5) - INSPECTION SB 737-57-1250 RI INSPECTION OF THE SECONDARY FUEL VAPOR-BARRIER APPLICATION ON THE WING CENTER SECTION TOP PANEL COMPUED WITH AND FRONT SPAR. SERVICE BULLETIN MOS 48 (5) 28-SEP-2009 04-SEP-2003 3378:04 AFL 812 SB 737-57-1250 R2 INSPECTION OF THE SECONDARY FUEL VAPOR-BARRIER APPLICATION ON THE WING CENTER SECTION TOP PANEL COMPUED WITH AND FRONT SPAR. SERVICE BULLETIN MOS 28-SEP-2009 28-NOV-2006 - (s) 3378:04 AFL 812 SB 737-57-1253 CENTER WING REAR SPAR - STIFFENER MODIFICATION. SERVICE BULLETIN RECOMMENDED MOS 16-DEC-1999 AFL 4500 (s) SB 737-57-1253 RI CENTER WING REAR SPAR - STIFFENER MODIFICATION. SERVICE BULLETIN MOS II-JAN-2001 AFL 4500 (s) RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 171 Of 748 @ Camp Systems EFTA00618462 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57-1255 WING - LEFT SIDE MIDSPAR LOWER PANEL REPLACEMENT. SERVICE BULLETIN MOS 21 -JUN-2001 - Is) SB 737-57-1255 RI LEFT SIDE MIDSPAR LOWER PANEL REPLACEMENT. SERVICE BULLETIN MOS II-MAR-2004 SB 737-57-1264 FLAP CARRIAGE BUSHING REPLACEMENT. SERVICE BULLETIN MOS 24-MAY-2001 SB 737-57-1268 WINGS-LOWER WING SKIN PANELS-INSTALLATION OF THE RUB STRIPS. SERVICE BULLETIN - (s) MOS 06-JUN-2002 - (s) SB 737-57-1268 RI WING LOWER SKIN PANELS INSTALLATION OF THE RUB STRIPS. SERVICE BULLETIN MOS I7-OCT-2002 - SB 737-57-1272 OUTBOARD KRUEGER FLAP INSPECTION. REPAIR. AND PREVENTIVE MODIFICATION. SERVICE BULLETIN MOS 24-JUN-2004 - (s) SB 737-57-1272 PART 1 INSPECT OUTBOARD KRUEGER FLAP INSPECTION. REPAIR. AND PREVENTIVE MODIFICATION. SERVICE BULLETIN MOS 24-JUN-2004 3000 (s) SB 737-57-1272 PART 2 MODIFICATION OUTBOARD KRUEGER FLAP INSPECTION. REPAIR. AND PREVENTIVE MODIFICATION. SERVICE BULLETIN !REPLACEMENT MOS 24-JUN-2004 RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED SB 737-57-1275 LOWER WING SKIN PANEL - NACELLE SUPPORT FITTINGS ATTACHMENT FASTENERS INSPECTION AND RECOMMENDED REPLACEMENT. SERVICE BULLETIN MOS 04-SEP-2003 30000 Is) AFL 30000 SB 737-57-1275 RI LOWER WING SKIN PANEL - NACELLE SUPPORT FITTINGS ATTACHMENT FASTENERS INSPECTION AND REPLACEMENT. SERVICE BULLETIN MOS I8-AUG-2005 30000 Is) AFL 30000 - REF: REV.3 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 172 Of 748 @ Camp Systems EFTA00618463 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57-1275 R2 LOWER WING SKIN PANEL - NACELLE SUPPORT FITTINGS ATTACHMENT FASTENERS INSPECTION AND - REF: REV.3 REPLACEMENT. SERVICE BULLETIN MOS 12-JUL-2006 - (s) SB 737-57-1275 R3 LOWER WING SKIN PANEL - NACELLE SUPPORT FITTINGS ATTACHMENT FASTENERS INSPECTION AND COMPLIED WITH - IAW THE AD 2005-24-03R1 REPLACEMENT. SERVICE BULLETIN MOS 24-AUG-2007 I7-OCT-2006 - (5) 2968:28 AFL 699 SB 737-57-1278 OUTBOARD FLAP BELLCRANK ASSEMBLY INSPECTION AND MODIFICATION. SERVICE BULLETIN RECOMMENDED 02-DEC-2004 MOS SB 737-57-1278 RI WINGS - TRAILING EDGE AND TRAIUNG EDGE DEVICES - OUTBOARD FLAP BELLCRANK ASSEMBLY INSPECTION AND MODIFICATION.. SERVICE BULLETIN MOS 27 -SEP-2006 58 737-57-1278 R2 WINGS - TRAILING EDGE AND TRAIUNG EDGE DEVICES - OUTBOARD FLAP BELLCRANK ASSEMBLY INSPECTION AND MODIFICATION.. SERVICE BULLETIN MOS 04-JUN-2007 SB 737-57-1281 REPAIR OF INBOARD MAIN FLAP UPPER SKIN AND MODIFICATION OF NUTPLATE STRIP ASSEMBLY. SERVICE RECOMMENDED BULLETIN MOS I 5-JUL-2004 SB 737-57-1284 WINGS - TRAILING EDGE AND TRAIUNG EDGE DEVICES - INSPECTION. REPAIR 7 MODIFICATION - WING BUTTOCK LINE 147 TO WING BUTTOCK LINE 201. SERVICE BULLETIN MOS 09-APR-2007 SB 737-57-1285 WINGS - WING STRINGERS - INSTALL STRINGERS 7 AND 9 REINFORCEMENT. SERVICE BULLETIN MOS SB 737-57-1285 RI WINGS - WING STRINGERS - INSTALL STRINGERS 7 AND 9 REINFORCEMENT. SERVICE BULLETIN MOS SB 737-57-1286 WINGS - CENTER - REAR SPAR VAPOR BARRIER - INSPECTION. REPAIR AND MODIFICATION.. SERVICE BULLETIN MOS 03-APR-2006 - INFORMATION REFER TO REV.1 AFL 5500 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 173 Of 748 @ Camp Systems EFTA00618464 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57-1286 RI 26-JUL-2007 SB 737-57-1288 30-MAR-2007 SB 737-57-1288 RI 03-JUN-2008 SB 737-57-1293 13-NOV-2008 MOS 24 (5) SB 737-57-1293 RI LEADING EDGE AND LEADING EDGE DEVICES - FUEL DRAIN PATH MODIFICATION (SUPERSEDED BY SB 737-57-1293 SUPERSEDED R2). SERVICE BULLETIN MOS SB 737-57-1293 R2 WINGS - LEADING EDGE AND LEADING EDGE DEVICES - FUEL DRAIN PATH MODIFICATION (SUPERSEDED BY SB SUPERSEDED 737-57-1293 R3). SERVICE BULLETIN MOS - Is) SB 737-57-1293 R3 WINGS - LEADING EDGE AND LEADING EDGE DEVICES - FUEL DRAIN PATH MODIFICATION. SERVICE BULLETIN RECOMMENDED MOS 24 (s) 28-SEP-2011 SB 737-57-1295 WINGS - TRAILING EDGE AND TRAIUNG EDGE DEVICES - WING INBOARD FIXED TRAILING EDGE UPPER PANEL BULB SEAL CHAFING ON WING-TO-BODY FAIRING PANEL - INSPECTION. REPAIR AND MODIFICATION.. SERVICE BULLETIN WINGS - CENTER WING - REAR SPAR VAPOR BARRIER - INSPECTION. REPAIR AND MODIFICATION. SERVICE BULLETIN MOS 28-SEP-2009 3378:04 AFL 5500 812 6312 TRAILING EDGE FLAP - NUMBER 3 AND NUMBER 6 TAILCONE ASSEMBLIES - INSPECTION AND REPAIR. SERVICE BULLETIN MOS AFL 5600 (s) WINGS - TRAILING EDGE FLAP - NUMBER 3 AND NUMBER 6 TAILCONE ASSEMBLES - INSPECTION AND REPAIR. SERVICE BULLETIN MOS AFL 5000(s) LEADING EDGE AND LEADING EDGE DEVICES - FUEL DRAIN PATH MODIFICATION. SERVICE BULLETIN RECURRING COMPUED WITH - PARTIALLY GENERAL MOS 12 (s) 04-JUN-2007 4500 SB 737-57-1300 04-JUN-2007 WINGS - TRAILING EDGE FLAPS - INBOARD FLAPS- INBOARD MAIN FLAP TRACKS. K4 AND #5- INSPECTION AND RECOMMENDED EXCHANGE PROGRAM. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 174 Of 748 @ Camp Systems EFTA00618465 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57-1300 NO 4 DETAILED INSPECTION WINGS - TRAILING EDGE FLAPS - INBOARD FLAPS - INBOARD MAIN FLAP TRACKS. 84 AND 85 - RECOMMENDED FLAP INSPECTION AND EXCHANGE PROGRAM. SERVICE BULLETIN MOS 24 (5) 03-FEB-2010 AFL 5500 SB 737-57-1300 NO 5 DETAILED INSPECTION WINGS - TRAILING EDGE FLAPS - INBOARD FLAPS - INBOARD MAIN FLAP TRACKS. #4 AND 85 - RECOMMENDED FLAP INSPECTION AND EXCHANGE PROGRAM. SERVICE BULLETIN MOS 24 (s) 03-FEB-2010 SB 737-57-1306 26-SEP-2008 AFL 5500 INBOARD FLAPS - INBOARD MAIN FLAP TRACKS. #4 AND 85 - SUPER 0-GUN COATING. DETAILED INSPECTION AND EXCHANGE PROGRAM. SERVICE BULLETIN MOS 24 (s) AFL 5500 SB 737-57-1309 28-JAN-2011 WINGS - CENTER WING BOX- FRONT SPAR SHEAR FITTING - INSPECTION. REPAIR AND PREVENTIVE MODIFICATION. SERVICE BULLETIN MOS RECOMMENDED SB 737-57-1310 WINGS - CENTER WING - WING SPARS- FORWARD TRUNNION SUPPORT FITTING- FUSE PIN BORES - INSPECTION SUPERSEDED FOR CORROSION (SUPERSEDED BY SB 737-57-1310 RN. SERVICE BULLETIN MOS - Is) SB 737-57-1310 RI WINGS - CENTER WING - WING SPARS- FORWARD TRUNNION SUPPORT FITTING- FUSE PIN BORES - INSPECTION SUPERSEDED FOR CORROSION (SUPERSEDED BY SB 737-57-1310 R2). SERVICE BULLETIN MOS - Is) SB 737-57-1310 R2 WINGS - CENTER WING - WING SPARS- FORWARD TRUNNION SUPPORT FITTING- FUSE PIN BORES - INSPECTION RECOMMENDED FOR CORROSION. SERVICE BULLETIN MOS 120(s) SB 737-57-1312 WINGS - OUTER WING - WIRE BUNDLE SUPPORT GENERAL VISUAL INSPECTION. REPLACE TFE-4X WITH TFE-2X RECOMMENDED SLEEVE. SERVICE BULLETIN MOS 60 (s) 07-SEP-2010 SB 737-57-1316 WINGS - SPOILERS - INSTALLATION OF POLYURETHANE PROTECTIVE TAPE ON LOWER SKIN SURFACE OF INBOARD RECOMMENDED GROUND SPOILER NUMBER 6 AND 7. SERVICE BULLETIN MOS 05-SEP-2012 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 175 Of 748 @ Camp Systems EFTA00618466 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57A1279 24-JAN-2007 WINGS - CENTER AND OUTER WING - FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL INSPECTION (SUPERSEDED BY 737-57A1279 R1). SERVICE BULLETIN MOS SUPERSEDED S8 737-57A1279 RI CENTER AND OUTER WING - FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL INSPECTION SUPERSEDED (SUPERSEDED BY 737-57A1279 R2), SERVICE BULLETIN MOS (EFF) S8 737-57A1279 R2 WINGS - CENTER AND OUTER WING- FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL SUPERSEDED INSPECTION (SUPERSEDED BY SB 737-57A1279 R3). SERVICE BULLETIN MOS - (s) S8 737-57A1279 R3 WINGS - CENTER AND OUTER WING - FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL INSPECTION. SERVICE BULLETIN I5-FEB-20 I 1 SB 737-57A1279 R3 TABLE 1 24-JAN-2007 MOS (EFF) PERFORM WINGS - CENTER AND OUTER WING - FASTENER SEALING AND WIRE BUNDLE SUPPORT GENERAL VISUAL RECOMMENDED INSPECTION. SERVICE BULLETIN ACTIONS REQUIRED FOR FASTENER SEALEANT IN THE FUEL TANK AND WIRE CLAMP FOR GROUP 1.4 AIRPLANES MOS 60 (s) SB 737-57A1294 WINGS - WING CENTER SECTION - UPPER AND LOWER SWINGERS - DRILL START INSPECTION AND REPAIR. NOT APPLICABLE - BY EFFECTIVITY SB FOUND SERVICE BULLETIN TO BE NA BY VARIABLE NUMBER (YG006) MOS 16-FEB-2010 23-APR-2007 3417:51 AFL 829 SB 737-57A1294 TABLE 1 DETAILED INSPECTION WINGS - WING CENTER SECTION - UPPER AND LOWER STRINGERS - DRILL START INSPECTION AND REPAIR. SERVICE BULLETIN OF THE WING CENTER SECTION LOWER AND UPPER STRINGERS TO MINIMIZE CRACK SIZE. MOS 23-APR-2007 AFL 9000 9000 SB 737-57A1294 TABLE2 DETAILED INSPECTION WINGS - WING CENTER SECTION - UPPER AND LOWER STRINGERS - DRILL START INSPECTION AND REPAIR. SERVICE BULLETIN OF THE WING CENTER SECTION LOWER STRINGERS FOR SAFETY MOS 23-APR-2007 AFL 18000 18000 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 176 Of 748 @ Camp Systems EFTA00618467 C O Atiant.fran MP Ad-own/lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57A1302 SB 737-57A1302 RI 78-OCT-2010 SB 737-57A1302 RI TABLE 1 A 15-DEC-2008 SB 737-57A1302 RI TABLE 1 LEADING EDGE SLATS- MAIN TRACK DOWN STOP MODIFICATION AND DETAILED INSPECTION (SUPERSEDED BY SB SUPERSEDED 737-57A1302 R1). SERVICE BULLETIN MOS WINGS - LEADING EDGE SLATS- MAIN TRACK DOWN STOP MODIFICATION AND DETAILED INSPECTION, SERVICE BULLETIN MOS 12-FEB-2014 3743:34 AFL 917 REPLACE WINGS - LEADING EDGE SLATS- MAIN TRACK DOWN STOP MODIFICATION AND DETAILED INSPECTION. SERVICE BULLETIN DOWN STOP ASSEMBLY HARDWARE WITH NEW DOWN STOP ASSEMBLY HARDWARE AND DOA DETAILED INSPECTION OF THE SLAT CANS AND SLAT MAIN TRACKS FOR DEBRIS IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. STEP 2. AT ALL 16 SLAT MAIN TRACK LOCATIONS.(A) FOR ALL AIRPLANES MOS 12-FEB-2014 - (s) 3743:34 AFL 917 REPLACE WINGS - LEADING EDGE SLATS- MAIN TRACK DOWN STOP MODIFICATION AND DETAILED INSPECTION. SERVICE BULLETIN AFT SIDE GUIDE BOLTS WITH NEW AFT SIDE GUIDE BOLTS IN ACCORDANCE WITH PARAGRAPH 3.8.. WORK INSTRUCTIONS. STEP 2. AT ALL 16 SLAT MAIN TRACK LOCATIONS.(A) FOR ALL AIRPLANES MOS 12-FEB-2014 15-DEC-2008 -(s) 3743:34 AFL 917 SB 737-57A1308 RI OUTER WING - SKINS - LOWER WING SKIN AT FUEL TANK ACCESS DOOR CUTOUT KEYWAY - INSPECTION AND CHANGE. SERVICE BULLETIN MOS 01-OCT-2009 SB 737-57A1308 RI TABLE 1.1 01-OCT-2009 SB 737-57A1308 RI TABLE 1.2 01-OCT-2009 PERFORM OUTER WING - SKINS - LOWER WING SKIN AT FUEL TANK ACCESS DOOR CUTOUT KEYWAY - INSPECTION AND CHANGE. SERVICE BULLETIN A ONE TIME INSPECTION FOR A KEYWAY IN THE FUEL TANK ACCESS DOOR 53188 AND 631BB CUTOUTS MOS AFL 7500 (s) PERFORM OUTER WING - SKINS - LOWER WING SKIN AT FUEL TANK ACCESS DOOR CUTOUT KEYWAY - INSPECTION AND CHANGE. SERVICE BULLETIN A ONE TIME HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION OF THE FUEL TANK ACCESS DOOR 531 BB CUTOUT KEYWAY AND FUEL TANK ACCESS DOOR 631BB CUTOUT KEYWAY ON THE LEFT AND RIGHT WING MOS AFL 7500 (s) COMPUED WITH - IAW. AD 2011-06-05 PARA (I) DETAILED INSPECTION AND MODIFICATION REPLACED ALL DOWN STOP ASSEMBLY HARDWARERECOMMENDED COMPUED WITH - DETAILED INSPECTION AND MODIFICATION REPLACED ALL DOWN STOP ASSEMBLY HARDWARE RECOMMENDED COMPUED WITH - DETAILED INSPECTION AND MODIFICATION REPLACED ALL DOWN STOP ASSEMBLY HARDWARE RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 177 Of 748 @ Camp Systems EFTA00618468 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57A1314 WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT - SUPERSEDED INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 RD. SERVICE BULLETIN MOS - (s) SB 737-57A1314 RI WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT - RECOMMENDED INSPECTION AND MODIFICATION. SERVICE BULLETIN MOS I5-JUL-2014 - (s) SB 737-57A1314 Ftt TBL TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED 1.1 LH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN FOR LOOSE FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (ALL AIRPLANES) MOS AFL 32000 (s) SB 737-57A1314 Rt TBL TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY- INBOARD CARRIAGE TO TORQUE RECOMMENDED 1.1 RH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN FOR LOOSE FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (ALL AIRPLANES) MOS AFL 32000 (s) SB 737-57A1314 RI TBL RETOROUE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED 1.2 LH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT 7 ACCOMPLISH THE MODIFICATION (IF ANY LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE LEFT WING INBOARD FLAP ASSEMBLY) MOS 15-JUL-2014 BFIF (s) SB 737-57A1314 RI TBL RETOROUE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED 1.3 RH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT / ACCOMPLISH THE MODIFICATION (IF ANY LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE RIGHT WING INBOARD FLAP ASSEMBLY) MOS IS-JUL-2014 BFIF (s) SB 737-57A1314 RI TBL DO WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE 1.4 LH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN ONE OF THE OPTIONS THAT FOLLOW: OPTION 1: ACCOMPLISH THE MODIFICATION! OPTION 2: RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (IF NO LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE LEFT WING INBOARD FLAP ASSEMBLY) MOS I5-JUL-2014 BFIF (s) RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 178 Of 748 @ Camp Systems EFTA00618469 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57A1314 R1 TBL 1.5 RH 15-JUL-2014 DO WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN ONE OF THE OPTIONS THAT FOLLOW: OPTION 1: ACCOMPLISH THE MODIFICATION! OPTION 2: RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (IF NO LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE RIGHT WING INBOARD FLAP ASSEMBLY) MOS BFIF (s) RECOMMENDED SB 737-57A1314 RI TBL REPLACE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED 1.6 ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN EACH PART THAT HAS A CRACK OR WEAR OR CONTACT BOEING FOR A REPAIR AND DO THE REPAIR (IF ANY CRACK OR WEAR FOUND DURING ACCOMPLISHMENT OF PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 6 - LEFT WING - MODIFICATION OR PART 7 - RIGHT WING - MODIFICATION THAT CANNOT BE REMOVED BY OVERSIZING THE TORQUE TUBE ATTACHMENT HOLE TO SECOND OVERSIZE) 5-JUL-2014 MOS BF/F (s) SB 737-57A1314 RI TBL REPLACE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED 1.8 ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE INBOARD CARRIAGE OR CONTACT BOEING FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (IF ANY CHAFING OR FRETTING FOUND DURING ACCOMPLISHMENT OF PARAGRAPH 38.. WORK INSTRUCTIONS. PART 6- LEFT WING - MODIFICATION OR PART 7 - RIGHT WING - MODIFICATION THAT IS DEEPER THAN 0.020 INCH) MOS 15-JUL-2014 BF/F (s) SB 737-57AI314 RI TBL WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT - RECOMMENDED 1.9 INSPECTION AND MODIFICATION. SERVICE BULLETIN BLEND THE INBOARD CARRIAGE TO REMOVE THE CHAFING AND FRETTING (IF ANY CHAFING OR FRETTING FOUND DURING ACCOMPLISHMENT OF PARAGRAPH 3.B.. WORK INSTRUCTIONS. PART 6 - LEFT WING - MODIFICATION OR PART 7 - RIGHT WING - MODIFICATION UP TO A MAXIMUM DEPTH OF 0.020 INCH) MOS 15-JUL-2014 BF/F (s) SB 737-57AI314 RI TBL TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED 2.01 LH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN FOR LOOSE FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (ALL AIRPLANES) MOS AFL 11000(s) SB 737-57A1314 RI TBL TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED 2.01 RH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN FOR LOOSE FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (ALL AIRPLANES) MOS AFL 11000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 179 Of 748 @ Camp Systems EFTA00618470 CAMP AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57A1314 RI TBL 2.02 LH I5-JUL-2014 DETAIL INSPECTION WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN OF THE INBOARD CARRIAGE FOR CHAFING AND FRETTING / RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT /ACCOMPLISH THE MODIFICATION (IF ANY LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE LEFT WING INBOARD FLAP ASSEMBLY) MOS BFIF (s) SB 737-57A1314 RI TBL ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY- INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED 2.03 LH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE MODIFICATION (IF ANY CHAFING OR FRETTING FOUND BY DETAILED INSPECTION OF INBOARD CARRIAGE OF THE LEFT WING INBOARD FLAP ASSEMBLY) MOS 15-JUL-2014 BFIF (s) SB 737-57A1314 RI TBL DETAIL INSPECTION WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE RECOMMENDED 2.05 RH TUBE ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN OF THE INBOARD CARRIAGE FOR CHAFING AND FRETTING / RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT 1 ACCOMPLISH THE MODIFICATION (IF ANY LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE RIGHT WING INBOARD FLAP ASSEMBLY) MOS I5-JUL-2014 BFIF (s) SB 737-57A1314 RI TBL ACCOMPLISH WINGS - TRAILING EDGE FLAPS- INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED 2.06 RH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE MODIFICATION (IF ANY CHAFING OR FRETTING FOUND BY DETAILED INSPECTION OF INBOARD CARRIAGE OF THE RIGHT WING INBOARD FLAP ASSEMBLY) MOS 15-JUL-2014 BF/F (s) SB 737-57A1314 RI TBL DO WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE 2.08 LH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN ONE OF THE OPTIONS THAT FOLLOW: OPTION 1: ACCOMPLISH THE MODIFICATION! OPTION 2: RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (IF NO LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE LEFT WING INBOARD FLAP ASSEMBLY) MOS 5-JUL-2014 BF/F (s) SB 737-57A1314 RI TBL DO WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE 2.09 RH ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN ONE OF THE OPTIONS THAT FOLLOW: OPTION 1: ACCOMPLISH THE MODIFICATION! OPTION 2: RE-TORQUE THE INBOARD FOUR FASTENERS AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT (IF NO LOOSE FASTENER FOUND AT THE INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT OF THE RIGHT WING INBOARD FLAP ASSEMBLY) MOS 5-JUL-2014 BF/F (s) RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 180 Of 748 @ Camp Systems EFTA00618471 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57A1314 R1 TBL REPLACE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED 2.10 ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN EACH PART THAT HAS A CRACK OR WEAR OR CONTACT BOEING FOR A REPAIR AND DO THE REPAIR (IF ANY CRACK OR WEAR FOUND DURING ACCOMPLISHMENT OF PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 6 - LEFT WING - MODIFICATION OR PART 7 - RIGHT WING - MODIFICATION THAT CANNOT BE REMOVED BY OVERSIZING THE TORQUE TUBE ATTACHMENT HOLE TO SECOND OVERSIZE) 5-JUL-2014 MOS BF/F (s) SB 737-57AI314 RI TBL REPLACE WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE RECOMMENDED 2.12 ATTACHMENT - INSPECTION AND MODIFICATION. SERVICE BULLETIN THE INBOARD CARRIAGE OR CONTACT BOEING FOR REPAIR INSTRUCTIONS AND DO THE REPAIR (IF ANY CHAFING OR FRETTING FOUND DURING ACCOMPLISHMENT OF PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 6- LEFT WING - MODIFICATION OR PART 7 - RIGHT WING - MODIFICATION THAT IS DEEPER THAN 0.020 INCH) MOS 5-JUL-2014 BF/F (s) SB 737-57AI314 RI TBL WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE ATTACHMENT - RECOMMENDED 2.13 INSPECTION AND MODIFICATION. SERVICE BULLETIN BLEND THE INBOARD CARRIAGE TO REMOVE THE CHAFING AND FRETTING (IF ANY CHAFING OR FRETTING FOUND DURING ACCOMPLISHMENT OF PARAGRAPH 3.8.. WORK INSTRUCTIONS. PART 6 - LEFT WING - MODIFICATION OR PART 7 - RIGHT WING - MODIFICATION UP TO A MAXIMUM DEPTH OF 0.020 INCH) MOS I5-JUL-2014 BF/F (s) SB 737-57A1314 TABLE TORQUE CHECK WINGS- TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE SUPERSEDED 1.1 TUBE ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 R1). SERVICE BULLETIN (REQUIRED MINIMUM FOR SAFETY) MOS - (s) SB 737-57A1314 TABLE ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE SUPERSEDED 1.2 ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 RH. SERVICE BULLETIN THE MODIFICATION FOR LEFT WING (REQUIRED MINIMUM FOR SAFETY) MOS - (s) SB 737-57A1314 TABLE ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE SUPERSEDED 1.3 ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 RH. SERVICE BULLETIN THE MODIFICATION FOR RIGHT WING (REQUIRED MINIMUM FOR SAFETY) MOS - (s) SB 737-57A1314 TABLE TORQUE CHECK WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE SUPERSEDED 2.1 TUBE ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 RI). SERVICE BULLETIN (RECOMMENDED ECONOMIC INSPECTION) MOS - Is) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks %Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 181 Of 748 @ Camp Systems EFTA00618472 C O Atiant.fran MP Meowed lip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-57A1314 TABLE ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE SUPERSEDED 2.2 ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 R1). SERVICE BULLETIN THE MODIFICATION FOR LEFT WING (RECOMMENDED ECONOMIC INSPECTION) MOS - Is) SB 737-57A1314 TABLE ACCOMPLISH WINGS - TRAILING EDGE FLAPS - INBOARD FLAP ASSEMBLY - INBOARD CARRIAGE TO TORQUE TUBE SUPERSEDED 2.4 ATTACHMENT - INSPECTION AND MODIFICATION (SUPERSEDED BY SB 737-57A1314 R1). SERVICE BULLETIN THE MODIFICATION FOR RIGHT WING (RECOMMENDED ECONOMIC INSPECTION) MOS - (s) SB 737-71-1422 21 -JUN-I999 CONVERSION OF CFM56-76 TO 7827433. SERVICE BULLETIN MOS 7-OCT-2000 - (s) RECOMMENDED COMPUED WITH - CM SB 737-71-1422 RI CONVERSION OF CFM56-76 TO 7827433. SERVICE BULLETIN RECOMMENDED MOS 02-NOV-2000 - (s) SB 737-71-1422 R2 CONVERSION OF CFM56-76 TO 7827433. SERVICE BULLETIN RECOMMENDED MOS IS-FEB-2001 - (s) SB 737-71-1422 R3 CONVERSION OF CFM56-76 TO 7827/83. SERVICE BULLETIN MOS 12-FEB-2002 - (s) SB 737-71-1464 DRAIN TUBE REPLACEMENT. ENGINE FUEL PUMP PAD. SERVICE BULLETIN RECOMMENDED MOS 02-OCT-2003 SB 737-71-1551 RI POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-76 SINGLE ANNULAR SUPERSEDED COMBUSTOR (SACy3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES (SUPERSEDED BY SB 737-71-1551 R2). SERVICE BULLETIN MOS SB 737-71-1582 POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-7B SINGLE ANNULAR SUPERSEDED COMBUSTOR (SAC) ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-7B SAC/3 TECHNOLOGY INSERTION PROGRAM BASE ENGINES (SUPERSEDED BY SB 737-71-1582 R1). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 182 Of 748 @ Camp Systems EFTA00618473 C O A.m." MPvgnie• Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-71-1582 RI 58 737-71-1582 R2 13-JAN-2012 58 737-71-1588 02-AUG-2007 POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-78 SINGLE ANNULAR SUPERSEDED COMBUSTOR (SAC) ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-7B SAC/3 TECHNOLOGY INSERTION PROGRAM BASE ENGINES (SUPERSEDED BY SB 737-71-1582 R2). SERVICE BULLETIN MOS POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-7B SINGLE ANNULAR RECOMMENDED COMBUSTOR (SAC) ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-7B SACf3 TECHNOLOGY INSERTION PROGRAM BASE ENGINES. SERVICE BULLETIN MOS POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-7B SINGLE ANNULAR COMBUSTOR (SAC)/3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56- 78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN MOS SB 737-71-1588 RI POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC)/3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56- 78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN I5-AUG-2007 SB 737-71-1588 R2 I 7-DEC-2007 SB 737-71-1588 R3 24-DEC-2007 58 737-71-1588 R4 18-JUL-2008 MOS POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-76 SINGLE ANNULAR COMBUSTOR (SAC)/3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN MOS POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-76 SINGLE ANNULAR COMBUSTOR (SACO TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN MOS INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC)/3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 183 Of 748 @ Camp Systems EFTA00618474 C O A.m." MPvgnie• Megnundop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-71-1588 RS 58 737-71-1588 R6 07-DEC-2011 58 737-71-1603 S8 737-71-1603 RI SB 737-71-1603 R2 S8 737-71-1603 R3 S8 737-71-1603 R4 58 737-71-1608 02-OCT-2009 INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFMS6-78 SINGLE ANNULAR COMBUSTOR (SAC)/3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFM56-78 SAC BASE ENGINES (SUPERSEDED BY S8 737-71-1588 R6). SERVICE BULLETIN MOS SUPERSEDED POWER PLANT - GENERAL - INTERMIX ONE OR SUBSTITUTE ANY COMBINATION OF CFM56-7B SINGLE ANNULAR RECOMMENDED COMBUSTOR (SACy3 TECHNOLOGY INSERTION PROGRAM ENGINES OR CFM56-78 HIGH PRESSURE COMPRESSOR AND/OR HIGH PRESSURE TURBINE TECHNOLOGY INSERTION KIT ENGINES FOR THE TWO CFMS6-78 SAC BASE ENGINES. SERVICE BULLETIN MOS POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFMS6-78 SAC/3 (TECH SUPERSEDED INSERTION) ENGINES FROM 7826/3 TO 782773 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY SB 737-71-1603 RI). SERVICE BULLETIN MOS POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFM56-78 SAC/3 (TECH SUPERSEDED INSERTION) ENGINES FROM 7826/3 TO 7827/3 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY SB 737-71-1603 R2). SERVICE BULLETIN MOS POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFMS6-78 SAM (TECH SUPERSEDED INSERTION) ENGINES FROM 7826/3 TO 782773 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY SB 737-71-1603 R3). SERVICE BULLETIN MOS POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFM56-78 SAC/3 (TECH SUPERSEDED INSERTION) ENGINES FROM 7826/3 TO 7827/3 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY S8 737-71-1603 R4). SERVICE BULLETIN MOS POWER PLANT -POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF THE CFM56-78 SAC/3 (TECH SUPERSEDED INSERTION) ENGINES FROM 7826/3 TO 782773 BUMP AND RETURN TO 7826/3 (SUPERSEDED BY S8 737-71-1603 RS). SERVICE BULLETIN MOS INSPECTION AND REPAIR OF THE ENGINE BUILD UP BRACKETS TO PREVENT DAMAGE TO THE ENGINE FAN CASE. SERVICE BULLETIN MOS RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 184 Of 748 @ Camp Systems EFTA00618475 C O A.m." MPvgnie• Megnund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-71-1625 POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF CFM56-78 ENGINES FROM CFM56-7824 TO CFM56-7826/B2 THRUST RATING OR FROM CFM56-7824/3 TO CFM56-7826/382 OR CFM56-7826/382F THRUST RATING. SERVICE BULLETIN MOS RECOMMENDED 28-JUL-2010 SB 737-71-1634 POWER PLANT - GENERAL - CHANGE THE OPERATIONAL THRUST RATING OF CFM56-78 SACJ3 (TECH INSERTION) SUPERSEDED ENGINES FROM 7827/3 TO 7B24/3 OR 7826/3. OR FROM 7826/3 TO 7824/3 (SUPERSEDED BY SB 737-71-1634 RI). SERVICE BULLETIN MOS S8 737-71-1634 RI POWER PLANT - GENERAL - CHANGE THE OPERATIONAL THRUST RATING OF CFM56-78 SACJ3 (TECH INSERTION) SUPERSEDED ENGINES FROM 7827/3 TO 7824/3 OR 7826/3. OR FROM 7826/3 TO 7824/3 (SUPERSEDED BY S8 737-71-1634 R2). SERVICE BULLETIN MOS SB 737-71-1634 R2 POWER PLANT - GENERAL - CHANGE THE OPERATIONAL THRUST RATING OF CFM56-78 SAC/3 (TECH INSERTION) RECOMMENDED ENGINES FROM 7827/3 TO 7824/3 OR 7826/3. OR FROM 7626/3 TO 7824/3, SERVICE BULLETIN MOS 15-DEC-2010 SB 737-71-1658 POWER PLANT - CHANGE ONE OR TWO CFM56-78E ENGINES FOR ONE OR ANY COMBINATION OF TWO CFM56-78 SUPERSEDED SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56-78/3 SAC ENGINES (SUPERSEDED BY S8 737-71-1658 RI). SERVICE BULLETIN MOS SB 737-71-1658 RI POWER PLANT - CHANGE ONE OR TWO CFM56-78E ENGINES FOR ONE OR ANY COMBINATION OF TWO CFM56-78 SUPERSEDED SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56-78/3 SAC ENGINES (SUPERSEDED BY S8 737-71-1658 R2). SERVICE BULLETIN MOS SB 737-71-1658 R2 POWER PLANT - CHANGE ONE OR TWO CFM56-78E ENGINES FOR ONE OR ANY COMBINATION OF TWO CFM56-78 RECOMMENDED SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56-78/3 SAC ENGINES. SERVICE BULLETIN MOS 08-DEC-2011 SB 737-71-1673 POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC) SUPERSEDED ENGINES OR CFM56-78/3 SAC ENGINES FOR ONE OR TWO CFM56-78E ENGINES (SUPERSEDED BY SB 737-71-1673 R1). SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 185 Of 748 @ Camp Systems EFTA00618476 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-71-1673 RI 08-DEC-2011 SB 737-71-1674 SB 737-71-1674 RI SB 737-71-1674 R2 08-DEC-2011 POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56.78:3 SAC ENGINES FOR ONE OR TWO CFM56-7BE ENGINES. SERVICE BULLETIN MOS POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFP.I56-78 SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56.78:3 SAC ENGINES FOR ONE OR TWO CFM56-7BE ENGINES (SUPERSEDED BY SB 737-71-1674 RI). SERVICE BULLETIN MOS POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56.78:3 SAC ENGINES FOR ONE OR TWO CFM56-7BE ENGINES (SUPERSEDED BY SB 737-71-1674 R2). SERVICE BULLETIN MOS POWER PLANT - CHANGE ONE OR ANY COMBINATION OF TWO CFM56-78 SINGLE ANNULAR COMBUSTOR (SAC) ENGINES OR CFM56.78:3 SAC ENGINES FOR ONE OR TWO CFM56-7BE ENGINES. SERVICE BULLETIN MOS RECOMMENDED SUPERSEDED SUPERSEDED RECOMMENDED SB 737-71-1675 POWER PLANT - CHANGE TWO CFM56-78x2 DUAL ANNULAR COMBUSTOR (DAC) ENGINES FOR TWO CFM56-7BE SUPERSEDED ENGINES (SUPERSEDED BY S8 737-71-1675 RI). SERVICE BULLETIN MOS SB 737-71-1675 RI POWER PLANT - CHANGE TWO CFM56-78x2 DUAL ANNULAR COMBUSTOR (DAC) ENGINES FOR TWO CFM56-7BE RECOMMENDED 16-DEC-201I ENGINES. SERVICE BULLETIN MOS SB 737-71-1682 POWER PLANT - POWER PLANT - B1 FLANGE INSPECTION (SUPERSEDED BY S8 737-71-1682 R1). SERVICE BULLETIN SUPERSEDED MOS SB 737-71-1682 RI POWER PLANT - POWER PLANT - B1 FLANGE INSPECTION (SUPERSEDED BY S8 737-71-1682 R2). SERVICE BULLETIN SUPERSEDED MOS SB 737-71-1682 R2 POWER PLANT - POWER PLANT - B1 FLANGE INSPECTION (SUPERSEDED BY S8 737-71-1682 R3). SERVICE BULLETIN SUPERSEDED MOS SB 737-71-1682 R3 POWER PLANT - POWER PLANT - B1 FLANGE INSPECTION. SERVICE BULLETIN RECOMMENDED 07-MAR-2014 MOS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 186 Of 748 Camp Systems EFTA00618477 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-71-1705 21-DEC-2010 POWER PLANT - POWER PLANT - CHANGE OPERATIONAL THRUST RATING OF CFM5G-7B ENGINES FROM 7822 TO RECOMMENDED 7824 AND RETURN TO 7822. SERVICE BULLETIN MOS SB 737-71-1709 POWER PLANT - POWER PLANT - CHANGE THE OPERATIONAL THRUST RATING OF TWO CFM56-78 ENGINES FROM RECOMMENDED 7826 TO 7827 AND RETURN TO 7826. SERVICE BULLETIN MOS 12-JAN-2011 • SB 737-71-1717 POWER PLANT - ENGINE COWLING - HEAT RESISTANT ALUMINIZED PRIMER INSTALLATION TO THE LIPSKIN OF THE RECOMMENDED ENGINE INLET COWL. SERVICE BULLETIN MOS 12-SEP-2013 SB 737-71-1725 POWER PLANT - POWER PLANT - INSTALLATION OF ENGINE OWNERSHIP PLACARD. SERVICE BULLETIN RECOMMENDED MOS 23-NOV-2011 • SB 737-71A1462 AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION. SERVICE BULLETIN 29-AUG-2C02 SB 737-71A1462 Fti POWER PLANT-ENGINE MOUNTS-AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION. SERVICE BULLETIN DAYS CO (5) DAYS 90 (5) 29-AUG-2C02 SB 737-71A1462 R2 AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. SERVICE RECOMMENDED BULLETIN MOS 29-MAY-2C03 SB 737-71A1462 R2 PART INSPECT AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. RECOMMENDED SERVICE BULLETIN FOR CORRECT INSTALLATION MOS 29-MAY-2C03 SB 737-71A1462 R2 PART APPLY AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. RECOMMENDED 2 SERVICE BULLETIN PERMANENT MARKINGS MOS 29-MAY-2C03 (51 ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 187 Of 748 1, Camp Systems EFTA00618478 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-71A1462 R3 AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. SERVICE BULLETIN 20-MAY-2004 MOS 26-OCT-2011 3573:06 AFL 872 SB 737-71A1462 R3 PART INSPECT AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. 1 SERVICE BULLETIN FOR CORRECT INSTALLATION 20-MAY-2004 MOS 26-OCT-2011 3573:06 AFL 872 SB 737-71A1462 R3 PART INSTALL AFT ENGINE MOUNT. CENTER LINK ASSEMBLY INSTALLATION INSPECTION AND IDENTIFICATION OF PARTS. 2 SERVICE BULLETIN PERMANENTLY MARKED MOUNT 20-MAY-2004 MOS 26-OCT-2011 3573:06 AFL 872 COMPUED WITH - PERFORMED UNDER WO GVBBJ206 COMPUED WITH - PERFORMED UNDER WO GVBBJ206 COMPUED WITH - PERFORMED UNDER WO GVBBJ206 SB 737-73-1014 Of -JUL-7999 ELECTRONIC ENGINE CONTROL. SERVICE BULLETIN MOS I3-SEP-1999 - (s) RECOMMENDED COMPUED WITH -CM SB 737-73-1014 RI ELECTRONIC ENGINE CONTROL. SERVICE BULLETIN RECOMMENDED MOS 27-JUL-2000 - (s) SB 737-73A-026 . SERVICE BULLETIN MOS I3-SEP-1999 - (s) SB 737-73A1011 ENGINE FUEL SUPPLY HOSE (SUPERSEDED BY SB 737-73A1011 R1). SERVICE BULLETIN SUPERSEDED MOS - (s) SB 737-73A1011 RI ENGINE FUEL SUPPLY HOSE (SUPERSEDED BY SB 737-73A1011 R2). SERVICE BULLETIN SUPERSEDED MOS - (s) SB 737-73A1011 R2 ENGINE FUEL SUPPLY HOSE. SERVICE BULLETIN RECOMMENDED MOS I9-APR-2002 73-JUL-2000 988:36 AFL 250 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 188 Of 748 @ Camp Systems EFTA00618479 COMP Moan Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-73A1016 ELECTRONIC ENGINE CONTROL SOFTWARE CHANGE. SERVICE BULLETIN 20-FEB-2003 SB 737-73A1016 RI 08-MAY-2003 SB 737-77-1056 I6-AUG-2001 SB 737-77-1069 R2 10-DEC-2008 MOS 6 (s) 22-AUG-2003 1342 AFL 351 ELECTRONIC ENGINE CONTROL-SOFTWARE CHANGE. SERVICE BULLETIN MOS 22-AUG-2003 1342 AFL 351 AIRBORNE VIBRATION MONITORING SYSTEM UNIVERSAL SIGNAL CONDITIONER INSTALLATION, SERVICE BULLETIN RECOMMENDED MOS - (s) AIRBORNE VIBRATION MONITORING (AVM) SYSTEM - REPLACE CONDITIONER UNIT FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS SB 737-78-1063 R2 EXHAUST- THRUST REVERSER - INNER WALL BLANKET INSULATION CHANGE. SERVICE BULLETIN MOS 28-MAR-2014 07-OCT-1999 SB 737-78-1067 THRUST REVERSER, SERVICE BULLETIN MOS 10-AUG-2000 3000 (s) 44 AFL 2100 38 RECOMMENDED COMPUED WITH COMPUED WITH NOT APPLICABLE - BY EFFECTIVITY SB 737-78-1069 28-FEB-2002 EXHAUST- THRUST REVERSER- INSULATION BLANKET MODIFICATION. SERVICE BULLETIN MOS - (s) SB 737-78-1069 RI EXHAUST - THRUST REVERSER - INSULATION BLANKET MODIFICATION. SERVICE BULLETIN RECOMMENDED MOS I3-JUN-2002 SB 737-78-1069 R2 INSULATION BLANKET MODIFICATION. SERVICE BULLETIN RECOMMENDED MOS 06-FEB-2003 SB 737-78-1069 R3 INSULATION BLANKET MODIFICATION. SERVICE BULLETIN RECOMMENDED MOS 05-AUG-2004 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 189 Of 748 @ Camp Systems EFTA00618480 COMP Moan Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-78-1069 R4 16-JUN-2005 SB 737-78-1071 06-DEC-2001 SB 737-78-1071 RI 09-MAY-2002 SB 737-78-1072 28-MAR-2002 SB 737-78-1073 EXHAUST - THRUST REVERSER - INSULATION BLANKET MODIFICATION. SERVICE BULLETIN MOS REPLACE THRUST REVERSER EXHAUST FASTNERS FOR TRACKING SEALS. SERVICE BULLETIN MOS - RECOMMENDED THRUST REVERSER - REPLACE FASTNERS FOR TRACK FAIRING SEALS. SERVICE BULLETIN RECOMMENDED MOS - (s) EXHAUST - THRUST REVERSER - INSPECT/CHANGE CASCADE SUPPORT RING TO CORRECTLY INSTALL BARREL RECOMMENDED NUTS. SERVICE BULLETIN MOS - (s) INSPECTION AND MODIFICATION OR REPLACEMNT OF BUSHINGS IN THE ATTACH FITTING ASSEMBLIES FOR THE RECOMMENDED COMPLIED WITH DRAG LINKS. SERVICE BULLETIN 09-DEC-2004 MOS 07-SEP-2005 2202:21 AFL 541 SB 737-78-1073 RI EXHAUST - THRUST REVERSER - BLOCKED DOORS - INSPECTION AND MODIFICATION OR REPLACEMENT OF RECOMMENDED BUSHINGS IN THE ATTACH FITTING ASSEMBUES FOR THE DRAG LINKS. SERVICE BULLETIN MOS 21-APR-2005 SB 737-78-1073 R2 EXHAUST - THRUST REVERSER - BLOCKERS DOORS - INSPECTION AND MODIFICATION OR REPLACEMENT OF BUSHINGS IN THE ATTACH FITTING ASSEMBUES FOR THE DRAG LINKS. SERVICE BULLETIN MOS 12-JAN-2006 SB 737-78-1073 R3 EXHAUST - THRUST REVERSER - BLOCKER DOORS - INSPECTION AND MODIFICATION OR REPLACEMENT OF BUSHINGS IN THE ATTACH FITTING ASSEMBUES FOR THE DRAG LINKS. SERVICE BULLETIN MOS 20-JUL-2006 SB 737-78-1073 R4 EXHAUST - THRUST REVERSER - BLOCKER DOORS - INSPECTION AND MODIFICATION OR REPLACEMENT OF BUSHINGS IN THE ATTACH FITTING ASSEMBUES FOR THE DRAG LINKS. SERVICE BULLETIN MOS 16-NOV-2006 SB 737-78-1074 EXHAUST - THRUST REVERSER - BLOCKER DOOR AERO/FIRE SEAL REPLACEMENT. SERVICE BULLETIN MOS 24 (s) 07-APR-2005 AFL 4000 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 190 Of 748 @ Camp Systems EFTA00618481 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-78-1074 RI EXHAUST - THRUST REVERSER - BLOCKER DOOR AEROIFI RE SEAL REPLACEMENT. SERVICE BULLETIN MOS 60 (s) 15-SEP-2005 AFL 8200 SB 737-78-1075 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND REPLACEMENT OF THE FIRE SEAL ON EACH THRUST SUPERSEDED REVERSER HALF (SUPERSEDED BY SB 737-78-1075 RI). SERVICE BULLETIN MOS SB 737-78-1075 RI EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND REPLACEMENT OF THE FIRE SEAL ON EACH THRUST SUPERSEDED REVERSER HALF (REPLACED BY 737-78-1086 R2). SERVICE BULLETIN MOS SB 737-78-1076 RI EXHAUST - THRUST REVERSER SYSTEM - REPLACEMENT OF CASCADE ASSEMBLIES. SERVICE BULLETIN RECOMMENDED MOS 12-MAR-2010 SB 737-78-1078 EXHAUST - THRUST REVERSER INDICATING SYSTEM - ADDITION OF A RESISTOR TO THE THRUST REVERSER SYNC LOCK TIME DELAY CIRCUIT. SERVICE BULLETIN SB 17-AUG-2006 737-78-1078 RI 30-MAY-2007 MOS EXHAUST - THRUST REVERSER INDICATING SYSTEM - ADDITION OF A RESISTOR TO THE THRUST REVERSER SYNC LOCK TIME DELAY CIRCUIT. SERVICE BULLETIN MOS SB 737-78-1078 R2 EXHAUST - THRUST REVERSER INDICATING SYSTEM - ADDITION OF A RESISTOR TO THE THRUST REVERSER SYNC LOCK TIME DELAY CIRCUIT. SERVICE BULLETIN MOS 19-FEB-2008 SB 737-78-1078 R3 THRUST REVERSER INDICATING SYSTEM - ADDITION OF A RESISTOR TO THE THRUST RECOMMENDED REVERSER SYNC LOCK TIME DELAY CIRCUIT. SERVICE BULLETIN MOS 16-OCT-2009 SB 737-78-1079 EXHAUST - THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION. REPAIR. AND COOLING HOLE MODIFICATION. SERVICE BULLETIN MOS 06-AUG-2007 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 191 Of 748 @ Camp Systems EFTA00618482 C O Atiant.fran MP Ad-own/lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-78-1079 RI 17-DEC-2007 SB 737-78-1079 R2 SB 737-78-1079 R3 SB 737-78-1082 SB 737-78-1082 RI 10-MAY-2012 SB 737-78-1083 SB 737-78-1083 RI SB 737-78-1083 RI TABLE 1 01-JAN-2000 EXHAUST - THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION. REPAIR. AND COOLING HOLE MODIFICATION 9SUPERSEDED BY 737-78-1079 R2). SERVICE BULLETIN MOS SUPERSEDED EXHAUST - THRUST REVERSER- THRUST REVERSER INNER WALL INSPECTION. REPAIR. AND COOLING HOLE SUPERSEDED MODIFICATION (SUPERSEDED BY SB 737-78-1079 R3). SERVICE BULLETIN MOS EXHAUST - THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION. REPAIR. AND COOLING HOLE MODIFICATION. SERVICE BULLETIN MOS EXHAUST - THRUST REVERSER - INSTALLATION OF A COOLING HOLE AND BUSHING. APPLY SEALANT AND INSTALL SUPERSEDED COMPLIED WITH - LAW. AD 2012-05-02 PARA (G) FLANGE INSULATION ASSEMBLIES ON THE THRUST REVERSERS (SUPERSEDED BY SB 737-78-1082 R1). SERVICE - FOUND SATISFACTORY - TOP KIT RETROFIT BULLETIN THR / 002A0004-16 MOS 12-FEB-2014 - (s) 3743:34 AFL 917 EXHAUST - THRUST REVERSER - INSTALLATION OF A COOLING HOLE AND BUSHING. APPLY SEALANT AND INSTALL FLANGE INSULATION ASSEMBLIES ON THE THRUST REVERSERS. SERVICE BULLETIN MOS 12-FEB-2014 - (s) 3743:34 RECOMMENDED DECLINED - NO MORE WORK IS NECESSARY ON THE AIRPLANE(S) CHANGED IN ACCORDANCE WITH THE ORIGINAL ISSUE OF THIS SERVICE BULLETIN. AFL 917 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST SUPERSEDED REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS (SUPERSEDED BY SB 737-78-1083 R1). SERVICE BULLETIN MOS - (s) EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST SUPERSEDED REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS (SUPERSEDED BY SB 737-78-1083 R2). SERVICE BULLETIN MOS DEATILED INSPECTION EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT SUPERSEDED OF THE THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS (SUPERSEDED BY SB 737-78-1083 R2). SERVICE BULLETIN OF THE THRUST REVERSER HYDRAULIC ACTUATOR ROD ENDS AND ACTUATOR ATTACH FITTINGS MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 192 Of 748 @ Camp Systems EFTA00618483 C O Atiant.fran MP Ad-own/lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-78-1083 R2 13-JUN-2014 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN MOS RECOMMENDED SB 737-78-1083 R2 TBL DETAILED INSPECTION EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT RECOMMENDED 1.01 OF THE THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN FOR DAMAGE ON THE HYDRAULIC ACTUATOR ROD END ASSEMBLIES AND A DETAILED INSPECTION FOR DAMAGE ON THE ACTUATOR ATTACH FITTINGS (FOR ALL AIRPLANES) (GROUP 1 - 2. CNF 2) MOS 30-JUN-2010 7500 (s) SB 737-78-1083 R2 TBL DO EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED 1.03 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN DETAILED INSPECTIONS FOR DAMAGE ON THE HYDRAULIC ACTUATOR ROD END ASSEMBLIES (IF ANY DAMAGE FOUND ON THE HYDRAULIC ACTUATOR ROD END ASSEMBLIES) (GROUP 1 - 2. CNF 2) MOS 13-JUN-2014 BFIF SB 737-78-1083 R2 TBL REPAIR EXHAUST - THRUST REVERSER SYSTEM- INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED 1.04 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN OR REPLACE THE HYDRAULIC ACTUATOR ROD END BODY (IF ANY DAMAGE FOUND ON HYDRAULIC ACTUATOR ROD END BODY AND THE DAMAGE IS LESS THAN OR EQUAL TO THE REPAIR LIMITS) (GROUP 1 - 2. CNF 2) MOS 13-JUN-2014 BF/F SB 737-78-1083 R2 TBL REPLACE EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE RECOMMENDED 1.05 THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN HYDRAULIC ACTUATOR ROD END ASSEMBLY (IF ANY DAMAGE FOUND ON HYDRAULIC ACTUATOR ROD END BODY AND THE DAMAGE IS GREATER THAN THE REPAIR LIMITS) (GROUP 1 - 2. CNF 2) MOS 13-JUN-2014 BFIF SB 737-78-1083 R2 TBL EXHAUST- THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED 1.06 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN RETURN SPHERICAL BEARING TO SERVICE (IF WEAR LESS THAN OR EQUAL TO SERVICEABLE LIMITS FOUND ON SPHERICAL BEARING ON THE HYDRAULIC ACTUATOR ROD END) (GROUP 1 - 2. CNF 2) MOS 13-JUN-2014 BFIF SB 737-78-1083 R2 TBL REPLACE EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE RECOMMENDED 1.07 THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN THE SPHERICAL BEARING (IF WEAR GREATER THAN SERVICEABLE LIMITS FOUND ON SPHERICAL BEARING ON THE HYDRAULIC ACTUATOR ROD END) (GROUP 1 - 2. CNF 2) MOS 13-JUN-2014 BF/F 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 193 Of 748 @ Camp Systems EFTA00618484 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-78-1083 R2 TBL 1.08 13-JUN-20I1 INSTALL EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN SPACER (IF NO DAMAGE FOUND ON AN ACTUATOR ATTACH FITTING) (GROUP 1 - 2. CNF 2) MOS BFIF RECOMMENDED 58 737-78-1083 R2 TBL REPAIR EXHAUST - THRUST REVERSER SYSTEM- INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED 1.09 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN FITTING AND INSTALL SPACER (IF ANY DAMAGE FOUND ON ACTUATOR ATTACH FITTING AND THE DAMAGE IS LESS THAN OR EQUAL TO 0.020 INCH IN DEPTH) (GROUP 1- 2. CNF 2) MOS 13-JUN-2014 BFIF 58 737-78-1083 R2 TBL REPLACE EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE RECOMMENDED 1.10 THRUST REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN FITTING (IF ANY DAMAGE FOUND ON ACTUATOR ATTACH FITTING AND THE DAMAGE IS GREATER THAN 0.020 INCH IN DEPTH) (GROUP 1 - 2. CNF 2) MOS I3-JUN-2014 BFIF 58 737-78-1083 R2 TBL EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED 1.11 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN CHANGE THE SCHEDULED MAINTENANCE PROGRAM (FOR AIRPLANES WITH WEAR SPACERS INSTALLED ON THE ACTUATOR ATTACH FITTINGS) (GROUP 1 - 2. CNF 2) MOS 20000 (s) 58 737-78-1083 R2 TBL EXHAUST - THRUST REVERSER SYSTEM - INSPECTION AND CHANGE TO OR REPLACEMENT OF THE THRUST RECOMMENDED 2.1 REVERSER ACTUATOR ATTACH FITTING AND ACTUATOR ROD ENDS. SERVICE BULLETIN CHANGE THE SCHEDULED MAINTENANCE PROGRAM (FOR ALL AIRPLANES WITH WEAR SPACERS INSTALLED ON THE ACTUATOR ATTACH FITTINGS) (GROUP 1 - 2. CNF 1) MOS 12 (s) 13-JUN-2014 SS 737-78-1085 EXHAUST - THRUST REVERSER SYSTEM - CHANGE TO THE INSULATION BLANKETS ON THE THRUST REVERSERS SUPERSEDED (SUPERSEDED BY SS 737-78-1085 RI). SERVICE BULLETIN MOS SS 737-78-1085 RI EXHAUST - THRUST REVERSER SYSTEM - CHANGE TO THE INSULATION BLANKETS ON THE THRUST REVERSERS. RECOMMENDED SERVICE BULLETIN MOS 16-DEC-2011 SS 737-78-1086 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION OF THE FIRE SEAL AND INSTALLATION OF A NEW FIRE SEAL SUPERSEDED BRACKET ON THE THRUST REVERSER (SUPERSEDED BY SB 737-78-1086 R1). SERVICE BULLETIN 1/10S - Is) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 194 Of 748 @ Camp Systems EFTA00618485 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 737-78-1086 RI EXHAUST - THRUST REVERSER SYSTEM - INSPECTION OF THE FIRE SEAL AND INSTALLATION OF A NEW FIRE SEAL SUPERSEDED BRACKET ON THE THRUST REVERSER (SUPERSEDED BY SB 737-78-1086 R2). SERVICE BULLETIN MOS - (s) SB 737-78-1086 R2 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION OF THE FIRE SEAL AND INSTALLATION OF A NEW FIRE SEAL BRACKET ON THE THRUST REVERSER . SERVICE BULLETIN MOS SB 737-78-1087 REPLACEMENT OF THE LOCKOUT HANDLE ASSEMBLY ON THE THRUST REVERSER ACTUATORS (SUPERSEDED BY SUPERSEDED SB 737-78-1087 R1). SERVICE BULLETIN MOS SB 737-78-1087 RI EXHAUST - THRUST REVERSER SYSTEM - REPLACEMENT OF THE LOCKOUT HANDLE ASSEMBLY ON THE THRUST RECOMMENDED REVERSER ACTUATORS. SERVICE BULLETIN MOS 29-MAY-20 1 3 SB 737-78-1088 EXHAUST - THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION AND REPAIR (SUPERSEDED BY SB SUPERSEDED 737-78-1088 R1). SERVICE BULLETIN MOS - (s) SB 737-78-1088 RI EXHAUST- THRUST REVERSER - THRUST REVERSER INNER WALL INSPECTION AND REPAIR. SERVICE BULLETIN MOS SB 737-78-1089 EXHAUST - ENGINE PRIMARY EXHAUST NOZZLE AND PLUG ASSEMBLY INSTALLATION (SUPERSEDED BY SB SUPERSEDED 737-78-1089 R1). SERVICE BULLETIN MOS SB 737-78-1089 RI EXHAUST- ENGINE PRIMARY EXHAUST NOZZLE AND PLUG ASSEMBLY INSTALLATION. SERVICE BULLETIN RECOMMENDED MOS 25-OCT-2013 SB 737-78-1090 EXHAUST - THRUST REVERSER SYSTEM - INSPECTION FOR AND REMOVAL OF THE THRUST REVERSER INNER WALL COOLING HOLE BLOCKAGE. SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 195 Of 748 @ Camp Systems EFTA00618486 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 737-78-1092 EXHAUST - TURBINE EXHAUST SYSTEM - REWORK OF INTERFERENCE CONDITION AT EXHAUST NOZZLE FORWARD RECOMMENDED LABYRINTH. SERVICE BULLETIN MOS 22-JAN-2013 SB 737-SL-21-056 RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE BULLETIN RECOMMENDED MOS 25-OCT-2002 -(5) SB 737-SL-28-044 AIRCRAFT USE OF DYED FUELS (SUPERSEDED BY SL 737-SL-28-044 REV. A). SERVICE BULLETIN SUPERSEDED SB 737-SL-30-020 OI -MAR-2006 SB 737-SL-31-034 MOS WINDOW HEAT CONTROL UNIT MODIFICATION TO CORRECT A4 CIRCUIT BOARD CORROSION. SERVICE BULLETIN MOS TAKEOFF CONFIGURATION WARNING- ALTERNATE METHOD OF COMPLIANCE A.D., SERVICE BULLETIN MOS SB 737-SL-32-129 REV. A NOSE GEAR LOCK VALVE MANIFOLD DUPLICATE SERIAL NUMBERS. SERVICE BULLETIN MOS I0-JUL-2006 SB 737-SL-32-134 REV. A NLG SHOCK STRUT ALTERNATE DYNAMIC SEAL. SERVICE BULLETIN MOS 10-JUL-2006 OPTIONAL SB 737-SL-32-154 MAIN LANDING GEAR ACTUATOR BARREL CRACKS RECOMMENDED FOLLOWING REPAIR PER SERVICE BULLETIN. SERVICE BULLETIN MOS 09-FEB-2009 AFL 500(s) SB 737-SL-34-187 LOSS OF RELIABLE AIR DATA DUE TO ICING OF STATIC PORTS - SRP 34-0111. SERVICE BULLETIN MOS 04-JUN-2007 SB 737-SL-52-046 AUXILIARY POWER UNIT (APU) ACCESS DOOR SKIN LATCH RECOMMENDED CUTOUTS. SERVICE BULLETIN MOS I4-APR-2009 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 196 Of 748 @ Camp Systems EFTA00618487 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 920-34-25 ROCKWELL COLLINS - SB 25 - GLU-920 GLOBAL LANDING UNIT (CPN 822-1152-0011002/003) GNSS RECEIVER CIRCUIT CARD A8 (CPN 828-2940-302) REDUCE OCCURRENCE OF INCORRECT GPS DATE. SERVICE BULLETIN COMPLIED WITH 03-OCT-2008 MOS 23-FEB-2009 3353:18 AFL 804 SB 964-0452-23-39 COMMUNICATION - XK516D HF RADIO SYSTEM - UNIT MODIFICATION (MOD) 48 TO XK516D1 HF TRANSCEIVER (HF RECOMMENDED TRANSCEIVER). PN 964-0452-012. -042. OR -052: INSPECTION AND REPLACEMENT OF HIGH FREOUENCY (HF) MODEM NON-CONFORMING INTEGRATED CIRCUIT (VOICE BAND ANALOG INTERFACE). SERVICE BULLETIN MOS 05-N0V-2013 SB 965-0976-0XXX-34-38 . SERVICE BULLETIN R1 MOS - (s) SB A001-25-96 . SERVICE BULLETIN - IPECO SEATS MOS 13-SEP-1999 - (s) SB Bill 28-136 INSTALLATION OF COMPONENT IDENTIFICATIONS PLACARDS. SERVICE BULLETIN MOS - (s) SB BBJ-25-34 REMOVAL OF CARGO COMPARTMENT LOWER BILGE INSULATION BLANKETS. SERVICE BULLETIN MOS - (s) SB BB.J-28-001-K ST00936NY-D-28-SB-001- K SFAR 88 AFS INTERNAL FUEL CELL MODIFICATION AND VALVE PLATE ASSEMBLY. COMPLIED WITH SERVICE BULLETIN MOS 28-SEP-2009 3378:04 AFL 812 SB BBJ-28-02 MODIFICATION OF THE FORWARD HALF TANK, INBOARD SUPPORT RAIL. SERVICE BULLETIN MOS 17-AUG-1999 - (s) SB BBJ-28-021-K ST00936NY-D-28-SB-021-_K SFAR88 {AND FAR 25.981 (A) (8) (C1) (AMENDMENT 102)} AUXILIARY FUEL SYSTEM UPGRADE FOR PATS MODIFIED AIRCRAFT SERVICE BULLETIN, SERVICE BULLETIN MOS 28-SEP-2009 3378:04 AFL 812 RECOMMENDED COMPLIED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 197 Of 748 @ Camp Systems EFTA00618488 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB BBJ-28-02A 17-AUG-1999 SB Bill-28-02B 15-OCT-1999 SB BBJ-28-02C 28-NOV-1999 SB BBJ-28-03 10-JUN-1999 SB BBJ-28-04 SB BBJ-28-04A 12-AUG-1999 SB BBJ-28-048 14-APR-2000 SB BEJ-28-05 10-JUN-1999 SB BBJ-28-06 MODIFICATION OF THE FORWARD HALF TANK. INBOARD SUPPORT RAIL. SERVICE BULLETIN MOS - Is) MODIFICATION OF THE FORWARD HALF TANK. INBOARD SUPPORT RAIL. SERVICE BULLETIN MOS - Is) MODIFICATION OF THE FORWARD HALF TANK. INBOARD SUPPORT RAIL. SERVICE BULLETIN MOS - (s) MODIFICATION OF THE AUXILIARY FUEL ELECTRICAL SYSTEM. SERVICE BULLETIN MOS - (s) MODIFICATION OF THE AUXILIARY FUEL SYSTEM PRESSURE SWITCH, SERVICE BULLETIN MOS - Is) MODIFICATION OF THE AUXILIARY FUEL SYSTEM PRESSURE SWITCH, SERVICE BULLETIN MOS - (s) MODIFICATION OF THE AUXILIARY FUEL SYSTEM PRESSURE SWITCH, SERVICE BULLETIN MOS - (s) INSTALLATIONOF AUXILIARY FUEL SHROUD DRAIN SYSTEM FLOW RESTRICTOR. SERVICE BULLETIN MOS - Is) MODIFICATION TO ADDED ELECTRONICS RACK FOR INCREASED LOAD CAPACITY. SERVICE BULLETIN MOS - (s) SB BBJ-28-09 CONVERSION FROM AN EXISTING NINE (4FWD. 5 AFT) AFS CONFIGURATION 2-G TO AN EIGHT CELL (3 FWD. 5 AFT) AFS. CONFIGURATION 2-F. SERVICE BULLETIN SB BBJ-28-098 MOS RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED CONVERSION FROM AN EXISTING NINE (4FWD. 5 AFT) AFS CONFIGURATION 2-G TO AN EIGHT CELL (3 FWD. 5 AFT) RECOMMENDED AFS. CONFIGURATION 2-F. SERVICE BULLETIN MOS 23-AUG-1999 -(s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 198 Of 748 @ Camp Systems EFTA00618489 CAMP fin. thermiewlqi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB BBJ-28-09F 29-OCT-2001 CONVERSION FROM AN EXISTING NINE (4FWD. S AFT) AFS CONFIGURATION 2-G TO AN EIGHT CELL (3 FWD. S AFT) RECOMMENDED AFS. CONFIGURATION 2-F. SERVICE BULLETIN MOS - (s) SB BB.J-28-10 RELOCATION OF HOSE SHROUD CHECK VALVES. SERVICE BULLETIN RECOMMENDED MOS 10-JUN-1999 - (s) SB BBJ-28-108-A AUXILIARY FUEL SYSTEM (AFS) CONVERSION FROM AN EXISTING (2M) 1 FWD 5 AFT CELL CONFIGURATION TO A (3A) RECOMMENDED 0 FWD 3 AFT CELL CONFIGURATION, SERVICE BULLETIN MOS 08-MAR-2004 SB BBJ-28-11 INSTALLATION OF CARGO NET ATTACH PROVISIONS (FORWARD). SERVICE BULLETIN MOS - (s) SB BBJ-28-13 INSTALLATION: COMPONENT IDENTIFICATION PLACARDS. SERVICE BULLETIN MOS SB BBJ-28-13 . SERVICE BULLETIN - (s) MOS I3-SEP-1999 - (s) SB BBJ-28-13A INSTALLATION: COMPONENT IDENTIFICATION PLACARDS. SERVICE BULLETIN RECOMMENDED MOS 09-AUG-1999 - (s) SB BBJ-28-138 INSTALLATION OF COMPONENT IDENTIFICATIONS PLACARDS. SERVICE BULLETIN MOS - (s) SB BBJ-28-16 MODIFICATION OF THE AUX FUEL HALF TAW INBOARD SUPPORT RAIL. SERVICE BULLETIN MOS SB BBJ-28-16A 31-AUG-1999 - (s) MOUNTING OF THE AFT HALF FUEL CELL INBOARD SUPPORT RAIL AND THE ADDITION OF THE FASTENERS IN THE RECOMMENDED FLOOR BEAM REINFORCEMENT STRAPS. SERVICE BULLETIN MOS - PATS SB 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 199 Of 748 @ Camp Systems EFTA00618490 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB BBJ-28-18 31-AUG-1999 SB BBJ-28-19 INSPECTION/MODIFICATION OF FASTENERS ON RAIL AND FLOOR. SERVICE BULLETIN MOS - Is) MODIFICATION OF THE WIRING OF THE AUX FUEL PROCESSING UNIT. SERVICE BULLETIN MOS - SB BBJ-28-19A MODIFICATION OF THE WIRING OF THE AUX FUEL PROCESSING UNIT. SERVICE BULLETIN 06-JUL-2001 MOS - (s) SB BBJ-28-21 FUEL MIGRATION PREVENTION. SERVICE BULLETIN MOS - (s) SB BBJ-28-21A SB Bill-28-21B SB Bill-28-21C FUEL MIGRATION PREVENTION.. SERVICE BULLETIN MOS - FUEL MIGRATION PREVENTION.. SERVICE BULLETIN MOS - FUEL MIGRATION PREVENTION.. SERVICE BULLETIN MOS - Is) SB BBJ-28-210 FUEL MIGRATION PREVENTION. SERVICE BULLETIN MOS 28-AUG-2009 07-SEP-2000 - (s) 3378:04 AFL 812 SB BBJ-28-23 MODIFICATION TO PREVENT BATTERY DRAINING. SERVICE BULLETIN MOS 01-JAN-2000 - (s) RECOMMENDED RECOMMENDED RECOMMENDED COMPLIED WITH SB BBJ-28-23A MODIFICATION TO PREVENT BATTERY DRAIN. SERVICE BULLETIN RECOMMENDED MOS 21-DEC-1999 - (s) SB BBJ-28-24 THE INSTALLATION OF A CLIP ASSEMBLY IN THE FORWARD CARGO COMPARTMENT TO ALLOW FOR THE PROPER RECOMMENDED REINSTALLATION OF THE FORWARD MOST CARGO NET AT THE CARGO BAY DOOR.. SERVICE BULLETIN MOS 14-JAN-2000 - 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 200 Of 748 @ Camp Systems EFTA00618491 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB BBJ-28-25 I9-JAN-2000 INSTALLATION OF A PLATE & CHANNEL IN THE FORWARD CARGO COMPARTMENT TO ALLOW FOR THE PROPER RECOMMENDED REINSTALLATION OF THE AFT MOST CARGO NET AT THE CARGO BAY DOOR. SERVICE BULLETIN MOS - (s) SB BBJ-28-26A CONVERSION: FROM (2 WD 5 Fl) TO el FWD 5 AFT) 6 TANK.. SERVICE BULLETIN MOS - (s) SB BBJ-28-268 CONVERSION: FROM (2 WD 5 Fl) TO el FWD 5 AFT) 6 TANK.. SERVICE BULLETIN MOS - (s) SB BBJ-28-26C CONVERSION: FROM A 7 TANK (2 WD 5 FT) TO A 6 TANK. ( FWD 5 AFT). SERVICE BULLETIN RECOMMENDED MOS 30-JUN-2060 - (s) SB BBJ-28-30 CONVERSION OF A SEVEN TANK FUEL SYSTEM TO A SIXTANK FUEL SYSTEM. SERVICE BULLETIN MOS - (s) SB BBJ-28-39E EIGHT CELL TO SEVEN CELL CONVERSION. SERVICE BULLETIN RECOMMENDED MOS 77-JUL-2001 - (s) SB BBJ-28-39F CONVERSION FROM AN EXISTING 8 TANK (3 FWD. 5 AFT) TO A 7 TANK (2 FWD. 5 AFT) AFS. CONFIGURATION. RECOMMENDED SERVICE BULLETIN 04-OCT-2001 SB BBJ-28-00A MOS - (s) SB BB-I-28-00B MODIFICATION TO FORWARD BLEED AIR. SERVICE BULLETIN RECOMMENDED MOS 29-SEP-2000 - (s) SB Bal-28-038 FUEL LINE BRACKET MODIFICATION. SERVICE BULLETIN RECOMMENDED MOS 29-SEP-2000 - (s) SB BBJ-28-45A RELOCATION OF CHECK VALVE IN MIX BAY. SERVICE BULLETIN RECOMMENDED MOS I8-SEP-2000 - (s) MOS MODIFICATION TO FWD BLEED AIR.. SERVICE BULLETIN 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 201 Of 748 @ Camp Systems EFTA00618492 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB BBJ-28-458 I2-JUL-2001 SB BBJ-28-47F CONVERSION FROM 5 TANK(1 FWD 4 AFT) TO A4 TANK (0 FWD 4AFT) CONFIGURATION. SERVICE BULLETIN RECOMMENDED I6-AUG-2001 SB BBJ-28-56 REPLACEMENT OF THE BBJ FUELING PLACARDS. SERVICE BULLETIN SB BBJ-28-58 05-JUL-2001 SB BBJ-28-61 RELOCATION OF CHECK VALVE IN MIX BAY. SERVICE BULLETIN MOS MOS MOS - Is) - (s) - Is) REPLACEMENT OF THE BBJ CARGO LOADING PLACARDS. SERVICE BULLETIN MOS - (s) RECOMMENDED RECOMMENDED CONVERSION FROM AN EXISTING EIGHT CELL (3 FWD 5AFT) AFS. CONFIGURATION 2-F TO A SIX CELL (1 FWD 5 AFT) RECOMMENDED AFS. CONFIGURATION 24.1. SERVICE BULLETIN MOS I7-APR-2001 -Is) SB BBJ-28-63C 09-NOV-2001 CONVERSION FROM AN EXISTING SIX CELL (2 FWD. 4 AFT) AFS. CONFIGURATION 2-D TO A EIGHT CELL (3 FWD. 5 AFT) RECOMMENDED AFS. CONFIGURATION 2-F WITH AFT STRUCTURAL PROVISIONS PREVIOUSLY INSTALLED. SERVICE BULLETIN MOS SB BBJ-28-67 CONVERSION FROM AN EXISTING SIX CELL (1 FWD 5 AFT) AFS. CONFIGURATION 2-M TO A SEVEN CELL (2 FWD 5 AFT) RECOMMENDED AFS. CONFIGURATION 2-E.. SERVICE BULLETIN 05-DEC-2001 SB BBJ-28-6A 02-SEP-1999 SB BBJ-28-70 16-JAN-2002 SB BBJ-28-73A MOS - Is) MODIFICATION TO ADDED ELECTRONICS RACK FOR INCREASED LOAD CAPACITY. SERVICE BULLETIN MOS - (s) MODIFICATION OF THE EQUIPMENT EQUIPMENT RACK INSTALLED IN THE FORWARD CARGO COMPARTMENT. SERVICE BULLETIN MOS RELOCATION OF THE ATOP INSTALLED ON THE ELECTRICAL EQUIPMENT RACK IN THE FORWARD CARGO COMPARTMENT. SERVICE BULLETIN MOS 28-MAY-2002 - (s) RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 202 Of 748 @ Camp Systems EFTA00618493 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB BBJ-28-78-D SB BBJ-28-78A 05-JUN-2002 SB BBJ-28-788 13-NOV-2002 SB BBJ-28-84A CONVERSION UPDATE TO SOFTWARE 2.1. SERVICE BULLETIN MOS 28-SEP-2009 3378:04 AFL 812 AIRCRAFT CONVERSION TO UPDATE TO SOFTWARE 2.1 (STC: ST00936NY). SERVICE BULLETIN MOS - (s) AIRCRAFT CONVERSION TO UPDATE TO SOFTWARE 2.1 (AFCU/AFDU). SERVICE BULLETIN MOS - (s) INSTALLATION OF PRESSURE EQUALIZATION PANELS INTO EXISTING AUXILIARY FUEL SYSTEM (AFS) CONFIGURATIONS WITH ONE TANK FORWARD AND/OR TWO. THREE AND FOUR TANKS AFT.. SERVICE BULLETIN MOS 08-OCT-2002 - (s) SB BBJ-28-84B INSTALLATION OF PRESSURE EQUALIZATION PANELS. SERVICE BULLETIN MOS 31-DEC-2003 - (s) RECOMMENDED RECOMMENDED RECOMMENDED SB BBJ-28-84C INSTALLATION OF PRESSURE EQUALIZATION PANELS INTO EXISTING AUXILIARY FUEL SYSTEM (AFS) RECOMMENDED CONFIGURATION WITH ONE TANK FORWARD AN/OR TWO. THREE. AND FOUR TANKS AFT. SERVICE BULLETIN MOS 27-FEB-2003 SB BBJ-28-86 CONVERSION FROM AN EXISTING SIX CELL (1FWD 5 AFT). CONFIGURATION 244 TO A NINE CELL (4 FWD 5 AFT) AFS. RECOMMENDED CONFIGURATION 2-G WITH STRUCTURAL PROVISIONS PREVIOUSLY INSTALLED. (STC: ST00936NY AMENDED JUNE 17. 2002). SERVICE BULLETIN MOS 28-AUG-2002 - (s) SB BBJ-28-86A CONVERSION FROM AN EXISTING SIX CELL (1 FWD 5 AFT), CONFIGURATION 3-M TO A NINE CELL (4 FWD 5 AFT) AFS. RECOMMENDED CONFIGURATION 3-G WITH STRUCTURAL PROVISIONS PREVIOUSLY INSTALLED.. SERVICE BULLETIN MOS 30-SEP-2002 - (s) SB BRJ-28-890 ADDING ADDITIONAL PROVISIONS ONLY TO AN EXISITING THREE CELL (0 FWD 3 AFT) AFS. CONFIGURATION 3-A. FOR RECOMMENDED FUTURE INSTALLATION OF 2 FWD TANKS FOR A FIVE CELL (2 FWD 3 AFT) AFS. CPNFIGURATION 3-C. SERVICE BULLETIN MOS 15-JAN-2003 COMPLIED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 203 Of 748 @ Camp Systems EFTA00618494 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 88J-28-89E 14-FEB-2003 SB 88J-28-89F I7-APR-2003 SB 88J-28-90 07-NOV-2002 SB 88J-28-90A 05-DEC-2002 SB 88J-28-92 22-NOV-2002 ADDING ADDITIONAL PROVISIONS ONLY TO AN EXISITING THREE CELL (0 FWD 3 AFT) AFS. CONFIGURATION 3-A. FOR RECOMMENDED FUTURE INSTALLATION OF 2 FWD TANKS FOR A FIVE CELL (2 FWD 3 AFT) AFS. CPNFIGURATION 3-C. SERVICE BULLETIN MOS CONVERSION OF EXISTING CONFIGURATION 3-A A THREE CELL (0 FWD 3 AFT) AFS PER STC ST00936NY TO A RECOMMENDED CONFIGURATION 3-C A FIVE CELL (2 FWD 3 AFT) AFS ALSO PER STC ST00936NY.. SERVICE BULLETIN MOS CONVERSION TO CONFIGURATION TO A FIVE CELL. SERVICE BULLETIN MOS RECOMMENDED CONVERSION FROM AN EXISTING SEVEN CELL (2 FWD. 5 AFT) AFS. CONFIGURATION 2-E TO A FIVE CELL (1 FWD. 4 RECOMMENDED AFT) AFS. CONFIGURATION 3-K. SERVICE BULLETIN MOS CONVERSION FROM AN EXISTING SIX CELL (1 FWD. 5 AFT) AFS. CONFIGURATION 2-M TO A SEVEN CELL (2 FWD. 5 RECOMMENDED AFT) AFS. CONFIGURATION 3-E. SERVICE BULLETIN MOS SB 88J-28-928 CONVERSION FROM AN EXISTING SIX CELL (1 FWD 5 AFT) AFS. CONFIGURATION 3-M TO A SEVEN CELL (2 FWD 5 AFT) RECOMMENDED AFS. CONFIGURATION 3-E.. SERVICE BULLETIN MOS 20-NOV-2003 SB 88J-28-92C CONVERSION FROM AN EXISTING SIX CELL (1 FWD 5 AFT) AFS. CONFIGURATION 3-M TO A SEVEN CELL (2 FWD 5 AFT) RECOMMENDED AFS. CONFIGURATION 3-E.. SERVICE BULLETIN MOS 02-DEC-2003 SB 88J-28-93 1S-JAN-2003 IN AUX FUEL MODIFIED AIRPLANES. TO RELOCATE EXPOSED TEST PLUG IN THE AFT CARGO COMPARTMENT 8. RECOMMENDED STOW THE FUEL CONNECTOR PLUG IN THE FWD CARGO TO A PROTECTED AREA. SERVICE BULLETIN MOS SB 88J-28-94A CONVERSION OF PREVIOUS CONFIGURATION: FROM AN EXISTING SIX CELL (1 FWD 5 AFT) AFS. CONFIGURATION RECOMMENDED 2-M TO A EIGHT CELL (3 FWD 5 AFT) AFS. CONFIGURATION 3-F. SERVICE BULLETIN MOS 17-APR-2003 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 204 Of 748 @ Camp Systems EFTA00618495 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 88J-28-95 CHANGE THE FUEL QUANTITY INDICATING SYSTEM FROM KILOGRAMS TO POUNDS STC: ST00936NY AMENDED JUNE RECOMMENDED 17. 2002. SERVICE BULLETIN MOS I0-MAR-2003 SB 88J-33-37A DE-ACTIVATIONIREACTIVATION OF CARGO LIGHTING ABOVE AUX FUEL TANKS. SERVICE BULLETIN MOS - (s) SB 88J-33-37B DE-ACTIVATION! REACTIVATION OF CARGO LIGHTING ABOVE AUX FUEL TANKS.. SERVICE BULLETIN RECOMMENDED MOS I3-NOV-2000 - (s) SB 88J-34-79 REMOVAL OF EXISTING ARINC 740 MILTOPE COCKPIT PRINTER AND AND REPLACE WITH ALLIED SIGNAL PRIMER. RECOMMENDED SERVICE BULLETIN MOS I4-MAR-2003 SB 88J-53-38A IMPROVED MIX BAY ACCESS.. SERVICE BULLETIN RECOMMENDED MOS 06-JUL-2001 - (s) SB BB-Q-28-08A AIRCRAFT CONVERSION TO UPDATE TO SOFTWARE 2.1 (STC SA01384NY). SERVICE BULLETIN RECOMMENDED MOS 05-JUN-2002 - (s) SB 88J2-28-11A CONVERSION FROM AN EXISTING SEVEN CELL (2 FWD 5 AFT) AFS. CONFIGURATION 1-G TOA SIX CELL (1 FWD 5 AFT) RECOMMENDED AFS. CONFIGURATION 1-0. SERVICE BULLETIN MOS 08-JAN-2003 SB 88J2-28-118 15-APR-2003 CONVERSION FROM AN EXISTING SEVEN CELL (2 FWD 5 AFT) AFS. CONFIGURATION 1-G TOA SIX CELL (1 FWD 5 AFT) RECOMMENDED AFS. CONFIGURATION 1 -D. SERVICE BULLETIN MOS SB 88J2-28-15 CONVERSION FROM AN EXISITNG SIX CELL (2 FWD 4 AFT) AFS. CONFIGURATION 1-F TO A FIVE CELL (1 FWD 4 AFT) RECOMMENDED AFS. CONFIGURATION 1-C. SERVICE BULLETIN MOS 12-FEB-2003 SB 88J2-28-17A CHANGE FUEL OUANITY INDICATING SYSTEM. SERVICE BULLETIN RECOMMENDED MOS 21-FEB-2003 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 205 Of 748 @ Camp Systems EFTA00618496 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB BBJ2-28-9 IA CHANGE FUEL OUANITY INDICATING SYSTEM. SERVICE BULLETIN MOS SB CFM56-78S880-005 . SERVICE BULLETIN COMPUED WITH -CM SB CFMI-S872-168 . SERVICE BULLETIN MOS - (s) 10-AUG-2000 SB S-0380-34-02 . SERVICE BULLETIN MOS - (s) 17-OCT-2000 SB S-0380-34-03 . SERVICE BULLETIN MOS - (s) SB S8-17 . SERVICE BULLETIN MOS - (s) MOS - (s) SB TPR-901-34-10R2 ROCKWELL COLLINS- ELIMINATE OCCURANCE OF ERRANT MODE A CODE (0607) AND IMPROVE DESENDE RECOVERY TIMING. SERVICE BULLETIN MOS 20-DEC-2006 2785:43 AFL 661 SIL 920-08-1 ROCKWELL COLLINS - GLU-920 GLOBAL LANDING UNIT COMPUED WITH (CPN 822-1152-001/002=31220) GPS DATE CODE - 08-1. SERVICE INFORMATION LETTER MOS 23-FEB-2009 26-AUG-2008 3353:18 AFL 804 SIL D200808000008 R5 HONEYWELL HAS ISSUED A SPECIAL PRICE FOR THE PARTS NECESSARY FOR THE ATA 36 UPGRADES FOR 737. SERVICE INFORMATION LETTER MOS 07-AUG-20I3 SIL D201103000023 R1 INTRODUCTION OF WHEEL HUB ULTRASONIC INSPECTION KIT. PN 7416886. SERVICE INFORMATION LETTER RECOMMENDED MOS 27-NOV-20I3 COMPUED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 206 Of 748 @ Camp Systems EFTA00618497 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SIL D201104000050 R2 RE-INTRODUCTION OF VACUUM BLOWER. PN 606802-2. IN PLACE OF VACUUM BLOWER. PN 645172-1. -2. SERVICE OPERATORS 28-JUN-2013 INFORMATION LETTER MOS DISCRETION SIL D201311000043 POSSIBLE INCORRECT PACK DISCHARGE OVERHEAT SWITCH INSTALLED ON CERTAIN BOEING MODEL SUPERSEDED 737-800/-900/-900ER AIRCRAFT (SUPERSEDED BY SIL D201311000043 R1), SERVICE INFORMATION LETTER MOS SIL D201311000043 RI POSSIBLE INCORRECT PACK DISCHARGE OVERHEAT SWITCH INSTALLED ON CERTAIN BOEING MODEL RECOMMENDED 15-JAN-2011 737-800/-900/-900ER AIRCRAFT. SERVICE INFORMATION LETTER MOS SIL D201312000067 MK V ENHANCED GROUND PROXIMITY WARNING SYSTEM (EGPWS). PN 965-0976-003-XXX-XXX. PN RECOMMENDED 965-0976-020-XXX-XXX. PN 965-0976-040-XXX-XXX. PN 965-0976-060-XXX-XXX. PN 965-1676-00X. AND PN 965-1690-05X: 20-DEC-2013 END OF PRODUCTION ANNOUNCEMENT DUE TO PARTS OBSOLESCENCE. SERVICE INFORMATION LETTER MOS SIL D201401000052 BOEING 737 UGHT EMITTING DIODE (LED) WINGLET AND COLLISION LIGHT SYSTEM - WINGLET STROBE NOT RECOMMENDED 13-MAR-2011 FLASHING. SERVICE INFORMATION LETTER MOS SIL D201402000030 INSPECTION OF THE LEVER. PN 3177656-1 OR PN 63000974-1. AND ADAPTER ASSEMBLY. PN 3177635-2 OR -3. ON THE RECOMMENDED 26-FEB-2014 PRECOOLER CONTROL VALVE (PCCV). PN 3289562-6.-7. SERVICE INFORMATION LETTER MOS SL 737-SL-00-014 REV. A LOADABLE SOFTWARE MEDIA BINDERS. SERVICE LETTER INFORMATIONAL 19-SEP-2001 MOS - (s) SL 737-SL-00-015 FLIGHT DECK FAULT INDICATIONS AND NUISANCES MESSAGES. SERVICE LETTER INFORMATIONAL 29-JUN-1999 MOS - (s) SL 737-SL-00-016 SOFTWARE STORAGE ON DISKETTE SET. OTHER MEDIA SET. AND MASS STORAGE DEVICES. SERVICE LETTER INFORMATIONAL 20-SEP-1999 MOS - (s) SI. 737-SL-00-017 AVAILABILITY OF BOEING DISKETTE COPY PROCESS AND TOOL SET. (SUPERSEDED BY SL 737-SL-00-017 REV. A). SUPERSEDED SERVICE LETTER MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 207 Of 748 @ Camp Systems EFTA00618498 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-00-017 REV. A AVAILABILITY OF BOEING DISKETTE COPY PROCESS AND TOOL SET. SERVICE LETTER RECOMMENDED MOS 17-OCT-2012 SL 737-SL-00-019 SUSPECT DISCREPANCY REPORT PROCESS (SUPERSEDED BY SL 737-SL-00-019 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-00-019 REV. A SUSPECT DISCREPANCY REPORT PROCESS. SERVICE LETTER RECOMMENDED MOS I3-NOV-2012 SL 737-SL-00-020 PROCEDURES FOR SEEKING ALTERNATE METHOD OF COMPLIANCE APPROVAL. SERVICE LETTER MOS 24-JAN-2007 SL 737-SL-00-022 BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL OBJECTION (NTO). ACCEPTABLE. AND APPROVED (8100-9) DATA. SERVICE LETTER MOS 10-JAN-2008 SL 737-SL-00-022 REV. A BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL OBJECTION (NTO). ACCEPTABLE. AND APPROVED (8100-9) DATA. SERVICE LETTER MOS 12-MAR-2008 SI. 737-SL-00-022 REV. 8 BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL OBJECTION (NTO). ACCEPTABLE. AND APPROVED (8100-9) DATA (SUPERSEDED BY SL 737-SL-00-022 REV. C). SERVICE LETTER MOS INFORMATIONAL INFORMATIONAL INFORMATIONAL SUPERSEDED SL 737-SL-00-022 REV. C BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL SUPERSEDED OBJECTIONS. FAA 8100-9 FORMS. AND REPAIR AND DEVIATION RECORDS (SUPERSEDED BY SL 737-SL-00-022 REV. D), SERVICE LETTER MOS SL 737-SL-00-022 REV. D BOEING REVIEW PROCESS OF REQUESTS FOR AIRPLANE SYSTEMS AND FLIGHT OPERATIONS NO TECHNICAL RECOMMENDED OBJECTIONS. FAA 8100-9 FORMS. AND REPAIR AND DEVIATION RECORDS. SERVICE LETTER MOS I6-JUL-2013 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 208 Of 748 @ Camp Systems EFTA00618499 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-00-023 SMOKE AND BURNING ODOR (SBO) EVENT SUMMARY. SERVICE LETTER INFORMATIONAL MOS 22-FEB-2008 • SL 737-SL-00-023 REV. A SMOKE AND BURNING ODOR (SBO) EVENT SUMMARY. SERVICE LETTER INFORMATIONAL MOS 24-NOv-2008 SL 737-SL-00-023 REV. B SMOKE AND BURNING ODOR (SBO) EVENT SUMMARY. SERVICE LETTER INFORMATIONAL MOS 17-DEC-2009 SL 737-SL-00-024 BOEING TECHNICAL COMMUNICATIONS (SUPERSEDED BY SL 737-SL-00-024 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-00-024 REV. A BOEING TECHNICAL COMMUNICATIONS. SERVICE LETTER RECOMMENDED MOS 11-APR-2011 SL 737-SL-00-025 DISCONTINUED USE OF 3.5 INCH FLOPPY DISKETTES FOR ONBOARD LOADABLE LRLI'S (SUPERSEDED BY SL SUPERSEDED 737-SL-00-025 REV. A). SERVICE LETTER MOS SL 737-SL-00-025 REV. A DISCONTINUED USE OF 3 5 INCH FLOPPY DISKETTES FOR ONBOARD LOADABLE LRUS (SUPERSEDED BY SL SUPERSEDED 737-SL-00-025 REV B). SERVICE LETTER MOS SL 737-SL-00-025 REV. B DISCONTINUED USE OF 3.5 INCH FLOPPY DISKETTES FOR ON BOARD LOADABLE LRUS (SUPERSEDED BY SL 737-SL-00-025 REV. C). SERVICE LETTER MOS SL 737-SL-00-025 REV. C DISCONTINUED USE OF 3 5 INCH FLOPPY DISKETTES FOR ONBOARD LOADABLE LRU.S. SERVICE LETTER MOS 23-JUL-2014 SL 737-SL-00-026 OPERATOR CORRECTION OF ERRORS IN THE LIFE LIMITED PART LIST AND AIRCRAFT READINESS LOG. SERVICE LETTER MOS 17-JAN.2014 SUPERSEDED RECOMMENDED RECOMMENDED ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 209 Of 748 11 Camp Systems EFTA00618500 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-02-002 IN-FIGHT AIRFRAME VIBRATION. SERVICE LETTER INFORMATIONAL MOS 28-JUL-1987 - Is) St 737-SL-02-002 REV. A IN-FIGHT AIRFRAME VIBRATION. SERVICE LETTER INFORMATIONAL MOS 09-AUG-1995 - (s) St 737-SL-02-002 REV. B IN-FIGHT AIRFRAME VIBRATION. SERVICE LETTER INFORMATIONAL MOS I I -SEP-1996 - Is) St 737-SL-02-002 REV. C IN-FIGHT AIRFRAME VIBRATION. SERVICE LETTER INFORMATIONAL MOS 28-APR-1999 - Is) St 737-SL-02-002 REV. D IN FLIGHT AIRFRAME VIBRATION.. SERVICE LETTER INFORMATIONAL MOS 03-JUL-2001 - (s) St 737-SL-02-008 PASSENGER CARRY ON ELECTRONIC DEVICES (SUPERSEDED BY SL 737-SL-02-058 REV. A). SERVICE LETTER SUPERSEDED MOS 04-JUL-I 993 - (s) St 737-SL-02-008 REV. A PASSENGER CARRY ON ELECTRONIC DEVICES (SUPERSEDED BY SL 737-SL-02-058 REV. B). SERVICE LETTER SUPERSEDED MOS - (s) St 737-SL-02-008 REV. B PASSENGER CARRY ON ELECTRONIC DEVICES (SUPERSEDED BY SL 737-SL-02-058 REV. C), SERVICE LETTER SUPERSEDED MOS - St 737-SL-02-008 REV. C PASSENGER CARRY ON ELECTRONIC DEVICES (SUPERSEDED BY SL 737-SL-02-058 REV. D), SERVICE LETTER SUPERSEDED MOS - Is) St 737-SL-02-008 REV. D PASSENGER CARRY-ON ELECTRONIC DEVICES (SUPERSEDED BY 51 737-SL-02-008 REV. E), SERVICE LETTER SUPERSEDED MOS St 737-SL-02-008 REV. E PASSENGER CARRY-ON ELECTRONIC DEVICES (SUPERSEDED BY St 737-SL-02-008 REV. F). SERVICE LETTER SUPERSEDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 210 Of 748 @ Camp Systems EFTA00618501 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-02-008 REV. F PASSENGER CARRY-ON ELECTRONIC DEVICES. SERVICE LETTER 31 -JUL-2014 SL 737-SL-02-017 REDUCED VERTICAL SEPERATION MINIMUM (RVSM) QUALIFICATION.. SERVICE LETTER 10-FEB-1998 MOS MOS - (s) RECOMMENDED INFORMATIONAL SL 737-SL-02-017 REV. A REDUCED VERTICAL SEPERATION MINIMUM (RVSM) QUALIFICATION.. SERVICE LETTER INFORMATIONAL 25-SEP-1998 MOS - Is) SL 737-SL-02-017 REV. B REDUCED VERTICAL SEPERATION MINIMUM (RVSM) QUALIFICATION.. SERVICE LETTER INFORMATIONAL MOS 23-SEP-1998 - (s) SL 737-SL-02-017 REV. C REDUCED VERTICAL SEPERATION MINIMUM (RVSM) QUALIFICATION.. SERVICE LETTER INFORMATIONAL - INFORMATION COMPLIED WITH RVSM QUALIFICATION RENEWAL. CONTINUE IN REV.G MOS 27-JAN-2006 21-MAR-2001 2484:18 AFL 596 SL 737-SL-02-017 REV. 0 REDUCED VERTICAL SEPARATION MINIMUM (RVSM) QUALIFICATION. SERVICE LETTER INFORMATIONAL MOS 06-OCT-2003 SL 737-SL-02-017 REV. G REDUCED VERTICAL SEPARATION MINIMUM (RVSM) QUALIFICATION. SERVICE LETTER INFORMATIONAL COMPLIED WITH - FOUND NC ALREADY RVSM CERTIFIED MOS 24-AUG-2007 02-JUL-2004 2968:28 AFL 699 SL 737-SL-02-018 COMPLIANCE GUIDANCE TO EUROPEAN JOINT AVIATION AUTHORITY REQUIREMENTS FOR OPERATIONS. (JAR-OPS INFORMATIONAL I EUROPEAN). SERVICE LETTER MOS 26-MAR-1998 - Is) SL 737-SL-02-019 EXTENDED RANGE OPERATIONS WITH ETOPS NP CONFIGURATION CMP DOC, SERVICE LETTER INFORMATIONAL MOS 20-JAN-1999 - (s) SL 737-SL-02-020 BASIC AND PRECISION AREA NAVIGATION. SERVICE LETTER INFORMATIONAL MOS 04-JUN-2003 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 211 Of 748 @ Camp Systems EFTA00618502 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-02-020 REV. A BASIC AND PRECISION AREA NAVIGATION. SERVICE LETTER 03-NOV-2005 SL 737-SL-02-020 REV. 8 BASIC AND PRECISION AREA NAVIGATION. SERVICE LETTER I I -SEP-2006 SL 737-SL-02-020 REV. C BASIC AND PRECISION AREA NAVIGATION. SERVICE LETTER I2-FEB-2007 MOS MOS MOS SL 737-SL-02-021 UPDATE 10.5 INCORPORATION OF 2005 MAGNETIC VARIATION DATA. SERVICE LETTER MOS 23-MAR-2004 SL 737-SL-02-022 STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO TERMINAL AND EN-ROUTE AREA NAVIGATION IN UNITED STATES NATIONAL AIRSPACE. SERVICE LETTER MOS 31-AUG-2005 SI. 737-SL-02-022 REV. A STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO TERMINAL AND EN-ROUTE NAVIGATION IN UNITED STATES NATIONAL AIRSPACE. SERVICE LETTER MOS 22-SEP-2005 SI. 737-SL-02-022 REV. 8 STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO TERMINAL AND EN-ROUTE AREA NAVIGATION IN UNITED STATES NATIONAL AIRSPACE SERVICE LETTER MOS 29-JUN-2006 INFORMATIONAL INFORMATIONAL SL 737-SL-02-022 REV. C STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO TERMINAL AND EN-ROUTE AREA NAVIGATION IN UNITED SUPERSEDED STATES NATIONAL AIRSPACE (SUPERSEDED BY 737-SL-02-022 REV.D). SERVICE LETTER MOS 7-JUL-2007 SL 737-SL-02-022 REV. D STATEMENT OF AIRCRAFT CAPABILITY IN REFERENCE TO TERMINAL AND EN-ROUTE AREA NAVIGATION IN UNITED RECOMMENDED STATES NATIONAL AIRSPACE SERVICE LETTER MOS 08-FEB-20I2 SL 737-SL-02-023 TRANSPORT OF LIQUID CARGO. SERVICE LETTER RECOMMENDED MOS 15-DEC-2010 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 212 Of 748 @ Camp Systems EFTA00618503 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-02-024 LITHIUM BATTERY FIRE FIGHTING RECOMMENDATIONS (SUPERSEDED BY SL 737-SL-02-024 REV. A). SERVICE LETTER MOS 51 737-SL-02-024 REV. A LITHIUM BATTERY FIRE FIGHTING RECOMMENDATIONS. SERVICE LETTER 28-APR-20I4 MOS 51 737-SL-03-004 AVIOD USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON AIRPLANES. SERVICE LETTER MOS 16-AUG-2005 St 737-SL-03-004 REV. A AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON AIRPLANES (SUPERSEDED BY SL 737-SL-03-004 REV. 8). SERVICE LETTER MOS SUPERSEDED RECOMMENDED SUPERSEDED SL 737-SL-03-004 REV. 8 AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON AIRPLANES. SERVICE LETTER RECOMMENDED MOS 13-JUL-2011 SL 737-SL-03-004 REV. C AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON AIRPLANES (SUPERSEDED BY SL 737-SL-03-004 REV. 0). SUPERSEDED SERVICE LETTER MOS SL 737-SL-03-004 REV. 0 AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON AIRPLANES (SUPERSEDED BY SL 737-SL-03-004 REV. E). SUPERSEDED SERVICE LETTER MOS SL 737-SL-03-004 REV. E AVOID USE OF DRY CHEMICAL FIRE EXTINGUISHERS ON RECOMMENDED AIRPLANES. SERVICE LETTER MOS I8-FEB-2014 SL 737-SL-05-011 REPORTING PARTS DEPARTING AIRPLANE. SERVICE LETTER RECOMMENDED MOS 31 -JUL-2009 SL 737-SL-05-012 CONTROL AND ELIMINATION OF CIMICIDAE (BED BUGS) ON AIRPLANES. SERVICE LETTER RECOMMENDED MOS 24-MAY-2011 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 213 Of 748 @ Camp Systems EFTA00618504 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-05-013 I3-MAR-2014 SL 737-SL-05-014 CONTROL AND ELIMINATION OF RODENTS ON AIRPLANES. SERVICE LETTER 20-JAN-2014 St 737-SL-09-002 TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. A). SERVICE LETTER MOS REPORTING FUEL IMBALANCE EXCEEDANCES TO BOEING. SERVICE LETTER MOS MOS St 737-SL-09-002 REV. A TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. B). SERVICE LETTER MOS St 737-SL-09-002 REV. B TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. C), SERVICE LETTER MOS St 737-SL-09-002 REV. C TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. 0). SERVICE LETTER MOS St 737-SL-09-002 REV. 0 TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. E). SERVICE LETTER MOS St 737-SL-09-002 REV. E TOWBARLESS TOWING (SUPERSEDED BY a 737-SL-09-002 REV. F). SERVICE LETTER MOS I6-OCT-2009 St 737-SL-09-002 REV. F TOWBARLESS TOWING, SERVICE LETTER MOS I8-DEC-2013 St 737-SL-09-003 737 NOSE GEAR COLLAPSE POTENTIAL DURING TOWING4PUSHBACK SERVICE LETTER MOS I2-JUL-2007 St 737-SL-09-003 REV. A 737 NOSE GEAR COLLAPSE POTENTIAL DURING TOWING/PUSHBACK SERVICE LETTER MOS 17-JAN-2008 RECOMMENDED RECOMMENDED SUPERSEDED SUPERSEDED SUPERSEDED SUPERSEDED SUPERSEDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 214 Of 748 @ Camp Systems EFTA00618505 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-11-005 II-MAR-1998 -(s) 51 737-SL-11-005 REV. A RED CROSS PLACARDS. SERVICE LETTER 06-MAY-1998 -(s) 51 737-SL-11-005 REV. 8 RED CROSS PLACARDS. SERVICE LETTER 04-AUG-1998 SL 737-SL-11-007 PASSENGER ENTRY DOOR HANDLE ARROW PLACARD MODIFICATION.. SERVICE LETTER 08-OCT-1999 51 737-SL-11-009 EXTERNAL POWER PANEL-INCORRECT VOLTAGE MARKING. SERVICE LETTER 31-MAY-2000 -(s) 51 737-SL-11-010 LOWER CARGO COMPARTMENT LINER AND FLOOR PANEL REPLACEMENT.. SERVICE LETTER OI -JUN-2001 51 737-SL-11-010 REV. A EXTERIOR PLACARDS PEELING FROM AIRPLANE. SERVICE LETTER I5-APR-2003 51 737-SL-11-011 REV. A OWNER NAMEPLATE-INSPECTION AND REWORK. SERVICE LETTER 10-FEB-2004 51 737-SL-11-013 P18-2 CIRCUIT BREAKER MARKER WITH INCORRECT NOMENCLATURE. SERVICE LETTER MOS 26-SEP-2008 RED CROSS PLACARDS. SERVICE LETTER MOS MOS MOS MOS MOS MOS MOS MOS - (s) - (s) - (s) SI. 737-SL-11-013 REV. A P18-2 CIRCUIT BREAKER MARKER WITH INCORRECT NOMENCLATURE. SERVICE LETTER MOS I5-JUL-2009 INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 215 Of 748 @ Camp Systems EFTA00618506 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-11-013 REV. 8 21-AUG-2009 P18-2 CIRCUIT BREAKER MARKER WITH INCORRECT NOMENCLATURE. SERVICE LETTER MOS 51 737-SL-11-014 E/E BAY ACCESS DOOR STENCILS. SERVICE LETTER RECOMMENDED 23-AUG-2013 MOS 51 737-SL-11-015 FORWARD AND AFT DOOR SILL DRAIN SYSTEM STENCIL REPLACEMENTS (SUPERSEDED BY SL 737-SL-11-015 REV. SUPERSEDED A). SERVICE LETTER MOS 51 737-SL-11-015 REV. A FORWARD AND AFT DOOR SILL DRAIN SYSTEM STENCIL REPLACEMENTS. SERVICE LETTER RECOMMENDED 02-JUN-2014 MOS - (s) 51 737-SL-12-011 AIRPLANE HIGH PRESSURE WASHING VIDEO. SERVICE LETTER INFORMATIONAL 25-JUN-1993 MOS - (s) 51 737-SL-12-011 REV. A AIRPLANE HIGH PRESSURE WASHING VIDEO. SERVICE LETTER INFORMATIONAL 02-APR-1999 MOS - 51 737-SL-12-011 REV. 8 AIRPLANE HIGH PRESSURE WASHING VIDEO (SUPERSEDED BY 737-SL-12-011 REV. C). SERVICE LETTER SUPERSEDED 18-MAY-1999 MOS -(s) SL 737-SL-12-011 REV. C AIRPLANE HIGH PRESSURE WASHING VIDEO, SERVICE LETTER RECOMMENDED 08-JUL-2010 MOS 51 737-SL-12-014 DEICING/ANTI-ICING FLUID RESIDUE REHYDRATION AND FREEZING.. SERVICE LETTER INFORMATIONAL MOS 11-JAN-2000 - (s) 51 737-SL-12-015 RECOMMENDED INTERVALS FOR TIRE PRESSURE CHECKS. SERVICE LETTER INFORMATIONAL MOS 13-JUL-2001 - (s) 51 737-SL-12-015 REV. A RECOMMENDED INTERVALS FOR TIRE PRESSURE CHECKS. SERVICE LETTER MOS 17-JUL-2007 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 216 Of 748 @ Camp Systems EFTA00618507 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-12-01S REV. B RECOMMENDED INTERVALS FOR TIRE PRESSURE CHECKS. SERVICE LETTER 26-SEP-2007 SL 737-SL-12-016 09-OCT-2001 SI. 737-SL-12-017 CLEANING OF DEICING/ANTI-ICING FLUID RESIDUE FROM ELEVATOR BALANCE PANEL CAVITY AREA. SERVICE INFORMATIONAL LETTER MOS 10-APR-2002 - (s) MOS INTRODUCTION OF RE-BRANDED NAMES FOR APPROVED OILS. SERVICE LETTER MOS - Is) INFORMATIONAL SI. 737-SL-12-017 REV. A CLEANING OF DEICING/ANIT-ICI NG FLUID RESIDUE FROM ELEVATOR BALANCE PANEL CAVITY AREA. SERVICE INFORMATIONAL LETTER MOS 23-MAY-2002 - (s) SI. 737-SL-12-018 LANDING GEAR MAINTENANCE DURING COLD WEATHER OPERATION. SERVICE LETTER MOS 73-OCT-2006 SL 737-SL-12-018 REV. A LANDING GEAR MAINTENANCE DURING COLD WEATHER OPERATION. SERVICE LETTER MOS 18-MAR-2013 SL 737-SL-12-019 DEICING/ANTI-ICING FLUID RESIDUES CAUSING FLIGHT CONTROL RESTRICTIONS. SERVICE LETTER MOS 14-NOV-2006 SL 737-SL-12-019 REV. A DEICING/ANTI-ICING FLUID RESIDUES CAUSING FLIGHT CONTROL RESTRICTIONS. SERVICE LETTER MOS 28-AUG-2007 SL 737-SL-12-020 RECOMMENDED LANDING GEAR WASHING AND CLEANING PRACTICES (SUPERSEDED BY SL 737-SL-12-020 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-12-020 REV. A LANDING GEAR WASHING AND CLEANING PRACTICES. SERVICE LETTER RECOMMENDED MOS C6-JUN-2014 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 217 Of 748 @ Camp Systems EFTA00618508 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-12-022 20-JAN-2011 SL 737-SL-12-022 REV. A IATA GUIDANCE MATERIAL ON STANDARD INTO-PLANE FUEUNG PROCEDURES. SERVICE LETTER 27-JAN-2011 SL 737-SL-156-A UNPROTECTED WIRE BUNDLES IN P88 P9 PANELS, SERVICE LETTER MOS SL 737-SL-20-005 IATA GUIDANCE MATERIAL ON STANDARD INTO-PLANE FUEUNG PROCEDURES. SERVICE LETTER MOS MOS - (s) APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL AIRCRAFT MAINTENANCE (SUPERSEDED 8Y St 737-SL-20-005 REV. A). SERVICE LETTER MOS SL 737-SL-20-005 REV. A APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL AIRCRAFT MAINTENANCE (SUPERSEDED 8Y St 737-SL-20-005 REV. 8). SERVICE LETTER MOS St 737-SL-20-005 REV. 8 APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL AIRCRAFT MAINTENANCE (SUPERSEDED 8Y St 737-SL-20-005 REV. C). SERVICE LETTER MOS SL 737-SL-20-005 REV. C APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL AIRCRAFT MAINTENANCE (SUPERSEDED BY SL 737-SL-20-005 REV. D). SERVICE LETTER MOS SL 737-SL-20-005 REV. D APPROVAL OF VENDOR MATERIALS FOR USE IN GENERAL AIRCRAFT MAINTENANCE. SERVICE LETTER MOS I4-JAN-2014 SL 737-SL-20-012 QUICK REPAIR FUEL TANK SEALANT.. SERVICE LETTER MOS I -MAR-1987 - (s) SL 737-SL-20-012 REV. A QUICK REPAIR FUEL TANK SEALANT.. SERVICE LETTER MOS 04-MAY-1987 RECOMMENDED RECOMMENDED SUPERSEDED SUPERSEDED SUPERSEDED SUPERSEDED RECOMMENDED INFORMATIONAL INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 218 Of 748 @ Camp Systems EFTA00618509 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-20-012 REV. 8 QUICK REPAIR FUEL TANK SEALANT.. SERVICE LETTER 31-MAR-1992 MOS - Is) SL 737-SL-20-012 REV. C QUICK REPAIR FUEL TANK SEALANT.. SERVICE LETTER MOS 05-FEB-2001 SL 737-SL-20-014 REV. 8 CONTROL CABLE CHANGE TO IMPROVE TENSION STABILITY. SERVICE LETTER MOS 20-OCT-2008 SL 737-SL-20-025 REV. A EVALUATION OF GENERAL PURPOSE GREASES FOR ROUTINE RELUBRICATION DURING AIRPLANE MAINTENANCE. SERVICE LETTER MOS 26-K1AR-2009 SL 737-SL-20-027 REV. C SUMMARY OF MOST COMMONLY USED GREASES ON BOEING AIRCRAFT. SERVICE LETTER MOS I6-NOV-2001 - (4) SL 737-SL-20-027 REV. D SUMMARY OF MOST COMMONLY USED GREASES ON BOEING AIRPLANES (SUPERSEDED BY SL 737-SL-20-027 REV. E). SERVICE LETTER MOS C6-AUG-2008 INFORMATIONAL INFORMATIONAL RECOMMENDED SI. 737-SL-20-027 REV. E SUMMARY OF MOST COMMONLY USED GREASES ON BOEING AIRPLANES (SUPERSEDED BY 737-SL-20-027 REV. F). SUPERSEDED SERVICE LETTER MOS SL 737-SL-20-027 REV. F SUMMARY OF MOST COMMONLY USED GREASES ON BOEING AIRPLANES. SERVICE LETTER RECOMMENDED MOS 26-JUN-20I3 SL 737-SL-20-029 REV. A AIRPLANE STATIC/ELECTRICAL GROUNDING RECOMMENDATIONS. SERVICE LETTER INFORMATIONAL MOS 20-MAY-2003 SL 737-SL-20-029 REV. B AIRPLANE STATIC/ELECTRICAL GROUNDING RECOMMENDATIONS. SERVICE LETTER INFORMATIONAL MOS 24-JUL-2003 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 219 Of 748 @ Camp Systems EFTA00618510 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-20-029 REV. C AIRPLANE STATIC/ELECTRICAL GROUNDING RECOMMENDATIONS. SERVICE LETTER O1-MAR-2005 SL 737-SL-20-032 REV. A BMS 3-33 GENERAL PURPOSE AIRCRAFT GREASE. SERVICE LETTER MOS I4-AUG-2001 - (s) SL 737-SL-20-032 REV. 8 BMS 3-33 GENERAL PURPOSE AIRCRAFT GREASE. SERVICE LETTER MOS 26-MAR-2009 SL 737-SL-20-034 CONTROL CABLE TENSION INSPECTION. SERVICE LETTER MOS MOS 03-MAY-1991 -144 SL 737-SL-20-034 REV. A WIRE BUNDLE/COAXIAL CABLE ORDERING/FABRICATING PROCEDURE SERVICE LETTER MOS I6-JUN-1997 - (s) SL 737-SL-20-034 REV. 8 WIRE BUNDLE/COAXIAL CABLE ORDERING/FABRICATING PROCEDURE SERVICE LETTER MOS I6-JUL-1999 - (s) SL 737-SL-20-035 AS HOSE INTERCHANGEABILIN FOR POTABLE AND GREY WATER. SERVICE LETTER MOS 20-JUL-1998 - (s) SL 737-SL-20-036 NAS1611. NAS1612. NAS1613SEAL AND SEAL MATERIAL CHANGES. SERVICE LETTER MOS 04-JUN-1999 - (s) SL 737-SL-20-037 LOW BREAKAWAY TORQUE ON KAYNAR NAS 1805-5L.. SERVICE LETTER MOS 30-MAY-2000 -(s) SL 737-SL-20-038 CONTROL CABLE TENSION INSPECTION. SERVICE LETTER MOS 31-OCT-2000 SL 737-SL-20-038 REV. A CONTROL CABLE TENSION INSPECTION. SERVICE LETTER 22-OCT-2002 - MOS INFORMATIONAL RECOMMENDED INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 220 Of 748 @ Camp Systems EFTA00618511 C 4 11 Megnand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-20-038 REV. 8 CONTROL CABLE TENSION INSPECTION. SERVICE LETTER I 7-JUL-2003 SL 737-SL-20-040 PART MARKING., SERVICE LETTER 30-MAY-2001 SL 737-SL-20-041 OVERHAUL OF HIGH STRENGTH STEEL COMPONENTS - CADMIUM STRIP REQUIRED. SERVICE LETTER 22-MAR-2002 MOS MOS MOS - (s) SL 737-SL-20-042 REV. A MATERIAL REVIEW BOARD ACTION ON TILEFLEX STANDARD HOSES SHIPPED AS SPARES. SERVICE LETTER MOS 28-JAN-2003 SL 737-SL-20-043 DEFERRED APPLICATION OF AERO-SEALANT, SERVICE LETTER MOS 16-AUG-2002 SL 737-SL-20-043 REV. A DEFERRED APPLICATION OF AERO-SEALANT IN ANTENNA INSTALLATIONS. SERVICE LETTER MOS 02-MAY-2003 SL 737-SL-20-043 REV. 8 DEFERRED APPLICATION OF AERO-SEALANT IN ANTENNA INSTALLATIONS. SERVICE LETTER MOS 13-NOV-2003 SL 737-SL-20-043 REV. C DEFERRED APPLICATION OF AERO-SEALANT IN ANTENNA INSTALLATIONS. SERVICE LETTER MOS I I -JUN-2007 INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL SL 737-SL-20-044 ESCAPEMENT OF NONCONFORMING FIELD EFFECT TRANSISTOR (FET) P/N S182-10802-5 (SUPERSEDED BY SL SUPERSEDED 737-SL-20-044 REV. A). SERVICE LETTER MOS St 737-SL-20-044 REV. A ESCAPEMENT OF NONCONFORMING FIELD EFFECT TRANSISTOR (FET) P/N S182-10802-5 (SUPERSEDED BY SUPERSEDED 737-SL-20-044 REV. 8). SERVICE LETTER MOS SL 737-SL-20-044 REV. 8 ESCAPEMENT OF NONCONFORMING FIELD EFFECT TRANSISTOR (FET) P/N S182-10802-5. SERVICE LETTER RECOMMENDED MOS I4-JUN-20 I 1 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 221 Of 748 @Camp Systems EFTA00618512 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-20-045 07-AUG-2003 SI. 737-SL-20-045 REV. A USE OF GASKET IN LIEU OF SEALANT FOR THE FOLLOWING ANTENNA INSTALLATION (SUPERSEDED BY SL SUPERSEDED 737-SL-20-045 REV. 8). SERVICE LETTER MOS GASKET IN LIEU OF SEALANT FOR ANTENNA INSTALLATIONS. SERVICE LETTER MOS INFORMATIONAL SL 737-SL-20-045 REV. 8 USE OF GASKET IN LIEU OF SEALANT FOR THE FOLLOWING ANTENNA INSTALLATIONS: AIR TRAFFIC CONTROL (ATC). RECOMMENDED DISTANCE MEASURING EQUIPMENT (DME). LOW RANGE RADIO ALTIMETER (LRRA). MARKER BEACON (MB). TRAFFIC ALERT AND COLLISION AVOIDANCE SYSTEM (TCAS). AND VERY HIGH FREQUENCY (VHF) COMMUNICATION ANTENNAS. SERVICE LETTER 19-NOV-20I3 SL 737-SL-20-047 07-JAN-2005 SL 737-SL-20-048 19-DEC-2005 MOS CIRCUIT BREAKER RELIABILITY. SERVICE LETTER MOS NAS1611-XXXA CODE O-RING STATIC SEALS - HYDRULIC FLUID EXTERNAL LEAKAGE LOW TEMPERATURES. SERVICE LETTER MOS SL 737-SL-20-048 REV. A NAS1611-XXXA CODE O-RING STATIC SEALS - HYDRAULIC FLUID EXTERNAL LEAKAGE AT LOW TEMPERATURES. SERVICE LETTER MOS 21-MAR-2006 SL 737-SL-20-048 REV. 8 NAS1611-XXXA CODE O-RING STATIC SEALS - HYDRAULIC FLUID EXTERNAL LEAKAGE AT LOW TEMPERATURES. SERVICE LETTER MOS 22-SEP-2006 SL 737-SL-20-048 REV. C NAS1611-XXXA CODE O-RING STATIC SEALS - HYDRAULIC FLUID EXTERNAL LEAKAGE AT LOW TEMPERATURES. SERVICE LETTER MOS 29-JUN-2007 SL 737-SL-20-048 REV. D NAS16114COCA CODE O-RING STATIC SEALS - HYDRAULIC FLUID EXTERNAL LEAKAGE AT LOW TEMPERATURES. SERVICE LETTER MOS 09-APR-2008 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 222 Of 748 @ Camp Systems EFTA00618513 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-20-049 I4-NOV-2006 SL 737-SL-20-049 REV. A BACC1OKB( ) CONNECTOR BACKSHELL CHAFE. SERVICE LETTER 21-NOV-2007 SI. 737-SL-20-050 REPAINTING AIRPLANES THAT EXHIBIT FUSELAGE DECORATIVE PAINT PEELING FROM RIVET HEADS - -RIVET RASH'. SERVICE LETTER IS-FEB-2007 BACC1OKB( ) CONNECTOR BACKSHELL CHAFE. SERVICE LETTER MOS MOS MOS SL 737-SL-20-05I POSSIBLE INCORRECT WIRING BRACKET LOCATION. SERVICE LETTER RECOMMENDED MOS IS-JUL-2009 SL 737-SL-20-05I REV. A POSSIBLE INCORRECT WIRING BRACKET LOCATION (SUPERSEDED BY SL 737-SL-20-051 REV. B). SERVICE LETTER SUPERSEDED MOS SL 737-SL-20-051 REV. B POSSIBLE INCORRECT WIRING BRACKET LOCATION. SERVICE LETTER MOS IS-JUL-2010 SL 737-SL-20-052 WIRE BUNDLE SUPPORT BRACKETS IN NOSE GEAR E/E BAY RECOMMENDED INCORRECTLY INSTALLED. SERVICE LETTER MOS 13-AUG-2009 SL 737-SL-20-052 REV. A WIRE BUNDLE SUPPORT BRACKETS IN NOSE GEAR E/E BAY RECOMMENDED INCORRECTLY INSTALLED. SERVICE LETTER MOS 02-OCT-2009 SL 737-SL-20-053 ELECTRICAL CONNECTOR CORROSION IN UNPRESSURIZED RECOMMENDED AREAS. SERVICE LETTER MOS 04-N0V-2009 SL 737-SL-20-054 SEVEN CONNECTORS WITH POTENTIALLY INCORRECT PLATING (SUPERSEDED BY SL 737-SL-20-054 REV. A). SUPERSEDED SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 223 Of 748 @ Camp Systems EFTA00618514 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-20-054 REV. A SEVEN CONNECTORS WITH POTENTIALLY INCORRECT PLATING. SERVICE LETTER 30-SEP-2010 SL 737-SL-20-055 GROUND BLOCK CORROSION. SERVICE LETTER MOS 10-JAN-2012 SL 737-SL-20-056 28-MAR-2011 MOS RECOMMENDED RECOMMENDED INSPECTION FOR CORRECT LABELING OF THE TERMINAL BLOCKS IN THE .138 JUNCTION BOX. SERVICE LETTER RECOMMENDED MOS SL 737-SL-20-057 SAFETY WIRE (LOCKWIRE) MATERIAL SELECTION AND USAGE INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED MOS 04-SEP-2013 SL 737-SL-21-033 REV. D RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS. SERVICE LETTER MOS 28-MAY-2008 SL 737-SL-21-033 REV. E RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS. SERVICE LETTER MOS 0I-AUG-2008 SL 737-SL-21-033 REV. F RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS (SUPERSEDED BY SL 737-SL-21-033 REV. G). SERVICE SUPERSEDED LETTER MOS SL 737-SL-21-033 REV. G RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS (SUPERSEDED BY SL 737-SL-21-033 REV. H). SERVICE SUPERSEDED LETTER MOS SL 737-SL-21-033 REV. H RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS (SUPERSEDED BY SL 737-SL-21-033 REV. I). SERVICE SUPERSEDED LETTER MOS SL 737-SL-21-033 REV. I RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS (SUPERSEDED BY SL 737-SL-21-033 REV. J). SERVICE SUPERSEDED LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 224 Of 748 @ Camp Systems EFTA00618515 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-21-033 REV. J RECOMMENDED ALLOWABLE DRY ICE CARRIAGE LIMITS. SERVICE LETTER 28-MAY-20I4 SL 737-SL-21-044 DIGITAL CABIN PRESSURE SYSTEM - CABIN PRESSURE EXCURSION DUE TO EMI (SUPERSEDED BY SL 737-SL-21-044 SUPERSEDED REV. A). SERVICE LETTER MOS MOS RECOMMENDED SL 737-SL-21-044 REV. A DIGITAL CABIN PRESSURE SYSTEM - CABIN PRESSURE EXCURSION DUE TO EMI (SUPERSEDED BY SL 737-SL-21-044 SUPERSEDED REV. B). SERVICE LETTER MOS SL 737-SL-21-044 REV. 8 DIGITAL CABIN PRESSURE SYSTEM -CABIN PRESSURE EXCURSION DUE TO EMI (SUPERSEDED BY SL 737-SL-21-044 SUPERSEDED REV. C). SERVICE LETTER MOS SL 737-SL-21-044 REV. C DIGITAL CABIN PRESSURE SYSTEM-CABIN PRESSURE EXCURSIONS DUE TO EMI (SUPERSEDED BY SL 737-SL-21-044 SUPERSEDED REV. D). SERVICE LETTER MOS SL 737-SL-21-044 REV. D DIGITAL CABIN PRESSURE SYSTEM -CABIN PRESSURE EXCURSION DUE TO EMI. SERVICE LETTER MOS 78-JUL-2011 SL 737-SL-21-045 SINGLE PACK DISPATCHABILITY CONFIDENCE CHECK. SERVICE LETTER MOS -SEP-1998 - (s) SL 737-SL-21-045 REV. A SINGLE PACK DISPATCHABILITY CONFIDENCE CHECK. SERVICE LETTER MOS 19-APR-1999 - (s) SL 737-SL-21-045 REV. 8 SINGLE PACK DISPATCHABILITY CONFIDENCE CHECK. SERVICE LETTER MOS 04-OCT-1999 - (s) SL 737-SL-21-045 REV. C SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO) CHECK. SERVICE LETTER MOS 03-JUN-2003 RECOMMENDED INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 225 Of 748 @ Camp Systems EFTA00618516 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-21-045 REV. D SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO) CHECK. SERVICE LETTER 04-AUG-2CO3 SL 737-SL-21-045 REV. E SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO) CHECK. SERVICE LETTER 22-AUG-2007 MOS MOS SL 737-SL-21-045 REV. F SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO) CHECK. SERVICE LETTER MOS 02-JUN-2008 SL 737-SL-21-045 REV. G SINGLE PACK DISPATCHABILITY CONFIDENCE (DISCO) CHECK. SERVICE LETTER MOS 27-OCT-2009 INFORMATIONAL RECOMMENDED SL 737-SL-21-046 PASSENGER CABIN TEMPERATURE SENSOR INSTALLATION. SERVICE LETTER INFORMATIONAL 20-OCT-1998 MOS - Is) SL 737-SL-21-050 MODIFICATION OF THE AFT CABIN ZONE TEMPERATURE INDICATION SYSTEM WIRING.. SERVICE LETTER INFORMATIONAL 29-OCT-1999 MOS - Is) SL 737-SL-21-051 DIGITAL CABIN PRESSURE CONTROLLER-SOFTWARE UPGRADE. SERVICE LETTER INFORMATIONAL 29-OCT-1999 MOS - (s) SL 737-SL-21-052 AIR CYCLE MACHINE FAN DESIGN IMPROVEMENT.. SERVICE LETTER INFORMATIONAL 02-FEB-2000 MOS - Is) SL 737-SL-21-053 USE OF GROUND SOURCE CONDITIONED MR IN LIEU OF AIRPLANES ECS AIR CONDITIONING PACKS (SUPERSEDED SUPERSEDED BY SL 737-SL-21-053 REV. A). SERVICE LETTER MOS - (s) SL 737-SL-21-053 REV. A USE OF GROUND SOURCE CONDITIONED MR IN LIEU OF AIRPLANE ECS AIR CONDITIONING PACKS. SERVICE LETTER RECOMMENDED MOS I 7-OCT-2011 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 226 Of 748 @ Camp Systems EFTA00618517 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-21-055 02-JAN-2003 NEW RECIRCULATION AIR FILTER. SERVICE LETTER MOS SL 737-SL-21-056 REV. A RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER MOS 11-MAY-2004 • SL 737-SL-21-056 REV. C RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER MOS 02-DEC-2005 • SL 737-SL-21-056 REV. D RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER MOS 30-MAR-2006 • SL 737-SL-21-056 REV. E RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER MOS 23-MAR-2007 • SL 737-SL-21-056 REV. F RAM AIR INLET DUCT CLIP ASSEMBLY REPLACEMENT. SERVICE LETTER MOS 10-JUL-2007 SL 737-SL-21-058 SIDEWALL RISER DUCTS SEPARATE FROM THE DISTRIBUTION MANIFOLD. SERVICE LETTER MOS 21-JUL-2003 SL 737-SL-21-058 REV. B SIDEWALL RISER DUCTS SEPARATE FROM THE DISTRIBUTION MANIFOLD. SERVICE LETTER MOS 09-JUN-200,1 SL 737-SL-21-058 REV. C SIDEWALL RISER DUCTS SEPARATE FROM THE DISTRIBUTION MANIFOLD. SERVICE LETTER MOS 03-APR-2007 INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL SL 737-SL-21-059 AIR-CONDITIONING HIGH PRESSURE WATER SEPERATOR DRAM MANIFOLD INSPECTION. SERVICE LETTER MOS 18-JUL-2003 • SL 737-SL-21-060 RECOMMENDED CLEANING INTERVALS AND PROCEDURES FOR IN-FLIGHT ENTERTAINMENT (IFE) SYSTEM INFORMATIONAL COMPONENTS. SERVICE LETTER MOS 25-SEP-2003 9-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 227 Of 748 1' Camp Systems EFTA00618518 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-21-060 REV. A CLEAN RECOMMENDED CLEANING INTERVALS AND PROCEDURES FOR IN-FLIGHT ENTERTAINMENT (IFE) SYSTEM RECOMMENDED COMPONENTS. SERVICE LETTER COOLING SYSTEM MOS 25-SEP-2003 SL 737-SL-21-060 REV. B INSPECT RECOMMENDED CLEANING INTERVALS AND PROCEDURES FOR IN-FLIGHT ENTERTAINMENT (IFE) SYSTEM RECOMMENDED COMPONENTS. SERVICE LETTER IFE EQUIPMENT MOS 25-SEP-2003 800 (s) SL 737-SL-21-062 REV. B OPTIONAL PART FOR RIGHT AIR CYCLE MACHINE (ACM) SENSE LINE. SERVICE LETTER MOS I6-APR-2007 SL 737-SL-21-062 REV. C AIR CYCLE MACHINE (ACM) SENSE LINES. SERVICE LETTER MOS I6-JAN-2009 SI. 737-SL-21-063 NUISANCE PACK/ZONE TEMP LIGHT ILLUMINATION ON RECALL THAT RESETS - CONTROLLER INPROVEMENT. NOT APPLICABLE - BY EFFECTIVITY - SERVICE LETTER MOS 30-SEP-2004 SL 737-SL-21-064 OUTFLOW VALVE SOFTWARE UPGRADE AND EMI ENHANCEMENT. SERVICE LETTER MOS 04-NOV-2004 SL 737-SL-21-065 AIR CONDITIONING FLEX HOSE SEPARATION AT THE OVERHEAD DISTRIBUTION TAPED JOINTS. SERVICE LETTER MOS 15-K4AR-2005 SL 737-SL-21-065 REV. A AIR CONDITIONING FLEX HOSE SEPARATION AT THE OVERHEAD DISTRIBUTION TAPED JOINTS. SERVICE LETTER MOS 23-AUG-2007 SL 737-SL-21-066 I9-JUL-2005 SL 737-SL-21-067 07-DEC-2005 COOLING PACK MR CYCLE MACHINE TURBINE TORUS EROSION. SERVICE LETTER MOS FLIGHT DECK MUFFLER REPLACEMENT. SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 228 Of 748 @ Camp Systems EFTA00618519 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-21-068 AIRPLANE PRESSURIZATION - GUIDANCE TO UNDERSTANDING. SERVICE LETTER MOS 20-MAR-2006 51 737-SL-21-070 OUTFLOW VALVE MODIFICATION. SERVICE LETTER MOS I3-DEC-2006 51 737-SL-21-071 MISSING BOND JUMPER CABLE ON NC PACK. SERVICE LETTER MOS 30-NOV-2006 51 737-SL-21-071 REV. A MISSING BOND JUMPER CABLE ON NC PACK, SERVICE LETTER MOS 08-FEB-2007 51 737-SL-21-071 REV. B MISSING BOND JUMPER CABLE ON NC PACK, SERVICE LETTER MOS 09-APR-2007 51 737-SL-21-072 DIGITAL CABIN PRESSURE CONTROL SYSTEM - CONTROLLER SOFTWARE UPDATE. SERVICE LETTER MOS 23-FEB-2007 51 737-SL-21-072 REV. A DIGITAL CABIN PRESSURE CONTROL SYSTEM - CONTROLLER SOFTWARE UPDATE. SERVICE LETTER MOS 02-MAR-2007 51 737-SL-21-073 PRESSURIZATION TROUBLESHOOTING GUIDANCE. SERVICE LETTER MOS 24-JAN-2007 51 737-SL-21-074 COMPONENT INTERCHANGEABILITY - DIGITAL CABIN PRESSURIZATION SYSTEM (SUPERSEDED BY SL 737-SL-21-074 REV. A). SERVICE LETTER MOS 20-APR-2007 SL 737-SL-21-074 REV. A COMPONENT INTERCHANGEABILITY - DIGITAL CABIN PRESSURIZATION SYSTEM (SUPERSEDED BY SL 737-SL-21-074 REV. B). SERVICE LETTER MOS 23-DEC-2008 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 229 Of 748 @ Camp Systems EFTA00618520 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-21-074 REV. 8 COMPONENT INTERCHANGEABILITY - DIGITAL CABIN PRESSURIZATION SYSTEM (SUPERSEDED BY SL 737-SL-21-074 REV. C). SERVICE LETTER MOS SUPERSEDED SL 737-SL-21-074 REV. C COMPONENT INTERCHANGEABILITY - DIGITAL CABIN PRESSURIZATION SYSTEM (SUPERSEDED BY SL 737-SL-21-074 SUPERSEDED REV. 0). SERVICE LETTER MOS SL 737-SL-21-074 REV. D COMPONENT INTERCHANGEABILITY - DIGITAL CABIN PRESSURIZATION SYSTEM. SERVICE LETTER RECOMMENDED 24-JAN-2014 MOS SL 737-SL-21-075 DIAGNOSTIC CHECK OF THE MR CONDITIONING PACK. SERVICE LETTER MOS 01-MAY-2007 SL 737-SL-21-075 REV. A DIAGNOSTIC CHECK OF THE MR CONDITIONING PACK. SERVICE LETTER MOS 09-NOV-2007 SL 737-SL-21-075 REV. B DIAGNOSTIC CHECK OF THE MR CONDITIONING PACK. SERVICE LETTER MOS 30-APR-2008 SL 737-SL-21-077 AIR-CONDITIONING HIGH PRESSURE WATER SEPARATOR DRAIN MANIFOLD PLUG (SUPERSEDED BY SL 737-SL-21-077 REV. A). SERVICE LETTER MOS SUPERSEDED SL 737-SL-21-077 REV. A AIR-CONDITIONING HIGH PRESSURE WATER SEPARATOR RECOMMENDED DRAIN MANIFOLD PLUG. SERVICE LETTER MOS 24-JUN-20I4 SL 737-SL-21-078 FORWARD DOOR HEAT SYSTEM DUCT KINKING. SERVICE LETTER MOS 20-FEB-2008 SL 737-SL-21-078 REV. A FORWARD DOOR HEAT SYSTEM FLEXIBLE DUCT KINKING, SERVICE LETTER MOS 37 -JUL-2008 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 230 Of 748 @ Camp Systems EFTA00618521 C 4 11 Megnand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-21-078 REV. B 02-APR-2009 FORWARD DOOR HEAT SYSTEM FLEXIBLE DUCT KINKING. SERVICE LETTER MOS RECOMMENDED SI. 737-SL-21-079 EÆ COOLING IN PS PANEL - POTENTIAL WIRE CHAFING RECOMMENDED AGAINST HOSE CLAMP. SERVICE LETTER MOS I2-MAY-2009 SL 737-SL-21-080 AIR-CONDITIONING DUCT CLAMP ASSEMBLY TORQUE. SERVICE LETTER RECOMMENDED MOS 23-JAN-2009 SL 737-SL-21-080 REV. A AIR-CONDITIONING DUCT CLAMP ASSEMBLY TORQUE. SERVICE LETTER RECOMMENDED MOS 31-MAR-2009 SL 737-SL-21-081 CABIN ALTITUDE AND DIFFERENTIAL PRESSURE INDICATOR RECOMMENDED 24-APR-2009 INSPECTION. SERVICE LETTER DAYS 90 (s) SL 737-SL-21-082 CABIN ALTITUDE AND DIFFERENTIAL PRESSURE INDICATOR RECOMMENDED I2-MAY-2009 REPLACEMENT. SERVICE LETTER MOS SL 737-SL-21-083 PROTECTIVE CAPS NOT REMOVED FROM MIX MANIFOLD RECOMMENDED 08-OCT-2009 TEMPERATURE SENSORS. SERVICE LETTER MOS SL 737-SL-21-084 TRANSPORTATION OF CRYOGENIC LIQUIDS (SUPERSEDED BY SL 737-SL-21-084 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-21-084 REV. A TRANSPORTATION OF CRYOGENIC LIQUIDS (SUPERSEDED BY SL 737-SL-21-084 REV. B). SERVICE LETTER SUPERSEDED MOS SL 737-SL-21-084 REV. B TRANSPORTATION OF CRYOGENIC LIQUIDS. SERVICE LETTER RECOMMENDED MOS I8-JUL-2011 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 231 Of 748 @Camp Systems EFTA00618522 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-21-086 DIGITAL CABIN SELECTOR PANEL - VALVE POSITION RECOMMENDED INDICATION REPLACEMENT. SERVICE LETTER MOS 23-DEC-2009 SL 737-SL-21-087 DIGITAL CABIN PRESSURE CONTROLLER - P/N 7121-19971-01XX ON-WING SERVICE LIFE. SERVICE LETTER RECOMMENDED MOS 15-FEB-2010 SL 737-SL-21-088 DIGITAL CABIN PRESSURE CONTROLLER - SOFTWARE FOR DOWNLOAD AND ANALYSIS OF NON-VOLATILE MEMORY. RECOMMENDED SERVICE LETTER MOS 20-JUL-2010 SL 737-SL-21-089 OUTFLOW VALVE: ATTACHMENT CLAMP:BOLT-INTERFERENCE CONDITION (SUPERSEDED BY SL 737-SL-21-089 REV. RECOMMENDED A). SERVICE LETTER MOS 26-JUL-2011 SL 737-SL-21-089 REV. A OUTFLOW VALVE: ATTACHMENT CLAMP:BOLT-INTERFERENCE CONDITION. SERVICE LETTER RECOMMENDED MOS 19-MAR-2013 SL 737-SL-21-091 AIR CONDITIONING TEMPERATURE CONTROL VALVE IMPROVEMENT (SUPERSEDED BY SL 737-SL-21-091 REV. A). SUPERSEDED SERVICE LETTER MOS SL 737-SL-21-091 REV. A AIR CONDITIONING TEMPERATURE CONTROL VALVE IMPROVEMENT. SERVICE LETTER RECOMMENDED MOS 04-SEP-2013 SL 737-SL-21-092 CABIN ENVIRONMENTAL QUALITY - INFECTION CONTROL GUIDELINES. SERVICE LETTER RECOMMENDED MOS 10-DEC-2012 SI. 737-SL-21-094 CABIN PRESSURE CONTROLLER. ADDITIONAL LAYER OF TAPE (ALOP) FOR COPPER TAPE PROTECTION. SERVICE RECOMMENDED LETTER MOS 30-MAY-2013 SI. 737-SL-21-095 ACMS 'USER GUIDE FOR ENHANCED PRESSURIZATION SYSTEM TROUBLESHOOTING AND HEALTH MANAGEMENT. RECOMMENDED SERVICE LETTER MOS 02-APR-2014 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 232 Of 748 @ Camp Systems EFTA00618523 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-21-096 PACK DISCHARGE OVERHEAT SWITCH - POSSIBLE WRONG PART NUMBER INSTALLED. SERVICE LETTER MOS 17-OCT-2013 RECOMMENDED SL 737-SL-21-097 POSSIBLE UNDER-TORQUE OF THE GROUNDING JUMPER TO THE RAM AIR INLET ACTUATOR. SERVICE LETTER RECOMMENDED MOS 03-MAR-2014 SI. 737-SL-21-099 SMART RAM AIR DOOR ACTUATOR (SRADA) - RAM AIR DOOR STATUS LIGHT ILLUMINATION - SUSPECT CONNECTOR SUPERSEDED BUILD (SUPERSEDED 8Y SI. 737-SL-21-099 REV. A). SERVICE LETTER MOS SI. 737-SL-21-099 REV. A SMART RAM AIR DOOR ACTUATOR (SRADA) - RAM AIR DOOR STATUS LIGHT ILLUMINATION - SUSPECT CONNECTOR RECOMMENDED BUILD. SERVICE LETTER MOS I4-JUL-2014 SL 737-SL-22-040 AUTOPILOT FLIGHT CONTROL COMPUTER IMPROVEMENTS. SERVICE LETTER MOS 21 -JAN-1999 - (s) SL 737-SL-22-040 REV. A AUTOPILOT FLIGHT CONTROL COMPUTER IMPROVEMENTS. SERVICE LETTER MOS I8-FEB-1999 - (s) SL 737-SL-22-040 REV. B AUTOPILOT FLIGHT CONTROL COMPUTER IMPROVEMENTS.. SERVICE LETTER MOS I0-FEB-2000 - (s) SL 737-SL-22-043 737 AUTO THROTTLE COMPUTER. SERVICE LETTER MOS 08-MAR-2000 - (s) SL 737-SL-22-044 FCC SOFTWARE UPDATE (-705), SERVICE LETTER MOS 31-MAY-2000 -(s) SL 737-SL-22-045 AUTOTHROTTLE COMPUTER MODIFICATION. SERVICE LETTER MOS 08-SEP-2000 - (s) SL 737-SL-22-046 FCC HARDWARE UPDATE (PM 10-62038-8).. SERVICE LETTER MOS I3-NOV-2000 - (s) INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 233 Of 748 @ Camp Systems EFTA00618524 flP Megnand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-22-046 REV. A FCC HARDWARE UPDATE (PM 10-62038-8) (SUPERSEDED BY SL 737-SL-22-046 REV. B). SERVICE LETTER MOS SL 737-SL-22-046 REV. 8 21-OCT-2011 SL 737-SL-22-047 I3-JUL-2001 SL 737-SL-22-048 06-MAR-2002 SL 737-SL-22-051 I I -JUN-2002 SL 737-SL-22-052 REV. 8 FCC HARDWARE UPDATE (P/N 10-62038-8). SERVICE LETTER MOS FCC SOFTWARE UPDATE (-708). SERVICE LETTER MOS - (s) SUPERSEDED RECOMMENDED INFORMATIONAL AUTO THROTTLE COMPUTER MODIFICATION (-54), SERVICE LETTER INFORMATIONAL MOS - FCC SOFTWARE UPDATE(-709). SERVICE LETTER INFORMATIONAL MOS COLLINS ENHANCED DIGITAL FLIGHT CONTROL SYSTEM (SUPERSEDED BY 51 737-SL-22-052 REV. C). SERVICE SUPERSEDED LETTER MOS SL 737-SL-22-052 REV. C COLLINS ENHANCED DIGITAL FLIGHT CONTROL SYSTEM, SERVICE LETTER RECOMMENDED MOS 29-JUL-2010 SL 737-SL-22-053 09-FEB-2004 COLLINS FCC SOFTWARE UPDATE (-120). SERVICE LETTER MOS INFORMATIONAL SL 737-SL-22-054 POTENTIAL CHAFFING OF W3397 WIRE BUNDLE TO M1020 ELEVATOR CONTROL'. SERVICE LETTER INFORMATIONAL MOS I 7-JUN-2004 SL 737-SL-22-054 REV. A POTENTIAL CHAFFING OF W3397 WIRE BUNDLE TO M1020 ELEVATOR CONTROL'. SERVICE LETTER INFORMATIONAL MOS 02-JUL-2004 SL 737-SL-22-054 REV. B POTENTIAL CHAFFING OF W3397 WIRE BUNDLE TO M1020 ELEVATOR CONTROL 'A", SERVICE LETTER INFORMATIONAL MOS 03-NOV-2004 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 234 Of 748 @Camp Systems EFTA00618525 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-22-056 REV. A COLLINS FCC SOFTWARE UPDATE (-130). SERVICE LETTER I8-APR-2005 51 737-SL-22-056 REV. 8 COLLINS FCC SOFTWARE UPDATE (-130). SERVICE LETTER 21 -SEP-2005 MOS MOS INFORMATIONAL SL 737-SL-22-057 04-AUG-2006 COLLINS FCC SOFTWARE UPDATE (-100). SERVICE LETTER MOS SL 737-SL-22-058 HONEYWELL FCC SOFTWARE UPDATE (-710), SERVICE LETTER COMPUED WITH MOS 22-AUG-2008 09-AUG-2007 3260:48 AFL 782 SL 737-SL-22-059 COLLINS FCC SOFTWARE UPDATE (P5.0), SERVICE LETTER MOS 29-JUN-2007 SL 737-SL-22-060 CAT IIIB AUTOPILOT ROLLOUT RUDDER POSITION TRANSMITTER - MISSING LOCKWIRE. SERVICE LETTER MOS I9-FEB-2008 SL 737-SL-22-061 FIRST OFFICERS PITCH CONTROL WHEEL STEERING FORCE TRANSDUCER WIRE CONTACTING NEARBY WIRE RECOMMENDED BUNDLE CLAMP HARDWARE. SERVICE LETTER MOS 04-MAY-2011 SL 737-SL-22-062 COLLINS FCC SOFTWARE UPDATE (P7.0) (SUPERSEDED BY SL 737-SL-22-062 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-22-062 REV. A COLLINS FCC SOFTWARE UPDATE (P7.0), SERVICE LETTER RECOMMENDED MOS 17-OCT-2012 SL 737-SL-22-063 ROCKWELL COLLINS FCC HARDWARE UPDATE- PIN'S 822-1600-102 AND -152. SERVICE LETTER RECOMMENDED MOS 05-FEB-2013 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 235 Of 748 @ Camp Systems EFTA00618526 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-22-064 AUTOTHROTTLE COMPUTER MODIFICATION (P/N 10-62017-55) (SUPERSEDED BY 737-SL-22-064 REV. A). SERVICE SUPERSEDED 51 737-SL-22-064 REV. A LETTER MOS AUTOTHROTTLE COMPUTER MODIFICATION (P/N 10-62017-55). SERVICE LETTER 51 737-SL-23-01 MOS PASSENGER ADDRESS AMPLIFIER MODIFICATION I6-MAY-1990 . SERVICE LETTER MOS 51 737-SL-23-020 VHF 8.33 I0-IZ CHANNEL SPACING, SERVICE LETTER INFORMATIONAL 16-SEP-1997 MOS -(s) 51 737-SL-23-020 REV. A VHF 8.33 I0-IZ CHANNEL SPACING. SERVICE LETTER INFORMATIONAL 16-DEC-1997 MOS -(s) 51 737-SL-23-020 REV. 8 VHF 8.33 KHZ CHANNEL SPACING. SERVICE LETTER INFORMATIONAL 28-MAY-1998 MOS -(s) 51 737-SL-23-020 REV. C VHF 8.33 I0-IZ CHANNEL SPACING. SERVICE LETTER INFORMATIONAL 28-MAY-1998 MOS -(s) 51 737-SL-23-021 HF ANTENNA COUPLER RELIABILITY. SERVICE LETTER INFORMATIONAL 18-MAR-1998 MOS - (s) 51 737-SL-23-021 REV. A HF ANTENNA COUPLER RELIABILITY. SERVICE LETTER INFORMATIONAL 09-APR-1998 MOS -(s) 51 737-SL-23-021 REV. 8 HF ANTENNA COUPLER RELIABILITY. SERVICE LETTER INFORMATIONAL 02-NOV-1998 MOS - 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 236 Of 748 @ Camp Systems EFTA00618527 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-23-023 22-DEC-1998 RADIO COMMUNICATION COMPLIANT PINS. SERVICE LETTER MOS - Is) INFORMATIONAL 51 737-SL-23-024 COMMUNICATIONS-HF AUDIO DISTORTION ON OPPOSITE HF. SERVICE LETTER INFORMATIONAL 08-MAR-1999 MOS - (s) 51 737-SL-23-024 REV. A COMMUNICATIONS-HF AUDIO DISTORTION ON OPPOSITE HF. SERVICE LETTER INFORMATIONAL 27-MAY-1999 51OS - (s) 51 737-SL-23-025 COMMANDED FREQUENCY CHANGE. SERVICE LETTER INFORMATIONAL 23-APR-200O MOS - Is) 51 737-SL-23-025 REV. A COMMANDED FREQUENCY CHANGE.. SERVICE LETTER INFORMATIONAL 23-JAN-2001 MOS - (s) 51 737-SL-23-026 LOSS OF ESSENTIAL LEVELS VHF COMMUNICATIONS. SERVICE LETTER INFORMATIONAL 23-APR-1999 MOS - (s) 51 737-SL-23-026 REV. A LOSS OF ESSENTIAL LEVELS VHF COMMUNICATIONS. SERVICE LETTER INFORMATIONAL 27-MAY-1999 MOS - Is) 51 737-SL-23-026 REV. 8 LOSS OF ESSENTIAL LEVELS VHF COMMUNICATIONS. SERVICE LETTER INFORMATIONAL 26-AUG-1999 MOS - (s) 51 737-SL-23-027 SEAT ELECTRONICS BOX (SEB) MODIFICATION. SERVICE LETTER INFORMATIONAL C6-AUG-1999 MOS - SL 737-SL-23-028 VHF ANTENNA CONNECTION CHANGE. SERVICE LETTER INFORMATIONAL 13-JUL-2001 MOS - 51 737-SL-23-028 REV. A VHF ANTENNA CONNECTION CHANGE. SERVICE LETTER INFORMATIONAL 13-JUL-2001 MOS - 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 237 Of 748 @ Camp Systems EFTA00618528 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-23-029 INTERPHONE SYSTEM - REMOTE ELECTRONICS UNIT MODIFICATION. SERVICE LETTER INFORMATIONAL 15-AUG-2000 MOS - Is) St 737-SL-23-030 BOEING RADIO COMMUNICATIONS PANEL UPGRADE TO P/N 285U0037-61X. SERVICE LETTER INFORMATIONAL MOS 27 -SEP-2000 -(s) SL 737-SL-23-030 REV. 8 COMMUNICATIONS - BOEING RADIO COMMUNICATIONS PANEL (RCP) UPGRADE TO P/N 2850003761X. SERVICE INFORMATIONAL LETTER MOS IO-AUG-2001 - Is) St 737-SL-23-031 CABIN ATTENDANT HANDSET/FLIGHT DECK HANDSET, P/14 285W0024. SHELL REPLACEMENT.. SERVICE LETTER INFORMATIONAL MOS 04-DEC-2000 - (s) St 737-SL-23-031 REV. A CABIN ATTENDANT HANDSET/FLIGHT DECK HANDSET, PIN 285W0024. SHELL REPLACEMENT.. SERVICE LETTER INFORMATIONAL MOS 04-APR-2001 - Is) St 737-SL-23-032 REV. A AUDIO - REMOTE ELECTRONICS UNIT (REU) PIN 10-62090-121 (AVTECH PM 5340-1-1). SERVICE LETTER INFORMATIONAL MOS I9-OCT-2001 -(s) St 737-SL-23-032 REV. 8 AUDIO-REMOTE ELECTRONICS UNIT PM 10-62090-121 (AVTECH PIN 5340-1-1). SERVICE LETTER INFORMATIONAL MOS 27-NOV-2002 St 737-SL-23-032 REV. C AUDIO-REMOTE ELECTRONICS UNIT PM 10-62090-121 (AVTECH FIN 5340-1-1). SERVICE LETTER INFORMATIONAL MOS I5-OCT-2003 St 737-SL-23-033 AUDIO CONTROL PANEL. P5-15. INTERFERENCE WITH SCREW. SERVICE LETTER INFORMATIONAL MOS OI -APR-2002 - (s) St 737-SL-23-033 REV. A AUDIO CONTROL PANEL. P5-15. INTERFERENCE WITH SCREW. SERVICE LETTER INFORMATIONAL MOS 26-NOV-2002 St 737-SL-23-035 HIGH FREQUENCY TRANSCEIVER. SERVICE LETTER INFORMATIONAL MOS I6-JUL-2002 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (0-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 238 Of 748 @ Camp Systems EFTA00618529 C 4 11 Megnand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-23-036 19-SEP-2003 SL 737-SL-23-037 GABLES NEW RADIO TUNING PANEL (RTP) PM G7404-12X. SERVICE LETTER 15-OCT-2003 SL 737-SL-23-037 REV. B GABLES NEW RADIO TUNING PANEL (RTP) PM G7404-12X. SERVICE LETTER 09-JAN-2009 SL 737-SL-23-038 ARINC EUROPEAN VHF REOUENCY CHANGE. SERVICE LETTER 10-SEP-2004 SL 737-SL-23-038 REV. A ARINC EUROPEAN VHF FREQUENCY CHANGE. SERVICE LETTER 10-MAY-2005 SL 737-SL-23-038 REV. B 13-AUG-2009 SL 737-SL-23-039 03-NOV-2004 SL 737-SL-23-040 28-FEB-2005 SL 737-SL-23-041 II -OCT-2006 SI. 737-SL-23-042 27 -SEP-2007 MULTI-INPUT INTERACTIVE DISPLAY UNIT (MIDU) PIN 964-0443-002/-003 MODIFICATION. SERVICE LETTER MOS MOS MOS MOS MOS 28-APR-2006 2606:18 AFL 626 ARINC EUROPEAN VHF FREQUENCY CHANGE. SERVICE LETTER MOS UNCOMMANDED CHANGE OF VHF COMMUNICATIONS FREQUENCY, SERVICE LETTER MOS PASSENGER ADDRESS (PA) POPPING/CRACKLING SOUND. SERVICE LETTER MOS VHF NUMBER TWO ANTENNA CONNECTORS DISCONNECTING. SERVICE LETTER MOS VHF-2100 COM TRANSCEIVER - KEY EVENT SIGNAL LEVEL CORRECTION. SERVICE LETTER MOS INFORMATIONAL INFORMATIONAL INFORMATIONAL RECOMMENDED INFORMATIONAL COMPLIED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 239 Of 748 @Camp Systems EFTA00618530 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-23-043 12-JAN-2009 VHF-920 DATA RADIO (822-1250-002) - MODE LOCK-UP CONDITION. SERVICE LETTER MOS SL 737-SL-23-043 REV. A VHF-920 DATA RADIO (822-1250-002) - MODE LOCK-UP CONDITION. SERVICE LETTER MOS 09-JUL-2009 SL 737-SL-23-044 NOISE ON SERVICE INTERPHONE. SERVICE LETTER MOS I9-JAN-2010 SL 737-SL-23-044 REV. A NOISE ON SERVICE INTERPHONE (SUPERSEDED BY 737-SL-23-044-B). SERVICE LETTER MOS 26-JAN-2010 SL 737-SL-23-044 REV. B NOISE ON SERVICE INTERPHONE. SERVICE LETTER MOS I3-MAY-2010 RECOMMENDED RECOMMENDED SUPERSEDED SL 737-SL-23-045 MISWIRING OF TERMINAL BLOCKS IN CVR SELF-TEST WIRING. SERVICE LETTER RECOMMENDED MOS 22-DEC-2010 SI. 737-SL-23-046 BOEING SKY INTERIOR ATTENDANT CONTROL PANEL SOFTWARE IMPROVEMENTS-LOCK UPS AND UN-COMMANDED SUPERSEDED UGHT CHANGES (SUPERSEDED BY SL 737-SL-23-046 REV. A). SERVICE LETTER MOS SI. 737-SL-23-046 REV. A BOEING SKY INTERIOR ATTENDANT CONTROL PANEL SOFTWARE IMPROVEMENTS-LOCK UPS AND UN-COMMANDED RECOMMENDED UGHT CHANGES. SERVICE LETTER MOS 18-OCT-2011 SL 737-SL-23-047 INTERPHONE (INT) SYSTEM NOISE. SERVICE LETTER RECOMMENDED MOS I7-JUL-2013 SL 737-SL-23-048 POSSIBLE INCORRECT ORIENTATION OF GROUND CREW CALL HORN. SERVICE LETTER RECOMMENDED MOS 28-MAY-20I4 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 240 Of 748 @ Camp Systems EFTA00618531 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-24-111 REV. A MAIN WHEEL WELL JUNCTION BOX. SERVICE LETTER INFORMATIONAL 08-SEP-2000 MOS - (s) 51 737-SL-24-111 REV. B MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING, SERVICE LETTER INFORMATIONAL I6-JAN-2001 MOS - (s) 51 737-SL-24-111 REV. C MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING, SERVICE LETTER INFORMATIONAL 22-AUG-2001 MOS - (s) 51 737-SL-24-111 REV. D MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING, SERVICE LETTER INFORMATIONAL 28-NOV-2001 MOS - (s) 51 737-SL-24-111 REV. E MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING (SUPERSEDED BY SI. 737-SL-24-111 REV. F). SERVICE LETTER SUPERSEDED MOS SL 737-SL-24-111 REV. F MAIN WHEEL WELL JUNCTION BOX WIRE CHAFING. SERVICE LETTER MOS 21 -AUG-20I 2 RECOMMENDED SL 737-SL-24-125 CHECK SCREWS ATTACHING FEEDER TERMINALS TO RIGID BUS IN POWER DISTRIBUTION PANELS. SERVICE LETTER INFORMATIONAL MOS 05-NOV-1998 - (s) SL 737-SL-24-125 REV. A CHECK SCREWS ATTACHING FEEDER TERMINALS TO RIGID BUS IN POWER DISTRIBUTION PANELS. SERVICE LETTER INFORMATIONAL MOS C6-JAN-1999 - (s) SL 737-SL-24-133 FUELING VALVE WIRE CHAFING, SERVICE LETTER INFORMATIONAL MOS 23-FEB-1999 - (s) SL 737-SL-24-136 REV. A INSPECTION FOR WIRE CHAFING CONDITION IN P5 PANEL, SERVICE LETTER INFORMATIONAL MOS 30-AUG-1999 -(s) SL 737-SL-24-136 REV. B P-5 PANEL WIRE CHAFING INSPECTION/PROTECTION. SERVICE LETTER INFORMATIONAL MOS 17-NOV-2000 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 241 Of 748 @ Camp Systems EFTA00618532 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-24-136 REV. C INSPECTION FOR WIRE CHAFING CONDITION IN PS PANEL. SERVICE LETTER INFORMATIONAL I9-JUN-2001 MOS - (s) 51 737-SL-24-137 WIRE BUNDLE RIDING FLAP CONTROL CABLE.. SERVICE LETTER INFORMATIONAL MOS 26-APR-1999 - (s) 51 737-SL-24-139 BATTERY CHARGER MODIFICATION. SERVICE LETTER INFORMATIONAL MOS 24-MAY-1999 - Is) SL 737-SL-24-140 SPARE CONNECTOR CAVITIES NOT SEALED. SERVICE LETTER INFORMATIONAL MOS Of -JUN-1999 - (s) SL 737-SL-24-141 POWER FEEDER WIRE BUNDLE CHAFED AGAINST FILTER ON ENGINE. SERVICE LETTER INFORMATIONAL MOS Of -JUN-1999 - SL 737-SL-24-141 REV. A POWER FEEDER WIRE BUNDLE CHAFED AGAINST FILTER ON ENGINE. SERVICE LETTER INFORMATIONAL MOS 20-OCT-1999 - (s) SL 737-SL-24-142 STANDOFF NOT INSTALLED IN MAIN WHEEL WELL. SERVICE LETTER INFORMATIONAL MOS II -JUN-1999 - (s) SL 737-SL-24-143 . SERVICE LETTER INFORMATIONAL MOS II -JUN-1999 - 51 737-SL-24-143 REV. A .SERVICE LETTER INFORMATIONAL MOS 03-SEP-1999 - 51 737-SL-24-143 REV. B WIRE BUNDLE RIDING IN LEFT WING STINT. SERVICE LETTER INFORMATIONAL MOS IO-DEC-1999 -(s) SL 737-SL-24-144 DUAL BATTERY AND STATIC INVERTER REMOTE CONTROLLED CIRCUIT BREAKER INSTALLATION ERRORS. SERVICE INFORMATIONAL LETTER MOS 29-JUN-1999 - 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 242 Of 748 @ Camp Systems EFTA00618533 COMP Astant.fran Attn./whip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-24-145 WIRE BUNDLE RIDESACOUSTIC FIBER. SERVICE LETTER INFORMATIONAL 27-AUG-1999 MOS - (s) SL 737-SL-24-146 POWER DISTRIBUTION PANEL. P92. INSPECTION & MODIFICATION OF RIGID BUS ASSEMBLY. SERVICE LETTER INFORMATIONAL 07-SEP-1999 MOS - (s) SL 737-SL-24-146 REV. A POWER DISTRIBUTION PANEL. P92. INSPECTION & MODIFICATION OF RIGID BUS ASSEMBLY. SERVICE LETTER INFORMATIONAL 23-SEP-1999 MOS - (s) SI. 737-SL-24-147 BPCU MODIFICATION TO PREVENT POTENTIAL LOSS OF POWER TO A TRANSFER BUS WHEN CONNECTING GROUND INFORMATIONAL POWER. SERVICE LETTER MOS 23-SEP-1999 - (s) SI. 737-SL-24-147 REV. A BUS POWER CONTROL UNIT (3PCLI) MODIFICATION TO PREVENT POTENTIAL LOSS OF POWER TO A TRANSFER BUS INFORMATIONAL WHEN CONNECTING GROUND POWER. SERVICE LETTER MOS Of -JUL-2002 - (s) SL 737-SL-24-149 DUAL BATTERY ('API F LENGTH. SERVICE LETTER INFORMATIONAL MOS 08-OCT-1999 - (s) SL 737-SL-24-150 WIRE BUNDLES RIDING P15 REFUELING PANEL. SERVICE LETTER INFORMATIONAL MOS 08-OCT-1999 - (8) SL 737-SL-24-152 RIDING CONDITION OF THE COAXIAL CABLE ON THE KEEL BEAM STRUCTURE. SERVICE LETTER INFORMATIONAL MOS 15-NOV-1999 - (s) SL 737-SL-24-153 FUEL SHUTOFF VALVE WIRE CHAFING AGAINST THE RIGHT HYDRAULIC ACOUSTIC FILTER BRACKET BOLT IN THE INFORMATIONAL WHEEL WELL.. SERVICE LETTER MOS 16-NOV-1999 - (s) SL 737-SL-24-153 REV. A FUEL SHUTOFF VALVE WIRE CHAFING AGAINST THE RIGHT HYDRAULIC ACOUSTIC FILTER BRACKET BOLT IN THE INFORMATIONAL WHEEL WELL.. SERVICE LETTER MOS 29-JAN-2001 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 243 Of 748 @ Camp Systems EFTA00618534 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-24-154 REV. 8 BATTERY CHARGER INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL 09-SEP-2002 SL 737-SL-24-156 UNPROTECTED WIRE BUNDLES IN P88 P9 PANELS, SERVICE LETTER INFORMATIONAL MOS 13-DEC-1999 - (s) SL 737-SL-24-156 REV. A UNPROTECTED WIRE BUNDLES IN P88 P9 PANELS, SERVICE LETTER INFORMATIONAL MOS I7-APR-2000 MOS - (s) SL 737-SL-24-157 REV. A WIRE BUNDLES RIDING HYDRAULIC TUBE IN WHEEL WELL. SERVICE LETTER INFORMATIONAL MOS 13-OCT-2000 - (s) SL 737-SL-24-158 LANDING GEAR DOWN LOCK SENSOR- POTENTIAL WIRE CHAFING, SERVICE LETTER INFORMATIONAL 31 -JAN-2000 MOS - (s) SL 737-SL-24-162 POTENTIAL WIRE INTERFERENCE WITH HYDRAULIC LINE IN THE REFUELING PANEL. SERVICE LETTER INFORMATIONAL 31 -JUL-2000 MOS - (s) SL 737-SL-24-163 POTENTIAL WIRE RIDING CONDITION IN NOSE GEAR WHEEL WELL AREA, SERVICE LETTER INFORMATIONAL 14-AUG-2000 MOS - (s) SL 737-SL-24-164 EXTERNAL POWER RECEPTACLE - IMPROVED RETENTION. SERVICE LETTER INFORMATIONAL 31-OCT-2001 MOS -(s) SL 737-SL-24-165 STATIC INVERTER MODIFICATION. SERVICE LETTER INFORMATIONAL MOS 03-OCT-2000 - (s) SL 737-SL-24-165 REV. A STATIC INVERTER MODIFICATION TO REDUCE THE POTENTIAL FOR OVERHEATING. SERVICE LETTER INFORMATIONAL MOS 20-MAY-2003 SL 737-SL-24-165 REV. B STATIC INVERTER MODIFICATION TO REDUCE THE POTENTIAL FOR OVERHEATING (SUPERSEDED BY THE LATEST SUPERSEDED REVISION OF 737-SL-24-183). SERVICE LETTER MOS 03-APR-2007 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 244 Of 748 @ Camp Systems EFTA00618535 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-24-167 STANDBY POWER CONTROL UNIT (SPCU) IMPROVEMENTS. SERVICE LETTER INFORMATIONAL 09-APR-2001 MOS - Is) SL 737-SL-24-168 GROUND SERVICE BUS 28VAC TRANSFORMER WIRES-POTENTAL CHAFING ON FRAME. SERVICE LETTER INFORMATIONAL MOS I4-MAY-2001 - (s) SL 737-SL-24-168 REV. A GROUND SERVICE BUS 28VAC TRANSFORMER WIRES- POTENTIAL CHAFING ON FRAME. SERVICE LETTER INFORMATIONAL MOS II-DEC-2001 - (s) SI. 737-SL-24-169 INTEGRATED DRIVE GENERATOR (IDG) RETENTION LANYARDS CHAFING (SUPERSEDED BY SL 737-SL-24-169 REV. A). SUPERSEDED SERVICE LETTER MOS - (s) SL 737-SL-24-169 REV. A INTEGRATED DRIVE GENERATOR (IDG) RETENTION LANYARDS CHAFING. SERVICE LETTER MOS SL 737-SL-24-170 24-SEP-2001 SL 737-SL-24-171 31-OCT-2001 WIRE BUNDLE RIDING AIRSTAIR RAIL. SERVICE LETTER MOS - Is) CORROSION PROTECTION OF ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL. (SUPERSEDED BY 737-SL-24-171 REV. A). SERVICE LETTER MOS - (s) SL 737-SL-24-171 REV. A CORROSION PROTECTION OF ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL (SUPERSEDED BY 737-SL-24-171 REV.B). SERVICE LETTER MOS 21-AUG-2003 - (s) SL 737-SL-24-171 REV. 8 CORROSION PROTECTION OF ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL. SERVICE LETTER MOS 24 (s) 24-JUN-2005 INFORMATIONAL SUPERSEDED SUPERSEDED SL 737-SL-24-175 INTERGRATED DRIVE GENERATOR-MAIN ROTOR. EXCITER ROTOR. CHARGE RELIEF VALVE. AND INPUT SHAFT SEAL INFORMATIONAL IMPROVEMENTS. SERVICE LETTER MOS 04-N0V-2002 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 245 Of 748 @ Camp Systems EFTA00618536 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-24-176 WINGTIP WIRING CHAFING-INSPECTION. SERVICE LETTER INFORMATIONAL 27-NOV-2002 SL 737-SL-24-176 REV. B WINGTIP WIRING CHAFING - INSPECTION. SERVICE LETTER INFORMATIONAL I 7-DEC-2003 SL 737-SL-24-177 BATTERY RESTORATION REQUIREMENTS. SERVICE LETTER INFORMATIONAL I3-MAY-2003 SL 737-SL-24-178 INSTALLATION MODIFICATION TO PREVENT LANYARD CHAFING. SERVICE LETTER INFORMATIONAL 07-JUL-2003 SL 737-SL-24-178 REV. A INTEGRATED DRIVE GENERATOR - INSTALLATION MODIFICATION TO PREVENT LANYARD CHAFING. SERVICE LETTER INFORMATIONAL MOS 22-JAN-2004 MOS MOS MOS MOS SL 737-SL-24-179 FLIGHT DECK P5 OVERHEAD RUBBER SWITCH TIP P/NS, SERVICE LETTER INFORMATIONAL MOS 08-AUG-2003 SL 737-SL-24-180 INTEGRATED DRIVE GENERATOR-MAIN STATOR SHORT CIRCUIT. SERVICE LETTER INFORMATIONAL MOS 24-OCT-2003 SL 737-SL-24-181 WIRE BUNDLE CHAFING AT STATION 671 AILERON CONTROL QUADRANT. SERVICE LETTER MOS 23-FEB-2004 SL 737-SL-24-181 REV. A WIRE BUNDLE CHAFING AT STATION 671 SPOILER CONTROL QUADRANT. SERVICE LETTER MOS I3-SEP-2004 SL 737-SL-24-182 STANDBY POWER CONTROL UNIT (SPCU) l(1 8 K8 RELAY IMPROVEMENTS. SERVICE LETTER MOS I2-JAN-2006 SL 737-SL-24-183 STATIC INVERTER MODIFICATION TO REDUCE THE POTENTIAL FOR OVERHEATING. SERVICE LETTER MOS 09-DEC-2005 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 246 Of 748 @ Camp Systems EFTA00618537 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 51 737-SL-24-183 REV. A 03-APR-2007 737-SL-24-184 09-FEB-2006 STATIC INVERTER MODIFICATION TO REDUCE THE POTENTIAL FOR OVERHEATING. SERVICE LETTER MOS STATIC INVERTER TRANSISTOR REPLACEMENT. SERVICE LETTER MOS 51 737-SL-24-185 UPGRADE OF MAIN WHEEL WELL ELECTRICAL CONNECTORS. SERVICE LETTER 51 27-MAR-2006 737-SL-24-185 REV. A MOS UPGRADE OF MAIN WHEEL WELL ELECTRICAL CONNECTORS. SERVICE LETTER 51 22-MAY-2006 737-SL-24-185 REV. B MOS UPGRADE OF MAIN WHEEL WELL ELECTRICAL CONNECTORS. SERVICE LETTER 51 I I -SEP-2006 737-SL-24-186 MOS LEACH TIME DELAY RELAY DISCLOSURE. SERVICE LETTER RECOMMENDED 51 09-MAR-2012 737-SL-24-187 MOS CIC NOT APPLIED TO CONNECTOR O46038P. SERVICE LETTER 51 09-JAN-2007 737-SL-24-188 MOS DRAIN MAST HEATER WIRE CHAFING. SERVICE LETTER 51 09-APR-2007 737-SL-24-188 REV. A MOS DRAIN MAST HEATER WIRE CHAFING. SERVICE LETTER COMPLIED WITH I8-MAY-2007 MOS 29-AUG-2011 3533:32 AFL 863 SL 737-SL-24-189 03-DEC-2007 51 737-SL-24-190 77-JAN-2008 INTEGRATED DRIVE GENERATOR - DIFFERENTIAL PRESSURE INDICATOR CHECK - ALTERNATE PROCEDURE. SERVICE LETTER MOS NON-CONFORMING KINGS COAX CONNECTORS. SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 247 Of 748 @ Camp Systems EFTA00618538 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-24-190 REV. A NON-CONFORMING KINGS COAX CONNECTORS. SERVICE LETTER I 5-JUL -2008 SI. 737-SL-24-192 W10'22A/V1032 WIRE BUNDLE CHAFING NEAR FLAP TRACK BEAM. SERVICE LETTER 24-JAN-2008 MOS MOS SL 737-SL-24-192 REV. A W10'22AN1032 WIRE BUNDLE CHAFING NEAR FLAP TRACK BEAM. SERVICE LETTER MOS 12-MAY-2009 SL 737-SL-24-193 ELECTRICAL BRACKET ASSEMBLY INSTALLED INCORRECTLY. SERVICE LETTER MOS 28-JAN-2009 RECOMMENDED SL 737-SL-24-194 BACC6513L EXTERNAL POWER RECEPTACLE - CONTACTS SUPERSEDED BREAKING (SUPERSEDED BY SL 737-SL-24-194 REV. A). SERVICE LETTER MOS SL 737-SL-24-194 REV. A BACC8513L EXTERNAL POWER RECEPTACLE - CONTACTS BREAKING. SERVICE LETTER RECOMMENDED MOS I3-SEP-2011 SL 737-SL-24-195 CIRCUIT BREAKER TERMINAL SCREWS INSPECTION AND REPLACEMENT (SUPERSEDED BY 737-SL-24-195-A). SUPERSEDED SERVICE LETTER MOS I5-FEB-2010 SL 737-SL-24-195 REV. A CIRCUIT BREAKER TERMINAL SCREWS INSPECTION AND REPLACEMENT (SUPERSEDED BY SL 737-SL-24-195 REV. B), SUPERSEDED SERVICE LETTER MOS SL 737-SL-24-195 REV. B CIRCUIT BREAKER TERMINAL SCREWS INSPECTION AND REPLACEMENT. SERVICE LETTER MOS I5-JUL-2010 SL 737-SL-24-196 EXTERNAL POWER RECEPTACLE CRACKING (SUPERSEDED BY SL 737-SL-24-196 REV. A). SERVICE LETTER MOS SUPERSEDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 248 Of 748 @ Camp Systems EFTA00618539 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-24-196 REV. A EXTERNAL POWER RECEPTACLE CRACKING. SERVICE LETTER RECOMMENDED MOS OS-OCT-201 I SL 737-SL-24-197 ELECTRIC MOTOR DRIVEN HYDRAULIC CIRCUIT BREAKER TRIPPING (SUPERSEDED BY SL 737-SL-24-197 REV. A). SUPERSEDED SERVICE LETTER MOS SL 737-SL-24-197 REV. A ELECTRIC MOTOR DRIVEN HYDRAULIC CIRCUIT BREAKER TRIPPING. SERVICE LETTER RECOMMENDED MOS 20-MAR-2012 SI. 737-SL-24-198 POTENTIALLY INCORRECT CIRCUIT BREAKERS INSTALLED FOR STICK SHAKER AND MACH WARNING SYSTEM. RECOMMENDED SERVICE LETTER MOS 28-JAN-2011 SL 737-SL-24-200 FIRE PANEL WIRE INSTALLATION (SUPERSEDED BY SL 737-SL-24-200 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-24-200 REV. A FIRE PANEL WIRE INSTALLATION. SERVICE LETTER RECOMMENDED MOS I3-SEP-2011 SL 737-SL-24-201 POWER DISTRIBUTION PANEL - P91. UNUSED WIRE TERMINAL SLEEVES. SERVICE LETTER RECOMMENDED 08-DEC-2011 MOS SL 737-SL-24-202 GEN DRIVE STANDBY POWER TOGGLE SWITCH GUARD IS FOUND NOT FULLY ENGAGED TO AUTO POSITION. RECOMMENDED 28-MAR-2012 SERVICE LETTER MOS SL 737-SL-24-204 POSSIBLE MISLOCATED WIRE BUNDLE CLAMPS IN MAIN WHEEL WELL (SUPERSEDED BY SL 737-SL-24-204 REV. A). SUPERSEDED SERVICE LETTER MOS SI. 737-SL-24-204 REV. A POSSIBLE MISLOCATED WIRE BUNDLE CLAMPS IN MAIN WHEEL WELL (SUPERSEDED BY SL 737-SL-24-204 REV. B). SUPERSEDED SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 249 Of 748 @ Camp Systems EFTA00618540 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-24-204 REV. 8 27-AUG-2013 POSSIBLE MISLOCATED WIRE BUNDLE CLAMPS IN MAIN WHEEL WELL. SERVICE LETTER MOS RECOMMENDED 51 737-SL-24-205 IDG LANYARD ADJUSTMENT TO PREVENT CHAFING ON IDG SERVICING ACCESS DOOR. SERVICE LETTER RECOMMENDED 16-NOV-2012 MOS 51 737-SL-24-206 STANDBY POWER CONTROL UNIT - K1 AND K8 RELAY IMPROVEMENT. SERVICE LETTER RECOMMENDED 26-JUN-2013 MOS SL 737-SL-24-207 ENVIRONMENTAL PROTECTION OF ELECTRICAL COMPONENTS IN WHEEL WELL AND WING. SERVICE LETTER RECOMMENDED 08-JUL-2013 MOS 51 737-SL-24-208 IDG BARE BORE BLOCKS. SERVICE LETTER RECOMMENDED 19-AUG-2013 MOS 51 737-SL-24-209 STATIC INVERTER INSTALLATION - TERMINAL TORQUE, SERVICE LETTER RECOMMENDED 17-MAR-2014 MOS 51 737-SL-25-051 REV. D LOWER CARGO COMPARTMENT LINER REPAIRS. SERVICE LETTER INFORMATIONAL 07-DEC-2001 MOS -(s) 51 737-SL-25-051 REV. E LOWER CARGO COMPARTMENT LINER REPAIRS. SERVICE LETTER INFORMATIONAL 51 28-MAR-2002 737-SL-25-051 REV. F MOS - (s) LOWER CARGO COMPARTMENT LINER REPAIRS. SERVICE LETTER 05-NOV-2004 MOS 51 737-SL-25-073 OVERHEAD STOWAGE BIN SYSTEM CONTENT RETENTION.. SERVICE LETTER INFORMATIONAL 12-MAR-1997 MOS -(s) 51 737-SL-25-073 REV. A OVERHEAD STOWAGE BIN SYSTEM CONTENT RETENTION.. SERVICE LETTER INFORMATIONAL 23-JUN-1997 MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 250 Of 748 @ Camp Systems EFTA00618541 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-073 REV. 8 OVERHEAD STOWAGE BIN SYSTEM CONTENT RETENTION.. SERVICE LETTER INFORMATIONAL 26-MAR-1999 MOS - Is) SL 737-SL-25-076 INSTALLATION OF FELT TO PREVENT WATER DRIPPAGE INTO THE PASSENGER CABIN. SERVICE LETTER INFORMATIONAL MOS I6-JAN-I998 - (s) SL 737-SL-25-077 PREVENTING CONTAMINATION THAT AFFECTS FLAMMABILITY Of INSULATION BLANKETS. SERVICE LETTER INFORMATIONAL MOS 23-MAR-1998 SL 737-SL-25-078 REV. A RESCU 406 EMERGENCY LOCATOR TRANSMITTER (ELT) INSTALLATION. SERVICE LETTER MOS 03-JUN-2008 - (s) SL 737-SL-25-079 GALLEY OVEN MODIFICATION. SERVICE LETTER MOS I4-JUL-I998 - (4) SL 737-SL-25-082 EMI FILTER REPLACEMENT WE AEROSPACE AIR CHILLERS. SERVICE LETTER MOS 21-DEC-1998 - (4) SL 737-SL-25-082 REV. A EMI FILTER REPLACEMENT B/E AEROSPACE AIR CHILLERS. SERVICE LETTER MOS I8-JAN-1999 - (s) SL 737-SL-25-082 REV. B EMI FILTER REPLACEMENT WE AEROSPACE AIR CHILLERS. SERVICE LETTER MOS 06-AUG-1999 - (s) SL 737-SL-25-084 JAMCO GALLEY ELECTRICAL WIRE TERMINAL FASTENERS INSPECTION. SERVICE LETTER MOS 05-MAR-1999 - (s) SL 737-SL-25-085 IMPROVED OVERHEAD STOW BIN LATCH. SERVICE LETTER MOS 27-APR-1999 - (s) SL 737-SL-25-087 FLIGHT CREW SEAT ADJUSTMENT HANDLE. SERVICE LETTER MOS 14-JUL-I 999 - (s) INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 251 Of 748 @ Camp Systems EFTA00618542 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-088 29-JUL-I999 LAV BI-FOLD DOOR IMPROVEMENTS TO EASE EMERGENCY REMOVAL. SERVICE LETTER MOS - Is) St 737-SL-25-089 AVIO INTERIORS PASSENGER SEAT TRAC REPLACEMENT. SERVICE LETTER 22-MAR-1999 MOS - Is) St 737-SL-25-089 REV. A AVIO INTERIORS PASSENGER SEAT TRAC REPLACEMENT. SERVICE LETTER 10-AUG-1999 MOS - Is) St 737-SL-25-092 REV. A OVERHEAD STOWAGE BIN DOOR STRIKE ASSEMBLY MODIFICATION. SERVICE LETTER I4-JUL-2000 - (s) MOS St 737-SL-25-093 REV. B LAVATORY DOOR LATCH IMPROVEMENTS. SERVICE LETTER MOS 28-AUG-2000 - (s) St 737-SL-25-094 REV. B CARGO NET USE - LOWER LOBE. SERVICE LETTER MOS 27-OCT-2006 St 737-SL-25-094 REV. C CARGO NET USE - LOWER LOBE. SERVICE LETTER MOS 24-JUL-2007 St 737-SL-25-096 LOWER CARGO COMPARTMENT LINER AND FLOOR PANEL REPLACEMENT.. SERVICE LETTER MOS 26-APR-2001 - (s) St 737-SL-25-096 REV. A LOWER CARGO COMPARTMENT LINER AND FLOOR PANEL REPLACEMENT.. SERVICE LETTER MOS C6-JUN-2001 - Is) SL 737-SL-25-096 REV. B LOWER CARGO COMPARTMENT LINER AND FLOOR PANEL REPLACEMENT (SUPERSEDED BY SL 737-SL-25-096 REV. C), SERVICE LETTER MOS SL 737-SL-25-096 REV. C LOWER LOBE CARGO COMPARTMENT LINER AND FLOOR PANEL REPLACEMENT. SERVICE LETTER MOS 10-MAR-201 I INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL SUPERSEDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 252 Of 748 @ Camp Systems EFTA00618543 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-097 22-AUG-2001 SL 737-SL-25-098 27-JUL-2001 St 737-SL-25-099 REMOVAL OF FUSELAGE CARGO COMPARTMENT INSULATION BLANKETS. SERVICE LETTER MOS - Is) FLIGHT DECK SUITCASE RESTRAINT STRAP CLIP INSTALLATION. SERVICE LETTER INFORMATIONAL INFORMATIONAL MOS - FLIGHT DECK NO.2 SLIDING WINDOW UNING ASSEMBLY INTERFERENCE WITH CIRCUIT BREAKER PANEL. SERVICE INFORMATIONAL LETTER MOS 24-AUG-2001 - (s) SL 737-SL-25-100 24-SEP-2001 SL 737-SL-25-100 REV. A FORWARD CARGO LOADINGAJNLOADING PERCAUTIONS. SERVICE LETTER I3-OCT-2003 SL 737-SL-25-100 REV. B FORWARD CARGO LOADINGAJNLOADING PRECAUTIONS. SERVICE LETTER I7-OCT-2003 SL 737-SL-25-100 REV. 0 CARGO LOADING/UNLOADING PRECAUTIONS. SERVICE LETTER 25-SEP-2007 SL 737-SL-25-101 24-SEP-2001 - (s) SL 737-SL-25-103 03-JUN-2002 - SL 737-SL-25-104 29-MAY-2002 SL 737-SL-25-104 REV. A ATTENDANT SEAT MOUNTING BOLT MATERIAL. SERVICE LETTER MOS Of -JUL-2002 - FORWARD CARGO LOADINGAJNLOADING PRECAUTIONS. SERVICE LETTER INFORMATIONAL MOS INFORMATIONAL - Is) MOS MOS MOS ESCAPE ROPE "SHELLING'. SERVICE LETTER MOS SLIDING CARPET LOADING SYSTEM (SCLS) RAMP SEALING. SERVICE LETTER MOS ATTENDANT SEAT MOUNTING BOLT MATERIAL. SERVICE LETTER MOS - INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 253 Of 748 @ Camp Systems EFTA00618544 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-106 OUTBOARD GLARESHIELD LIGHTSHADE ASSEMBLY BREAKAGE.. SERVICE LETTER INFORMATIONAL MOS 03-OCT-2002 - Is) SL 737-SL-25-107 CLOSE OUT SEAL RETAINER. SERVICE LETTER INFORMATIONAL MOS I0-SEP-2002 SL 737-SL-25-107 REV. A CLOSE OUT SEAL RETAINER REPLACEMENT ON INTERIOR MONUMENTS. SERVICE LETTER INFORMATIONAL MOS 21-OCT-2002 SL 737-SL-25-108 CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD STOWAGE BIN AND FULL HEIGHT MONUMENTS. SERVICE INFORMATIONAL LETTER MOS I7-DEC-2002 SL 737-SL-25-108 REV. A CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD STOWAGE BIN AND FULL HEIGHT MONUMENTS. SERVICE INFORMATIONAL LETTER MOS 08-APR-2003 SL 737-SL-25-109 CABIN SIDEWALL AIR RETURN GRILLE INSTALLATION. SERVICE LETTER INFORMATIONAL MOS I5-MAY-2003 SL 737-SL-25-109 REV. A CABIN SIDEWALL AIR RETURN GRILLE INSTALLATION, SERVICE LETTER INFORMATIONAL MOS 02-JUL-2003 SL 737-SL-25-111 FLIGHT DECK DRIP-SHIELD DRAIN TUBE INTERFERENCE WITH THE NUMBER 2 WINDOW. SERVICE LETTER INFORMATIONAL MOS 27-OCT-2003 SL 737-SL-25-111 REV. A FLIGHT DECK DRIP-SHIELD DRAIN TUBE INTERFERENCE WITH THE NUMBER 2 WINDOW. SERVICE LETTER MOS 0I-FEB-2008 SL 737-SL-25-112 AFT CARGO COMPARTMENT BLOWOUT PANEL REPLACEMENT. SERVICE LETTER INFORMATIONAL MOS 30-MAR-2004 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 254 Of 748 @ Camp Systems EFTA00618545 flP Megnand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-114 REV. A ATTENDANT SEAT RUBSTRIPS. SERVICE LETTER INFORMATIONAL 51 31-MAR-2004 737-SL-25-115 REV. 8 MOS CARGO COMPARTMENT LINER TAPE AND FASTENERS. SERVICE LETTER 51 -JUL-2007 737-SL-25-116 REV. A MOS CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD STOWAGE BINS. SERVICE LETTER 51 76-DEC-2005 737-SL-25-116 REV. 8 MOS CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD STOWAGE BINS. SERVICE LETTER 51 30-MAR-2006 737-SL-25-117 REV. A MOS FORWARD CARGO CEILING PANEL PERMANENT REPAIR OPTIONS. SERVICE LETTER 51 04-JAN-2005 737-SL-25-118 MOS AVAILABILITY OF IMPROVED OXYGEN GENERATOR RELEASE PIN. SERVICE LETTER INFORMATIONAL 30-NOV-2004 MOS 51 737-SL-25-119 REV. A OVERHEAD STOWAGE BIN LATCH BEZEL CRACKING. SERVICE LETTER INFORMATIONAL NOT APPLICABLE - - 51 23-MAR-2005 737-SL-25-120 MOS IMPROVED CROWN INSULATION BLANKETS AT ANTENNAJLIGHT PENETRATIONS. SERVICE LETTER 51 29-MAR-2005 737-SL-25-120 REV. B MOS IMPROVED CROWN INSULATION BLANKETS AT ANTENNAJLIGHT PENETRATIONS. SERVICE LETTER 51 07-DEC-2005 737-SL-25-121 MOS OUST CONTAMINATION - LRU CLEANING PROCEDURES. SERVICE LETTER 51 72-JUL-2005 737-SL-25-122 MOS ATTENDANT SEAT FASTENERS. SERVICE LETTER NOT APPLICABLE 23-AUG-2005 MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 255 Of 748 @Camp Systems EFTA00618546 1y taM1pM„ Megnand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-123 REV. B AIR STAIRS HANDRAIL FITTING ATTACHMENT TO YRC FWD LAVATORY. SERVICE LETTER MOS 24 (s) 13-DEC-2005 SL 737-SL-25-124 NEW FLAMMABILITY REQUIREMENT FOR THERMAUACOUS11C INSULATION MATERIALS. SERVICE LETTER MOS 06-JAN-2006 SL 737-SL-25-124 REV. A NEW FLAMMABILITY REQUIREMENT FOR THERMAUACOUSTIC INSULATION MATERIALS. SERVICE LETTER MOS I3-APR-2006 SL 737-SL-25-125 GALLEY AIR CHILLER RELIABILITY IMPROVEMENTS, SERVICE LETTER MOS 28-APR-2006 SL 737-SL-25-125 REV. A GALLEY AIR CHILLER RELIABILITY IMPROVEMENTS, SERVICE LETTER MOS 30-AUG-2006 SL 737-SL-25-126 IMPROVING GALLEY REFRIGERATION PERFORMANCE AND RELIABILITY BEST PRACTICES. SERVICE LETTER MOS 15-MAR-2007 SL 737-SL-25-127 OVERHEAD STOWAGE BIN DOOR IMPROVEMENTS, SERVICE LETTER MOS Of-OCT-2007 SL 737-SL-25-128 CARGO COMPARTMENT BILGE TFUM, - FUSELAGE SKIN DAMAGE. SERVICE LETTER MOS 27-MAR-2008 SL 737-SL-25-130 CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD STOWAGE AND FULL HEIGHT MONUMENTS. SERVICE LETTER MOS 08-DEC-2008 SL 737-SL-25-130 REV. A CLOSE OUT SEAL REPLACEMENT BETWEEN OVERHEAD RECOMMENDED STOWAGE AND FULL HEIGHT MONUMENTS. SERVICE LETTER MOS 27-FEB-2009 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 256 Of 748 @Camp Systems EFTA00618547 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-131 POSSIBLE DAMAGE TO E4-1 RACK SHROUD DRAIN TUBE. SERVICE LETTER MOS 24-OCT-2008 SL 737-SL-25-132 GALLEY OVEN MODIFICATION. SERVICE LETTER MOS I9-DEC-2008 SL 737-SL-25-132 REV. A GALLEY OVEN MODIFICATION. SERVICE LETTER MOS I7-FEB-2009 SI. 737-SL-25-133 IMPROVED OXYGEN GENERATOR FITTING FOR 417N3011- SERIES PASSENGER SERVICE UNITS (SUPERSEDED BY SL 737-SL-25-133 REV. A). SERVICE LETTER MOS SUPERSEDED SL 737-SL-25-133 REV. A IMPROVED OXYGEN GENERATOR FITTING FOR 417N3011-SERIES PASSENGER SERVICE UNITS. SERVICE LETTER RECOMMENDED MOS I0-SEP-2010 SL 737-SL-25-134 GOODRICH 2110-SERIES FLIGHT ATTENDANT SEATBACK CRACKING. SERVICE LETTER 21-AUG-2009 SL 737-SL-25-135 31-AUG-2009 MOS INSULATION BLANKET REPAIR PROCEDURES - NEW THERMAL-ACOUSTIC INSULATION BLANKETS FOR FUSELAGE BURNTHROUGH STANDARDS. SERVICE LETTER MOS SL 737-SL-25-135 REV. A INSULATION BLANKET REPAIR PROCEDURES -NEW THERMAL-ACOUSTIC INSULATION BLANKETS FOR FUSELAGE BURNTHROUGH STANDARDS. SERVICE LETTER MOS 06-OCT-2009 RECOMMENDED RECOMMENDED SL 737-SL-25-136 SELL OVEN INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED MOS 23-SEP-2009 SL 737-SL-25-137 FLIGHT DECK SIDE GRILLE MODIFICATION. SERVICE LETTER RECOMMENDED MOS 23-SEP-2009 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 257 Of 748 @ Camp Systems EFTA00618548 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-137 REV. A 29-SEP-2009 SL 737-SL-25-138 19-OCT-2009 FLIGHT DECK SIDE GRILLE MODIFICATION. SERVICE LETTER MOS RESTRAINT SYSTEM WITH INERTIA REEL - MANUAL LOCK MAY BE INOPERABLE. SERVICE LETTER MOS SL 737-SL-25-138 REV. A RESTRAINT SYSTEM WITH INERTIA REEL - MANUAL LOCK MAY BE INOPERABLE. SERVICE LETTER MOS I I -NOV-2009 SL 737-SL-25-139 27-OCT-2009 SL 737-SL-25-140 23-DEC-2009 SL 737-SL-25-141 30-JUL-2010 SL 737-SL-25-142 SL 737-SL-25-142 REV. A 22-DEC-2010 SL 737-SL-25-143 23-DEC-2010 SL 737-SL-25-144 03-DEC-2010 RECOMMENDED RECOMMENDED RECOMMENDED DRIESSEN 61 GALLEY SHROUD COVER MODIFICATION. SERVICE LETTER RECOMMENDED MOS RESCU 406(5) ELT ANTENNA RADIATION ISSUE. SERVICE LETTER INFORMATIONAL MOS FOLD DOWN TABLE ASSEMBLY MECHANICAL LINKAGE. SERVICE LETTER RECOMMENDED MOS 737NG ESCAPE SLIDE VALISE RELEASE CABLE AND ASPIRATOR (SUPERSEDED BY SL 737-SL-25-142 REV. A). SUPERSEDED SERVICE LETTER MOS 737NG ESCAPE SLIDE VALISE RELEASE CABLE AND ASPIRATOR. SERVICE LETTER RECOMMENDED MOS LRU EQUIPMENT DECALS SWAPPED ON E1-5 SHELF FOR VHF NO.2 TRANSCEIVER AND DME NO.2 INTERROGATOR. RECOMMENDED SERVICE LETTER MOS ATTENDANT SERVICE UNIT - OXYGEN DOOR PANEL ASSEMBLY DESIGN IMPROVEMENT. SERVICE LETTER RECOMMENDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 258 Of 748 @ Camp Systems EFTA00618549 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-145 737 BSI OVERHEAD STOWAGE BIN BUCKET LATCH END ASSEMBLY FASTENERS. SERVICE LETTER RECOMMENDED MOS 12-MAY-2011 SL 737-SL-25-146 RETENTION OF OXYGEN DOOR LATCH ACTUATOR FOR 417N3011-SERIES PASSENGER SERVICE UNITS. SERVICE RECOMMENDED LETTER MOS 08-FEB-2012 SL 737-SL-25-148 EUROPEAN UNION (EU) RESTRICTION ON IMPORT OF CADMIUM IN PLASTICS. SERVICE LETTER RECOMMENDED MOS 19-DEC-2011 SL 737-SL-25-149 BSI PIVOT STOWAGE BIN TORQUE TUBE COVER FASTENERS (SUPERSEDED BY SL 5L737-SL-25-149 REV. A). SERVICE SUPERSEDED LETTER MOS SI. 737-SL-25-149 REV. A BSI PIVOT STOWAGE BIN TORQUE TUBE COVER FASTENERS (SUPERSEDED BY SL 737-SL-25-149 REV. B). SERVICE RECOMMENDED LETTER MOS 18-DEC-2012 SL 737-SL-25-149 REV. B BSI PIVOT STOWAGE BIN TORQUE TUBE COVER FASTENERS. SERVICE LETTER RECOMMENDED MOS 28-MAR-2013 SL 737-SL-25-150 HORIZONTAL BATWING TRIM DIS-BONDING BSI STOW BINS. SERVICE LETTER RECOMMENDED MOS 06-AUG-2012 SL 737-SL-25-152 FLIGHT DECK DRIP-SHIELD DRAIN TUBE INSTALLATION. SERVICE LETTER RECOMMENDED MOS 12-MAR-2013 SL 737-SL-25-153 BOEING SKY INTERIOR (BSI) - SEAT ROW MARKER (SUPERSEDED BY SL 737-SL-25-153 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-25-153 REV. A BOEING SKY INTERIOR (BSI) - SEAT ROW MARKER. SERVICE LETTER RECOMMENDED MOS 22-MAY-2013 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 259 Of 748 @ Camp Systems EFTA00618550 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-25-155 06-JUN-2013 SL 737-SL-25-156 YRC (YOKOHAMA RUBBER COMPANY) TOILET DOOR HANDLE MISSING LOCTITE. SERVICE LETTER MOS RECOMMENDED 2ND OBSERVERS SEAT: REPLACEMENT OF THE FWD ATTACH BOLTS AND THE ATTACHMENT SCREWS IN THE FLT SUPERSEDED DECK CLOSET (SUPERSEDED BY 737-SL-25-156 REV. A). SERVICE LETTER MOS SL 737-SL-25-156 REV. A 2ND OBSERVERS SEAT: REPLACEMENT OF THE FWD ATTACH BOLTS AND THE ATTACHMENT SCREWS IN THE FLT RECOMMENDED DECK CLOSET. SERVICE LETTER MOS 30-JAN-2014 SL 737-SL-25-157 CONNECTOR BACKSHELL POTENTIALLY RIDING BSI CEILING PANEL. SERVICE LETTER RECOMMENDED 81OS 02-JUN-2014 - (s) SL 737-SL-25-159 INTRODUCTION OF IMPROVED SIDEWALL WINDOW SHADES (SUPERSEDED BY SL 737-SL-25-159 REV. A). SERVICE SUPERSEDED LETTER 81OS SL 737-SL-25-159 REV. A INTRODUCTION OF IMPROVED SIDEWALL WINDOW SHADES. SERVICE LETTER RECOMMENDED MOS 16-MAY-2014 SL 737-SL-25-160 BOEING SKY INTERIOR (BSI) - PASSENGER WINDOW REVEAL SHARP EDGE. SERVICE LETTER RECOMMENDED MOS 03-MAR-2014 SL 737-SL-26-037 FORWARD ATTENDANT PANEL - LAVATORY SMOKE DETECTOR MODULE IMPROVEMENTS. SERVICE LETTER INFORMATIONAL MOS 09-AUG-2000 - (s) SL 737-SL-26-037 REV. A FORWARD ATTENDANT PANEL- LAVATORY SMOKE DETECTOR MODULE IMPROVEMENTS. SERVICE LETTER RECOMMENDED MOS 07-DEC-2000 - (s) SL 737-SL-26-038 CFM56-78 FIRE DETECTION HARNESS IMPROVEMENT. SERVICE LETTER RECOMMENDED MOS 14-MAR-2001 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 260 Of 748 @ Camp Systems EFTA00618551 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-26-040 22-APR-2002 PORTABLE WATER FIRE EXTINGUISHERS. SERVICE LETTER MOS - Is) INFORMATIONAL SL 737-SL-26-042 PORTABLE WATER FIRE EXTINGUISHERS MISSING PIERCER. SERVICE LETTER INFORMATIONAL MOS 13-JUN-2002 - (s) SL 737-SL-26-043 RECALL OF KIDDE AEROSPACE PORTABLE HALON 1211 FIRE EXTINGUISHERS-P/N 898052. SERVICE LETTER INFORMATIONAL COMPUED WITH MOS 15-FEB-2004 05-NOV-2002 -Is) 1579:18 AFL 398 SL 737-SL-26-044 INCORRECT INSTALLATION OF ENGINE FIRE EXTINGUISHING HOSE MAY PREVENT AGENT FLOW TO ENGINE. INFORMATIONAL COMPUED WITH SERVICE LETTER MOS 15-FEB-2004 17-DEC-2003 1579:18 AFL 398 SL 737-SL-26-045 CARGO COMPARTMENT FIRE SUPPRESSION BOTTLE REQUIREMENTS. SERVICE LETTER INFORMATIONAL MOS 18-AUG-2004 SL 737-SL-26-046 LAVATORY FIRE EXTINGUISHER EXTINGUISHING AGENT REPLACEMENT. SERVICE LETTER MOS 20-SEP-2006 SL 737-SL-26-046 REV. A LAVATORY FIRE EXTINGUISHER EXTINGUISHING AGENT REPLACEMENT. SERVICE LETTER MOS 27-FEB-2007 SL 737-SL-26-047 ENGINE FIRE LIGHT ILLUMINATION. SERVICE LETTER MOS 27-NOV-2006 SL 737-SL-26-048 CARGO FIRE EXTINGUISHER -METERING ASSEMBLY/DRIER DISC RUPTURE. SERVICE LETTER 09-NOV-2007 SL 737-SL-26-049 14-NOV-2007 MOS IMPROPERLY TORQUED APU LOWER FIRE DETECTOR SENSOR, SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 261 Of 748 @ Camp Systems EFTA00618552 CAMP Asiant.fran Atna: up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-26-049 REV. A IMPROPERLY TORQUED APU LOWER FIRE DETECTOR SENSOR. SERVICE LETTER 51 24-JAN-2008 737-SL-26-050 MOS CARD CONTAMINATION IN FIRE DETECTION MODULES. SERVICE LETTER 03-DEC-2008 MOS 51 737-SL-26-051 CONTAMINATED HALON 1211 FIRE EXTINGUISHERS. SERVICE LETTER INFORMATIONAL 23-DEC-2009 MOS 51 737-SL-26-051 REV. A CONTAMINATED HALON 1211 FIRE EXTINGUISHERS. SERVICE LETTER INFORMATIONAL 08-FEB-2010 MOS 51 737-SL-26-052 WASHERS ON APU FIRE DETECTOR CLAMPS INADVERTENTLY OMITTED (SUPERSEDED BY SL SL 737-SL-26-052 REV. SUPERSEDED A). SERVICE LETTER MOS 51 737-SL-26-052 REV. A WASHERS ON APU FIRE DETECTOR CLAMPS INADVERTENTLY OMITTED. SERVICE LETTER RECOMMENDED 10-JAN-2011 MOS 51 737-SL-26-054 POSSIBLE OVERHEAT SENSOR BRACKET DISCREPANCY. SERVICE LETTER RECOMMENDED 14-MAY-2012 MOS 51 737-SL-26-055 WING(BODY OVERHEAT FAULTS DUE TO FENWAL CONNECTORS. SERVICE LETTER RECOMMENDED I9-JUN-2012 MOS 51 737-SL-26-056 APU FIRE DETECTOR PART MARK INCORRECT. SERVICE LETTER RECOMMENDED 23-MAY-20I3 MOS 51 737-SL-27-079 REV. A MACH TRIM FLAPS UP. AND LANDING WARNING SWITCH IMPROVEMENT. SERVICE LETTER INFORMATIONAL 51 10-APR-2003 737-SL-27-079 REV. F MOS NEW S138 LAND WARNING. S245 FLAP POSITION. S290 MACH TRIM WARNING. AND S1051 FLAPS UP SWITCHES. 08-FEB-2005 SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 262 Of 748 @ Camp Systems EFTA00618553 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-124 STALL MANAGEMENT/ YAW DAMPER MODULE ASSY MODIFICATION. SERVICE LETTER INFORMATIONAL MOS 23-FEB-1999 - Is) SL 737-SL-27-126 REV. A PERIODIC OPERATIONAL VERIFICATION OF THE ELEVATOR TAB CONTROL SYSTEM. SERVICE LETTER RECOMMENDED I3-NOV-2000 MOS - (s) SL 737-SL-27-130 REV. A STABILIZER TRIM ACTUATOR CMR RETROFIT PROCEDURE. SERVICE LETTER INFORMATIONAL MOS 06-AUG-1999 - Is) SL 737-SL-27-131 ELEVATOR TAB ROD HI-LOK INTERFERENCE WITH STRUCTURE. SERVICE LETTER INFORMATIONAL I8-DEC-1998 MOS - SL 737-SL-27-131 REV. A ELEVATOR TAB ROD HI-LOK INTERFERENCE WITH STRUCTURE. SERVICE LETTER INFORMATIONAL MOS I 7-JUN-1999 - 51 737-SL-27-132 INSPECTION OF FLEXIBLE HOSES BETWEEN ELEVATOR FEEL PITOT PROBES AND RIGID METAL TUBING. SERVICE INFORMATIONAL LETTER MOS I8-DEC-1998 - (s) SL 737-SL-27-133 ELEVATOR TAB CONTROL ROD NUT REPLACEMENT. SERVICE LETTER INFORMATIONAL MOS I8-JAN-1999 - (s) SL 737-SL-27-134 REV. A TRAILING EDGE FLAP ALTERNATE DRIVE MOTOR DESIGN IMPROVEMENTS. SERVICE LETTER MOS 27-MAR-2007 SL 737-SL-27-136 ELEVATOR CONTROL CABLE CLEARANCE INSPECTION. SERVICE LETTER INFORMATIONAL MOS 31-MAR-1999 - (s) SL 737-SL-27-137 REV. B ELEVATOR TAB PIVOT BOLT WASHER OMISSION. SERVICE LETTER INFORMATIONAL MOS 03-NOV-2000 - (s) SL 737-SL-27-138 AILERON TAB CONTROL ROD CONNECTING BARREL. SERVICE LETTER INFORMATIONAL MOS 31-MAR-1999 -(s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 263 Of 748 @ Camp Systems EFTA00618554 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-139 ELEVATOR CONTROLS-FORWARD QUADRANT INTERFERENCE. SERVICE LETTER MOS I6-APR-1999 - Is) SL 737-SL-27-140 FLIGHT CONTROLS-ELEVATOR BUSS INSTALLATION-RIVET INTERFERENCE. SERVICE LETTER MOS 13-SEP-1999 23-APR-1999 - SL 737-SL-27-140 REV. A FLIGHT CONTROLS-ELEVATOR BUSS INSTALLATION-RIVET INTERFERENCE. SERVICE LETTER MOS I7-MAY-1999 - (s) SL 737-SL-27-140 REV. B FLIGHT CONTROLS-ELEVATOR BUSS INSTALLATION-RIVET INTERFERENCE. SERVICE LETTER MOS I6-JUN-1999 - SL 737-SL-27-141 AILERON WING CONTROL CABLE ROUTING INSPECTION. SERVICE LETTER MOS 18 (s) 13-SEP-1999 I3-JUL-I 999 AFL 4000 SL 737-SL-27-142 ELEVATOR FEEL COMPUTER DISCREPANT O RINGS, SERVICE LETTER MOS 14-JUL-I 999 - (s) SL 737-SL-27-143 AILERON SPRING CARTRIDGE BOLTINTERFERENCE. SERVICE LETTER MOS 07-SEP-1999 - (s) SL 737-SL-27-147 REV. A RUDDER CONTROL AFT QUADRANT ATTACHMENT FASTENERS UNDERTOROUED.. SERVICE LETTER MOS 08-DEC-1999 - (s) SL 737-SL-27-148 INABILITY TO MOVE WING LEADING EDGE DEVICE. SERVICE LETTER MOS 21-DEC-1999 - (s) SL 737-SL-27-148 REV. A INABILITY TO MOVE WING LEADING EDGE DEVICES, SERVICE LETTER MOS 01-MAR-2005 SL 737-SL-27-149 RUDDER CONTROL AFT QUADRANT ATTACHMENT FASTENERS UNDERTOROUED.. SERVICE LETTER MOS 11 -JUN-2000 - INFORMATIONAL INFORMATIONAL COMPLIED WITH - CM INFORMATIONAL INFORMATIONAL INFORMATIONAL COMPLIED WITH - CM RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED INFORMATIONAL RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 264 Of 748 @ Camp Systems EFTA00618555 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-149 REV. A CONTROLS-AILERON CABLE PULLEY INSTALLATION-INTERFERNCE. SERVICE LETTER 21-FEB-2000 MOS - Is) St 737-SL-27-150 ELEVATOR POWER CONTROL UNIT LINKAGE INSPECTION, SERVICE LETTER MOS I 7-APR-2000 I4-FEB-2000 - (s) St 737-SL-27-150 REV. A ELEVATOR POWER CONTROL UNIT LINKAGE INSPECTION. SERVICE LETTER MOS I4-FEB-2001 - (s) St 737-SL-27-150 REV. B ELEVATOR POWER CONTROL UNIT LINKAGE- INSPECTION.. SERVICE LETTER MOS I2-MAY-2000 -(s) St 737-SL-27-152 STABILIZER TRIM MOTOR IMPROVEMENTS. SERVICE LETTER MOS 27-JUL-2000 - St 737-SL-27-153 TRAILING EDGE FLAP TORQUE TUBE COUPLING AND U-JOINT LUBRICATION. SERVICE LETTER MOS 03-OCT-2000 - (s) St 737-SL-27-154 REPLACEMENT OF ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING. SERVICE LETTER MOS I3-OCT-2000 - (s) St 737-SL-27-154 REV. A REPLACEMENT OF ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING. SERVICE LETTER MOS I 7-NOV-2000 - (s) St 737-SL-27-154 REV. B REPLACEMENT OF ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING. SERVICE LETTER MOS I8-APR-2001 - (s) St 737-SL-27-154 REV. C REPLACEMENT OF ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING, SERVICE LETTER MOS 27-APR-2001 - Is) St 737-SL-27-154 REV. D ELEVATOR CONTROL SYSTEM - ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING. SERVICE LETTER MOS I6-NOV-2001 - (s) RECOMMENDED RECOMMENDED COMPUED WITH - CM INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 265 Of 748 @ Camp Systems EFTA00618556 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-154 REV. E ELEVATOR CONTROL SYSTEM - ELEVATOR OUTPUT TOROUE TUBE CONTROL CRANK BEARING. SERVICE LETTER MOS I5-OCT-2007 SL 737-SL-27-154 REV. F ELEVATOR CONTROL SYSTEM - ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING. SERVICE LETTER MOS 27-OCT-2009 RECOMMENDED SL 737-SL-27-154 REV. G ELEVATOR CONTROL SYSTEM- ELEVATOR OUTPUT TORQUE SUPERSEDED TUBE CONTROL CRANK BEARING (SUPERSEDED BY SL 737-SL-27-154 REV. H). SERVICE LETTER MOS SL 737-SL-27-154 REV. H ELEVATOR CONTROL SYSTEM - ELEVATOR OUTPUT TORQUE TUBE CONTROL CRANK BEARING, SERVICE LETTER RECOMMENDED MOS I3-JUL-2011 SL 737-SL-27-155 ELEVATOR TAB SOLENOID VALVE REPLACEMENT. SERVICE LETTER INFORMATIONAL MOS I 7-NOV-2000 - (s) SL 737-SL-27-155 REV. A ELEVATOR TAB SOLENOID VALVE REPLACEMENT. SERVICE LETTER INFORMATIONAL MOS I3-APR-2001 - (s) SI. 737-SL-27-156 STABILIZER TRIM CABLE GUARD INTERFERENCE WITH AUTOTHROTTLE MECHANISMMOUNTING FLANGE. SERVICE INFORMATIONAL LETTER MOS 79-DEC-2000 - (s) SL 737-SL-27-159 STANDBY RUDDER PCU REACTION BEARING INCORRECTLY SWAGED. SERVICE LETTER INFORMATIONAL MOS I6-JAN-2001 - (s) SL 737-SL-27-160 AILERON POWER CONTROL SUPPORT ARM INTERFERENCE WITH HYDRAULIC HOSE. SERVICE LETTER INFORMATIONAL MOS 07-MAY-2001 - (s) SL 737-SL-27-162 STALL MANAGEMENT/YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO.1. 1,401748 NO.2. P/N 285A1010. INFORMATIONAL SERVICE LETTER MOS I9-OCT-2001 -(s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 266 Of 748 @ Camp Systems EFTA00618557 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-162 REV. A STALL MANAGEMENT/ YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO.1. M01748 NO.2. PIN 285A1010. INFORMATIONAL SERVICE LETTER MOS 12-APR-2002 - Is) SL 737-SL-27-162 REV. B STALL MANAGEMENT/YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO.1. M01748 NO.2. PIN 285A1010. INACTIVE SERVICE LETTER 08-MAR-2004 MOS SL 737-SL-27-164 INSPECTION FOR BENT CLEVIS ON ELEVATOR FEEL AND CENTERING BRACKET SUPPORT. SERVICE LETTER INFORMATIONAL MOS 02-MAY-2002 - (s) SL 737-SL-27-164 REV. A INSPECTION FOR BENT CLEVIS ON ELEVATOR FEEL AND CENTERING BRACKET SUPPORT. SERVICE LETTER INFORMATIONAL MOS 16-DEC-2004 SL 737-SL-27-165 P2-3 LANDING GEAR PANEL ASSEMBLIES - DISCREPANT FLAP PLACARD SPEEDS. SERVICE LETTER INFORMATIONAL MOS I2-APR-2002 - (s) SL 737-SL-27-167 CONTROL COLUMN NEEDLE BEARING CORROSION. SERVICE LETTER INFORMATIONAL MOS I I -DEC-2002 SL 737-SL-27-169 LUBRICATION OMITTED FROM THE ROD END ASSEMBLY FOR THE FLIGHT SPOILER ACTUATOR. SERVICE LETTER INFORMATIONAL MOS I I -DEC-2002 SL 737-SL-27-169 REV. A LUBRICATION OMITTED FROM THE ROD END ASSEMBLY FOR THE FLIGHT SPOILER ACTUATOR. SERVICE LETTER INFORMATIONAL MOS 29-OCT-2003 SL 737-SL-27-170 TRAILING EDGE FLAP AND SPOILER HANDLE-LUBRICATION. SERVICE LETTER INFORMATIONAL MOS I8-DEC-2002 SL 737-SL-27-171 ELEVATOR CONTROL CABLE INSPECTION. SERVICE LETTER INFORMATIONAL MOS 21-JAN-2003 SL 737-SL-27-171 REV. A ELEVATOR CONTROL CABLE INSPECTION-INSUFFICIENT CLEARANCE. SERVICE LETTER INFORMATIONAL MOS 29-SEP-2003 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 267 Of 748 @ Camp Systems EFTA00618558 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-172 MOUNTING BRACKET FASTENERS INCORRECTLY INSTALLED. SERVICE LETTER INFORMATIONAL 02-JAN-2003 MOS SL 737-SL-27-173 ELEVATOR CABLE PULLEY NUT AND BOLT INSTALLATION-POTENTIAL FOR LOW TORQUE VALUE. SERVICE LETTER INFORMATIONAL MOS 01-AUG-2003 SL 737-SL-27-174 AILERON AND SPEED BRAKE CONTROL CABLE LOW TENSION. SERVICE LETTER INFORMATIONAL MOS 18-AUG-2003 SL 737-SL-27-175 AUTOPILOT ACTUATOR MOUNTING BOLTS-TORQUE INSPECTION. SERVICE LETTER INFORMATIONAL MOS 07-JUL-2003 SL 737-SL-27-175 REV. A AUTOPILOT ACTUATOR MOUNTING BOLTS-TORQUE INSPECTION. SERVICE LETTER INFORMATIONAL MOS 23-DEC-2003 SL 737-SL-27-176 AILERON CONTROL CABLE HIGH TENSION. SERVICE LETTER INFORMATIONAL MOS 13-JAN-2004 SL 737-SL-27-177 REV. A AILERON SPRING CARTRIDGE ANOMALIES. SERVICE LETTER INFORMATIONAL MOS 23-MAR-2004 SL 737-SL-27-178 REV. B TRAILING EDGE FLAP POWER DRIVE UNIT (POU) GEARBOX-NEW RETAINER WITH EXCLUDER SEAL. SERVICE LETTER INFORMATIONAL MOS 30-SEP-2004 SL 737-SL-27-178 REV. C TRAILING EDGE FLAP POWER DRIVE UNIT (POU) GEARBOX - NEW RETAINER WITH EXCLUDER SEAL (SUPERSEDED SUPERSEDED BY St 737-SL-27-178 REV. O). SERVICE LETTER 51OS SL 737-SL-27-178 REV. D TRAILING EDGE FLAP POWER DRIVE UNIT (POU) GEARBOX-NEW EXCLUDER SEAL. SERVICE LETTER RECOMMENDED MOS 30-NOV-2012 SL 737-SL-27-179 REV. A LEADING EDGE SLAT POSITION SENSOR INSTALLATION-POSSIBLE MIS-ORIENTATION ALLOWS WIRE BUNDLE INFORMATIONAL CHAFING. SERVICE LETTER MOS 15-JUL-2004 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 268 Of 748 @ Camp Systems EFTA00618559 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-179 REV. B LEADING EDGE SLAT POSITION SENSOR INSTALLATION-POSSIBLE MIS-ORIENTATION ALLOWS WIRE BUNDLE CHAFING. SERVICE LETTER MOS 20-JUL-2004 51 737-SL-27-179 REV. C LEADING EDGE SLAT POSITION SENSOR INSTALLATION - POSSIBLE MIS-ORIENTATION ALLOWS WIRE BUNDLE CHAFING.. SERVICE LETTER MOS 26-APR-2005 51 737-SL-27-180 FLIGHT SPOILER PCU LEAKAGE DUE TO INCORRECT PISTON ROD SEAL. SERVICE LETTER MOS 04-AUG-2004 RECOMMENDED 51 737-SL-27-181 RUDDER SYSTEM ENHANCEMENT PROGRAM SERVICE BULLETIN-INCORRECT WIRE IN KIT. SERVICE LETTER INFORMATIONAL MOS I3-JUL-2004 51 737-SL-27-181 REV. A RUDDER SYSTEM ENHANCEMENT PROGRAM SERVICE BULLETIN - INCORRECT WIRE IN KIT. SERVICE LETTER MOS 25-MAY-2006 51 737-SL-27-182 ELEVATOR FEEL SHIFT MODULE FILLET SEAL INSPECTION. SERVICE LETTER INFORMATIONAL MOS II -OCT-2004 51 737-SL-27-183 ELEVATOR FEEL COMPUTER DISCLOSURE - OVERTOROUED FASTENERS. SERVICE LETTER INFORMATIONAL MOS I4-DEC-2004 51 737-SL-27-184 FLIGHT CONTROLS IN MAIN WHEEL WELL - CHANGES TO THE FINISH OF CADMIUM PLATED COMPONENTS.. SERVICE LETTER MOS 27-MAY-2005 SL 737-SL-27-184 REV. A FLIGHT CONTROLS IN MAIN WHEEL WELL - CHANGES TO THE FINISH OF CADMIUM PLATED COMPONENTS. SERVICE LETTER MOS I 3-DEC-2007 SL 737-SL-27-184 REV. 8 FLIGHT CONTROLS IN MAIN WHEEL WELL - CHANGES TO THE FINISH OF CADMIUM PLATED COMPONENTS. SERVICE LETTER MOS 19-JAN-2010 RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 269 Of 748 @ Camp Systems EFTA00618560 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-185 07-DEC-2005 51 737-SL-27-185 REV. A RUDDER PEDAL ADJUSTMENT SHAFT. SERVICE LETTER 07-AUG-2066 SL 737-SL-27-186 TRAILING EDGE FLAP HANDLE HARD TO ROTATE - PULLEY AND CABLE CHECK. SERVICE LETTER MOS RUDDER PEDAL ADJUSTMENT SHAFT. SERVICE LETTER MOS MOS INFORMATIONAL 29-AUG-2005 SL 737-SL-27-186 REV. A TRAILING EDGE FLAP HANDLE HARD TO ROTATE - PULLEY AND CABLE CHECK. SERVICE LETTER MOS 09-APR-2007 SL 737-SL-27-186 REV. B TRAILING EDGE FLAP HANDLE HARD TO ROTATE - PULLEY AND CABLE CHECK. SERVICE LETTER COMPLIED WITH MOS 22-AUG-2008 I9-JUN-2007 3260:48 AFL 782 SL 737-SL-27-186 REV. C TRAILING EDGE FLAP HANDLE HARD TO ROTATE - PULLEY AND CABLE CHECK. SERVICE LETTER MOS 0I-APR-2009 RECOMMENDED SL 737-SL-27-188 AILERON CONTROL CABLE TENSION INSPECTION (SUPERSEDED BY 737-SL-27-188 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-27-188 REV. A AILERON CONTROL CABLE TENSION INSPECTION. SERVICE LETTER MOS SL 737-SL-27-189 09-JAN-2006 SL 737-SL-27-190 09-FEB-2006 TRAILING EDGE FLAP BALLSCREW - MIXED GREASE. SERVICE LETTER MOS STABILIZER TRIM MOTOR - EMI FILTER SUPPLIER CHANGE. SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 270 Of 748 @ Camp Systems EFTA00618561 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-191 09-MAR-2006 SUSPECT CONTROL COLUMN WIRE BUNDLES. SERVICE LETTER MOS SL 737-SL-27-191 REV. A SUSPECT CONTROL COLUMN WIRE BUNDLES. SERVICE LETTER MOS 06-JUN-2006 SL 737-SL-27-191 REV. 8 SUSPECT CONTROL COLUMN WIRE BUNDLES. SERVICE LETTER MOS 22-MAR-2007 SL 737-SL-27-191 REV. C SUSPECT CONTROL COLUMN WIRE BUNDLES. SERVICE LETTER MOS 27-AUG-2007 51 737-SL-27-192 INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE LETTER MOS 17-JUL-2006 51 737-SL-27-192 REV. A INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE LETTER MOS 01-SEP-2006 SI. 737-SL-27-192 REV. 8 INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE LETTER MOS 22-MAR-2007 SI. 737-SL-27-192 REV. C INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE LETTER MOS 10-APR-2007 SI. 737-SL-27-192 REV. 0 INSPECTION OF MACH TRIM TORQUE TUBE FOR OVERSIZED FASTENER HOLES OR EXCESSIVE FREEPLAY. SERVICE LETTER MOS 24-JUL-2007 SI. 737-SL-27-19a STALL MANAGEMENT/YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO. 1. M01748 NO. 2. PM 285A1010. SERVICE LETTER MOS 10-AUG-2006 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 271 Of 748 @ Camp Systems EFTA00618562 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-193 REV. A STALL MANAGEMENT/ YAW DAMPER MODULE ASSEMBLY MODIFICATION. M01747 NO. 1. MO I 748 NO. 2. PIN 285A1010. SERVICE LETTER MOS 27-JUL-2007 51 737-SL-27-195 ELEVATOR FEEL COMPUTER INPUT ROD WASHER INSTALLATION DISCREPANCY. SERVICE LETTER MOS I6-NOV-2006 SL 737-SL-27-195 REV. A ELEVATOR FEEL COMPUTER INPUT ROD WASHER INSTALLATION DISCREPANCY. SERVICE LETTER 24-JUL-2007 SL 737-SL-27-196 22-FEB-2007 MOS 22-AUG-2008 3260:48 AFL 782 TRAILING EDGE FLAP POSITION TRANSMITTER AND SKEW SENSOR CONNECTOR - WATER INGRESS. SERVICE LETTER MOS 51 737-SL-27-196 REV. A TRAILING EDGE FLAP POSITION TRANSMITTER AND SKEW SENSOR CONNECTOR - WATER INGRESS. SERVICE LETTER MOS 09-APR-2007 SL 737-SL-27-196 REV. 8 TRAILING EDGE FLAP POSITION TRANSMITTER AND SKEW SENSOR CONNECTOR - WATER INGRESS. SERVICE LETTER MOS I5-FEB-2008 SL 737-SL-27-198 10-APR-2007 51 737-SL-27-199 05-NOV-2007 SL 737-SL-27-200 19-OCT-2007 NOSE DOWN STAB TAKE-OFF WARNING SWITCH (S-546) PLACARD AND STAB NOSE DOWN LIMIT SWITCH (S-145) PLACARD INSTALLED INCORRECTLY. SERVICE LETTER MOS RUDDER TRIM INDICATOR - ERRATIC OR STUCK NEEDLE. SERVICE LETTER MOS WSA1 SPOILER CABLE MAY HAVE A MINIMAL RIDING CONDITION ON THE UPPER SIDE OF THE LOWER PULLEY OF THE 251A1411.6 SPOILER TURNAROUND PULLEY BRACKET. SERVICE LETTER MOS COMPUED WITH - IAW THE 58 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 272 Of 748 @ Camp Systems EFTA00618563 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-201 24-JAN-2008 LATERAL TRIM - AIRPLANE CONFIGURATION HISTORY AND CORRECTION. SERVICE LETTER MOS SL 737-SL-27-202 ELEVATOR FEEL COMPUTER - INSPECTION FOR FEEL COMPUTER RETURN SPRING. SERVICE LETTER MOS 24-JAN-2008 SL 737-SL-27-203 TROUBLESHOOTING FOR HIGH CONTROL WHEEL AND COLUMN FORCES. SERVICE LETTER MOS 24-JAN-2008 SL 737-SL-27-203 REV. A TROUBLESHOOTING FOR HIGH CONTROL WHEEL AND SUPERSEDED COLUMN FORCES (SUPERSEDED BY SL 737-SL-27-203 REV. B). SERVICE LETTER MOS SL SL 737-SL-27-203 REV. B 16-NOV-2012 737-SL-27-204 27-MAR-2008 TROUBLESHOOTING FOR HIGH CONTROL WHEEL AND COLUMN FORCES, SERVICE LETTER MOS SPEEDBRAKE GROUND PROXIMITY SENSOR ADJUSTMENT, SERVICE LETTER MOS RECOMMENDED SL 737-SL-27-205 ELEVATOR FEEL COMPUTER INPUT ROD FASTENER INSTALLATION DISCREPANCY. SERVICE LETTER MOS 18-JUL-2008 SL 737-SL-27-206 POSSIBLE CONTAMINATION OF STANDBY RUDDER PCU. SERVICE LETTER RECOMMENDED MOS 18-AUG-2009 SL 737-SL-27-207 SPEED BRAKE BRACKET ASSEMBLY -CABLE RETAINER BOLTS - TORQUE INSPECTION. SERVICE LETTER MOS 20-OCT-2008 SL 737-SL-27-208 SPOILER BRACKET MOUNTING BOLTS - TORQUE INSPECTION. SERVICE LETTER MOS 20-OCT-2008 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 273 Of 748 @ Camp Systems EFTA00618564 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-209 ELEVATOR POSITION SENSOR INSTALLATION - IMPROPER FASTENER TORQUE (SUPERSEDED BY SL 737-SL-27-209 REV. A). SERVICE LETTER MOS SUPERSEDED SL 737-SL-27-209 REV. A ELEVATOR POSITION SENSOR INSTALLATION - IMPROPER FASTENER TORQUE, SERVICE LETTER RECOMMENDED 22-MAR-2011 MOS SL 737-SL-27-210 19-AUG-2009 POSSIBLE CONTAMINATION OF AILERON/ELEVATOR PCU, SERVICE LETTER MOS RECOMMENDED SI. 737-SL-27-211 AIRPLANE PITCH UPSETS DURING MANUAL REVERSION TEST RECOMMENDED FLIGHTS DUE TO INCORRECT ADJUSTMENT OF ELEVATOR TAB PUSHRODS. SERVICE LETTER MOS OS-MAY-2009 a 737-SL-27-212 HORIZONTAL STABILIZER LIMIT AND WARNING SWITCH SUPERSEDED INSTALLATION (SUPERSEDED BY SL 737-SL-27-212 REV. A). SERVICE LETTER MOS a 737-SL-27-212 REV. A HORIZONTAL STABILIZER LIMIT AND WARNING SWITCH INSTALLATION (SUPERSEDED 8Y SL 737-SL-27-230 AND SL SUPERSEDED 737-SL-31-057). SERVICE LETTER MOS SL 737-SL-27-214 HORIZONTAL STABILIZER TRIM ACTUATOR- LOWER PLUG RECOMMENDED ASSEMBLY - OVER-SIZED 0 -RING GROOVE. SERVICE LETTER MOS 30-JUN-2009 SL 737-SL-27-215 LEAKAGE OF ELEVATOR TAB LOCK ACTUATORS ON SUPERSEDED RECENTLY DELIVERED AIRPLANES (SUPERSEDED BY SL 737-SL-27-215 REV. A). SERVICE LETTER MOS SL 737-SL-27-215 REV. A LEAKAGE OF ELEVATOR TAB LOCK ACTUATORS ON RECENTLY DELIVERED AIRPLANES. SERVICE LETTER RECOMMENDED MOS 04-DEC-2013 SL 737-SL-27-216 STABILIZER POSITION SENSOR INPUT ROD WASHER RECOMMENDED INSTALLATION DISCREPANCY. SERVICE LETTER MOS OS-NOV-2009 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 274 Of 748 @ Camp Systems EFTA00618565 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-217 ELEVATOR SYSTEM COMPONENTS FASTENERS UNDERTOROUED. SERVICE LETTER RECOMMENDED MOS 08-DEC-2009 SL 737-SL-27-218 GROUND SPOILER INTERLOCK VALVE END PLATE ASSEMBLY RECOMMENDED INSTALLED UPSIDE DOWN. SERVICE LETTER MOS 07-JAN-2010 SL 737-SL-27-219 737NG FLAP/SLAT ELECTRONICS UNIT (FSEU) (M01746) - HISTORY. APPLICABILITY AND INTERCHANGEABILITY. SERVICE LETTER MOS 07-MAY-2010 SL 737-SL-27-220 AILERON CENTERING MECHANISM PIN DELIVERED WITHOUT REQUIRED SURFACE COATING. SERVICE LETTER RECOMMENDED MOS 26-JUL-2010 SL 737-SL-27-221 INCORRECT USE OF CAD PLATED SCREWS WITH TITANIUM PROXIMITY SENSOR P/N 80-207-01 ON WING LEADING RECOMMENDED EDGE. SERVICE LETTER MOS 20-AUG-2010 SL 737-SL-27-222 AILERON CENTERING MECHANISM LEVER DELIVERED WITH MINOR ASSEMBLY DAMAGE, SERVICE LETTER RECOMMENDED MOS 20-SEP-2010 SL 737-SL-27-223 GROUND SPOILER INTERLOCK VALVE IMPROVEMENTS. SERVICE LETTER RECOMMENDED MOS 14-OCT-2010 SL 737-SL-27-224 RUDER PCU - DAMAGE SUMMING LEVER BOLTS. SERVICE LETTER RECOMMENDED MOS 05-NOV-2010 SL 737-SL-27-225 6355C0001-01 STABILIZER TRIM MOTOR - MODIFICATION HISTORY (SUPERSEDED 8Y 737-SL-27-225 REV. A). SERVICE SUPERSEDED LETTER MOS SL 737-SL-27-225 REV. A 6355C0001-01 STABILIZER TRIM MOTOR- MODIFICATION HISTORY, SERVICE LETTER RECOMMENDED MOS 30-JAN-2014 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 275 Of 748 @ Camp Systems EFTA00618566 COMP Astant.frar• Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-226 STICK SHAKER MOTOR GROUND TERMINAL INSPECTION (SUPERSEDED BY SL 737-SL-27-226 REV. A). SERVICE LETTER MOS SUPERSEDED SL 737-SL-27-226 REV. A STICK SHAKER MOTOR GROUND TERMINAL INSPECTION (SUPERSEDED BY SL 737-SL-27-226 REV. B). SERVICE SUPERSEDED LETTER MOS SL 737-SL-27-226 REV. B 08-JUN-2012 STICK SHAKER MOTOR GROUND TERMINAL INSPECTION. SERVICE LETTER MOS RECOMMENDED SL 737-SL-27-227 RUDDER FEEL AND CENTERING INSTALLATION - FASTENERS UNDERTOROUED. SERVICE LETTER RECOMMENDED 17-NOV-2010 MOS SL 737-SL-27-228 TRAILING EDGE FLAP BALLSCREWS-IN-SERVICE WEAR. SERVICE LETTER RECOMMENDED 15-NOV-2010 MOS SI. 737-SL-27-229 737NG LEADING EDGE CRUISE DEPRESSURIZATION VALVE N00163). INCORRECTLY APPLIED INSTALLATION RECOMMENDED 16-DEC-2010 SEALANT. SERVICE LETTER MOS SL 737-SL-27-230 HORIZONTAL STABILIZER LIMIT SWITCH INSTALLATION (SUPERSEDED BY SL 737-SL-27-230 REV. A). SERVICE LETTER RECOMMENDED 31-MAR-2011 MOS SL 737-SL-27-230 REV. A HORIZONTAL STABILIZER LIMIT SWITCH INSTALLATION. SERVICE LETTER RECOMMENDED 08-FEB-20IS MOS SL 737-SL-27-231 GROUND STUD DECAL GD1086ST INCORRECTLY LABELED (SUPERSEDED BY SL 737-SL-27-231 REV. A). SERVICE SUPERSEDED LETTER MOS SL 737-SL-27-231 REV. A GROUND STUD DECAL GD1086ST INCORRECTLY LABELED (SUPERSEDED BY SL 737-SL-27-231 REV. 8). SERVICE SUPERSEDED LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 276 Of 748 @ Camp Systems EFTA00618567 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-231 REV. 8 09-DEC-2011 SL 737-SL-27-232 24-AUG-2011 SL 737-SL-27-233 09-DEC-2011 SL 737-SL-27-234 REV. A 13-AUG-2013 SL 737-SL-27-235 18-SEP-2012 SL 737-SL-27-236 GROUND STUD DECAL GD1086ST INCORRECTLY LABELED. SERVICE LETTER MOS AUTO SPEEDBRAKE ACTUATOR IMPROVEMENTS. SERVICE LETTER MOS WIRE BUNDLE W1032 POSSIBLE CHAFING. SERVICE LETTER MOS RECOMMENDED RECOMMENDED RECOMMENDED CORROSION PROTECTION FOR S138. S245. AND 51051 FLAP POSITION SWITCH CONNECTORS. SERVICE LETTER RECOMMENDED MOS GROUND STUD DECAL GD236ST POTENTIALLY LOCATED INCORRECTLY. SERVICE LETTER RECOMMENDED MOS S245 FLAP SWITCH CONNECTOR - POSSIBLE IMPROPER ASSEMBLY OF BACKSHELL CLAMP (SUPERSEDED BY SL SUPERSEDED 737-SL-27-236 REV. A). SERVICE LETTER MOS SL 737-SL-27-236 REV. A 5245 FLAP SWITCH CONNECTOR - POSSIBLE IMPROPER ASSEMBLY OF BACKSHELL CLAMP. SERVICE LETTER RECOMMENDED MOS 27-SEP-2012 SL 737-SL-27-238 19-SEP-2012 SL 737-SL-27-239 C5-FEB-20I3 SL 737-SL-27-240 16-NOV-2012 SL 737-SL-27-241 19-DEC-2012 INADVERTENT ACTIVATION OF RUDDER TRIM. SERVICE LETTER RECOMMENDED MOS RUDDER CENTERING UNIT SPRING ASSEMBLY - INCORRECT SPRING SEAT MATERIAL. SERVICE LETTER RECOMMENDED MOS TRAILING EDGE FLAP - ALTERNATE ELECTIC MOTOR - POSSIBILITY OF NO LUBRICATION FLUID. SERVICE LETTER RECOMMENDED MOS FLIGHT CONTROL DAMAGE CAUSED BY EXTREME WINDS. SERVICE LETTER MOS RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 277 Of 748 @ Camp Systems EFTA00618568 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-27-242 POTENTIAL OF WIRES SHORTING TO GROUND ON STAB TRIM SWITCHES (SUPERSEDED BY SL 737-SL-27-242 REV. A). SUPERSEDED SERVICE LETTER MOS SL 737-SL-27-242 REV. A POTENTIAL OF WIRES SHORTING TO GROUND ON STAB TRIM SWITCHES (SUPERSEDED BY SL 737-SL-27-242 REV. B), SUPERSEDED SERVICE LETTER MOS SL 737-SL-27-242 REV. B 05-AUG-20I3 POTENTIAL OF WIRES SHORTING TO GROUND ON STAB TRIM SWITCHES. SERVICE LETTER MOS RECOMMENDED SL 737-SL-27-243 POSSIBLE ELECTRO-HYDRAULIC SERVO VALVE (EHSV) GASKET PLATE LEAKAGE ON PARKER AEROSPACE RUDDER RECOMMENDED POWER CONTROL UNITS (PCU), SERVICE LETTER MOS 21 -JUN-2073 SL 737-SL-27-244 POSSIBLE DISCREPANT FLOW LIMITER ASSEMBLIES. SERVICE LETTER RECOMMENDED MOS 06-SEP-2013 SL 737-SL-27-245 SHOULDER BOLT AND SLAT TORSION ROD CLEARANCE. SERVICE LETTER RECOMMENDED MOS 30-SEP-2013 SI. 737-SL-27-246 POSSIBLE EXTERNAL LEAKAGE FROM AILERON/ELEVATOR POWER CONTROL UNIT (PCU) CRANK ASSEMBLY SUPERSEDED (SUPERSEDED BY SL 737-SL-27-246 REV. A). SERVICE LETTER MOS SL 737-SL-27-246 REV. A POSSIBLE EXTERNAL LEAKAGE FROM AILERON/ELEVATOR POWER CONTROL UNIT (PCU) CRANK ASSEMBLY. RECOMMENDED SERVICE LETTER MOS 02-JUN-20I4 SL 737-SL-27-247 HORIZONTAL STABILIZER TRIM ACTUATOR- INPUT CAM ASSEMBLY- IMPROPERLY CARBURIZED. SERVICE LETTER RECOMMENDED MOS 21-APR-2014 SL 737-SL-27-248 FLIGHT SPOILER PCU RELIABILITY IMPROVEMENTS ON SHORT FIELD PERFORMANCE AIRPLANES. SERVICE LETTER RECOMMENDED MOS I I -JUN-20I4 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 278 Of 748 @ Camp Systems EFTA00618569 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-28-015 REV. D FUEL TANKS OPEN AND PURGED. ELECTRICAL POWER APPUCATION (SUPERSEDED 737-SL-28-082). SERVICE LETTER MOS SUPERSEDED I3-APR-2010 SL 737-SL-28-039 REV. B FUEL LEAK DETECTION AND REPAIR OVERVIEW VIDEO. SERVICE LETTER INFORMATIONAL MOS 1O-JAN-2002 SL 737-SL-28-044 REV. A AIRCRAFT USE OF DYED FUELS (SUPERSEDED BY SL 737-SL-28-044 REV. B). SERVICE LETTER SUPERSEDED - (s) MOS SL 737-SL-28-044 REV. B AIRCRAFT USE OF DYED FUELS. SERVICE LETTER RECOMMENDED MOS 02-APR-20I2 SL 737-SL-28-053 AIRCRAFT USE OF FUELS CONTAMINATED WITH DYE (SUPERSEDED BY SL 737-SL-28-053 REV. A). SERVICE LETTER SUPERSEDED MOS - SL 737-SL-28-053 REV. A AIRCRAFT USE OF FUELS CONTAMINATED WITH DYE. SERVICE LETTER RECOMMENDED MOS I6-APR-2012 SL 737-SL-28-055 DESIGN IMPROVEMENT FOR PITCH AND ROLL INCLINOMETERS TO PREVENT CRACKING OF GLASS TUBE, SERVICE INFORMATIONAL LETTER I8-JUN-1999 MOS - (s) SL 737-SL-28-055 REV. A DESIGN IMPROVEMENT FOR PITCH AND ROLL INCLINOMETERS TO PREVENT CRACKING OF GLASS TUBE. SERVICE INFORMATIONAL LETTER MOS 22-JAN-2003 SL 737-SL-28-056 FUEL QUANITITY PROCESSOR UNIT (FOPU) SOFTWARE IMPROVEMENTS. SERVICE LETTER INFORMATIONAL MOS 15-DEC-1999 - (s) SL 737-SL-28-057 NEW SCAVENGE PUMP INLET AND SCREEN.. SERVICE LETTER INFORMATIONAL MOS 15-AUG-2000 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 279 Of 748 @ Camp Systems EFTA00618570 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-28-060 I9-OCT-2001 SHORT SCREWS INSTALLED ON ENGINE FUEL SHUTOFF VALVES. CROSSFEED VALVE. AND DEFUEL VALVE. SERVICE RECOMMENDED LETTER MOS SL 737-SL-28-060 REV. A SHORT SCREWS INSTALLED ON ENGINE FUEL SHUTOFF VALVES. CROSSFEED VALVE. AND DEFUEL VALVE. SERVICE INFORMATIONAL LETTER MOS 28-NOV-2001 - (s) SL 737-SL-28-060 REV. 8 SHORT SCREWS INSTALLED ON ENGINE FUEL SHUTOFF VALVES. CROSSFEED VALVE. AND DEFUEL VALVE. SERVICE LETTER MOS I5-OCT-2007 SL 737-SL-28-061 ESTIMATION OF FREEZING POINTS OF JET AMET A-I FUEL BLENDS(SUPERSEDEO BY SL 737-SL-28-061 REV. A). SUPERSEDED SERVICE LETTER MOS SL 737-SL-28-061 REV. A ESTIMATION OF FREEZING POINTS OF JET AMET A-I FUEL BLENDS(SUPERSEDEO BY SL 737-SL-28-061 REV. A). SUPERSEDED SERVICE LETTER MOS SI. 737-SL-28-061 REV. 8 ESTIMATION OF FREEZING POINTS OF JET A/JET A-I FUEL BLENDS (SUPERSEDED 8Y SL 737-SL-28-06I REV. C). SUPERSEDED SERVICE LETTER MOS SL 737-SL-28-061 REV. C ESTIMATION OF FREEZING POINTS OF JET AMET A-1 FUEL BLENDS. SERVICE LETTER RECOMMENDED MOS 28-NOV-2011 SL 737-SL-28-062 POSSIBLE MISS-LOCATION OF FUEL TANK VENT TUBE CLIMB PORT. SERVICE LETTER INFORMATIONAL MOS I8-JUN-2003 SL 737-SL-28-062 REV. A POSSIBLE MISS-LOCATION OF FUEL TANK VENT TUBE CLIMB PORT. SERVICE LETTER INFORMATIONAL MOS I5-SEP-2003 SL 737-SL-28-062 REV.B POSSIBLE MISS - LOCATION OF FUEL TANK VENT TUBE CLIMB PORT. SERVICE LETTER RECOMMENDED MOS 20-JUN-2005 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 280 Of 748 @ Camp Systems EFTA00618571 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-28-063 APU FUEL LINE SHROUD DRAIN MAST DAMAGE PROTECTION. SERVICE LETTER MOS I9-NOV-2003 SL 737-SL-28-063 REV. A APU FUEL LINE SHROUD DRAIN MAST DAMAGE PROTECTION. SERVICE LETTER MOS I8-MAR-2005 SL 737-SL-28-063 REV. B APU FUEL LINE SHROUD DRAIN MAST DAMAGE PROTECTION. SERVICE LETTER MOS 07-AUG-2006 SL 737-SL-28-065 POTENTIAL FUEL LEAKS IN THE OUTBOARD ORYBAY ON 737NG AIRPLANE RETROFITTED WITH BLENDED WINGLETS. SERVICE LETTER MOS 28-JUN-2004 SL 737-SL-28-065 REV. A POTENTIAL FUEL LEAKS IN THE OUTBOARD ORYBAY ON 737NG AIRPLANE RETROFITTED WITH BLENDED WINGLETS. SERVICE LETTER MOS 01-AUG-2005 SL 737-SL-28-066 SPECIAL FEDERAL AVIATION REGULATION (SFAR) 88 DESIGN. OPERATION. AND MAINTENANCE TRAINING INFORMATION. SERVICE LETTER MOS 13-FEB-2007 SL 737-SL-28-066 REV. A SPECIAL FEDERAL AVIATION REGULATION (SFAR) 88 DESIGN. OPERATION. AND MAINTENANCE TRAINING INFORMATION. SERVICE LETTER MOS I 7-JUN-2008 SL 737-SL-28-067 SUSPECT FUELING FLOAT SWITCHES. SERVICE LETTER MOS 05-APR-2007 SL 737-SL-28-067 REV. A SUSPECT FUELING FLOAT SWITCHES. SERVICE LETTER MOS I3-DEC-2007 SL 737-SL-28-069 FUEL SYSTEM MOTOR OPERATED VALVE ACTUATORS, SERVICE LETTER MOS 21-MAY-2007 INFORMATIONAL INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 281 Of 748 @ Camp Systems EFTA00618572 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-28-069 REV. A FUEL SYSTEM MOTOR OPERATED VALVE ACTUATORS. SERVICE LETTER 05-DEC-2008 MOS SL 737-SL-28-070 GROUND FAULT INTERRUPT (GA) RELAYS FOR THE FUEL BOOST PUMP. SERVICE LETTER MOS 24-JUL-2007 SL 737-SL-28-070 REV. A GROUND FAULT INTERRUPT (GFI) RELAYS FOR THE FUEL BOOST PUMP. SERVICE LETTER MOS 27-MAR-2008 SL 737-SL-28-07I AVIATION FUELS SPECIFICATION. SERVICE LETTER MOS I8-JAN-2008 SL 737-SL-28-07I REV. A AVIATION FUELS SPECIFICATION. SERVICE LETTER MOS I9-FEB-2008 SL 737-SL-28-071 REV. B AVIATION FUELS SPECIFICATION. SERVICE LETTER MOS 31 -JUL-2008 SL 737-SL-28-071 REV. C AVIATION FUELS SPECIFICATION (SUPERSEDED BY SL 737-SL-28-071 REV. D). SERVICE LETTER SUPERSEDED MOS SL 737-SL-28-07I REV. D AVIATION FUELS SPECIFICATION (SUPERSEDED BY SL 737-SL-28-071 REV. E). SERVICE LETTER SUPERSEDED MOS SL 737-SL-28-07I REV. E AVIATION FUELS SPECIFICATION. SERVICE LETTER RECOMMENDED MOS 27-JUN-20I2 SL 737-SL-28-072 WIRE BUNDLE W1126 POSSIBLE CHAFING. SERVICE LETTER MOS I8-JUL-2008 SL 737-SL-28-072 REV. A WIRE BUNDLE W1126 POSSIBLE CHAFING. SERVICE LETTER MOS 24-OCT-2008 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 282 Of 748 @ Camp Systems EFTA00618573 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-28-073 18-FEB-2009 AFL 863 SI. 737-SL-28-073 REV. A INTRODUCTION OF IMPROVED SPAR. DEFUEL AND CROSSFEED VALVE DISK (SUPERSEDED BY SL 737-SL-28-073 REV. SUPERSEDED 8). SERVICE LETTER INTRODUCTION OF IMPROVED SPAR. DEFUEL AND CROSSFEED VALVE DISK. SERVICE LETTER MOS - (s) MOS 29-AUG-2011 3533:32 COMPUEO WITH SL 737-SL-28-073 REV. 8 INTRODUCTION OF IMPROVED SPAR. DEFUEL AND CROSSFEED VALVE DISK (SUPERSEDED BY SL 737-SL-28-073 REV. SUPERSEDED COMPUEO WITH C). SERVICE LETTER MOS 29-AUG-2011 3533:32 AFL 863 SL 737-SL-28-073 REV. C 25-JUL-2012 INTRODUCTION OF IMPROVED SPAR. DEFUEL AND CROSSFEED VALVE DISK SERVICE LETTER MOS RECOMMENDED SL 737-SL-28-074 CENTER TANK REFUEL TUBE LOCATED IN THE RIGHT WING RECOMMENDED PM 344A2202-8 MAY BE INSTALLED BACKWARDS. SERVICE LETTER MOS I4-MAY-2009 SL 737-SL-28-075 POTENTIAL FOR FOREIGN OBJECTS LEFT IN THE FUEL TANK RECOMMENDED AFTER REWORK PRIOR TO AIRPLANE DELIVERY. SERVICE LETTER MOS I3-AUG-2009 SL 737-SL-28-076 POSSIBLE OVER-TWISTED LOCKWIRE ON THE MAIN TANK RECOMMENDED FUEL BOOST PUMPS. SERVICE LETTER MOS 24-NOV-2009 SL 737-SL-28-077 POSSIBLE OVER-TWISTED LOCKWIRE ON THE CENTER TANK RECOMMENDED FUEL BOOST PUMP DRAIN PLUG. SERVICE LETTER MOS 24-NOV-2009 SL 737-SL-28-078 POSSIBLE LACK OF SEALANT ON THE FUEL PUMP PRESSURE INFORMATIONAL SWITCH SPAR PENETRATIONS FOR THE LEFT AND RIGHT FORWARD MAIN-TANK PUMPS. SERVICE LETTER MOS 22-DEC-2009 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 283 Of 748 @ Camp Systems EFTA00618574 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-28-079 22-DEC-2009 SL 737-SL-28-080 15-FEB-2010 POSSIBLE LACK OF SEALANT ON THE FUEL PUMP PRESSURE SWITCH SPAR PENETRATIONS FOR THE LEFT AND RIGHT CENTER-TANK OVERRIDE-PUMPS. SERVICE LETTER MOS INFORMATIONAL POTENTIAL UNDER-TORQUED FUEL SUMP DRAIN AND AN UNDER-TORQUED BULKHEAD FITTING NUT (SUPERSEDED SUPERSEDED BY 737-SL-28-080-A). SERVICE LETTER MOS SL 737-SL-28-080 REV. A POTENTIAL UNDER-TORQUED FUEL SUMP DRAIN AND AN UNDER-TORQUED BULKHEAD FITTING NUT. SERVICE LETTER MOS 09-JUN-20I0 SL 737-SL-28-081 CONNECTOR D01828 HAS INCORRECT PLATING. SERVICE LETTER RECOMMENDED MOS 25-MAR-2010 SL 737-SL-28-082 AIRCRAFT MAINTENANCE WITH FUEL CELLS OPEN. SERVICE LETTER INFORMATIONAL MOS I3-APR-2010 SL 737-SL-28-082 REV. A AIRCRAFT MAINTENANCE WITH FUEL CELLS OPEN (SUPERSEDED BY 737-SL-28-082 REV. B). SERVICE LETTER SUPERSEDED MOS 22-APR-20I0 SL 737-SL-28-082 REV. B AIRCRAFT MAINTENANCE WITH FUEL CELLS OPEN (SUPERSEDED BY SL 737-SL-28-082 REV. C), SERVICE LETTER SUPERSEDED MOS SL 737-SL-28-082 REV. C AIRCRAFT MAINTENANCE WITH FUEL CELLS OPEN. SERVICE LETTER RECOMMENDED MOS 27-JUN-20 I I SL 737-SL-28-083 POTENTIALLY MIS-INSTALLED LOCKWIRE FOR THE RH MAIN TANK FUEL QUANTITY INDICATING SYSTEM(FOIS) BULKHEAD CONNECTOR. SERVICE LETTER MOS I7-JUN-2010 SL 737-SL-28-085 WIRE BUNDLE CONTACTS P-15 REFUELING PANEL (SUPERSEDED BY SL 737-SL-28-085 REV. A). SERVICE LETTER SUPERSEDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 284 Of 748 @ Camp Systems EFTA00618575 CAMP Asiant.fran Atna: up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-28-085 REV. A WIRE BUNDLE CONTACTS P-15 REFUELING PANEL. SERVICE LETTER RECOMMENDED MOS 31-JAN-2012 SI. 737-SL-28-086 PM 343A2212-31-4 WATER SCAVENGE TUBE CLEARANCE (SUPERSEDED BY SI. 737-SL-28-086 REV. A). SERVICE SUPERSEDED LETTER MOS SL 737-SL-28-086 REV. A PM 343A2212-31-4 WATER SCAVENGE TUBE CLEARANCE (SUPERSEDED BY SL 737-SL-28-086 REV. B). SERVICE SUPERSEDED LETTER MOS SL 737-SL-28-086 REV. B P/N 343A2212-3/-4 WATER SCAVENGE TUBE CLEARANCE (SUPERSEDED BY SL 737-SL-28-086 REV. C). SERVICE RECOMMENDED LETTER MOS I8-APR-2012 SL 737-SL-28-086 REV. C PM 343A2212-3/-4 WATER SCAVENGE TUBE CLEARANCE (SUPERSEDED BY SL 737-SL-28-086 REV. 0). SERVICE SUPERSEDED LETTER MOS SL 737-SL-28-086 REV. D PIN 343A2212-31-4 WATER SCAVENGE TUBE CLEARANCE. SERVICE LETTER RECOMMENDED MOS 25-MAR-2014 SL 737-SL-28-087 FUEL QUANTITY INDICATION SYSTEM (FOIS) FUEL TANK UNITS WITH PLASTIC CLAMPS. SERVICE LETTER RECOMMENDED MOS 05-MAY-2011 SL 737-SL-28-088 SHIELD GROUND WIRES NOT CONNECTED TO GROUND STUD (SUPERSEDED BY SL 737-SL-28-088 REV. A). SERVICE SUPERSEDED LETTER MOS SL 737-SL-28-088 REV. A SHIELD GROUND WIRES NOT CONNECTED TO GROUND STUD. SERVICE LETTER RECOMMENDED MOS 14-NOV-2011 SL 737-SL-28-089 MOTOR OPERATED VALVE (54OV) ACTUATOR IMPROVEMENT. SERVICE LETTER RECOMMENDED MOS I9-DEC-2011 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 285 Of 748 @ Camp Systems EFTA00618576 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-28-090 20-JUL-2012 SL 737-SL-28-09I REFUELING PANEL LAMP MOD. SERVICE LETTER MOS • RECOMMENDED MISSING GROMMET FOR THE CENTER FUEL TANK SUMP DRAIN VALVE (SUPERSEDED BY SL 737-SL-28-091 REV. A). SUPERSEDED SERVICE LETTER MOS SL 737-SL-28-09I REV. A MISSING GROMMET FOR THE CENTER FUEL TANK SUMP DRAIN VALVE. SERVICE LETTER RECOMMENDED 13-JUN-2012 MOS SL 737-SL-28-092 POTENTIAL MISSING WASHER AT FUEL TANK VENT TUBE DRAIN. SERVICE LETTER RECOMMENDED 20-JUL-2012 MOS SL 737-SL-28-093 MAIN TANK REFUEL TUBE ASSEMBLY. 344A2201-12. MAY BE INSTALLED INCORRECTLY. SERVICE LETTER RECOMMENDED 06-MAR-2013 MOS SL 737-SL-28-094 FUEL TEMPERATURE SENSOR WIRE CHAFING. SERVICE LETTER RECOMMENDED I9-JUN-2013 MOS SL 737-SL-28-095 ENGINE FUEL SUCTION FEED TEST - ENGINE PARAMETER CHANGES RECOMMENDED I3-AUG-2013 . SERVICE LETTER MOS SL 737-SL-28-096 ENGINE FUEL SHUTOFF VALVE WIRE CHAFING. SERVICE LETTER RECOMMENDED 10-DEC-2013 MOS SL 737-SL-28-098 FUEL BOOST PUMP BACKSHELL CHAFING WIRES. SERVICE LETTER RECOMMENDED 24-JUN-2014 MOS SL 737-SL-28-099 POSSIBLE MISSING FINISH ON APU DRAIN MAST TUBE. SERVICE LETTER RECOMMENDED MOS SL 737-SL-29-069 HYDRAULIC PRESSURE SWITCH REPLACEMENT. SERVICE LETTER INFORMATIONAL 26-AUG-1996 MOS - Is) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 286 Of 748 @ Camp Systems EFTA00618577 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-29-069 REV. A HYDRAULIC PRESSURE SWITCH REPLACEMENT. SERVICE LETTER MOS 30-JAN-1997 - Is) 51 737-SL-29-069 REV. 8 HYDRAULIC PRESSURE SWITCH REPLACEMENT. SERVICE LETTER MOS 09-APR-1999 - (s) 51 737-SL-29-069 REV. C HYDRAULIC PRESSURE SWITCH REPLACEMENT. SERVICE LETTER MOS 24-MAY-2010 SL 737-SL-29-074 27-JUN-1998 SL 737-SL-29-075 18-AUG-1998 SL 737-SL-29-076 20-NOV-1998 INFORMATIONAL INFORMATIONAL RECOMMENDED HYDRAULIC PRESSURE TRANSDUCER IMPROVEMENT. SERVICE LETTER INFORMATIONAL MOS - (s) IMPROVED HYDRAULIC STANDBY SYSTEM MODULAR PACKAGE HOUSING. SERVICE LETTER INFORMATIONAL MOS - (s) CHAFING OF HYDRAULIC SYSTEM A ELECTRIC MOTOR-DRIVEN PUMP PRESSURE HOSE ON RETURN FILTER V-BAND INFORMATIONAL CLAMP. SERVICE LETTER MOS - Is) SL 737-SL-29-076 REV. A CHAFING OF HYDRAULIC SYSTEM A ELECTRIC MOTOR-DRIVEN PUMP PRESSURE HOSE ON RETURN FILTER V-BAND INFORMATIONAL CLAMP. SERVICE LETTER MOS 29-JUN-1999 - (s) SL 737-SL-29-078 HYDRAULIC FLUID NEW FORMULATION. SERVICE LETTER INFORMATIONAL MOS 29-JUL-1999 - SL 737-SL-29-079 INSUFFICIENT SWAGE ON THRUST REVERSER HYDRAULIC HOSES. PM AS115-06H0152. SERVICE LETTER INFORMATIONAL MOS 13-DEC-1999 - (s) SL 737-SL-29-080 CROSS CONNECTION OF LANDING GEAR HYDRAULIC LINES. SERVICE LETTER INFORMATIONAL MOS 05-JUL-2000 - Is) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 287 Of 748 @ Camp Systems EFTA00618578 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-29-081 03-NOV-2000 St 737-SL-29-082 IMPROVED ENGINE DRIVEN HYDRAULIC PUMP HOSE QUICK-DISCONNECTS. SERVICE LETTER MOS 500 (s) AFL NEW ELEVATOR TAB LOCK ACTUATOR HOSE. SERVICE LETTER MOS 17-NOV-2000 - (s) St 737-SL-29-082 REV. A NEW ELEVATOR TAB LOCK ACTUATOR HOSE. SERVICE LETTER MOS 21-DEC-2000 - (s) St 737-SL-29-082 REV. B NEW ELEVATOR TAB LOCK ACTUATOR HOSE. SERVICE LETTER MOS 23-MAR-2004 23-JUL-2001 320 127 St 737-SL-29-083 REV. A POSSIBLE IMPROPERLY TORQUED JAM NUTS ON BULKHEAD HYDRAULIC FITTINGS. SERVICE LETTER MOS 12-OCT-2001 - (s) St 737-SL-29-084 POSSIBLE THIN-WALL CONDITION ON PARKER ABEX ELECRTIC MOTOR-DRIVEN PUMPS. SERVICE LETTER MOS 24 (s) 08-OCT-2001 St 737-SL-29-084 REV. A POSSIBLE THIN-WALL CONDITION ON PARKER ABEX ELECRTIC MOTOR-DRIVEN PUMPS. SERVICE LETTER MOS 24 (s) 08-OCT-2001 St 737-SL-29-085 LOOSE JAM NUT ON ENGINE STRUT HYDRAULIC FITTING. SERVICE LETTER MOS 21-AUG-2002 INFORMATIONAL COMPUED WITH - -ACCOMPLISHED ON AAC WO 1828 AVV040 CLOSED 06/1561. CONSTITUTES TERMINATING ACTION. INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL AFL St 737-SL-29-085 REV. A LOOSE JAM NUT ON ENGINE STRUT HYDRAULIC FITTING. SERVICE LETTER INFORMATIONAL MOS 03-JUN-2003 St 737-SL-29-085 REV. B LOSE JAM NUT ON ENGINE STRUT HYDRAULIC FITTING (SUPERSEDED BY SL 737-SL-29-085 REV. C). SERVICE LETTER SUPERSEDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 288 Of 748 @ Camp Systems EFTA00618579 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-29-085 REV. C 10-JUN-2011 LOOSE JAM NUT ON ENGINE STRUT HYDRAULIC FITTING. SERVICE LETTER MOS RECOMMENDED SL 737-SL-29-086 ELECTRIC MOTOR OPERATED HYDRAULIC SHUTOFF VALVE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL MOS 27-NOV-2002 SL 737-SL-29-087 TITEFLEX DISCLOSURE.IMPROPER HEAT TREATMENT ON HOSE B-NUTS. SERVICE LETTER INFORMATIONAL MOS I4-APR-2003 SL 737-SL-29-088 DRUCK HYDRAULIC PRESSURE TRANSDUCER DISCREPANCY. SERVICE LETTER INFORMATIONAL MOS I7-JAN-2003 SL 737-SL-29-089 ENGINE DRIVEN PUMP(EDP) AND AIR DRIVEN PUMP (ADP)- REPLACEMENT OF DISCREPANT WEAR PLATE. SERVICE INFORMATIONAL LETTER MOS 26-MAR-2003 SL 737-SL-29-090 FLIGHT CONTROLS HYDRAULIC MODULAR PACKAGE REPLACEMENT - INTERCHANGEABILITY (SUPERSEDED BY SL SUPERSEDED 737-SL-29-090 REV. A). SERVICE LETTER MOS SL 737-SL-29-090 REV. A FLIGHT CONTROLS HYDRAULIC MODULAR PACKAGE REPLACEMENT-INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED MOS 23-NOV-2011 SL 737-SL-29-091 METHODS TO HELP REDUCE OR ELIMINATE PRELOAD WHEN REPLACING FRACTURED HYDRAULIC PRESSURE TUBE PfN 312A2110-2 IN 737NG STRUTS. SERVICE LETTER MOS 24-MAR-2005 St 737-SL-29-092 REV. A RECOMMENDED ACTION TO RESOLVE CORROSION OF HYDRAULIC TUBES IN THE WHEEL WELLS CAUSED BY EXPOSURE TO POTASSIUM-CONTAINING RUNWAY DEICING FLUIDS. SERVICE LETTER MOS 22-AUG-2005 St 737-SL-29-092 REV. 8 RECOMMENDED ACTION TO RESOLVE CORROSION OF HYDRAULIC TUBES IN THE WHEEL WELLS CAUSED BY EXPOSURE TO POTASSIUM-CONTAINING RUNWAY DEICING FLUIDS. SERVICE LETTER MOS 21-MAR-2006 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 289 Of 748 @ Camp Systems EFTA00618580 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-29-095 HYDRAULIC FLUID EXTERNAL LEAKAGE - RELIABILITY IMPROVEMENTS (SUPERSEDED BY SL 737-SL-29-095 REV. A), SUPERSEDED SERVICE LETTER MOS 51 737-SL-29-095 REV. A HYDRAULIC FLUID EXTERNAL LEAKAGE - RELIABILITY IMPROVEMENTS. SERVICE LETTER 22-DEC-2010 51 737-SL-29-096 INCORRECT SEALS IN HYDRAULIC SYSTEM A HEAT EXCHANGER FITTINGS. SERVICE LETTER 12-APR-2007 MOS MOS 51 737-SL-29-097 INCORRECT SADDLE-TYPE TUBE CLAMPS INSTALLED. SERVICE LETTER MOS 24-JUL-2007 51 737-SL-29-099 CORROSION-RESISTANT HYDRAULIC FUSES (SUPERSEDED BY 737-SL-29-099-A). SERVICE LETTER MOS 28-AUG-2007 51 737-SL-29-099 REV. A CORROSION-RESISTANT HYDRAULIC FUSES. SERVICE LETTER MOS 07-JUN-20I0 51 737-SL-29-100 TROUBLESHOOTING OF REPEATED ENGINE-DRIVEN PUMP FAILURES. SERVICE LETTER MOS 10-OCT-2007 SL 737-SL-29-100 REV. A TROUBLESHOOTING OF REPEATED ENGINE-DRIVEN PUMP FAILURES. SERVICE LETTER I7-OCT-2007 51 737-SL-29-101 17-DEC-2007 MOS FILTER ELEMENTS WITH INCORRECT EPDXY OR INCORRECTLY MACHINED 0 -RING GROOVES. SERVICE LETTER MOS SL 737-SL-29-101 REV. A FILTER ELEMENTS WITH INCORRECT EPDXY OR INCORRECTLY MACHINED 0-RING GROOVES. SERVICE LETTER MOS 20-FEB-2008 RECOMMENDED SUPERSEDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 290 Of 748 @ Camp Systems EFTA00618581 CIMP Asiant.Inne Attn....14C AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-29-102 20-JUN-2008 STANDBY HYDRAULIC SYSTEM CASE DRAIN FILTER I CHECK VALVE INSTALLED REVERSED. SERVICE LETTER MOS SL 737-SL-29-102 REV. A STANDBY HYDRAULIC SYSTEM CASE DRAIN FILTER / CHECK VALVE INSTALLED REVERSED. SERVICE LETTER 23-JAN-2009 MOS AFL SL 737-SL-29-103 HYDRAULIC FLUID - NEW FORMULATION. SERVICE LETTER MOS 26-JUN-2008 SL 737-SL-29-103 REV. A HYDRAULIC FLUID - NEW FORMULATION. SERVICE LETTER MOS 07-MAY-2012 • SL 737-SL-29-104 EXCESS SLACK IN WIRE W8538 CAUSES CHAFING AGAINST FAIRING PANEL. SERVICE LETTER MOS 29-AUG-2C08 28-SEP-2009 3378:04 812 SL 737-SL-29-104 REV. A EXCESS SLACK IN WIRE W8538 CAUSES CHAFING AGAINST FAIRING PANEL (SUPERSEDE BY SL 737-SL-29-104 REV. B). SERVICE LETTER MOS RECOMMENDED SUPERSEDED SL 737-SL-29-104 REV. B EXCESS SLACK IN WIRE W8538 CAUSES CHAFING AGAINST FAIRING PANEL. SERVICE LETTER RECOMMENDED MOS 18-MAY-2011 SL 737-SL-29-105 HYDRAULIC RESERVOIR DRAIN VALVE LEAKAGE. SERVICE LETTER MOS 11-AUG-2C08 SL 737-SL-29-106 RECOMMENDED HANDLING AND STORAGE PRACTICES FOR HYDRAULIC COMPONENTS USING BMS 3-11. SERVICE LETTER MOS 17-FEB-2009 SL 737-SL-29-107 18-MAY-20O9 CRACKING OF HYDRAULIC STANDBY SYSTEM RESERVOIR BOSS—AVAILABILITY OF NEW TUBE. SERVICE LETTER MOS RECOMMENDED COMPLIED WITH ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 291 Of 748 '2 Camp Systems EFTA00618582 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-29-108 HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE RECOMMENDED FRACTURES. SERVICE LETTER MOS 07-JUL-2009 SL 737-SL-29-108 REV. 8 HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE FRACTURES. SERVICE LETTER INFORMATIONAL MOS IS-MAR-2010 SL 737-SL-29-108 REV. C HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE FRACTURES (SUPERSEDED BY SL 737-SL-29-108 REV. SUPERSEDED 0). SERVICE LETTER MOS SL 737-SL-29-108 REV. D POTENTIAL PERSONAL HAZARD - HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE FRACTURES SUPERSEDED (SUPERSEDED BY SB 737-SL-29-108 REV. E). SERVICE LETTER MOS SL 737-SL-29-108 REV. E POTENTIAL PERSONAL HAZARD - HYDRAULIC PRESSURE MODULE CARTRIDGE CHECK VALVE FRACTURES. SERVICE RECOMMENDED LETTER I2-JUL-2013 SL 737-SL-29-109 MOS INTRODUCTION OF AXIALLY SWAGED PERMANENT HYDRAULIC FITTING AND TUBE INSTALLATIONS TO THE MAIN SUPERSEDED LANDING GEAR (MLG) WHEEL WELL (SUPERSEDED BY SL 737-SL-29-109 REV. A). SERVICE LETTER MOS SI. 737-SL-29-109 REV. A INTRODUCTION OF AXIALLY SWAGED PERMANENT HYDRAULIC FITTING AND TUBE INSTALLATIONS TO THE MAIN SUPERSEDED LANDING GEAR (MLG) WHEEL WELL (SUPERSEDED BY SL 737-SL-29-109 REV. B). SERVICE LETTER MOS SI. 737-SL-29-109 REV. 8 INTRODUCTION OF AXIALLY SWAGED PERMANENT HYDRAULIC FITTING AND TUBE INSTALLATIONS TO THE MAIN RECOMMENDED LANDING GEAR (MLG) WHEEL WELL. SERVICE LETTER -JAN-2012 SL 737-SL-29-110 I8-JUN-2010 SL 737-SL-29-111 MOS HYDRAULIC FLUID - NEW FORMULATION-SKYDROL-PE-5. SERVICE LETTER MOS POSSIBLE HYDRAULIC TUBE INSUFFICIENT CLEARANCE. MAIN WHEEL WELL (SUPERSEDED 8Y SL 737-SL-29-111 REV. SUPERSEDED A). SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 292 Of 748 @ Camp Systems EFTA00618583 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-29-111 REV. A POSSIBLE HYDRAULIC TUBE INSUFFICIENT CLEARANCE. MAIN WHEEL WELL. SERVICE LETTER MOS 28-SEP-2011 SL 737-SL-29-112 RETURN FILTER MODULE IMPROVEMENTS - SYSTEM-A AND SYSTEM-B HYDRAULIC POWER (SUPERSEDED BY SL SUPERSEDED 737-SL-29-112 REV. A). SERVICE LETTER MOS RECOMMENDED SL 737-SL-29-112 REV. A RETURN FILTER MODULE IMPROVEMENTS - SYSTEM-A AND SYSTEM-B HYDRAULIC POWER (SUPERSEDED BY SL SUPERSEDED 737-SL-29-112 REV. 8). SERVICE LETTER MOS SL 737-SL-29-112 REV. 8 RETURM FILTER MODULE IMPROVEMENTS - SYSTEN-A AND SYSTEM-B HYDRAULIC POWER. SERVICE LETTER RECOMMENDED MOS I9-JUL-2012 SL 737-SL-29-113 POTENTIAL INSUFFICIENT CLEARANCE BETWEEN HYDRAULIC TUBE AND FILTER MODULE. SERVICE LETTER RECOMMENDED MOS I6-SEP-2011 SL 737-SL-29-114 MISSING PACKING IN FUSE ASSEMBLY PIN 2-7680-2 (SUPERSEDED BY SL 737-SL-29-114 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-29-114 REV. A MISSING PACKING IN FUSE ASSEMBLY PIN 2-7680-2. SERVICE LETTER RECOMMENDED MOS I8-APR-2012 SL 737-SL-29-115 GROUND STUD DECALS GO304DC 8 GD304ST (SUPERSEDED BY SL 737-SL-29-115 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-29-115 REV. A GROUND STUD DECALS GO304DC 8 GD304ST (SUPERSEDED BY 737-SL-29-115 REV. B). SERVICE LETTER RECOMMENDED MOS 08-AUG-20I2 SL 737-SL-29-115 REV. 8 GROUND STUD DECALS GO304DC 8 GD304ST. SERVICE LETTER RECOMMENDED MOS 06-MAR-2013 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 293 Of 748 @ Camp Systems EFTA00618584 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-29-116 POSSIBLE INSUFFICIENTLY TIGHTENED HYDRAULIC TUBE CONNECTIONS - LEFT AND RIGHT INBOARD WING REAR SUPERSEDED SPAR INSTALLATIONS (SUPERSEDED BY SL 737-SL-29-116 REV. A). SERVICE LETTER MOS SL 737-SL-29-116 REV. A POSSIBLE INSUFFICIENTLY TIGHTENED HYDRAULIC TUBE CONNECTIONS? LEFT AND RIGHT INBOARD WING REAR RECOMMENDED SPAR INSTALLATIONS. SERVICE LETTER MOS I3-APR-2012 SL 737-SL-29-117 IMPROVED EDP PRESSURE HOSE QUICK-DISCONNECTS. SERVICE LETTER RECOMMENDED 30-JUL-2012 MOS SL 737-SL-29-118 DETERMINE INSTALLATION TORQUE FOR TUBES/FITTINGSMOSES. SERVICE LETTER RECOMMENDED 30-NOV-2012 MOS SL 737-SL-29-119 TROUBLESHOOTING HYDRAULIC TUBE/FITTING/HOSE LEAKAGE. SERVICE LETTER RECOMMENDED 02-APR-20I3 MOS SL 737-SL-29-120 PREMATURE LEAKAGE OF SHAFT SEAL ON PARKER HYDRAULIC EDP AND PTU. SERVICE LETTER RECOMMENDED 10-DEC-2013 MOS SI. 737-SL-29-121 INCORRECT ORIENTATION OF POWER TRANSFER UNIT (PTU) RECOMMENDED 03-APR-20I4 PRESSURE FILTER ASSEMBLY. SERVICE LETTER MOS SL 737-SL-30-017 COWL THERMAL ANT-ICE VALVE IMPROVEMENT. SERVICE LETTER INFORMATIONAL 13-OCT-2000 MOS - (s) SL 737-SL-30-019 INTRODUCTION OF IMPROVED NOSE COWL THERMAL ANTI-ICE VALVE (SUPERSEDED BY SL 737-SL-30-019 REV. A). SUPERSEDED SERVICE LETTER 28-JUL-2003 SL 737-SL-30-019 REV. A 20-SEP-2013 MOS INTRODUCTION OF IMPROVED NOSE COWL THERMAL ANTI-ICE VALVES. SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 294 Of 748 @ Camp Systems EFTA00618585 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-30-021 WINDOW HEAT CONTROL UNIT - DUST CONTAMINATION CLEANING PROCEDURES. SERVICE LETTER 29-AUG-2006 MOS AFL SL 737-SL-30-024 IDENTIFICATION OF DRAIN MAST MATERIAL. SERVICE LETTER INFORMATIONAL MOS 28-APR-2010 28-SEP-2009 3378:04 812 SL 737-SL-30-025 POTENTIAL IMPROPERLY TORQUED NUTS ON THE WING ANTI-ICE DUCT SUPPORT CLAMP (SUPERSEDED BY SL SUPERSEDED 737-SL-30-025 REV. A), SERVICE LETTER MOS SL 737-SL-30-025 REV. A POTENTIAL IMPROPERLY TORQUED NUTS ON THE WING ANTI-ICE DUCT SUPPORT CLAMP. SERVICE LETTER RECOMMENDED MOS 12-AUG-2013 SL 737-SL-31-038 COMMON DISPLAY SYSTEM (CDS) SOFTWARE UPDATE. SERVICE LETTER INFORMATIONAL MOS 08-DEC-1998 - (s) SI. 737-SL-31-039 COMMON DISPLAY SYSTEM (CDS) AND AIRPLANE INFORMATION MANAGEMENT SYSTEM (AIMS) NORMALLY WHITE INFORMATIONAL (NW) DISPLAY UNIT (DU) INCORPORATION. SERVICE LETTER MOS 10-MAR-1999 - (s) SI. 737-SL-31-039 REV. A COMMON DISPLAY SYSTEM (CDS) AND AIRPLANE INFORMATION MANAGEMENT SYSTEM (AIMS) NORMALLY WHITE INFORMATIONAL (NW) DISPLAY UNIT (DU) INCORPORATION. SERVICE LETTER MOS 18-DEC-2000 - (s) SL 737-SL-31-040 STICK SHAKEN SPEED DIFFERENCES INFORMATION. SERVICE LETTER INFORMATIONAL MOS 05-APR-1999 - (s) SL 737-SL-31-041 COMMON DISPLAY SYSTEM(CDS) BLOCK POINT 99 SOFTWARE RELEASE. SERVICE LETTER INFORMATIONAL MOS 24-DEC-1999 -(s) SL 737-SL-31-042 DISPLAYS: INCORPORATION OF PHASE II NORMALLY WHITE DISPLAY UNITS. SERVICE LETTER INFORMATIONAL MOS 1 7-SEP-2001 - (s) COMPUED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 295 Of 748 @ Camp Systems EFTA00618586 C4INI Asitant.P Inne Ad-gnu...14C AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-31-042 REV. A DISPLAYS: INCORPORATION OF PHASE II NORMALLY WHITE DISPLAY UNITS. SERVICE LETTER MOS 07-NOV-2C07 SL 737-SL-31-043 RUDDER PEDAL POSITION SENSOR COTTER PIN INSTALLATION. SERVICE LETTER MOS 21-NOV-2C01 • (s) SL 737-SL-31-044 COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER MOS 11-FEB-2003 • SL 737-SL-31-044 REV. A COMMON DISPLAY SYSTEM (COS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER 07-MAR-2003 SL 737-SL-31-044 REV. B COMMON DISPLAY SYSTEM (COS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER 04-JUN-2003 MOS MOS SL 737-SL-31-044 REV. C COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER MOS 07-JUL-2003 SL 737-SL-31-044 REV. D COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER MOS 04-AUG-2C03 • SL 737-SL-31-044 REV. E COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER 24-OCT-2003 SL 737-SL-31-044 REV. F COMMON DISPLAY SYSTEM (COS) BLOCK POINT 02 SOFTWARE RELEASE. SERVICE LETTER MOS 02-DEC-2003 MOS SL 737-SL-31-045 OPTICAL QUICK ACCESS RECORDER (OOAR) P/N D52C00 SERIES MODIFICATION. SERVICE LETTER MOS 02-FEB-2005 SL 737-SL-31-046 COMMON DISPLAY SYSTEM (COS) BLOCK POINT 04 SOFTWARE RELEASE. SERVICE LETTER MOS 03-MAR-2005 INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 296 Of 748 .2 Camp Systems EFTA00618587 CORP As man wire „veland up AD/SI Status Report 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-31-046 REV. A COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 04 SOFTWARE RELEASE. SERVICE LETTER 28-JUN-2005 SL 737-SL-31-046 REV. 8 COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 04A SOFTWARE RELEASE. SERVICE LETTER 16-NOV-2005 51 737-SL-31-047 GPS CLOCK REPLACEMENT. P/N 9010-14, SERVICE LETTER I6-JAN-2006 51 737-SL-31-048 COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 06 SOFTWARE RELEASE. SERVICE LETTER MOS 19-SEP-2006 MOS MOS MOS SI. 737-SL-31-048 REV. A COMMON DISPLAY SYSTEM (CDS) BLOCK POINT 06 SOFTWARE RELEASE. SERVICE LETTER MOS 22-AUG-2008 18-SEP-2007 3260:48 AFL 782 SL 737-SL-31-049 CDS INHIBITION OF PFD TIME CRITICAL ALERTS, SERVICE LETTER MOS 15-MAR-2007 SL 737-SL-31-050 COMMON DISPLAY SYSTEM (CDS) DISPLAY ELECTRONIC UNIT (DEU-II). SERVICE LETTER MOS 12-SEP-2007 SL 737-SL-31-050 REV. A COMMON DISPLAY SYSTEM (CDS) DISPLAY ELECTRONIC UNIT (DEU-II), SERVICE LETTER MOS 05-MAY-2008 SL 737-SL-31-051 DISPLAYS: INCORPORATION OF PHASE 3 NORMALLY WHITE DISPLAY UNITS. SERVICE LETTER MOS 09-JAN-2009 SL 737-SL-31-051 REV. A DISPLAYS: INCORPORATION OF PHASE 3 NORMALLY WHITE RECOMMENDED DISPLAY UNITS. SERVICE LETTER MOS 26-MAR-2009 COMPLIED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 297 Of 748 @Camp Systems EFTA00618588 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-31-051 REV. B DISPLAYS: INCORPORATION OF PHASE 3 NORMALLY WHITE DISPLAY UNITS. SERVICE LETTER MOS 26-JUN-2009 SL 737-SL-31-051 REV. C DISPLAYS: INCORPORATION OF PHASE 3 NORMALLY WHITE DISPLAY UNITS. SERVICE LETTER MOS RECOMMENDED RECOMMENDED 10-SEP-2009 SL 737-SL-31-052 AURAL WARNING MODULE PIN 69-78214-4. SERVICE LETTER RECOMMENDED MOS 01-MAY-2009 SL 737-SL-31-052 REV. A AURAL WARNING MODULE P/N 69-78214-4. SERVICE LETTER RECOMMENDED MOS 16-SEP-2009 SL 737-SL-31-052 REV. B AURAL WARNING MODULE P/N 69-78214-4. SERVICE LETTER RECOMMENDED MOS 14-DEC-2009 SI. 737-SL-31-053 COMMON DISPLAY SYSTEM (CDS) DISPLAY ELECTRONIC RECOMMENDED UNIT (DEU-II) MOD A. SERVICE LETTER MOS I I -SEP-2009 SI. 737-SL-31-055 P8 AISLE STAND STAB TRIM LIGHTPLATE WITH INCORRECT NOMENCLATURE RECOMMENDED . SERVICE LETTER MOS 22-FEB-2010 SL 737-SL-31-056 NEW S651 SPEEDBRAKE LEVER TAKEOFF WARNING SWITCH ANOMALIES (SUPERSEDED BY SL 737-SL-31-056 REV. A). SUPERSEDED SERVICE LETTER MOS SL 737-SL-31-056 REV. A NEW S651 SPEEDBRAKE LEVER TAKEOFF WARNING SWITCH ANOMALIES. SERVICE LETTER RECOMMENDED MOS I9-MAY-2011 SL 737-SL-31-057 HORIZONTAL STABILIZER TAKEOFF WARNING SWITCH INSTALLATION (SUPERSEDED BY SL 737-SL-31-057 REV. A). RECOMMENDED SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 298 Of 748 @ Camp Systems EFTA00618589 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-31-057 REV. A HORIZONTAL STABILIZER TAKEOFF WARNING SWITCH INSTALLATION. SERVICE LETTER RECOMMENDED MOS 08-FEB-2013 SL 737-SL-31-058 P1-3 AND P3-1 PANEL MODIFICATION: VENDOR SERVICE BULLETINS FOR THE CABIN ALTITUDE AND TAKE-OFF SUPERSEDED WARNING LIGHTS (SUPERSEDED BY SL 737-SL-31-058 REV. A). SERVICE LETTER MOS SL 737-SL-31-058 REV. A P1-3 AND P3-1 PANEL MODIFICATION: VENDOR SERVICE BULLETINS FOR THE CABIN ALTITUDE AND TAKE-OFF RECOMMENDED WARNING LIGHTS. SERVICE LETTER MOS 06-AUG-20I2 SL 737-SL-31-059 DISPLAYS: INCORPORATION OF PHASE 3A NORMALLY WHITE RECOMMENDED 77-SEP-2012 DISPLAY UNITS. SERVICE LETTER MOS SL 737-SL-32-074 PROXIMITY SWITCH ELECTRONIC UNIT, P/N Z85A1600. BITE MODULE CASKET MODIFICATION. SERVICE LETTER INFORMATIONAL 01 -JAN-2000 MOS - (s) SL 737-SL-32-075 IMPROPERLY TORQUED NOSE WHEEL STEERING TILLER NUT. SERVICE LETTER INFORMATIONAL 19-MAR-I999 MOS - (s) SL 737-SL-32-075 REV. A IMPROPERLY TORQUED NOSE WHEEL STEERING TILLER NUT. SERVICE LETTER INFORMATIONAL 17-NOV-2000 MOS - (s) SL 737-SL-32-076 MLG BRAKE HOUSING CORROSION AT HYDRAULIC DISCONNECT. SERVICE LETTER RECOMMENDED 17-SEP-2001 MOS - (s) SL 737-SL-32-076 REV. B MAIN LANDING GEAR BRAKE HOUSING CORROSION AT THE HYDRAULIC DISCONNECT COUPLING. SERVICE LETTER INFORMATIONAL 17-SEP-2001 MOS - (s) SL 737-SL-32-077 MLG TIRE SHOULDER WEAR. SERVICE LETTER RECOMMENDED 05-MAY-1999 MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 299 Of 748 @ Camp Systems EFTA00618590 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-078 02-JUL-1999 SL 737-SL-32-079 ANTISKID/AUTOBRAKE CONTROL UNIT UPGRADE. SERVICE LETTER MOS - Is) APPROVED LG TIRE SUPPLIER P/NS (SUPERSEDED BY SL 737-SL-32-079 REV. A). SERVICE LETTER RECOMMENDED SUPERSEDED MOS - Is) SL 737-SL-32-079 REV. A APPROVED LG TIRE SUPPLIER P/NS (SUPERSEDED BY SL 737-SL-32-079 REV. B). SERVICE LETTER SUPERSEDED MOS - Is) SI. 737-SL-32-079 REV. B APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR (SUPERSEDED BY SL 737-SL-32-079 REV. C). SERVICE SUPERSEDED LETTER MOS - (s) SI. 737-SL-32-079 REV. C APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SI. 737-SL-32-079 REV. O). SUPERSEDED SERVICE LETTER MOS SI. 737-SL-32-079 REV. F APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SL 737-SL-32-079 REV. G). SUPERSEDED SERVICE LETTER MOS SL 737-SL-32-079 REV. G APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SL 737-SL-32-079 REV. H). SUPERSEDED SERVICE LETTER MOS SL 737-SL-32-079 REV. H APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR SUPERSEDED TIRES (SUPERSEDED BY SL 737-SL-32-079 REV. I). SERVICE LETTER MOS SL 737-SL-32-079 REV. I APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SL 737-SL-32-079 REV. J). SUPERSEDED SERVICE LETTER MOS SL 737-SL-32-079 REV. J APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES (SUPERSEDED BY SL 737-SL-M-079 REV. K), SUPERSEDED SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 300 Of 748 @ Camp Systems EFTA00618591 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-079 REV. K APPROVED SUPPLIER PART NUMBERS FOR LANDING GEAR TIRES. SERVICE LETTER RECOMMENDED MOS 26-AUG-2013 SL 737-SL-32-080 INVESTIGATING TIRE TREAD LOSSES. SERVICE LETTER RECOMMENDED MOS 06-AUG-1999 (s) SL 737-SL-32-081 REV. A NOSE GEAR STEERING METERING VALVE HYDRAULIC FLUID LEAKAGE. SERVICE LETTER RECOMMENDED MOS 26-APR-2000 (s) SL 737-SL-32-082 MLG DOWN LOCK PROXIMITY SENSOR GROUND JUMPER INSTALLATION.. SERVICE LETTER RECOMMENDED MOS 17-N0v-1999 (s) SL 737-SL-32-085 MLG FLEX CONDUIT CHAFING ON TORSION LINK APEX NUT.. SERVICE LETTER RECOMMENDED MOS 22-DEC-1999 -c.$) SL 737-SL-32-086 LANDING GEAR RETRACTION DIFFICULITIES CAUSED BY MANUAL EXTENSION SYSTEM SWITCH. SERVICE LETTER RECOMMENDED MOS 17-JAN-2000 (51 SL 737-SL-32-086 REV. A LANDING GEAR RETRACTION DIFFICULITIES CAUSED BY MANUAL EXTENSION SYSTEM SWITCH. SERVICE LETTER INFORMATIONAL MOS 07-AUG-2000 (51 SL 737-SL-32-086 REV. B LANDING GEAR RETRACTION DIFFICULTIES CAUSED BY MANUAL EXTENTION SYSTEM SWITCH. SERVICE LETTER INFORMATIONAL MOS 29-OCT-2002 SL 737-SL-32-086 REV. D LANDING GEAR RETRACTION DIFFICULTIES CAUSED BY MANUAL EXTENSION SYSTEM SWITCH. SERVICE LETTER INFORMATIONAL MOS 04-JUN-2003 SL 737-SL-32-086 REV. F LANDING GEAR RETRACTION DIFFICULTIES CAUSED BY MANUAL EXTENTION SYSTEM SWITCH. SERVICE LETTER INFORMATIONAL MOS 09-MAR-2004 SL 737-SL-32-087 REV. A NOSE GEAR TORSIN LINK APEX PIN REPLACEMENT. 162A1310-1. SERVICE LETTER INFORMATIONAL MOS 07-FEB-2000 is) ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 301 Of 748 Camp Systems EFTA00618592 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-088 02-FEB-2000 PROXIMITY SWITCH ELECTRONIC UNIT UPGRADE TO PIN 285A1600-3. SERVICE LETTER MOS - (s) 51 737-SL-32-088 REV. A PROXIMITY SWITCH ELECTRONIC UNIT UPGRADE TO P/N 285A1600-3. SERVICE LETTER MOS I6-MAY-2000 - (s) 51 737-SL-32-089 REV. A INABILITY TO EXTEND NOSE GEAR ON THE FIRST ATTEMPT. SERVICE LETTER MOS 31-AUG-2000 - Is) 51 737-SL-32-090 USE 737 STEERING LOCKOUT PINS.. SERVICE LETTER MOS I 7-APR-2000 - (s) 51 737-SL-32-090 REV. A USE 737 STEERING LOCKOUT PINS.. SERVICE LETTER MOS 31 -JUL-2000 - (s) 51 737-SL-32-091 NOSE GEAR FLEXIBLE CONDUIT P/N 287A6212-21 DAMAGED. SERVICE LETTER MOS I2-MAY-2000 - (s) 51 737-5L-32-091 REV. A NOSE GEAR FLEXIBLE CONDUIT P/N 287A6212-21 DAMAGED. SERVICE LETTER MOS 20-JUN-2000 - (s) 51 737-SL-32-091 REV. 8 NOSE GEAR FLEXIBLE CONDUIT P/N 287A6212-21/-26 DAMAGE. SERVICE LETTER MOS 04-MAY-2006 INFORMATIONAL RECOMMENDED INFORMATIONAL RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED 51 737-SL-32-092 LEFT ALTERNATE BRAKE PRESSURE TRANSMITTER SEALANT MISSING. SERVICE LETTER RECOMMENDED MOS 03-MAY-2000 - (s) SL 737-SL-32-094 COTTER PINS MISSING FROM RUDDER PEDAL STEERING INTERCONNECT MECHANISM. SERVICE LETTER RECOMMENDED MOS I5-MAY-2000 - (s) SL 737-SL-32-094 REV. A COTTER PINS MISSING FROM RUDDER PEDAL STEERING INTERCONNECT MECHANISM SERVICE LETTER, SERVICE RECOMMENDED LETTER MOS 28-JUL-2000 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 302 Of 748 @ Camp Systems EFTA00618593 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-094 REV. 8 COTTER PINS MISSING FROM RUDDER PEDAL STEERING INTERCONNECT MECHANISM, SERVICE LETTER I6-AUG-2000 MOS - Is) St 737-SL-32-095 PROXIMITY SENSOR 10-61226-29 IMPROVEMENT. SERVICE LETTER MOS 20-JUL-2000 -(s) St 737-SL-32-096 NOSE LANDING GEAR STEERING ACTUATOR. SERVICE LETTER MOS 23-AUG-2000 - Is) St 737-SL-32-096 REV. A NOSE LANDING GEAR STEERING ACTUATOR, SERVICE LETTER MOS 22-SEP-2000 - Is) St 737-SL-32-097 REV. B PREMATURE WEAR ON 737NG NOSE GEAR STEERING COLLAR. SERVICE LETTER MOS 72-OCT-2001 - (s) St 737-SL-32-097 REV. C PREMATURE WEAR ON 737NG NOSE GEAR STEERING COLLAR. SERVICE LETTER MOS 06-MAR-2002 - (s) St 737-SL-32-097 REV. 0 PREMATURE WEAR ON 737NG NOSE GEAR STEERING COLLAR. SERVICE LETTER MOS I7-MAR-2003 St 737-SL-32-098 LANDING GEAR BRAKE METERING VALVE CONTROL CRANK BOLT INSPECTION. SERVICE LETTER MOS I9-DEC-2000 03-OCT-2000 - (s) St 737-SL-32-100 MAIN LANDING GEAR SHIMMY DAMPER INSTALLATION AND SHIMMY INSPECTIONS, SERVICE LETTER MOS I2-APR-2002 St 737-SL-32-101 LANDING GEAR WHEEL. BRAKE AND TIRE INTERCHANGEABILITY INFORMATION. SERVICE LETTER I5-JUN-2001 - (s) St 737-SL-32-101 REV. A LANDING GEAR WHEEL. BRAKE AND TIRE INTERCHANGEABILITY INFORMATION. SERVICE LETTER I3-MAY-2005 - (s) MOS MOS RECOMMENDED INFORMATIONAL INFORMATIONAL RECOMMENDED INFORMATIONAL INFORMATIONAL SUPERSEDED INFORMATIONAL COMPUED WITH INFORMATIONAL INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 303 Of 748 @ Camp Systems EFTA00618594 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-101 REV. 8 WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION. SERVICE LETTER MOS 16-AUG-2007 SL 737-SL-32-101 REV. C LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SL 737-SL-32-101 SUPERSEDED REV. D). SERVICE LETTER MOS SL 737-SL-32-101 REV. D LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SL 737-SL-32-101 SUPERSEDED REV. E), SERVICE LETTER MOS SL 737-SL-32-101 REV. E LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SL 737-SL-32-101 SUPERSEDED REV. F). SERVICE LETTER MOS SI. 737-SL-32-101 REV. F LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SI. 737-SL-32-101 RECOMMENDED REV. G). SERVICE LETTER MOS I3-APR-2012 SI. 737-SL-32-101 REV. G LANDING GEAR WHEEL BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SS 737-SL-32-101 SUPERSEDED REV. H). SERVICE LETTER MOS SI. 737-SL-32-101 REV. H LANDING GEAR WHEEL. BRAKE AND TIRE INTERCHANGEABILITY INFORMATION (SUPERSEDED BY SL 737-SL-32-101 SUPERSEDED REV. I). SERVICE LETTER MOS SL 737-SL-32-101 REV. I LANDING GEAR WHEEL. BRAKE AND TIRE INTERCHANGEABILITY INFORMATION. SERVICE LETTER RECOMMENDED MOS 19-MAR-2014 SL 737-SL-32-103 ADDITION OF ANTI-ROTATION WASHERS TO PREVENT STEERING ACTUATOR ROD END CHAFING. SERVICE LETTER RECOMMENDED MOS 17-SEP-2001 - (s) SL 737-SL-32-103 REV. A ADDITION OF ANTI-ROTATION WASHERS TO PREVENT STEERING ACTUATOR ROD END CHAFING. SERVICE LETTER MOS 19-MAR-2002 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 304 Of 748 @ Camp Systems EFTA00618595 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-103 REV. 8 ADDITION OF ANTI-ROTATION WASHERS TO PREVENT STEERING ACTUATOR ROD END CHAFING. SERVICE LETTER 05-NOV-2002 MOS AFL 51 737-SL-32-101 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) UPGRADE TO PIN 285A1600-4, SERVICE LETTER INFORMATIONAL 51 I I -SEP-2001 737-SL-32-105 REV. A MOS - (s) LANDING GEAR COMPONENT INTERCHANGEABILITY AND 51 10-MAY-2005 737-SL-32-105 REV. 8 SAFE LIFE COMPONENT INFORMATION, SERVICE LETTER MOS LANDING GEAR COMPONENT INTERCHANGEABILITY AND 28-AUG-2007 SAFE LIFE COMPONENT INFORMATION, SERVICE LETTER MOS 51 737-SL-32-105 REV. C LANDING GEAR COMPONENT INTERCHANGEABILITY AND SAFE LIFE COMPONENT INFORMATION (SUPERSEDED BY SUPERSEDED 51 737-SL-32-105 REV. O). SERVICE LETTER MOS 51 737-SL-32-105 REV. D LANDING GEAR COMPONANT INTERCHANGEABILITY AND SAFE LIFE COMPONENT INFORMATION. SERVICE LETTER RECOMMENDED 27 -SEP-2010 MOS 51 737-SL-32-106 REWORK OF MLG SIDE STRUT PIN FIN 161A2331 PROTECTIVE EPDXY PRIMER. SERVICE LETTER INFORMATIONAL 27-NOV-2001 MOS - (s) 51 737-SL-32-107 TIE BOLT NUTS FOUND CRACKED ON HONEYWELL (BENDIX) NOSE WHEELS SERVICE LETTER. SERVICE LETTER RECOMMENDED 23-OCT-2001 MOS 51 737-SL-32-107 REV. A TIE BOLT NUTS FOUND CRACKED ON HONEYWELL (BENDIX) NOSE WHEELS, SERVICE LETTER INFORMATIONAL 28-NOV-2001 MOS - (s) 51 737-SL-32-108 MAIN GEAR TORSION UNK APEX NUT FOUND LOOSE. SERVICE LETTER INFORMATIONAL I6-NOV-2001 MOS - (4) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 305 Of 748 @ Camp Systems EFTA00618596 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-110 22-FEB-2002 NLG STEERING - INTERCONNECT - EXCESSIVE GAP BETWEEN CABLE QUADRANT AND CABLE KEEPER PIN. SERVICE LETTER MOS - Is) St 737-SL-32-111 REV. A ESTABLISHING A LIFE LIMIT FOR WHEEL TIE BOLTS ON SUPERSEDED BENDIX (HONEYWELL) 737 WHEELS (SUPERSEDED BY SL 737-SL-32-111 REV. B). SERVICE LETTER MOS St 737-SL-32-111 REV. B ESTABLISHING A LIFE LIMIT FOR WHEEL TIE BOLTS ON BENDIX (HONEYWELL) 737 WHEELS. SERVICE LETTER RECOMMENDED MOS 27-SEP-2012 St 737-SL-32-112 REV. A OVERHAUL OF STEEL COMPONENTS - CADMIUM STRIP REQUIRED. SERVICE LETTER INFORMATIONAL MOS 24-JAN-2002 - (s) St 737-SL-32-113 MAIN GEAR EXTENSION PROBLEMS CAUSED BY DOWNLOCK ACTUATOR MANUFACTURING DISCREPANCY. SERVICE INFORMATIONAL LETTER MOS 09-APR-2002 - (s) St 737-SL-32-113 REV. A MAIN GEAR EXTENTION PROBLEMS CAUSED BY DOWNLOCK ACUTATOR MANUFACTURING DISCREPANCY. SERVICE INFORMATIONAL LETTER MOS I6-JUN-2003 St 737-SL-32-116 CRACKS FOUND ON MAIN LANDING GEAR SYSTEM SUPPORT TRAYS (SUPERSEDED BY SL 737-SL-32-116 REV. A). RECOMMENDED SERVICE LETTER MOS 30-OCT-2002 - (s) St 737-SL-32-116 REV. A CRACKS FOUND ON MAIN LANDING GEAR SYSTEM SUPPORT TRAYS (SUPERSEDED BY SL 737-SL-32-116 REV. B). INFORMATIONAL SERVICE LETTER MOS 27-MAY-2003 St 737-SL-32-116 REV. B CRACKS FOUND ON MAIN LANDING GEAR SYSTEM SUPPORT TRAYS (SUPERSEDED BY SL 737-SL-32-116 REV. C). SUPERSEDED SERVICE LETTER MOS St 737-SL-32-116 REV. C CRACKS FOUND ON MAIN LANDING GEAR SYSTEM SUPPORT TRAYS. SERVICE LETTER RECOMMENDED MOS 08-JUN-20I2 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 306 Of 748 @ Camp Systems EFTA00618597 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-119 MAIN GEAR ACTUATOR INTERNAL LEAKAGE CHECK. SERVICE LETTER MOS 03-FEB-2003 AFL 3000 (s) SL 737-SL-32-119 REV. A MAIN GEAR ACTUATOR INTERNAL LEAKAGE CHECK, SERVICE LETTER 21 -JAN-2004 MOS AIR RECOMMENDED INFORMATIONAL RECURRING SL 737-SL-32-119 REV. B MAIN GEAR ACTUATOR INTERNAL LEAKAGE CHECK. SERVICE LETTER 27-OCT-2005 SL 737-SL-32-119 REV. D MAIN GEAR ACTUATOR INTERNAL LEAKAGE CHECK. SERVICE LETTER RECOMMENDED MOS 13-OG1.-2010 MOS SL 737-SL-32-121 LANDING GEAR CONTROL LEVER IMPROVEMENTS. SERVICE LETTER INFORMATIONAL MOS 07-APR-2003 SL 737-SL-32-121 REV. A LANDING GEAR CONTROL LEVER IMPROVEMENTS. SERVICE LETTER MOS 06-OCT-2005 SL 737-SL-32-121 REV. B LANDING GEAR CONTROL LEVER IMPROVEMENTS (SUPERSEDED BY SL 737-SL-32-121 REV. C), SERVICE LETTER SUPERSEDED MOS SL 737-SL-32-121 REV. C LANDING GEAR CONTROL LEVER IMPROVEMENTS. SERVICE LETTER RECOMMENDED MOS 04-OCT-2011 SL 737-SL-32-122 REV. A LANDING GEAR WHEEL INSTALLATION. SPACER AND RETENTION WASHER. SERVICE LETTER MOS 04-MAY-2006 SL 737-SL-32-123 MAIN LANDING GEAR UPLOCK SPRING FRACTURES. SERVICE LETTER INFORMATIONAL MOS 15-DEC-2003 SL 737-SL-32-124 IMPROVED STEERING METERING VALVE FOR NOSE LANDING GEAR. SERVICE LETTER INFORMATIONAL MOS 23-MAR-2004 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 307 Of 748 @ Camp Systems EFTA00618598 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-125 27-APR-2006 SL 737-SL-32-126 03-FEB-2005 SL 737-SL-32-128 I6-MAY-2005 SL 737-SL-32-129 30-AUG-2005 SL 737-SL-32-130 09-DEC-2005 MLG OUTER CYUNDER RETRACT ACTUATOR AND WALKING BEAM ATTACH LUG BUSHING MIGRATION AND FILLET SEAL CRACKS. SERVICE LETTER MOS NOSE LANDING GEAR FLEXIBLE CONDUIT P/N 287A6212-25 REPLACEMENT. SERVICE LETTER MOS TIRE RETREADING RECOMMENDATIONS. SERVICE LETTER MOS NOSE GEAR LOCK VALVE MANIFOLD DUPLICATE SERIAL NUMBERS. SERVICE LETTER MOS MAIN LANDING GEAR UPLOCK PINS MAY NOT HAVE BEEN PROPERLY PREPARED PRIOR TO CHROME PLATE APPLICATION. SERVICE LETTER MOS SL 737-SL-32-130 REV. A MAIN LANDING GEAR UPLOCK PINS MAY NOT HAVE BEEN PROPERLY PREPARED PRIOR TO CHROME PLATE APPLICATION. SERVICE LETTER MOS 21-MAR-2006 SL 737-SL-32-131 MAIN LANDING GEAR ACTUATOR - LOOSE LOCKNUT & BROKEN SAFETY WIRE. SERVICE LETTER MOS O6-OCT-2005 SL 737-SL-32-131 REV. A MAIN LANDING GEAR RETRACT ACTUATOR - LOOSE LOCKNUT & BROKEN SAFETY WIRE. SERVICE LETTER MOS I9-APR-2006 SL 737-SL-32-131 REV. B MAIN LANDING GEAR RETRACT ACTUATOR - LOOSE LOCKNUT & BROKEN SAFETY WIRE. SERVICE LETTER MOS 26-MAY-2009 SL 737-SL-32-132 09-NOV-2005 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) UPGRADE OF P/N 285A1600-4 TO MOD A. SERVICE LETTER MOS RECOMMENDED NOT APPLICABLE 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 308 Of 748 @ Camp Systems EFTA00618599 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-133 30-MAR-2006 LANDING GEAR CONTROL CABLE HIGH TENSION. SERVICE LETTER MOS SL 737-SL-32-134 NLG SHOCK STRUT ALTERNATE DYNAMIC SEAL. SERVICE LETTER MOS 03-APR-2006 SL 737-SL-32-134 REV. B NLG SHOCK STRUT ALTERNATE DYNAMIC SEAL. SERVICE LETTER MOS I I -AUG-2008 SL 737-SL-32-135 SHIMMY DAMPER MOUNTING BOLTS- GRIP LENGTH. SERVICE LETTER INFORMATIONAL MOS I3-APR-2006 SL 737-SL-32-135 REV. A SHIMMY DAMPER MOUNTING BOLTS - GRIP LENGTH (SUPERSEDED BY SL 737-SL-32-135 REV. B). SERVICE LETTER SUPERSEDED MOS SL 737-SL-32-135 REV. B SHIMMY DAMPER MOUNTING BOLTS- GRIP LENGTH. SERVICE LETTER RECOMMENDED MOS 08-SEP-2011 SL 737-SL-32-137 STEERING METERING VALVE TOW LEVER STUCK IN TOW POSITION. SERVICE LETTER MOS I4-JUN-2006 SL 737-SL-32-137 REV. A STEERING METERING VALVE TOW LEVER STUCK IN TOW POSITION. SERVICE LETTER 30-OCT-2006 SL 737-SL-32-138 10-JUL-2006 MOS AFL 50 (s) SUGGESTED SHOP MAINTENANCE PROCEDURES FOR WHEEL AND TIRE ASSEMBLIES (SUPERSEDED BY SL 737-SL-32-138 REV. A). SERVICE LETTER MOS SL 737-SL-32-138 REV. A SUGGESTED SHOP MAINTENANCE PROCEDURES FOR WHEEL AND TIRE ASSEMBLIES (SUPERSEDED BY SL 737-SL-32-138 REV. B). SERVICE LETTER MOS 06-DEC-2006 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 309 Of 748 @ Camp Systems EFTA00618600 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-138 REV. 8 SUGGESTED SHOP MAINTENANCE PROCEDURES FOR WHEEL AND TIRE ASSEMBLIES. SERVICE LETTER 29-APR-20I3 SL 737-SL-32-140 BRAKE METERING VALVE STATIC SEAL LEAKAGE. SERVICE LETTER MOS 05-OCT-2006 SL 737-SL-32-141 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) P/N 285A1600-5. SERVICE LETTER MOS 17-NOV-2006 MOS RECOMMENDED SL 737-SL-32-141 REV. A PROXIMITY SWITCH ELECTRONIC UNIT (PSEU)P!N 285A1600-5. SERVICE LETTER INFORMATIONAL MOS 23-MAR-2010 SL 737-SL-32-143 FATALITY OF A MAINTENANCE WORKER DUE TO WHEEL/TIRE OVERPRESSURIZATION. SERVICE LETTER MOS 09-JUL-2007 SL 737-SL-32-143 REV. A FATALITY OF A MAINTENANCE WORKER DUE TO WHEEL/TIRE OVERPRESSURIZATION. SERVICE LETTER RECOMMENDED MOS Of-MAY-2009 SI. 737-SL-32-144 REV. A LANDING GEAR LIFE LIMITED PART RECORDKEEPING REQUIREMENTS. SERVICE LETTER MOS I9-FEB-2008 SL 737-SL-32-145 NOSE LANDING GEAR VIBRATION. SERVICE LETTER MOS I 7-JUL-2007 SL 737-SL-32-145 REV. A NOSE LANDING GEAR VIBRATION (SUPERSEDED BY SL 737-SL-32-105 REV. 8). SERVICE LETTER SUPERSEDED MOS SL 737-SL-32-145 REV. 8 NOSE LANDING GEAR VIBRATION (SUPERSEDED BY SL 737-SL-32-105 REV. C). SERVICE LETTER SUPERSEDED MOS SL 737-SL-32-145 REV. C NOSE LANDING GEAR VIBRATION. SERVICE LETTER RECOMMENDED MOS 25-JUL-2012 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 310 Of 748 @ Camp Systems EFTA00618601 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-146 28-AUG-2007 NOSE WHEEL STEERING INTERCONNECT MECHANISM - LOOSE NUT FOUND. SERVICE LETTER MOS St 737-SL-32-147 CLARIFICATION CONCERNING MOBIL AVIATION WHEEL BEARING GREASE NAMES. SERVICE LETTER MOS 26-SEP-2007 St 737-SL-32-149 POSSIBLE CAUSES OF LANDING GEAR WHEEL LOSSES AND WHEEL BEARING FAILURES (SUPERSEDED BY SL 737-SL-32-149 REV. A). SERVICE LETTER MOS SUPERSEDED St 737-SL-32-149 REV. A POSSIBLE CAUSES OF LANDING GEAR WHEEL LOSSES AND WHEEL BEARING FAILURES. SERVICE LETTER RECOMMENDED MOS I2-SEP-2013 St 737-SL-32-150 NLG INNER CYLINDER AXLE INSPECTIONS. SERVICE LETTER MOS 27-NOV-2007 St 737-SL-32-150 REV. A NLG INNER CYLINDER AXLE INSPECTIONS. SERVICE LETTER MOS 28-FEB-2008 St 737-SL-32-150 REV. 8 NLG INNER CYLINDER AXLE INSPECTIONS. SERVICE LETTER MOS 25-JUL-2008 St 737-SL-32-151 NOSE LANDING GEAR MANUAL EXTENSION SPRING. SERVICE LETTER MOS 08-FEB-2008 St 737-SL-32-152 IMPROVED NOSE LANDING GEAR ACTUATOR ROD ATTACH CLAMP-UP BUSHING. SERVICE LETTER MOS 30-APR-2008 SL 737-SL-32-152 REV. A IMPROVED NOSE LANDING GEAR ACTUATOR ROD ATTACH CLAMP-UP BUSHING. SERVICE LETTER MOS 21-AUG-2009 RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 311 Of 748 @ Camp Systems EFTA00618602 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-152 REV. 8 IMPROVED NOSE LANDING GEAR ACTUATOR ROD ATTACH CLAMP-UP BUSHING. SERVICE LETTER 03-MAR-2010 SL 737-SL-32-153 ANTISKID VALVE CONNECTOR MISSING POTTING. SERVICE LETTER 04-APR-2008 MOS MOS SI. 737-SL-32-154 REV. A MAIN LANDING GEAR ACTUATOR BARREL CRACKS FOLLOWING REPAIR PER SERVICE BULLETIN. SERVICE LETTER MOS I2-MAY-2009 SL 737-5L-32-154 REV. 8 MAIN LANDING GEAR ACTUATOR BARREL CRACKS FOLLOWING REPAIR PER SERVICE BULLETIN. SERVICE LETTER MOS 04-AUG-2009 SL 737-SL-32-154 REV. C MAIN LANDING GEAR ACTUATOR BARREL CRACKS FOLLOWING REPAIR PER SERVICE BULLETIN. SERVICE LETTER DAYS 7 (s) 02-OCT-2009 SL 737-SL-32-156 EFFECTS OF ALKALI METAL (ORGANIC SALT) RUNWAY DEICERS ON CARBON BRAKES. SERVICE LETTER MOS 26-JAN-2009 SL 737-SL-32-157 BRAKE METERING VALVE SHAFT SEAL LEAKAGE. SERVICE LETTER MOS O5-FEB-2009 SL 737-SL-32-157 REV. A BRAKE METERING VALVE SHAFT SEAL LEAKAGE. SERVICE LETTER MOS IO-JUN-2009 SL 737-SL-32-157 REV. 8 BRAKE METERING VALVE SHAFT SEAL LEAKAGE. SERVICE LETTER MOS IO-MAR-2010 SL 737-SL-32-158 INCORRECT PART NUMBER ON NOSE GEAR DOWN LINE HYDRAULIC FUSE. SERVICE LETTER MOS 31-MAR-2009 RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED INFORMATIONAL RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (0-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 312 Of 748 @ Camp Systems EFTA00618603 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-159 MESSIER-BUGATTI MAIN GEAR WHEEL - SPECIAL INSPECTIONS (SUPERSEDED BY SL 737-SL-32-159 REV. A). SERVICE SUPERSEDED LETTER MOS SL 737-SL-32-159 REV. A MESSIER-BUGATTI MAIN GEAR WHEEL - SPECIAL INSPECTIONS (SUPERSEDED BY SL 737-SL-32-159 REV. B), SERVICE SUPERSEDED LETTER MOS SL 737-SL-32-159 REV. B MESSIER-BUGATTI MAIN GEAR WHEEL - SPECIAL INSPECTIONS. SERVICE LETTER 22-FEB-20I1 MOS SL 737-SL-32-160 MAIN LANDING GEAR SIDE STRUT APEX PIN FINISH CHANGES. SERVICE LETTER MOS 02-JUL-2009 SL 737-SL-32-161 RIDING CONDITION FOUND ON BRAKE PEDAL BUS. SERVICE LETTER MOS 26-AUG-2009 SI. 737-SL-32-162 INBOARD HUB FRACTURES ON HONEYWELL MAIN GEAR WHEELS. SERVICE LETTER MOS 19-AUG-2009 SL 737-SL-32-162 REV. A INBOARD HUB FRACTURES ON HONEYWELL MAIN GEAR WHEELS. SERVICE LETTER MOS 04-MAY-2010 SL 737-SL-32-163 LANDING GEAR LEVER DOES NOT DROP INTO 'OFF DETENT. SERVICE LETTER MOS 02-OCT-2009 SL 737-SL-32-164 LANDING GEAR ALTERNATE EXTENSION SYSTEM SWITCH DAMAGED (SUPERSEDED BY 737-SL-32-164-A). SERVICE LETTER MOS 12-OCT-2009 SL 737-SL-32-164 REV. A LANDING GEAR ALTERNATE EXTENSION SYSTEM SWITCH DAMAGE. SERVICE LETTER MOS 07-JUN-2010 RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED INFORMATIONAL RECOMMENDED SUPERSEDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 313 Of 748 @ Camp Systems EFTA00618604 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-165 737NG LANDING GEAR RESTORATION REQUIREMENTS (SUPERSEDED BY SL 737-SL-32-165 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-32-165 REV. A 737NG LANDING GEAR RESTORATION REQUIREMENTS. SERVICE LETTER RECOMMENDED MOS I5-JUL-2010 SL 737-SL-32-166 INSTALLATIONiREMOVAL OF THE MAIN LANDING GEAR. SERVICE LETTER INFORMATIONAL MOS 09-MAR-2010 SI. 737-SL-32-167 INSTALLATION OF TITANIUM PROXIMITY SENSOR P/N 80-207-01 ON WING LEADING EDGE AND LANDING GEAR INFORMATIONAL (SUPERSEDED BY SL 737-SL-32-167 REV. A). SERVICE LETTER MOS 31-MAR-2010 SI. 737-SL-32-167 REV. A INSTALLATION OF TITANIUM PROXIMITY SENSOR P/N 80-207-01 ON WING LEADING EDGE AND LANDING GEAR. INFORMATIONAL SERVICE LETTER MOS 03-APR-20I3 a 737-SL-32-168 POTENTIALLY INCORRECT MAIN LANDING GEAR AXLE INSTALLATION. SERVICE LETTER RECOMMENDED MOS I6-JUL-2010 a 737-SL-32-169 POTENTIALLY INCORRECT MAIN LANDING GEAR LOWER TORSION LINK INSTALLATION. SERVICE LETTER RECOMMENDED MOS I5-JUL-2010 SL 737-SL-32-170 LANDING GEAR CONTROL CABLE LOW TENSION, SERVICE LETTER RECOMMENDED MOS I5-JUL-2010 a 737-SL-32-171 NOSE LANDING GEAR AXLE INSPECTIONS DUE TO POSSIBLE CHROME GRINDING DAMAGE DURING PRODUCTION SUPERSEDED (SUPERSEDED BY SL 737-SL-32-171 REV. A). SERVICE LETTER MOS SL 737-SL-32-171 REV. A NOSE LANDING GEAR AXLE INSPECTIONS DUE TO POSSIBLE CHROME GRINDING DAMAGE DURING PRODUCTION. RECOMMENDED SERVICE LETTER MOS 07-APR-20 1 4 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 314 Of 748 @ Camp Systems EFTA00618605 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-172 25-MAY-2011 LANDING GEAR BEARING CARRIER REFINISH OPTION. SERVICE LETTER MOS RECOMMENDED SL 737-SL-32-173 MAIN LANDING GEAR UPLOCK SPRING FRACTURES (SUPERSEDED BY SL 737-SL-32-173 REV. A). SERVICE LETTER SUPERSEDED MOS 09-FEB-2011 SI. 737-SL-32-173 REV. A MAIN LANDING GEAR UPLOCK SPRING FRACTURES (SUPERSEDED BY SL 737-SL-32-173 REV. B) SUPERSEDED . SERVICE LETTER MOS SL 737-SL-32-173 REV. B MAIN LANDING GEAR UPLOCK SPRING FRACTURES. SERVICE LETTER RECOMMENDED MOS I9-JUL-2011 SL 737-SL-32-174 LANDING GEAR SHOCK STRUT DYNAMIC SEAL INSTALLATION TOOLING. SERVICE LETTER RECOMMENDED MOS 03-FEB-2011 SL 737-SL-32-175 LANDING GEAR LOWER BEARING CARRIER REFINISH OPTION. SERVICE LETTER RECOMMENDED MOS 25-MAY-2011 SL 737-SL-32-176 POTENTIALLY INCORRECT MAIN LANDING GEAR UPPER TORSION LINK PIN INSTALLATION. SERVICE LETTER RECOMMENDED MOS 19-MAY-2011 SL 737-SL-32-178 DIGITAL LANDING GEAR SHOCK STRUT AND TIRE PRESSURE GAUGE (SUPERSEDED BY SL 737-SL-32-178 REV. A). SUPERSEDED SERVICE LETTER MOS SL 737-SL-32-178 REV. A DIGITAL LANDING GEAR SHOCK STRUT AND TIRE PRESSURE GAUGE. SERVICE LETTER RECOMMENDED MOS 17-OCT-2012 SL 737-SL-32-179 HYDRAULIC LINE RIDING W8224 WIRE BUNDLE 9SUPERSEDED BY SL 737-SL-32-179 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-32-179 REV. A HYDRAULIC LINE RIDING W8224 WIRE BUNDLE (SUPERSEDED BY SL 737-SL-32-179 REV. B). SERVICE LETTER RECOMMENDED MOS I4-FEB-2012 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 315 Of 748 @ Camp Systems EFTA00618606 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-179 REV. B HYDRAULIC LINE RIDING W8224 WIRE BUNDLE. SERVICE LETTER 27-APR-20I2 SI. 737-SL-32-180 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) P/N 285A1600-6 (SUPERSEDED BY SL 737-SL-32-180 REV. A). SERVICE SUPERSEDED LETTER MOS MOS RECOMMENDED SL 737-SL-32-180 REV. A PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) P/N 285A1600-6 (SUPERSEDED BY SL 737-SL-32-180 REV. 8). SERVICE RECOMMENDED LETTER MOS I8-SEP-2012 SL 737-SL-32-180 REV. 8 PROXIMITY SWITCH ELECTRONIC UNIT (PSEU) P/N 285A1600-6. SERVICE LETTER RECOMMENDED MOS 02-APR-20I3 SL 737-SL-32-181 -737NG NOSE LANDING GEAR NON-CONFORMING STEERING SUPERSEDED SYSTEM STRUCTURAL COMPONENTS" (SUPERSEDED BY SL 737-SL-32-181 REV. A). SERVICE LETTER MOS SL 737-SL-32-181 REV. A 03-OCT-2012 SL 737-SL-32-182 21 -JUN-20I2 SL 737-SL-32-183 26-APR-20I2 737NG NOSE LANDING GEAR NON-CONFORMING STEERING SYSTEM STRUCTURAL COMPONENTS. SERVICE LETTER RECOMMENDED MOS COLD SPRAY REPAIR OF P/N 287A8115 MLG WIRE BUNDLE SUPPORT BRACKET. SERVICE LETTER RECOMMENDED MOS THERMAL SPRAY REPAIR OF TITANIUM LANDING GEAR BEARING CARRIERS. SERVICE LETTER RECOMMENDED MOS SL 737-SL-32-184 REPAIR OF TITANIUM LANDING GEAR BEARING CARRIERS USING THE LASER DEPOSITION PROCESS. SERVICE RECOMMENDED LETTER MOS I I -MAY-20I2 SL 737-SL-32-185 I4-JUN-2012 WIRE BUNDLE W8224 - POSSIBLE MISSING CLAMP IN MAIN GEAR WHEEL WELL. SERVICE LETTER RECOMMENDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 316 Of 748 @ Camp Systems EFTA00618607 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-186 03-OCT-2012 SL 737-SL-32-187 26-OCT-2012 SL 737-SL-32-188 22-JUL-2013 SL 737-SL-32-188 REV. A SHIMMY DAMPER COMPENSATOR MOUNTING BOLTS (SUPERSEDED BY SL 737-SL-32-188 REV. B). SERVICE LETTER SUPERSEDED MOS MLG OUTER CYLINDER TRUNNIONS LUBRICATION SERVICING AND REMOVED DECALS. SERVICE LETTER MOS MAIN LANDING GEAR OUTBOARD DOWNLOCK SPRING PIN. SERVICE LETTER MOS RECOMMENDED RECOMMENDED SHIMMY DAMPER COMPENSATOR MOUNTING BOLTS (SUPERSEDED BY SL 737-SL-32-188 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-32-188 REV. B 09-MAY-2014 SHIMMY DAMPER COMPENSATOR MOUNTING BOLTS. SERVICE LETTER MOS RECOMMENDED SL 737-SL-32-189 NOSE WHEEL STEERING CABLE - POTENTIAL CHAFING CONDITION WITH A WIRE BUNDLE. SERVICE LETTER RECOMMENDED MOS 08-FEB-20I3 SL 737-SL-32-190 ANTISKID/AUTOBRAKE CONTROL UNIT (AACU) - REPLACEMENT OF UNAUTHORIZED TRANSISTORS. SERVICE LETTER RECOMMENDED MOS 13-FEB-20I3 SL 737-SL-32-191 MLG SHOCK STRUT ALTERNATE DYNAMIC SEAL. SERVICE LETTER RECOMMENDED MOS 16-APR-20I3 SL 737-SL-32-192 BRAKE CONTROL CABLE TENSION CHECK (SUPERSEDED BY SL 737-SL-32-192 REV. A). SERVICE LETTER MOS SL 737-SL-32-192 REV. A BRAKE CONTROL CABLE TENSION CHECK. SERVICE LETTER MOS 07-FEB-2014 SL 737-SL-32-193 NLG ALTERNATE EXTENSION MECHANISM BINDING. SERVICE LETTER MOS 12-JUN-2013 SUPERSEDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 317 Of 748 @ Camp Systems EFTA00618608 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-32-194 LANDING GEAR LIFE LIMITED PARTS IN THE AIRCRAFT READINESS LOG (SUPERSEDED BY SL 737-SL-32-194 REV. A), SUPERSEDED SERVICE LETTER MOS 51 737-SL-32-194 REV. A LANDING GEAR LIFE LIMITED PARTS IN THE AIRCRAFT READINESS LOG (REPLACED BY SL 737-SL-00-026). SERVICE SUPERSEDED LETTER MOS 51 737-SL-32-195 USE OF SMARTSTEM TIRE PRESSURE SENSOR ON DELIVERED AIRPLANES. SERVICE LETTER RECOMMENDED 10-OCT-2013 MOS 51 737-SL-32-196 PROXIMITY SENSOR MAINTENANCE/REMOVAL BEST PRACTICES AND SUPPLIER RELIABILITY IMPROVEMENTS. RECOMMENDED 31-MAR-2014 SERVICE LETTER MOS 51 737-SL-33-029 PRESS-TO-TEST ANNUNCIATORSDISCREPANT PRINTED CIRCUIT ASSEMBLY. SERVICE LETTER RECOMMENDED 01-APR-1999 MOS -(s) 51 737-SL-33-029 REV. A PRESS-TO-TEST ANNUNCIATORSDISCREPANT PRINTED CIRCUIT ASSEMBLY. SERVICE LETTER RECOMMENDED 14-MAY-2001 MOS -(s) 51 737-SL-33-030 FLORESCENT LIGHT LAMP DAMPENERS. SERVICE LETTER RECOMMENDED I2-JUL-1999 MOS - (s) 51 737-SL-33.032 REV. A FORWARD POSITION LIGHT LENS CRACKING - INTERIM CORRECTION ACTION. SERVICE LETTER INFORMATIONAL I2-JAN-2000 MOS - (s) SL 737-SL-33.033 LIGHTED PUSHBUTTON SWITCHES AND ANUNCIATORS - KOFtRY - EMITTING DIODE (LED) REPLACEMENTS FOR INFORMATIONAL 08-OCT-1999 INCANDESCENT LIGHTS. SERVICE LETTER MOS - (s) 51 737-SL-33-034 RETRACTABLE LANDING LIGHT (RLL) DRAIN HOLE.. SERVICE LETTER RECOMMENDED 16-JUL-2001 MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 318 Of 748 @ Camp Systems EFTA00618609 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-33-035 EMERGENCY LIGHTING BATTERY PACK SCHEDULED MAINTENANCE. SERVICE LETTER MOS I 7-JUL-2001 - Is) SL 737-SL-33-037 RETRACTABLE LANDING LIGHT (RLL) WIRE HARNESS REPLACEMENT. SERVICE LETTER MOS OS-NOV-2001 - (s) SL 737-SL-33-038 RETRACTABLE LANDING LIGHT (RLL) CURVED LENS. SERVICE LETTER MOS OS-NOV-2001 SL 737-SL-33-039 BOEING PHOTOLUMINESCENT EMERGENCY FLOOR PROXIMITY LIGHTING SYSTEMS OPERATIONL PROCEDURES. SERVICE LETTER - Is) MOS 31 -JAN-2002 - (s) INFORMATIONAL INFORMATIONAL INFORMATIONAL SL 737-SL-33-041 WIRE CRIMP TOOL OUT OF CALIBRATION. SERVICE LETTER RECOMMENDED MOS 23-JUL-2003 SL 737-SL-33-041 REV. A WIRE CRIMP TOOL OUT OF CALIBRATION. SERVICE LETTER INFORMATIONAL MOS 23-JUL-2003 - SL 737-SL-33-042 SIDEWALL UGHTING COMPONENTS-CASE GROUNDING. SERVICE LETTER INFORMATIONAL MOS I8-OCT-2002 SL 737-SL-33-042 REV. A SIDEWALL UGHTING COMPONENTS-CASE GROUNDING. SERVICE LETTER INFORMATIONAL MOS 04-AUG-2003 SL 737-SL-33-043 KOFtRY LIGHTED PUSHBUTTON SWITCHES-NEW PART NUMBER WITH 'CONFIGURATION 0' MASTER MODULE. INFORMATIONAL SERVICE LETTER MOS 27-MAR-2003 SL 737-SL-.33-044 BALLAST DAMAGE DUE TO AIRCRAFT VOLTAGE SPIKES. SERVICE LETTER INFORMATIONAL MOS I7-NOV-2003 SL 737-SL-33-045 AUXILIARY DIM AND TEST MODULE-DIODE OVERHEAT. SERVICE LETTER INFORMATIONAL MOS I I -MAY-2004 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 319 Of 748 @ Camp Systems EFTA00618610 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-33-046 I8-OCT-2004 OVERWING EMERGENCY LIGHT - DECAL MISSING. SERVICE LETTER MOS SL 737-SL-33-047 RETRACTABLE LANDING LIGHT (RLL) -MOTOR CONNECTOR TIGHTENING. SERVICE LETTER 08-SEP-2005 SL 737-SL-33-048 RETRACTABLE LANDING LIGHT (RLL) IMPROVEMENTS. SERVICE LETTER I4-SEP-2006 MOS MOS SL 737-SL-33.048 REV. A RETRACTABLE LANDING LIGHT (RLL) IMPROVEMENTS. SERVICE LETTER MOS 22-MAR-2007 INFORMATIONAL INFORMATIONAL SL 737-SL-33-049 ANTI-COLLISION LIGHT POWER SUPPLY BRACKET - FILLET SEAL APPLICATION (SUPERSEDED BY SL 737-SL-33-049 SUPERSEDED REV. A). SERVICE LETTER MOS I I -MAY-2007 SL 737-SL-33.049 REV. A ANTI-COLLISION LIGHT POWER SUPPLY BRACKET- FILLET SEAL APPLICATION RECOMMENDED . SERVICE LETTER MOS 06-MAY-201I SI. 737-SL-33-050 SEALING OF TAILCONE AND ANTI-COLLISION LIGHT INTERFACES. SERVICE LETTER MOS 22-AUG-2008 I7-AUG-2007 3260:48 AFL 782 SL 737-SL-33-051 NEW CHART LIGHT BRACKET ASSEMBLY. SERVICE LETTER MOS 28-AUG-2007 SL 737-SL-33-052 REFUELING PANEL FLOODLIGHT INSTALLATION. SERVICE LETTER MOS 30-OCT-2007 SL 737-SL-33-052 REV. A REFUELING PANEL FLOODLIGHT INSTALLATION. SERVICE LETTER INFORMATIONAL MOS 26-MAR-2010 COMPLIED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 320 Of 748 @ Camp Systems EFTA00618611 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-33-053 20-OCT-2008 ANTI-COLLISION LIGHT POWER SUPPLY 8 BRACKET- FAYING SEAL APPLICATION. SERVICE LETTER MOS SL 737-SL-.33-053 REV. A ANTI-COLLISION LIGHT POWER SUPPLY 8 BRACKET- FAYING SEAL APPLICATION. SERVICE LETTER MOS 11-DEC-2008 SL 737-SL-33-053 REV. B ANTI-COLLISION LIGHT POWER SUPPLY 8 BRACKET-FAYING RECOMMENDED SEAL APPLICATION. SERVICE LETTER MOS 01-MAY-2009 51 737-SL-33-053 REV. C ANTI-COLLISION LIGHT POWER SUPPLY 8 BRACKET- FAYING RECOMMENDED SEAL APPLICATION. SERVICE LETTER MOS 26-JUN-2009 51 737-SL-.33-055 RETRACTABLE LANDING LIGHT CONNECTORS BURNED. SERVICE LETTER RECOMMENDED MOS I7-SEP-2010 51 737-SL-.33-056 RETRACTABLE LANDING LIGHT IMPROVEMENTS. SERVICE LETTER RECOMMENDED MOS 31-AUG-2011 51 737-SL-33-057 LOWER ANTI-COLLISION LIGHT - SEALANT POSSIBLY OMITTED BETWEEN SKIN PANELS. SERVICE LETTER RECOMMENDED MOS 04-SEP-2013 51 737-SL-33-058 POSSIBLE WIRE RIDING CONDITION IN EMERGENCY WING LIGHTS. SERVICE LETTER RECOMMENDED MOS I8-MAY-2012 SI. 737-SL-33-059 WINGLET FORWARD POSITION LIGHT LENS REPLACEMENT GUIDEUNES (SUPERSEDED BY SL 737-SL-33-059 REV. A). SUPERSEDED SERVICE LETTER MOS SL 737-SL-33-059 REV. A WINGLET FORWARD POSITION LIGHT LENS REPLACEMENT GUIDEUNES. SERVICE LETTER RECOMMENDED MOS 30-MAY-20I2 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 321 Of 748 @ Camp Systems EFTA00618612 CAMP Miatioafra ihrenninthur AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL SL SL 737-SL-33-060 24-AUG-2012 737-SL-33-061 737-SL-33.061 REV. A R427 SIDEWALL LIGHT RELAY IMPROVEMENT. SERVICE LETTER MOS CONFIGURATION DATABASE TOOL - CHANGING AVAILABLE SCENES ON THE BOEING SKY INTERIOR (BSI) LIGHTING SYSTEM (SUPERSEDED BY SL 737-SL-33-061 REV. A). SERVICE LETTER MOS CONFIGURATION DATABASE TOOL - CHANGING AVAILABLE SCENES ON THE BOEING SKY INTERIOR (BSI) LIGHTING SYSTEM. SERVICE LETTER RECOMMENDED SUPERSEDED RECOMMENDED AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 SL 12-N0V-2012 737-SL-33-062 MOS IMPROVED WIRE ATTACHMENT FOR BSI CENTER OVERHEAD STOWAGE (COS) AREA EMERGENCY LIGHTING. SERVICE LETTER RECOMMENDED 12-DEC-2012 MOS SL 737-SL-33.063 FAIRED ANTICOLLISION LENS - SEALANT BLOCKING SKIN PANEL DRAIN HOLE. SERVICE LETTER RECOMMENDED 29-APR-2073 MOS SL 737-SL-33-064 LOWER ANTI-COLLISION LIGHT CABLE CHAFING. SERVICE LETTER RECOMMENDED 22-MAY-20I3 MOS SL 737-SL-33.065 WINGLET LED (LIGHT EMITTING DIODE) POSITION LIGHTS AND ANTI-COLLISION LIGHTS. SERVICE LETTER RECOMMENDED 27-JAN-2014 MOS SL 737-SL-33-066 BOEING SKY INTERIOR (BSI) LED LIGHTING IMPROVEMENTS (REFERRED TO AS GENERATION 2 LED LIGHTS). RECOMMENDED 25-OCT-2013 SERVICE LETTER MOS SL 737-SL-33.067 MEMORY DEVICE DESIGN IMPROVEMENTS. SERVICE LETTER RECOMMENDED 20-FEB-20I4 MOS SL 737-SL-33-068 EMERGENCY LIGHTS WIRE BUNDLE CHAFING. SERVICE LETTER RECOMMENDED 28-JAN-2014 MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks --Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 322 Of 748 Camp Systems EFTA00618613 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-33-069 BOEING SKY INTERIOR LIGHTING - DARK SHADOW EFFECT. SERVICE LETTER RECOMMENDED 27-MAR-2014 MOS SL 737-SL-33-070 EMERGENCY LIGHTING - WIRE W3142-0522-20 POSSIBLE CHAFING. SERVICE LETTER RECOMMENDED 25-MAR-2014 MOS SL 737-SL-33-071 WINGLET ANTICOLLISION LIGHT STEP DOWN CONVERTER BOX- R11 AND INDUCTOR IMPROVEMENT. SERVICE RECOMMENDED 25-APR-20I4 LETTER MOS SL 737-SL-34-131 DATA LOADER INCOMPATIBILITY. SERVICE LETTER RECOMMENDED 28-MAR-1997 MOS - (s) SL 737-SL-34-131 REV. A DATA LOADER INCOMPATIBILITY. SERVICE LETTER RECOMMENDED 08-SEP-1998 MOS - (s) SL 737-SL-34-140 AIR DATA INERTIAL REFERENCE UNIT (ADIRU) UPDATE. SERVICE LETTER RECOMMENDED 23-MAR-1998 MOS - (s) SL 737-SL-34-140 REV. A AIR DATA INERTIAL REFERENCE UNIT (ADIRU) UPDATE. SERVICE LETTER RECOMMENDED 25-SEP-1998 MOS - (s) SL 737-SL-34-143 FLIGHT MANAGEMENT COMPUTER 0 UPDATE 10.1 AND 10.2. SERVICE LETTER RECOMMENDED MOS 13-NOV-1998 - (s) SL 737-SL-34-144 INTRODUCTION OF ENHANCED GROUND PROXIMITY WARNING SYSTEM AND PREDICTIVE WINDSHEAR SYSTEM. RECOMMENDED SERVICE LETTER MOS 15-DEC-1998 - (s) SL 737-SL-34-144 REV. A INTRODUCTION OF ENHANCED GROUND PROXIMITY WARNING SYSTEM AND PREDICTIVE WINDSHEAR SYSTEM. RECOMMENDED SERVICE LETTER MOS 19-MAY-1999 -(s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 323 Of 748 @ Camp Systems EFTA00618614 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-34-145 FLIGHT MANAGEMENT COMPUTER UPDATE 10.2A. SERVICE LETTER RECOMMENDED 18-DEC-1998 MOS - Is) 51 737-SL-34-146 GABLES VHF NAV CONTROL PANEL UPGRADE. SERVICE LETTER RECOMMENDED 30-APR-1999 MOS - (s) 51 737-SL-34-147 ROCKWELL COLLINS WEATHER RADAR TRANSCEIVER UPGRADE. SERVICE LETTER RECOMMENDED 25-MAY-1999 MOS - Is) 51 737-SL-34-150 ALLIEDSIGNAL WEATHER RADAR TRANSCEIVER UPGRADE. SERVICE LETTER INFORMATIONAL 13-OCT-1999 MOS - Is) 51 737-SL-34-152 AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER RECOMMENDED 19-MAY-2000 MOS - Is) 51 737-SL-34-152 REV. A AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER RECOMMENDED 09-DEC-2000 MOS - (s) 51 737-SL-34-152 REV. B AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER RECOMMENDED 30-APR-2001 MOS - (s) 51 737-SL-34-152 REV. C AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER RECOMMENDED 29-JUN-2001 MOS - (s) 51 737-SL-34-152 REV. 0 AIRSPEED SPLITS DURING TAKEOFF ROLL CAUSED BY STICKING ANGLE OF ATTACK SENSOR. SERVICE LETTER INFORMATIONAL 06-OCT-2003 DAYS 180(s) SL 737-SL-34-153 REV. A FLIGHT MANAGEMENT COMPUTER - UPDATE 10.3. SERVICE LETTER INFORMATIONAL 14-AUG-2000 MOS - Is) 51 737-SL-34-154 AIR DATA INTERIAL REFERENCE UNIT (ADIRU) UPDATE TO PART NUMBER 5242A101.004. SERVICE LETTER RECOMMENDED MOS 10-NOV-2000 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 324 Of 748 @ Camp Systems EFTA00618615 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-34-154 REV. A AIR DATA INERTIAL REFERENCE UNIT (ADIRU) UPDATE TO PART NUMBER 5242A101.004. SERVICE LETTER 03-NOV-2003 SL 737-SL-34-155 MISSING '2500 FEET ALTITUDE CALLOUT DUE TO SUDDEN ANOMALOUS DROP IN RADIO ALTITUDE. SERVICE LETTER INFORMATIONAL I7-AUG-2000 MOS MOS - (s) INFORMATIONAL SL 737-SL-34-156 ENHANCED GROUND PROXIMITY WARNING SYSTEM TERRAIN ALERTS AREA DISPLAY SHIFT. SERVICE LETTER INFORMATIONAL MOS I 7-AUG-2000 - (s) SL 737-SL-34-159 MARKER BEACON ANTENNA ENHANCEMENT. SERVICE LETTER RECOMMENDED MOS 02-MAR-2001 - (s) SL 737-SL-34-160 AIR DATA INTERIAL REFERENCE UNIT (ADIRU) UPDATE TO PART NUMBER 5242A101.005. SERVICE LETTER RECOMMENDED MOS Of -JUN-2001 - (s) SL 737-SL-34-161 PM 5242A101-006 AIR DATA INERTIAL REFERENCE UNIT (ADIRU). SERVICE LETTER INFORMATIONAL MOS 27-AUG-2001 - (s) SL 737-SL-34-161 REV. B PM 5242A101-006 AIR DATA INERTIAL REFERENCE UNIT (ADIRU). SERVICE LETTER INFORMATIONAL MOS I8-APR-2002 - (s) SL 737-SL-34-161 REV. C PM 5242A101-006 AIR DATA INERTIAL REFERENCE UNIT (ADIRU). SERVICE LETTER INFORMATIONAL MOS 21-FEB-2003 SL 737-SL-34-162 FLIGHT MANAGEMENT COMPUTER - 4 MODULAR CONCEPT UNIT PIN 10-62225-004. SERVICE LETTER INFORMATIONAL MOS I4-SEP-2001 - (s) SL 737-SL-34-163 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.4. SERVICE LETTER INFORMATIONAL MOS I4-SEP-2001 - (s) SL 737-SL-34-164 ACTIVATION OF 'PEAKS' AND 'OBSTACLES' IN HONEYWELL'S ENHANCED GROUND PROXIMITY WARNING INFORMATIONAL COMPUTER (EGWPS). SERVICE LETTER MOS 26-MAR-2002 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 325 Of 748 @ Camp Systems EFTA00618616 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-34-165 ANGLE OF ATTACK INSTALLATION CALIBRATION PROCEDURES. SERVICE LETTER MOS 15-FEB-2002 - Is) SL 737-SL-34-166 FLIGHT MANAGEMENT COMPUTER - UPDATE 10AA, SERVICE LETTER MOS I7-MAY-2002 - (s) SL 737-SL-34-168 ENHANCED GROUND PROXIMITY WARNING COMPUTER UPGRADE. SERVICE LETTER MOS 22-OCT-2002 INFORMATIONAL INFORMATIONAL SL 737-SL-34-169 HONEYWELL TCAS COMPUTER CHANGE-CORRECTION FOR NUISANCE TRAFFIC ADVISORIES ON GROUND TARGETS.. INFORMATIONAL SERVICE LETTER MOS 14-OCT-2002 - (s) St 737-SL-34-169 REV. A HONEYWELL TCAS COMPUTER CHANGE-CORRECTION FOR NUISANCE TRAFFIC ADVISORIES ON GROUND TARGETS. INFORMATIONAL SERVICE LETTER MOS 30-OCT-2002 - (s) St 737-SL-34-169 REV. 8 HONEYWELL TCAS COMPUTER CHANGE-CORRECTION FOR NUISANCE TRAFFIC ADVISORIES ON GROUND TARGETS. INFORMATIONAL SERVICE LETTER MOS 27-OCT-2003 SL 737-SL-34-170 REPLACEMENT OF PITOT PROBE. SERVICE LETTER INFORMATIONAL MOS 20-FEB-2003 SL 737-SL-34-170 REV. A REPLACEMENT OF PITOT PROBE. SERVICE LETTER INFORMATIONAL COMPUED WITH MOS 11-JAN-2005 10-APR-2003 1965:18 AFL SL 737-SL-34-171 PITOT STATIC PROBE HOSE FIRE. SERVICE LETTER MOS 18 (s) 29-MAY-2001 SL 737-SL-34-171 REV. A PITOT STATIC PROBE HOSE FIRE. SERVICE LETTER MOS 22-JUL-2005 482 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 326 Of 748 @ Camp Systems EFTA00618617 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-34-172 FLIGHT MANAGEMENT COMPUTER-UPDATE 10.5. SERVICE LETTER INFORMATIONAL MOS 10-FE8-2003 51 737-SL-34-174 NEW STANDBY MAGNETIC COMPASS. SERVICE LETTER INFORMATIONAL MOS 02-JUL-2003 SI. 737-SL-34-175 AIR TRAFFIC CONTROL (ATC) SYSTEM ELEMENTARY SURVEILLANCE . ENHANCED SURVEILLANCE . AND EXTENDED INFORMATIONAL SOUITTER UPGRADE. SERVICE LETTER 18-DEC-2003 MOS SI. 737-SL-34-178 ROCKWELL COLLINS TCAS COMPUTER CHANGE-ELIMINATION POTENTIAL NUISANCE RESOLUTION AND TRAFFIC INFORMATIONAL ADVISORIES ON THE GROUND OR AT LOW ALTITUDE. SERVICE LETTER MOS I9-JUL-2004 SL 737-SL-34-180 REV. A NEW HONEYWELL MULTI-MODE RECEIVER -PiN 066-50029-1201. SERVICE LETTER INFORMATIONAL MOS 0I-FEB-2005 SL 737-SL-34-180 REV. 8 NEW HONEYWELL MULTI-MODE RECEIVER - 066-50029-1201. SERVICE LETTER MOS 10-MAY-2005 SL 737-SL-34-181 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.6. SERVICE LETTER INFORMATIONAL MOS 09-MAR-2005 SL 737-SL-34-181 REV. A FLIGHT MANAGEMENT COMPUTER - UPDATE 10.6. SERVICE LETTER COMPUED WITH MOS 11-MAY-2006 I3-JUL-2005 2619:10 SL 737-SL-34-182 10-MAR-2005 SL 737-SL-34-184 26-APR-2006 AFL NEW MASTER CAUTION UNIT - PIN 69-37399-13. SERVICE LETTER MOS 629 AIR TRAFFIC CONTROL ANTENNA CONNECTOR CHANGE - INSTALLATION INSTRUCTIONS. SERVICE LETTER MOS INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 327 Of 748 @ Camp Systems EFTA00618618 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-34-185 29-AUG-2006 SL 737-SL-34-186 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.7. SERVICE LETTER I0-APR-2007 SL 737-SL-34-187 REV. A LOSS OF RELIABLE AIR DATA DUE TO ICING OF STATIC PORTS - SRP 34-0111. SERVICE LETTER 20-JUL-2007 SI. 737-SL-34-188 HONEYWELL WEATHER RADAR TRANSCEIVER SUPERSEDED MODIFICATION FOR PIN 066-50008-0406 (SUPERSEDED BY SL 737-SL-34-188 REV. A). SERVICE LETTER STANDBY ALTIMETER/AIRSPEED INDICATOR IMPROVEMENTS (WL102AMS SERIES). SERVICE LETTER MOS MOS MOS MOS SL 737-SL-34-188 REV. A HONEYWELL WEATHER RADAR TRANSCEIVER MODIFICATION FOR P/N 066-50008-0406. SERVICE LETTER RECOMMENDED 14-JUN-2012 MOS SL 737-SL-34-189 HONEYWELL WEATHER RADAR TRANSCEIVER SUPERSEDED MODIFICATION FOR PIN 066-50008-0408 (SUPERSEDED BY SL 737-SL-34-189 REV. A). SERVICE LETTER MOS SL 737-SL-34-189 REV. A HONEYWELL WEATHER RADAR TRANSCEIVER MODIFICATION FOR PIN 066-50008-0408. SERVICE LETTER RECOMMENDED MOS 14-JUN-2012 SL 737-SL-34-191 MASTER CAUTION UNIT P/N 69-37399-13 ANOMALY, SERVICE LETTER MOS 09-JUL-2008 SL 737-SL-34-192 HEAD-UP GUIDANCE SYSTEM - DESIGN ENHANCEMENTS TO SUPERSEDED ADDRESS DISPLAY SYMBOLOGY JITTER (SUPERSEDED BY SL 737-SL-34-192 REV. A). SERVICE LETTER MOS SL 737-SL-34-192 REV. A HEAD-UP GUIDANCE SYSTEM - DESIGN ENHANCEMENT TO ADDRESS DISPLAY SYMBOLOGY JITTER. SERVICE RECOMMENDED LETTER MOS 17-N0V-2010 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 328 Of 748 @ Camp Systems EFTA00618619 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-34-193 30-JAN-2009 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8. SERVICE LETTER MOS SL 737-SL-34-193 REV. A FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8. SERVICE LETTER 18-FEB-2009 MOS St 737-SL-34-194 AIR DATA INERTIAL REFERENCE SYSTEM (ADIRS) FAULT ISOLATION MANUAL IMPROVEMENTS. SERVICE LETTER MOS 04-NOV-2008 St 737-SL-34-195 23-MAR-2009 AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADSB) OUT IMPLEMENTATION AND EUROPEAN AVIATION SAFETY AGENCY (EASA) AMC 20-24 COMPLIANCE. SERVICE LETTER MOS SL 737-SL-34-195 REV. A AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADSB) OUT IMPLEMENTATION AND EUROPEAN AVIATION SAFETY AGENCY (EASA) AMC 20-24 COMPLIANCE. SERVICE LETTER MOS 06-JUL-2009 RECOMMENDED RECOMMENDED SL 737-SL-34-195 REV. 8 AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-8) OUT IMPLEMENTATION AND EUROPEAN AVIATION INFORMATIONAL SAFETY AGENCY (EASA) AMC 20-24 COMPLIANCE. SERVICE LETTER MOS 24-MAR-2010 SL 737-SL-34-196 FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8A (SUPERSEDED BY SL 737-SL-34-196 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-34-196 REV. A FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8A (SUPERSEDED BY SL 737-SL-34-196 REV. B). SERVICE LETTER SUPERSEDED MOS SL 737-SL-34-196 REV. B FLIGHT MANAGEMENT COMPUTER - UPDATE 10.8A, SERVICE LETTER RECOMMENDED MOS I7-JAN-2012 SL 737-SL-34-198 NEW ENHANCED GROUND PROXIMITY WARNING COMPUTER (EGPWC) UPGRADE TO SUPPORT RAAS AND ADD RECOMMENDED AIRSPEED LOW CALLOUT, SERVICE LETTER MOS 27-OCT-2010 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 329 Of 748 @ Camp Systems EFTA00618620 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-34-199 NEW FLIGHT MANAGEMENT COMPUTER DISPLAY UNIT. SERVICE LETTER RECOMMENDED MOS 04-N0V-2010 SL 737-SL-34-201 INTEGRATED STANDBY FLIGHT DISPLAY (ISFD) - NEW INSTRUMENT CLAMP. SERVICE LETTER RECOMMENDED MOS 06-APR-20 I 1 SI. 737-SL-34-202 FLIGHT MANAGEMENT COMPUTER (FMC) DISPLAY UNIT? AVAILABILITY OF AN ALTERNATE KEYBOARD WITH KEY SUPERSEDED GUARDS AND WIDE HOLD HANDLE (SUPERSEDED BY SL 737-SL-34-202 REV. A). SERVICE LETTER MOS SL 737-SL-34-202 REV. A FLIGHT MANAGEMENT COMPUTER (FMC) DISPLAY UNIT - AVAILABILITY OF AN ALTERNATE KEYBOARD WITH KEY RECOMMENDED GUARDS AND WIDE HOLD HANDLE. SERVICE LETTER MOS 06-JUL-2011 SL 737-SL-34-203 LOW RANGE RADIO ALTIMETER (LRRA) REPLACEMENT - THALES ERT-550 TRANSCEIVER P/N 9599-607 19996. RECOMMENDED SERVICE LETTER MOS 20-SEP-2011 SL 737-SL-34-204 LOW RANGE RADIO ALTIMETER REPLACEMENT - HONEYWELL ALA-528 TRANSCEIVER P/N 066-50007-0531 RECOMMENDED . SERVICE LETTER MOS 28-NOV-2011 SL 737-SL-34-205 NEW FLIGHT MANAGEMENT COMPUTER CONTROL DISPLAY UNIT OPERATIONAL SOFTWARE- U3.1 (SUPERSEDED BY SUPERSEDED SL 737-SL-34-205 REV. A). SERVICE LETTER MOS SL 737-SL-34-205 REV. A NEW FLIGHT MANAGEMENT COMPUTER CONTROL DISPLAY UNIT OPERATIONAL SOFTWARE - U3.1, SERVICE LETTER RECOMMENDED MOS 09-APR-20I2 SL 737-SL-34-206 23-NOV-2011 SL 737-SL-34-207 10-NOV-2011 PITOT PROBE FLEXIBLE HOSE CONFIGURATIONS. SERVICE LETTER RECOMMENDED MOS DEFERRED APPLICATION OF AERO-SEALANT IN AIR DATA SENSOR INSTALLATIONS. SERVICE LETTER RECOMMENDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 330 Of 748 @ Camp Systems EFTA00618621 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-34-208 23-MAR-2012 SL 737-SL-34-210 25-JAN-2013 SL 737-SL-34-211 18-DEC-2012 SL 737-SL-34-212 22-FEB-2013 SL 737-SL-34-213 27-FEB-20I3 SL 737-SL-34-215 28-MAY-2014 SL 737-SL-34-216 30-APR-2014 SL 737-SL-34-217 25-JUN-2014 NEW FLIGHT MANAGEMENT COMPUTER (FMC) DISPLAY UNIT PART NUMBERS (P/N) 5242A600-1003.S242A600-2003.5242A600-3003. SERVICE LETTER MOS LOW RANGE RADIO ALTIMETER (LRRA) ANTENNA GEL rasKET INSTALLATION. SERVICE LETTER MOS RECOMMENDED RECOMMENDED NEW SUPPLIER AND PART NUMBER OF STANDBY MAGNETIC COMPASS. SERVICE LETTER RECOMMENDED MOS P5 PANEL BONDING JUMPER - FASTENER NUT NOT PROPERLY TORQUED. SERVICE LETTER RECOMMENDED MOS NEW SENSOR SYSTEMS LOW RANGE RADIO ALTIMETER (LRRA) ANTENNA PART NUMBER. SERVICE LETTER RECOMMENDED MOS P/N 5242A101-009 AIR DATA INERTIAL REFERENCE UNIT (ADIRU) (HONEYWELL P/N HG2050AC11) MAG VAR UPDATE. RECOMMENDED SERVICE LETTER MOS ENHANCED GROUND PROXIMITY WARNING COMPUTER (EGPWC) UPGRADE FROM MK V TO MK V-A. SERVICE LETTER RECOMMENDED MOS NEW ENHANCED GROUND PROXIMITY WARNING COMPUTER (EGPWC) - P/N 69000940-102. SERVICE LETTER MOS RECOMMENDED SL 737-SL-35-003 REV. C PASSENGER OXYGEN MASK ASSEMBLY. TUBE DETERIORATION.. SERVICE LETTER RECOMMENDED MOS 30-MAR-2000 - (s) SL 737-SL-35-003 REV. D PASSENGER OXYGEN MASK ASSEMBLY. TUBE DETERIORATION, SERVICE LETTER MOS 22-AUG-2001 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 331 Of 748 @ Camp Systems EFTA00618622 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-35-015 29-JUN-1999 MODIFICATION OF THE MXPHI0 CREW OXYGEN MASK STOWAGE BOX. SERVICE LETTER MOS - Is) RECOMMENDED 51 737-SL-35-016 POTENTIALLY OVERSIZED 115 SCF STEEL OXYGEN CYLINDERS. SERVICE LETTER RECOMMENDED 16-SEP-1999 MOS - (s) 51 737-SL-35-016 REV. A POTENTIALLY OVERSIZED 115 SCF STEEL OXYGEN CYLINDERS. SERVICE LETTER RECOMMENDED 51 C6-NOV-1999 737-SL-35-018 MOS - (s) B/E AEROSPACE PROTECTIVE BREATHING EQUIPMENT USEFUL LIFE CHANGE AND NECK SEAL IMPROVEMENT. 01-FEB-2002 SERVICE LETTER MOS - (s) 51 737-SL-35-019 MAINTAINING OXYGEN SYSTEM CLEANLINESS. SERVICE LETTER INFORMATIONAL I7-OCT-2003 MOS SL 737-SL-35-019 REV. A MAINTAINING OXYGEN SYSTEM CLEANLINESS. SERVICE LETTER INFORMATIONAL 10-MAR-2004 MOS 51 737-SL-35-020 OXYGEN CYLINDER SERVICING. SERVICE LETTER RECOMMENDED 23-JUN-2009 MOS 51 737-SL-35-021 B/E AEROSPACE PROTECTIVE BREATHING EQUIPMENT (PBE) REPLACEMENT. SERVICE LETTER RECOMMENDED 26-MAY-2011 MOS 51 737-SL-35-022 CREW OXYGEN MASK INFLATABLE HARNESS LEAKAGE. SERVICE LETTER RECOMMENDED I3-JUN-2011 MOS 51 737-SL-35-023 CREW OXYGEN SYSTEM- TOTAL LOSS OF OXYGEN. SERVICE LETTER RECOMMENDED 30-APR-2012 MOS 51 737-SL-35-026 CREW OXYGEN MASK REGULATORS SET INCORRECTLY BY RECOMMENDED 09-JAN-2013 SUPPLIER REPAIR STATION. SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 332 Of 748 @ Camp Systems EFTA00618623 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-35-027 CREW OXYGEN - FLEX HOSE AND WIRE BUNDLE INSTALLATION RECOMMENDED 31-OCT-2013 . SERVICE LETTER MOS 51 737-SL-35-028 SMOKE HOOD USE. DISPOSAL AND IMPROVEMENT (SUPERSEDED BY SL 737-SL-35-028 REV. A). SERVICE LETTER SUPERSEDED MOS 51 737-SL-35-028 REV. A SMOKE HOOD USE. DISPOSAL AND IMPROVEMENT. SERVICE LETTER RECOMMENDED 16-JUN-2014 MOS 51 737-SL-36-010 APU DUCT BOOT CLAMP T-BOLT NUT TORQUE INSPECTION. SERVICE LETTER RECOMMENDED 29-JUL-I 999 MOS - (s) 51 737-SL-36-010 REV. A APU DUCT BOOT CLAMP T-BOLT NUT TOROUE INSPECTION. SERVICE LETTER RECOMMENDED 13-OCT-1999 MOS - (s) SL 737-SL-36-010 REV. B APU DUCT BOOT CLAMP T-BOLT NUT TORQUE INSPECTION. SERVICE LETTER RECOMMENDED 20-OCT-2000 MOS - (s) 51 737-SL-36-011 SEPARATION BETWEEN AN ENGINE WIRE BUNDLE AND A PNEUMATIC SENSE LINE. SERVICE LETTER INFORMATIONAL 12-MAR-2004 MOS 51 737-SL-36-011 REV. A SEPARATION BETWEEN AN ENGINE WIRE BUNDLE AND A INFORMATIONAL 51 08-JUN-2004 737-SL-36-011 REV. B PNEUMATIC SENSE LINE. SERVICE LETTER MOS SEPARATION BETWEEN AN ENGINE WIRE BUNDLE AND A 51 05-JUL-2005 737-SL-36-012 PNEUMATIC SENSE LINE. SERVICE LETTER MOS IMPROVED CABIN PRESSURE SEAL FLANGE ON THE APU DUCT ASSEMBLY. SERVICE LETTER 15-MAR-2005 MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 333 Of 748 @ Camp Systems EFTA00618624 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-36-012 REV. A IMPROVED CABIN PRESSURE SEAL FLANGE ON THE APU DUCT ASSEMBLY. SERVICE LETTER 31-AUG-2005 SI. 737-SL-36-012 REV. B IMPROVED CABIN PRESSURE SEAL FLANGE ON THE APU DUCT ASSEMBLY. SERVICE LETTER MOS 08-OCT-2007 MOS SL 737-SL-36-013 MINIMUM SERVICEABLE PNEUMATIC DUCT PRESSURE. SERVICE LETTER MOS 20-APR-2007 SL 737-SL-36-013 REV. A MINIMUM SERVICEABLE PNEUMATIC DUCT PRESSURE. SERVICE LETTER MOS 21-MAY-2007 SL 737-SL-36-013 REV. B MINIMUM SERVICEABLE PNEUMATIC DUCT PRESSURE. SERVICE LETTER MOS 04-FEB-2008 SL 737-SL-36-014 BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER MOS 31-AUG-2006 SL 737-SL-36-014 REV. A BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER MOS 79-DEC-2006 SL 737-SL-36-014 REV. B BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER MOS I0-JUL-2007 SL 737-SL-36-014 REV. C BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER MOS I9-SEP-2007 SL 737-SL-36-014 REV. D BLEED AIR REGULATOR MODIFICATION. SERVICE LETTER MOS 09-JAN-2008 SL 737-SL-36-016 HIGH STAGE REGULATOR MODIFICATION. SERVICE LETTER MOS I0-APR-2007 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 334 Of 748 @ Camp Systems EFTA00618625 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-36-017 21-FEB-2008 HIGH STAGE BLEED AIR VALVE. SERVICE LETTER MOS • SI. 737-SL-36-018 BLEED AIR SYSTEM 390 AND 450 TEMPERATURE SENSOR RECOMMENDED 13-MAR-2009 IMPROVEMENTS. SERVICE LETTER MOS SL 737-SL-36-019 PRESSURE REGULATOR SHUTOFF VALVE (PRSOV) RECOMMENDED 18-MAR-2009 IMPROVEMENTS, SERVICE LETTER MOS 51 737-SL-36-020 NEW PRSOV FLEX LINE. SERVICE LETTER RECOMMENDED 07-OCT-2009 MOS SL 737-SL-36-021 FIFTH STAGE BLEED AIR CHECK VALVE INSPECTION (SUPERSEDED BY SL 737-SL-36-021 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-36-021 REV. A FIFTH STAGE BLEED AIR CHECK VALVE INSPECTION. SERVICE LETTER RECOMMENDED MOS 21 -JAN-2011 SI. 737-SL-36-022 FIFTH STAGE BLEED AIR CHECK VALVE- BUSHING BRAZING (SUPERSEDED BY SL 737-SL-36-022 REV. A). SERVICE SUPERSEDED LETTER MOS SL 737-SL-36-022 REV. A FIFTH STAGE BLEED AIR CHECK VALVE - BUSHING BRAZING. SERVICE LETTER RECOMMENDED MOS 22-MAY-20I2 SL 737-SL-36-023 27 -JUL-2010 SL 737-SL-36-024 BLEED AIR PRECOOLER CONTROL VALVE(PCCV) IMPROVEMENTS. SERVICE LETTER MOS ACMS 'USER GUIDE FOR ENHANCED ECS TROUBLESHOOTING AND HEALTH MANAGEMENT (SUPERSEDED BY SL SUPERSEDED 737-SL-36-024 REV. A). SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 335 Of 748 @ Camp Systems EFTA00618626 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-36-024 REV. A ACMS 'USER GUIDE' FOR ENHANCED ECS TROUBLESHOOTING AND HEALTH MANAGEMENT (SUPERSEDED BY SL RECOMMENDED 737-SL-36-024 REV. 8). SERVICE LETTER MOS I3-SEP-2011 SL 737-SL-36-024 REV. 8 ACMS 'USER GUIDE FOR ENHANCED PNEUMATIC SYSTEM TROUBLESHOOTING AND HEALTH MANAGEMENT. RECOMMENDED SERVICE LETTER 18-MAR-2013 MOS SL 737-SL-36-025 PRECOOLER CONTROL VALVE KISS SEAL IMPROVEMENT. SERVICE LETTER RECOMMENDED MOS 29-OCT-2010 SL 737-SL-36-026 ENGINE BLEED SYSTEM MAINTENANCE PROCEDURES DESCRIPTION TABLES. SERVICE LETTER RECOMMENDED MOS 06-DEC-2010 SI. 737-SL-36-029 CIRCUIT BREAKERS LABEL-INCORRECT NOMENCLATURE (SUPERSEDED BY SL 737-SL-36-029 REV. A). SERVICE SUPERSEDED LETTER MOS SL 737-SL-36-029 REV. A CIRCUIT BREAKERS LABEL-INCORRECT NOMENCLATURE (SUPERSEDED BY SL 737-SL-36-029 REV. B). SERVICE SUPERSEDED LETTER MOS SL 737-SL-36-029 REV. 8 CIRCUIT BREAKERS LABEL4NCORRECT NOMENCLATURE (SUPERSEDED BY SL 737-SL-36-029 REV. C). SERVICE RECOMMENDED LETTER 72-APR-2073 MOS SL 737-SL-36-029 REV. C CIRCUIT BREAKERS LABEL4NCORRECT NOMENCLATURE. SERVICE LETTER RECOMMENDED MOS 22-MAY-20I3 SL 737-SL-36-030 PRE-COOLER INSTALLATION. INCORRECT SAFETY WIRE INSTALLATION. SERVICE LETTER RECOMMENDED MOS 03-MAY-20I3 SL 737-SL-36-031 PRSOV AND HIGH STAGE VALVE IMPROVMENTS. SERVICE LETTER RECOMMENDED MOS 10-DEC-2013 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 336 Of 748 @ Camp Systems EFTA00618627 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-38-009 WASTE WATER DRAIN SYSTEM BLOCKAGE PREVENTION (SUPERSEDED BY SL 737-SL-38-009 REV. A). SERVICE LETTER MOS SUPERSEDED St 737-SL-38-009 REV. A WASTE WATER DRAIN SYSTEM BLOCKAGE PREVENTION (SUPERSEDED BY SL 737-S1-38-009 REV. B). SERVICE SUPERSEDED LETTER MOS St 737-SL-38-009 REV. B WASTE WATER DRAIN SYSTEM BLOCKAGE PREVENTION (SUPERSEDED BY SL 737-S1-38-009 REV. C). SERVICE SUPERSEDED LETTER MOS St 737-SL-38-009 REV. C WASTE WATER DRAIN SYSTEM BLOCKAGE PREVENTION. SERVICE LETTER RECOMMENDED MOS 29-NOV-2012 St 737-SL-38-015 REV. 8 GREY WATER DRAIN CLEANING INFORMATION AND FREQUENCY. SERVICE LETTER RECOMMENDED MOS 19-NOV-2012 St 737-SL-38-016 IN SITU CHEMICAL rIPANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER INFORMATIONAL MOS 10-APR-2007 - (s) St 737-SL-38-016 REV. A IN SITU CHEMICAL rIPANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER INFORMATIONAL MOS 31-MAR-2006 - (s) St 737-SL-38-016 REV. 8 IN SITU CHEMICAL CLEANING PROCEDURES FOR VACUUM WASTE TUBES. SERVICE LETTER MOS 31-MAR-2006 St 737-SL-38-018 IN SITU CHEMICAL rl PANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER RECOMMENDED MOS 26-NOV-1996 - (s) St 737-SL-38-018 REV. A IN SITU CHEMICAL rIPANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER RECOMMENDED MOS 25-NOV-1997 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 337 Of 748 @ Camp Systems EFTA00618628 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-38-018 REV. 8 IN SITU CHEMICAL CLEANING PROCEDURE FOR VACUUM WASTE TUBES. SERVICE LETTER INFORMATIONAL MOS 28-MAY-1999 SL 737-SL-38-018 REV. C IN-SITU PRESSURE CLEANING PROCEDURE OF VACUUM WASTE TUBES (SUPERSEDED BY SL 737-SL-38-018 REV. D). SUPERSEDED SERVICE LETTER MOS SL 737-SL-38-018 REV. 0 IN SITU PRESSURE CLEANING PROCEDURE OF VACUUM WASTE TUBES (S1 REPORTED AS ATA 3832-90). SERVICE RECOMMENDED LETTER MOS 15-OCT-2012 SL 737-SL-38-019 VACUUM WASTE SYSTEM MAINTENANCE RECOMMENDATIONS. SERVICE LETTER RECOMMENDED MOS ZS-JUL-1997 - (s) SL 737-SL-38-019 REV. A VACUUM WASTE SYSTEM MAINTENANCE RECOMMENDATIONS (SUPERSEDED BY SL 737-SL-38-019 REV. B). SERVICE SUPERSEDED LETTER - Is) MOS - (s) SL 737-SL-38-019 REV. 8 VACUUM WASTE SYSTEM MAINTENANCE RECOMMENDATIONS. SERVICE LETTER RECOMMENDED MOS OS-NOV-2012 SL 737-SL-38-020 -JAN-1999 VACUUM WASTE TANK IMPROVE AIR/WATER SEPARATOR. SERVICE LETTER MOS - (s) INFORMATIONAL SL 737-SL-38-022 LAVATORY POTABLE WATER SELECTOR VALVE ADAPTER REPLACEMENT. SERVICE LETTER RECOMMENDED MOS 27-MAY-1999 - (s) SL 737-SL-38-023 INSPECT FOR POTENTIAL MISSING CLAMPS FROM FORWARD GRAY WATER DRAIN LINE TUBE INSTIL. SERVICE RECOMMENDED LETTER MOS 16-AUG-1999 - (s) SL 737-SL-38-020 WASTE SERVICE PANEL COVER FASTENER INSPECTION AND POTENTIAL REPLACEMENT. SERVICE LETTER RECOMMENDED MOS 28-SEP-1999 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 338 Of 748 @ Camp Systems EFTA00618629 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-38-026 02-NOV-1999 SL 737-SL-38-026 REV. A I4-JUL-2000 SL 737-SL-38-028 REV. A AVAILABILITY OF POTABLE WATER TANK WITH IMPROVED LINER AND WINDING MATERIAL. SERVICE LETTER 04-AUG-2000 SL 737-SL-38-031 REV. B VACUUM WASTE LINE BLOCKAGE -KINETIC WATER RAM' REMOVAL TOOL AND USAGE (SUPERSEDED BY SL 737-SL-38-031 REV. C). SERVICE LETTER MOS MOS POTABLE WATER CABLE ASSEMBLY IMPROVEMENTS. SERVICE LETTER MOS - (s) POTABLE WATER CABLE ASSEMBLY IMPROVEMENTS. SERVICE LETTER MOS - (s) - Is) SL 737-SL-38-031 REV. C VACUUM WASTE LINE BLOCKAGE KINETIC WATER RAM' REMOVAL TOOL AND USAGE, SERVICE LETTER MOS 29-OCT-2012 SL 737-SL-38-032 VACUUM WASTE CLEANING METHODS, SERVICE LETTER MOS 22-JUN-2007 SL 737-SL-38-032 REV. A VACUUM WASTE CLEANING METHODS. SERVICE LETTER MOS II-MAR-2008 INFORMATIONAL RECOMMENDED INFORMATIONAL SUPERSEDED RECOMMENDED SL 737-SL-38-032 REV. B VACUUM WASTE CLEANING METHODS (SUPERSEDED BY 737-SL-38-019-C). SERVICE LETTER SUPERSEDED MOS I0-SEP-2009 SL 737-SL-38-032 REV. C VACUUM WASTE CLEANING METHODS (SUPERSEDED BY SL 737-SL-38-032 REV. D). SERVICE LETTER SUPERSEDED MOS SL 737-SL-38-032 REV. 0 VACUUM WASTE CLEANING METHODS (SUPERSEDED BY SL 737-SL-38-032 REV. E), SERVICE LETTER SUPERSEDED MOS SL 737-SL-38-032 REV. E VACUUM WASTE CLEANING METHODS (SUPERSEDED BY SL 737-SL-38-032 REV. F). SERVICE LETTER SUPERSEDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 339 Of 748 @ Camp Systems EFTA00618630 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-38-032 REV. F VACUUM WASTE CLEANING METHODS (SUPERSEDED BY SL 737-SL-38-032 REV. G). SERVICE LETTER MOS SUPERSEDED 51 737-SL-38-032 REV. G VACUUM WASTE CLEANING METHODS. SERVICE LETTER RECOMMENDED 51 01-APR-2014 737-SL-38-033 MOS FORWARD DOOR SILL DRAIN VALVE REPLACEMENT. SERVICE LETTER 10-FEB-2010 MOS SL 737-SL-38-034 VACUUM WASTE SYSTEM BLOWER REPLACEMENT. SERVICE LETTER RECOMMENDED 10-JUN-2011 MOS 51 737-SL-38-035 VACUUM WASTE SYSTEM MAINTENANCE PRACTICES. SERVICE LETTER RECOMMENDED 25-NOV-20I3 MOS 51 737-SL-45-001 READINESS OF BOEING MODELS FOR Y2K. SERVICE LETTER RECOMMENDED 23-DEC-1998 MOS - (s) 51 737-SL-45-001 REV. A READINESS OF BOEING MODELS FOR Y2K. SERVICE LETTER RECOMMENDED 28-APR-1999 MOS - (s) 51 737-SL-45-001 REV. B READINESS OF BOEING MODELS FOR Y2K. SERVICE LETTER RECOMMENDED 51 03-JAN-2000 737-SL-48-001 REV. A MOS - (s) ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.0 (PHASE 1) AND EFB DISPLAY UNIT UPDATE. SERVICE LETTER 51 08-JUN-2007 737-SL-46-002 MOS ELECTRONIC FLIGHT BAG DISPLAY UNIT PART NUMBER 1978O3-5/-51 BRIGHTNESS CONTROL CORRECTION. SERVICE 51 08-JUN-2007 737-SL-46-003 LETTER MOS ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER 01 -JUL-2008 MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 340 Of 748 @ Camp Systems EFTA00618631 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-46-003 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER 1O-NOV-2008 St 737-SL-46-003 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER MOS 24-MAR-2009 St 737-SL-46-003 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER 13-APR-2009 MOS MOS SL 737-SL-46-003 REV. D ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3. SERVICE LETTER MOS I6-JUL-2009 SL 737-SL-46-003 REV. E ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.3, SERVICE LETTER MOS 10-FEB-2010 St 737-SL-46-004 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.4. SERVICE LETTER MOS 05-NOV-2008 St 737-SL-46-004 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.4. SERVICE LETTER MOS 21-APR-2009 RECOMMENDED RECOMMENDED RECOMMENDED St 737-SL-46-004 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.4. SERVICE LETTER RECOMMENDED MOS 08-JUL-2009 St 737-SL-46-004 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.4. SERVICE LETTER RECOMMENDED MOS 23-NOV-2009 St 737-SL-46-004 REV. D ELECTRONIC FLIGHT BAG (EFB)BLOCKPOINT 3.4 (SUPERSEDED BY SL 737-SL-46-004 REV. E). SERVICE LETTER SUPERSEDED MOS a 737-SL-46-004 REV. E ELECTRONIC FLIGHT BAG (EFB)BLOCKPOINT 3.4. SERVICE LETTER RECOMMENDED MOS 06-AUG-20I0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 341 Of 748 @ Camp Systems EFTA00618632 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-46-004 REV. F ELECTRONIC FLIGHT BAG (EFB)BLOCKPOINT 3.4. SERVICE LETTER 14-FEB-2011 MOS SL 737-SL-46-005 REV. A ELECTRONIC FLIGHT BAG (EFB) ELECTRONIC UNIT (EU) HARDWARE UPGRADE. SERVICE LETTER MOS 29-OCT-2008 SL 737-SL-46-006 REV. A BLOCKPOINT 4 ELECTRONIC FLIGHT BAG (EFB) HARDWARE AND EFB BP 4.0 SOFTWARE (SUPERSEDED BY SL 737-SL-46-006 REV. B). SERVICE LETTER MOS RECOMMENDED SUPERSEDED SL 737-SL-46-006 REV. B BLOCKPOINT 4 ELECTRONIC FLIGHT BAG(EFB)HARDWARE AND EFB BP 4.0 SOFTWARE (SUPERSEDED BY SL SUPERSEDED 737-SL-46-006 REV. C). SERVICE LETTER MOS SL 737-SL-46-006 REV. C BLOCKPOINT 4 ELECTRONIC FLIGHT BAG(EFB)HARDWARE AND EFB BP 4.0 SOFTWARE. SERVICE LETTER RECOMMENDED MOS I7-JUN-20 I 1 SL 737-SL-46-007 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) RECOMMENDED BLOCKPOINT (BP) 1. SERVICE LETTER MOS 01-DEC-2009 SL 737-SL-46-007 REV. A BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) RECOMMENDED BLOCKPOINT (BP) 1. SERVICE LETTER MOS I6-DEC-2009 SL 737-SL-46-008 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2 (SUPERSEDED BY SL 737-SL-46-008 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-46-008 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2 (SUPERSEDED BY SL 737-SL-46-008 REV. B). SERVICE LETTER SUPERSEDED MOS SL 737-SL-46-008 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2 (SUPERSEDED BY SL 737-SL-46-008 REV. C). SERVICE LETTER SUPERSEDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 342 Of 748 @ Camp Systems EFTA00618633 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-46-008 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2 (SUPERSEDED BY SL 737-SL-46-008 REV. D). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-008 REV. D ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.2. SERVICE LETTER RECOMMENDED MOS 27-JUL-2012 St 737-SL-46-009 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.5 (SUPERSEDED BY SL 737-SL-46-009 REV. A) SUPERSEDED . SERVICE LETTER MOS St 737-SL-46-009 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.5 (SUPERSEDED BY SL 737-SL-46-009 REV. B). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-009 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.5 (SUPERSEDED BY SL 737-SL-46-009 REV. C). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-009 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.5. SERVICE LETTER RECOMMENDED MOS IO-NOV-2011 St 737-SL-46-010 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 2 (SUPERSEDED BY St 737-SL-46-010 REV. A), SERVICE LETTER SUPERSEDED MOS St 737-SL-46-010 REV. A BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 2 (SUPERSEDED BY St 737-SL-46-010 REV. B). SUPERSEDED SERVICE LETTER MOS St 737-SL-46-010 REV. B BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 2. SERVICE LETTER RECOMMENDED MOS 04-NOV-2011 St 737-SL-46-013 WIRE BUNDLE DISCONNECT BRACKET AB366 INCORRECTLY LABELED (SUPERSEDED BY SL 737-SL-46-013 REV. A), SUPERSEDED SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 343 Of 748 @ Camp Systems EFTA00618634 CAMP Asiant.fran Atna: up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-46-013 REV. A WIRE BUNDLE DISCONNECT BRACKET A8366 INCORRECTLY LABELED. SERVICE LETTER RECOMMENDED MOS 19-APR-2012 51 737-SL-46-014 CLASS 2 ELECTRONIC FLIGHT BAG (EFB) (SUPERSEDED BY SL 737-51-46-014 REV. A). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-014 REV. A CLASS 2 ELECTRONIC FLIGHT BAG (EFB) (SUPERSEDED BY SL 737-SL-46-014 REV. B) SUPERSEDED . SERVICE LETTER MOS St 737-SL-46-014 REV. 8 CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 2.0 (SUPERSEDED BY SL 737-SL-46-014 REV. C). SERVICE SUPERSEDED LETTER MOS SL 737-SL-46-014 REV. C CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 2.0. SERVICE LETTER RECOMMENDED MOS 21-NOV-2013 SL 737-SL-46-015 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3. SERVICE LETTER RECOMMENDED MOS 12-DEC-2011 SL 737-SL-46-016 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-46-016 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. 8). SERVICE LETTER SUPERSEDED MOS SL 737-SL-46-016 REV. 8 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. C). SERVICE LETTER RECOMMENDED MOS 20-AUG-2012 SL 737-SL-46-016 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. 0) RECOMMENDED . SERVICE LETTER MOS 18-FEB-20I3 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 344 Of 748 @ Camp Systems EFTA00618635 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-46-016 REV. D ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. E). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-016 REV. E ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7 (SUPERSEDED BY SL 737-SL-46-016 REV. F). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-016 REV. F ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.7. SERVICE LETTER RECOMMENDED MOS 10-MAR-2014 St 737-SL-46-017 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. A). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-017 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. B). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-017 REV. B ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. C). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-017 REV. C ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. D). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-017 REV. D ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4 (SUPERSEDED BY SL 737-SL-46-017 REV. E). SERVICE LETTER SUPERSEDED MOS St 737-SL-46-017 REV. E ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.4. SERVICE LETTER RECOMMENDED MOS 10-MAR-2014 SL 737-SL-46-018 GOODRICH SERVICE INFORMATION LETTER (SIL) - CAMERA INTERFACE UNIT (CIU) UPGRADE. SERVICE LETTER RECOMMENDED MOS 22-AUG-20I2 St 737-SL-46-019 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 3.1. SERVICE LETTER RECOMMENDED MOS 25-FEB-2013 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 345 Of 748 @ Camp Systems EFTA00618636 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-46-020 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.8 (SUPERSEDED 737-SL-46-020 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-46-020 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.8. SERVICE LETTER RECOMMENDED MOS 21-NOV-2013 SL 737-SL-46-021 ELECTRONIC FLIGHT BAG (EFB) BLOCK POINT 4.5 (SUPERSEDED BY SL 737-S1-46-021 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-46-021 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.5. SERVICE LETTER RECOMMENDED MOS 10-MAR-2014 SL 737-SL-46-022 CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.0 (SUPERSEDED BY SL 737-SL-46-022 REV. A). SERVICE RECOMMENDED LETTER MOS 13-DEC-2012 SL 737-SL-46-022 REV. A CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 3.0. SERVICE LETTER RECOMMENDED MOS 29-APR-2013 SL 737-SL-46-023 PORTABLE MAINTENANCE DEVICE MALWARE PREVENTION. DISCOVERY. AND OPERATOR GUIDANCE FOR EVENT RECOMMENDED HANDLING. SERVICE LETTER MOS 19-AUG-2013 SL 737-SL-46-024 CLASS 2 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.0. SERVICE LETTER RECOMMENDED MOS 13-MAR-2014 SL 737-SL-46-025 BOEING CLASS 1 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT (BP) 4.0. SERVICE LETTER RECOMMENDED MOS 13-MAR-2014 SL 737-SL-46-026 ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.614.6E (SUPERSEDED BY SL 737-SL-46-026 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-46-026 REV. A ELECTRONIC FLIGHT BAG (EFB) BLOCKPOINT 4.614.6E. SERVICE LETTER RECOMMENDED MOS 09-MAY-2014 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 346 Of 748 @ Camp Systems EFTA00618637 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-46-027 REV. A AIRCRAFT NETWORK SECURITY PROGRAM (ANSP) REGULATORY REQUIREMENT. SERVICE LETTER RECOMMENDED 20-JUN-2014 51 737-SL-47-001 POSSIBLE INCORRECT TEE-FITTING ON THE NGS SYSTEM. SERVICE LETTER RECOMMENDED 1 1 -NOV-2009 SI. 737-SL-47-001 REV. A POSSIBLE INCORRECT TEE-FITTING ON THE NGS SYSTEM (SUPERSEDED BY SL 737-SL-47-001 REV. B). SERVICE SUPERSEDED LETTER MOS MOS 24 (s) MOS SL 737-SL-47-001 REV. B POSSIBLE INCORRECT TEE-FITTING ON THE NGS SYSTEM. SERVICE LETTER RECOMMENDED 23-SEP-2010 SL 737-SL-47-002 INCORRECT MATING TEETH ON NGS ELECTRICAL CONNECTIONS. SERVICE LETTER RECOMMENDED I6-FEB-2010 SL 737-SL-47-002 REV. A INCORRECT MATING TEETH ON NGS ELECTRICAL CONNECTIONS. SERVICE LETTER INFORMATIONAL MOS 18-MAR-2010 MOS MOS SL 737-SL-47-004 NGS NEADS TUBE CHAFING. SERVICE LETTER SUPERSEDED MOS SL 737-SL-47-004 REV. A NGS NEADS TUBE CHAFING. SERVICE LETTER RECOMMENDED MOS 16-DEC-2011 SL 737-SL-47-006 ENVIRONMENTAL CONTROL- NGS BITE DISPLAY UNIT (BDU)- CRACKED CAPACITORS ON BDU. SERVICE LETTER RECOMMENDED MOS 17-DEC-2013 SL 737-SL-49-058 FALSE APU MAINTENANCE LIGHT ILLUMINATION. SERVICE LETTER RECOMMENDED MOS 19-DEC-1997 - (s) SL 737-SL-49-058 REV. A FALSE APU MAINTENANCE LIGHT ILLUMINATION. SERVICE LETTER RECOMMENDED MOS 19-MAR-1999 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 347 Of 748 @ Camp Systems EFTA00618638 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-49-058 REV. 8 FALSE AUXILIARY POWER UNIT (APU) MAINTENANCE UGHT ILLUMINATION. SERVICE LETTER RECOMMENDED 23-JUL-2001 MOS - Is) 51 737-SL-49-058 REV. C FALSE AUXILIARY POWER UNIT (APU) MAINTENANCE LIGHT ILLUMINATION. SERVICE LETTER INFORMATIONAL 27-NOV-2001 MOS - (s) 51 737-SL-49-058 REV. 0 FALSE AUXILIARY POWER UNIT (APU) MAINTENANCE LIGHT ILLUMINATION. SERVICE LETTER INFORMATIONAL 07-APR-2004 MOS 51 737-SL-49-058 REV. E FALSE AUXILIARY POWER UNIT (APU) MAINTENANCE LIGHT RECOMMENDED 28-MAY-2009 ILLUMINATION. SERVICE LETTER MOS SI. 737-SL-49-059 START POWER UNIT (SPU) TRANSFORMER MOUNTING PLATE IMPROVEMENT ALLIED SIGNAL MODEL 131-98 RECOMMENDED AUXILIARY POWER UNIT (APU). SERVICE LETTER MOS 08-APR-1998 - (s) SI. 737-SL-49-060 BENEFITS OF OPERATING TWO AIR CONDITIONING PACKS WITH 131-96 AUXILIARY POWER UNIT (APU). SERVICE RECOMMENDED LETTER MOS 03-JUN-1998 - (s) SL 737-SL-49-061 131-98 APU START CONVERTER UNIT MODIFICATION. SERVICE LETTER RECOMMENDED MOS 10-JUL-1998 - Is) SL 737-SL-49-067 131-98 AUXILIARY POWER UNIT ELECTRONIC CONTROL UNIT (ECU). SERVICE LETTER RECOMMENDED MOS 12-AUG-1999 - SL 737-SL-49-067 REV. A 131-98 AUXILIARY POWER UNIT ELECTRONIC CONTROL UNIT (ECU). SERVICE LETTER RECOMMENDED MOS 20-SEP-1999 - (s) SL 737-SL-49-071 MISSING COMBUSTOR CASE DRAIN PLUG CAUSING HEAT DAMAGE TO THE APU DOOR. SERVICE LETTER INFORMATIONAL MOS 15-JUN-2001 - 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 348 Of 748 @ Camp Systems EFTA00618639 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-49-071 REV. A MISSING COMBUSTER CASE DRAIN PLUG CAUSING HEAT DAMAGE TO THE APU DOOR. SERVICE LETTER I4-APR-2003 SI. 737-SL-49-072 131-98 APU START SYSTEM IMPREOVEMENT - INTRODUCTION OF NEW START CONVERTER UNIT AND START POWER INFORMATIONAL UNIT. SERVICE LETTER 73-JUL-2001 MOS MOS - (s) INFORMATIONAL SL 737-SL-49-074 PAINT PEELING OFF FROM APU EDUCTOR INLET DUCT. SERVICE LETTER INFORMATIONAL MOS 02-APR-2003 SL 737-SL-49-075 HIGH RESISTANCE ACROSS APU EXHAUST GROUND STRAP. SERVICE LETTER INFORMATIONAL MOS 09-FEB-2004 SL 737-SL-49-075 REV. A HIGH RESISTANCE ACROSS APU EXHAUST GROUND STRAP. SERVICE LETTER INFORMATIONAL MOS 05-APR-2004 SL 737-SL-49-076 APU AIR INLET DUCT BOX CORROSION. SERVICE LETTER MOS I5-AUG-2005 SL 737-SL-49-076 REV. A APU AIR INLET DUCT BOX CORROSION. SERVICE LETTER MOS 04-JUN-2009 SL 737-SL-49-076 REV. 8 APU AIR INLET DUCT BOX CORROSION (SUPERSEDED BY SL 737-SL-49-076 REV. C). SERVICE LETTER MOS 30-MAR-2010 SL 737-SL-49-076 REV. C APU AIR INLET DUCT BOX CORROSION. SERVICE LETTER MOS 26-MAR-2013 SL 737-SL-49-077 APU EXHAUST MUFFLER - INSULATION BLANKET REPAIR. SERVICE LETTER MOS 22-SEP-2005 SL 737-SL-49-078 APU ECU SOFTWARE - VERSION 4. SERVICE LETTER MOS I4-AUG-2008 RECOMMENDED INFORMATIONAL RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 349 Of 748 @ Camp Systems EFTA00618640 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-49-078 REV. A APU ECU SOFTWARE - VERSION 4. SERVICE LETTER 31-OCT-2008 MOS SL 737-SL-49-078 REV. B APU ECU SOFTWARE- VERSION 4. SERVICE LETTER RECOMMENDED MOS 79-JAN-2010 SL 737-SL-49-079 GAP IN APU INSULATION BLANKET. SERVICE LETTER RECOMMENDED MOS 11-MAY-2009 SL 737-SL-49-080 UNDERTOROUED FASTENERS IN APU MOUNT INSTALLATION. SERVICE LETTER RECOMMENDED MOS 12-MAY-2009 SL 737-SL-49-080 REV. A UNDERTOROUED FASTENERS IN APU MOUNT INSTALLATION. SERVICE LETTER RECOMMENDED MOS 21-JAN-2010 SL 737-SL-49-081 IMPROPER REMOVAL OF DRY FILM LUBRICANT FROM APU RECOMMENDED MOUNT STRUT ASSEMBLY. SERVICE LETTER MOS 30-OCT-2009 SL 737-SL-49-081 REV. A IMPROPER REMOVAL OF DRY FILM LUBRICANT FROM APU RECOMMENDED MOUNT STRUT ASSEMBLY. SERVICE LETTER MOS 22-DEC-2000 SL 737-SL-49-082 VERSION 5- APU ECU OPERATION SOFTWARE. SERVICE LETTER RECOMMENDED MOS Id-MAY-2010 SL 737-SL-49-084 HYDRAULIC LOCK IN APU SOLENOID VALVE. SERVICE LETTER RECOMMENDED MOS 06-APR-2012 SL 737-SL-49-085 LOW DUCT PRESSURE DUE TO APU INLET GUIDE VANE DISAGREES WITH COMMAND FAULT, SERVICE LETTER RECOMMENDED MOS 23-MAR-2012 SL 737-SL-49-086 APU OIL DRAIN TUBE MISALIGNMENT CAUSING EXTERNAL OIL STREAKING. SERVICE LETTER RECOMMENDED MOS 22-MAR-2012 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 350 Of 748 @ Camp Systems EFTA00618641 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-49-087 FIRST STAGE TURBINE WHEEL BLADE WALKING - 131-98 APU (SUPERSEDED BY SL 737-SL-49-087 REV. A). SERVICE SUPERSEDED LETTER MOS SL 737-SL-49-087 REV. A FIRST STAGE TURBINE WHEEL BLADE WALKING -131-98 APU. SERVICE LETTER RECOMMENDED MOS 28-JUL-2014 SL 737-SL-49-088 131-9B APU CERAMIC DUPLEX BALL BEARING ASSEMBLY. SERVICE LETTER RECOMMENDED MOS I2-JUL-2012 SL 737-SL-49-089 APU DATA MEMORY MODULE WITH NON-COMPLIANT COMPONENT. SERVICE LETTER RECOMMENDED 01-AUG-2012 MOS SL 737-SL-49-090 COMMON COMMERCIAL CONTROL UNIT -131-98 APU (SUPERSEDED BY SL 737-SL-49-090 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-49-090 REV. A COMMON COMMERCIAL CONTROL UNIT -131-98 APU. SERVICE LETTER RECOMMENDED MOS I I -OCT-2012 SL 737-SL-49-091 STARTER- GENERATOR IMPROVEMENT - 9 STARTER GENERATOR, SERVICE LETTER RECOMMENDED MOS 72-SEP-2012 SL 737-SL-49-092 MANUFACTURING ESCAPE - LOOSE COMBUSTOR DRAIN ADAPTOR -131-98 APU. SERVICE LETTER RECOMMENDED MOS 25-JAN-2013 SL 737-SL-49-093 POSSIBLE GROUND JUMPER ASSEMBLY UNDER TORQUE - 131-98 APU (SUPERSEDED BY SL 737-SL-49-093 REV. A). SUPERSEDED SERVICE LETTER MOS SL 737-SL-49-093 REV. A POSSIBLE GROUND JUMPER ASSEMBLY UNDER TORQUE -131-98 APU. SERVICE LETTER RECOMMENDED MOS I9-JUN-2013 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 351 Of 748 @ Camp Systems EFTA00618642 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-49-094 INCORRECT INSTALLATION OF SEALING PLUGS IN APU WIRING HARNESS CONNECTORS - 131-98 APU (SUPERSEDED SUPERSEDED BY SL 737-SL-49-094 REV. A). SERVICE LETTER MOS SL 737-SL-49-094 REV. A INCORRECT INSTALLATION OF SEALING PLUGS IN APU WIRING HARNESS CONNECTORS - 131-98 APU. SERVICE LETTER 20-DEC-2013 SL 737-SL-51-022 SL 737-SL-51-022 REV. A 13-APR-2012 SL 737-SL-51-027 REV. B 10-JUL-2002 MOS WING AND HORIZONTAL STABILIZER INSPAR FINISHES (ORIGINALLY REPORTED AS ATA 5180-21) (SUPERSEDED BY SL 737-SL-51-022 REv. A). SERVICE LETTER MOS WING AND HORIZONTAL STABILIZER INSPAR FINISHES (ORIGINALLY REPORTED AS ATA 5180-21). SERVICE LETTER MOS BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA. SERVICE LETTER MOS (s) SL 737-SL-51-027 REV. D BOEING COMMERCIAL AIRPLANES REVIEW AND DELEGATED APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA. SERVICE LETTER MOS 12-MAY-2C05 SL 737-SL-51-027 REV. E BOEING COMMERCIAL AIRPLANES REVIEW AND DELEGATED APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA. SERVICE LETTER MOS 11-OCT-2000 SL 737-SL-51-027 REV. F BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIRS. SERVICE LETTER MOS 24-MAY-2C07 SL 737-SL-51-027 REV O BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIRS. SERVICE LETTER MOS 21-JAN-2008 SL 737-SL-51-027 REV. H BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIRS. SERVICE LETTER MOS 19-JUN-2008 RECOMMENDED SUPERSEDED RECOMMENDED INFORMATIONAL ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 352 Of 748 Camp Systems EFTA00618643 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-51-027 REV. I 09-APR-2010 SL 737-SL-51-027 REV. J BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA (SUPERSEDED BY SL 737-SL-51-027 REV. K). SERVICE LETTER MOS BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA. SERVICE LETTER MOS SL 737-SL-51-027 REV. K BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIR AND MODIFICATION DATA (SUPERSEDED BY SL 737-SL-51-027 REV. L). SERVICE LETTER MOS SL 737-SL-51-027 REV. L BOEING APPROVAL OF AIRPLANE STRUCTURAL REPAIRS. SERVICE LETTER MOS 1 1 -APR-20I4 SL 737-SL-51-029 REV. B DAMAGE TOLERANT MAINTENANCE REQUIREMENTS. SERVICE LETTER MOS 03-DEC-2002 SL 737-SL-51-035 DESIGN IMPROVEMENT TO PREVENT DIFFICULTY IN THE OPERATION OF THE FORWARD ENTRY DOOR. SERVICE LETTER MOS 26-NOV-2002 INFORMATIONAL SUPERSEDED SUPERSEDED RECOMMENDED INFORMATIONAL SL 737-SL-51-036 'METALBOND•-STRUCTURAL ALUMINUM BONDING PRECAUTIONS AND PROCEDURES. SERVICE LETTER INFORMATIONAL MOS 01-AUG-2003 SL 737-SL-51-037 INACTIVATION OF BACB30MY6p•X AND Y FASTENERS. SERVICE LETTER INFORMATIONAL MOS 15-APR-2003 SL 737-SL-51-037 REV. A INACTIVATION OF BACB3LIMY6()0X ANDY FASTENERS. SERVICE LETTER INFORMATIONAL MOS 11 -JUL-2003 SL 737-SL-51-038 REV. A DAMAGE IDENTIFICATION AND REMOVAL DURING STRUCTURAL REPAIRS, SERVICE LETTER MOS I4-JUL-2006 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 353 Of 748 @ Camp Systems EFTA00618644 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-51-039 IS-SEP-2005 SI. 737-SL-51-039 REV. A MAJOR REVISIONS TO STRUCTURAL REPAIR MANUAL METALBOND SECTIONS. SERVICE LETTER MOS I7-OCT-2007 MAJOR REVISIONS TO STRUCTURAL REPAIR MANUAL METALBOND SECTIONS. SERVICE LETTER MOS SL 737-SL-51-040 POSSIBLE CORROSION ON THE EMERGENCY ESCAPE HATCH UPPER SILLS. BS616 8 639 (-600 8 -700) BS578 8 BS639 NOT APPLICABLE (-800 & -900). SERVICE LETTER MOS 22-AUG-2008 17-DEC-2006 3260:48 AFL 782 SL 737-SL-51-040 REV. A POSSIBLE CORROSION ON THE EMERGENCY ESCAPE HATCH UPPER SILLS. BS616 8 639 (-600 8 -700) BS578 8 BS639 (-800 & -900). SERVICE LETTER MOS I0-JUL-2007 SL 737-SL-51-041 MAJOR MINOR REPAIR CLASSIFICATION (SUPERSEDED BY SL 737-SL-51-041 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-51-041 REV. A MAJOR/MINOR REPAIR CLASSIFICATION (SUPERSEDED BY SL 737-SL-51-041 REV. B). SERVICE LETTER SUPERSEDED MOS SL 737-SL-51-041 REV. B MAJOR MINOR REPAIR CLASSIFICATION (SUPERSEDED BY SL 737-SL-51-041 REV. C). SERVICE LETTER SUPERSEDED MOS SL 737-SL-51-041 REV. C MAJOR MINOR REPAIR CLASSIFICATION (SUPERSEDED BY SL 737-SL-51-041 REV. D). SERVICE LETTER SUPERSEDED MOS SL 737-SL-51-041 REV. D MAJOR/MINOR REPAIR CLASSIFICATION. SERVICE LETTER RECOMMENDED MOS 22-NOV-20I3 SL 737-SL-51-042 REV. B DAMAGE REPORTING AND REPAIR PLAN/DESIGN GUIDELINES. SERVICE LETTER RECOMMENDED MOS 09-DEC-2009 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 354 Of 748 @ Camp Systems EFTA00618645 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-51-042 REV. C DAMAGE REPORTING AND REPAIR PLANIDESIGN GUIDELINES (SUPERSEDED BY SL 737-SL-51-042 REV. DJ, SERVICE LETTER MOS SUPERSEDED 51 737-SL-51-042 REV. D DAMAGE REPORTING AND REPAIR PLAN/DESIGN GUIDELINES. SERVICE LETTER RECOMMENDED I6-MAR-2011 MOS 51 737-SL-51-043 BOEING SUPPORT OF OPERATOR COMPLIANCE WITH THE AGING AIRPLANE SAFETY RULE (SUPERSEDED BY SL SUPERSEDED 737-SL-51-043 REV. A). SERVICE LETTER MOS 51 737-SL-51-043 REV. A BOEING SUPPORT OF OPERATOR COMPLIANCE WITH THE AGING AIRPLANE SAFETY RULE (SUPERSEDED BY SL SUPERSEDED 737-SL-51-043 REV. B). SERVICE LETTER MOS 51 737-SL-51-043 REV. B BOEING SUPPORT OF OPERATOR COMPLIANCE WITH THE AGING AIRPLANE SAFETY RULE. SERVICE LETTER RECOMMENDED 27-OCT-2010 MOS 51 737-SL-51-044 PINHOLES IN THE FINISH OF CARBON FIBER REINFORCED RECOMMENDED 21-OCT-2011 PLASTIC (CFRP) PARTS, SERVICE LETTER MOS 51 737-SL-51-045 CORROSION PREVENTION AND CONTROL PROGRAMS. SERVICE LETTER RECOMMENDED 02-FEB-20I2 MOS 51 737-SL-51-047 ESCAPEMENT OF SPS TECHNOLOGIES BACN10JR3CFD NUTPLATES WITH MISSING CADMIUM PLATING. SERVICE RECOMMENDED 25-JAN-2013 LETTER MOS 51 737-SL-52-023 WING REFUEL ACCESS DOOR HOLD OPEN STRUT ASSY LOCK MODIFICATION TO PREVENT OVER EXTENSION. RECOMMENDED I8-JAN-1999 SERVICE LETTER MOS - (s) 51 737-SL-52-024 AFT LEFT ENTRY DOOR HANDLE SEPARATION. SERVICE LETTER RECOMMENDED 29-OCT-1999 MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 355 Of 748 @ Camp Systems EFTA00618646 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-52-024 REV. A AFT LEFT ENTRY DOOR HANDLE SEPARATION. SERVICE LETTER I4-FEB-2002 MOS - Is) SL 737-SL-52-025 AUTOMATIC OVERWING EXIT FLIGHT LOCK- SOLENOID IMPROVEMENT. SERVICE LETTER 05-OCT-2000 MOS - (s) SL 737-SL-52-026 FORWARD AIRSTAIR TOP STEP CONTROL ACTUATOR AND ROLLER ENGAGEMENT. SERVICE LETTER 24-SEP-2001 MOS - (s) SL 737-SL-52-026 REV. A FORWARD AIRSTAIR TO STEP CONTROL ACTUATOR AND ROLLER ENGAGEMENT. SERVICE LETTER MOS 20-MAY-2003 INFORMATIONAL RECOMMENDED INFORMATIONAL INFORMATIONAL SL 737-SL-52-027 FORWARD AIRSTAIR TOP STEP INTERFFERENCE WITH FLOOR BEAM HEX-DRIVE BOLT COLLARS. SERVICE LETTER INFORMATIONAL MOS 07-NOV-2001 - (s) SL 737-SL-52-027 REV. A FORWARD AIRSTAIR TOP STEP INTERFERENCE WITH FLOOR BEAM HEX-DRIVE BOLT COLLARS. SERVICE LETTER INFORMATIONAL MOS I3-SEP-2005 SL 737-SL-52-027 REV. 8 FORWARD AIRSTAIR TOP STEP INTERFERENCE WITH FLOOR RECOMMENDED BEAM HEX-DRIVE BOLT COLLARS. SERVICE LETTER MOS 05-MAR-2009 SL 737-SL-52-027 REV. C FORWARD AIRSTAIR TOP STEP INTERFERENCE WITH FLOOR BEAM HEX-DRIVE BOLT COLLARS. SERVICE LETTER INFORMATIONAL MOS I9-MAR-2010 SL 737-SL-52-028 FORWARD AIRSTAIR DOOR LOCK PIN ACTUATOR - NEW POTTING MATERIAL. SERVICE LETTER INFORMATIONAL MOS 29-MAY-2002 - Is) SL 737-SL-52-029 CARGO DOOR SWITCH COVER IMPROVEMENT. SERVICE LETTER INFORMATIONAL MOS I I -APR-2002 - (s) SL 737-SL-52-029 REV. A AFT CARGO DOOR SWITCH COVER IMPROVEMENT. SERVICE LETTER INFORMATIONAL MOS 21-OCT-2002 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 356 Of 748 @ Camp Systems EFTA00618647 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-52-029 REV. 8 I3-NOV-2006 AFT CARGO DOOR SWITCH COVER IMPROVEMENT. SERVICE LETTER MOS 51 737-SL-52-030 ENHANCED SECURITY FLIGHT DECK DOOR PRESSURE RELIEF LATCH REPLACEMENT. SERVICE LETTER INFORMATIONAL 51 37 -JAN-2003 737-SL-52-03I MOS - Is) SECURE FLIGHT DECK DOOR LOCK CONTROL MODULE ROTARY SWITCH. SERVICE LETTER INFORMATIONAL 51 04-APR-2003 737-SL-52-032 REV. A MOS ENHANCED FLIGHT DECK ACCESS DOOR. NEW BEZEL FOR ACCESS SYSTEM KEYPAD MODULE. SERVICE LETTER INFORMATIONAL 51 09-MAY-2003 737-SL-52-034 MOS AIRSTAIR DOOR INDICATION TARGET AND BRACKET-REPLACEMENT. SERVICE LETTER INFORMATIONAL 51 20-MAY-2003 737-SL-52-034 REV. A MOS AIRSTAIR DOOR INDICATION TARGET AND BRACKET-REPLACEMENT. SERVICE LETTER COMPLIED WITH - COMPONENT REPLACEMENT 51 I3-SEP-2005 737-SL-52-036 REV. A MOS 02-MAR-2006 2509:38 AFL 609 DEADBOLT ARMOR PLATE INSTALLATION, SERVICE LETTER COMPLIED WITH 51 I6-NOV-2006 737-SL-52-037 REV. A MOS C8D AEROSPACE ENHANCED SECURITY FLIGHT DECK DOOR DIFFICULT TO OPEN. SERVICE LETTER 51 I6-APR-2004 737-SL-52-038 MOS FORWARD AIRSTAIR RELIABILITY IMPROVEMENTS - PRR 38582, SERVICE LETTER 51 I 7-NOV-2005 737-SL-52-039 MOS AIRSTAIR DOOR FORWARD OVERHEAD WARNING LIGHT - INOP PLACARD CHECK. SERVICE LETTER 09-APR-2007 MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 357 Of 748 @ Camp Systems EFTA00618648 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-52-039 REV. A 28-AUG-2007 AIRSTAIR DOOR FORWARD OVERHEAD WARNING LIGHT - !NOP PLACARD CHECK. SERVICE LETTER MOS SL 737-SL-52-039 REV. B AIRSTAIR DOOR FORWARD OVERHEAD WARNING LIGHT - INOP PLACARD CHECK, SERVICE LETTER MOS 23-JUL-2008 SL 737-SL-52-040 AFT FAIRING BRAKE ACCUMULATOR DOOR HOLD OPEN STRUT ASSEMBLY, SERVICE LETTER MOS 21-MAY-2007 51 737-SL-52-040 REV. A AFT FAIRING BRAKE ACCUMULATOR DOOR HOLD OPEN STRUT ASSEMBLY. SERVICE LETTER MOS 22-JUN-2007 51 737-SL-52-041 CARGO DOOR HANDLE IMPROVEMENTS. SERVICE LETTER MOS 24-JUL-2007 51 737-SL-52-042 MAIN LANDING GEAR DOOR. BULB SEAL ATTACHMENT. SERVICE LETTER MOS 23-JUL-2007 SL 737-SL-52-043 STAB TRIM AND FLIGHT DECK DOOR CONTROL P8-47 PANEL - ANNUNCIATOR. SERVICE LETTER MOS 24-JAN-2008 SI. 737-SL-52-044 AVAILABILITY OF IMPROVED FORWARD ENTRY DOOR SNUBBER. SERVICE LETTER MOS 22-DEC-2008 SL 737-SL-52-044 REV. A AVAILABILITY OF IMPROVED FORWARD ENTRY DOOR SNUBBER. SERVICE LETTER MOS 19-JAN-2009 SL 737-SL-52-044 REV. 8 AVAILABILITY OF IMPROVED FORWARD ENTRY DOOR RECOMMENDED SNUBBER. SERVICE LETTER 11.10S 13-MAY-2009 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 358 Of 748 @ Camp Systems EFTA00618649 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-52-045 FORWARD ENTRY DOOR GUIDE ARM RADIUS LINKS PIN SCREW. SERVICE LETTER MOS 22-DEC-2008 51 737-SL-52-047 AVAILABILITY Of IMPROVEMENTS FOR AFT ENTRY. AFT SUPERSEDED SERVICE AND FORWARD GALLEY DOOR SNUBBERS (SUPERSEDED BY SL 737-SL-52-047 REV. A). SERVICE LETTER MOS 51 737-SL-52-047 REV. A AVAILABILITY OF IMPROVEMENTS FOR AFT ENTRY. AFT SERVICE AND FORWARD GALLEY DOOR SNUBBERS. RECOMMENDED SERVICE LETTER MOS I8-AUG-2010 51 737-SL-52-048 AVAILABILITY OF IMPROVED FORWARD AND AFT CARGO RECOMMENDED DOOR LATCH ASSEMBLIES. SERVICE LETTER MOS 13-AUG-2009 51 737-SL-52-048 REV. A AVAILABILITY Of IMPROVED FORWARD AND AFT CARGO DOOR LATCH ASSEMBLIES. SERVICE LETTER INFORMATIONAL MOS 25-MAR-2010 51 737-SL-52-049 AVAILABILITY Of IMPROVED EE BAY DOOR LATCH ASSEMBLY. SERVICE LETTER RECOMMENDED MOS 08-DEC-2009 51 737-SL-52-049 REV. A AVAILABILITY OF IMPROVED EE BAY DOOR LATCH ASSEMBLY. SERVICE LETTER INFORMATIONAL MOS 15-MAR-2010 51 737-SL-52-050 POTENTIAL DAMAGE TO THE FORWARD ENTRY DOOR SEAL AND SEAL RETAINER. SERVICE LETTER RECOMMENDED MOS 08-FEB-2010 51 737-SL-52-051 SECURE FLIGHT DECK DOOR - DESIGN CHANGE FOR THE SOLENOID STRIKER LINK. SERVICE LETTER RECOMMENDED MOS 06-AUG-20I0 51 737-SL-52-052 FORWARD AIRSTAIR ASSEMBLY - ACTUATOR GEAR- DISCREPANCY. SERVICE LETTER RECOMMENDED MOS 07-OCT-2010 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 359 Of 748 @ Camp Systems EFTA00618650 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-52-053 DURABILITY IMPROVEMENT FOR THE BEARING PLATE ON THE DOORSTOP PAD INSTALLATION. SERVICE LETTER RECOMMENDED MOS I I -NOV-2010 SL 737-SL-52-054 POSSIBLE INCORRECTLY INSTALLED 0 -RING IN DOOR HANDLES IN THE FORWARD GALLEY. AFT GALLEY AND AFT SUPERSEDED ENTRY DOORS (SUPERSEDED BY SL 737-SL-52-054 REV. A). SERVICE LETTER MOS SL 737-SL-52-054 REV. A POSSIBLE INCORRECTLY INSTALLED 0 -RING IN DOOR HANDLES IN THE FORWARD GALLEY. AFT GALLEY AND AFT RECOMMENDED ENTRY DOORS. SERVICE LETTER MOS 23-AUG-2011 SL 737-SL-52-05S DOORS - FORWARD AIRSTAIR - BALLSCREW - DISCREPANT MATERIAL. SERVICE LETTER RECOMMENDED 27-JAN-2011 MOS SL 737-SL-52-057 FORWARD AIRSTAIRS -DOOR - CONTROLS - OCK PIN ACTUATOR- MODIFICATION. SERVICE LETTER RECOMMENDED 29-NOV-2011 MOS SL 737-SL-52-058 "FORWARD AIRSTAIR - AFT HANDRAIL BRACKET - STRIKER RECOMMENDED 08-FEB-2012 PLATE'. SERVICE LETTER MOS SL 737-SL-52-080 FORWARD ENTRY DOOR PROXIMITY SENSOR TARGET UPGRADE. SERVICE LETTER RECOMMENDED 16-NOV-2012 MOS SL 737-SL-53-047 NOSE RADOME DIVERTER STRIP ATTACHINSERT SEALING IMPROVEMENTS. SERVICE LETTER INFORMATIONAL 22-DEC-2008 MOS - (s) SL 737-SL-53-048 POSSIBLE MISSING SEALANT COMMON TO A BSTA 727 BRACKET. SERVICE LETTER INFORMATIONAL 17-OCT-2000 MOS - (s) SL 737-SL-53-049 POSSIBLE MISLOCATED ELEVATOR CONTROL CABLE ISOLATION BLOCKS ON SECTION 43 SEAT TRACKS. SERVICE INFORMATIONAL 29-SEP-2000 LETTER MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 360 Of 748 @ Camp Systems EFTA00618651 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-53-050 POSSIBLE CRACKS IN THE COUNTERSINKS OF FASTNER HOLES COMMON TO FRONT SPAR TO REAR SPAR UNDERWING PANELS. SERVICE LETTER MOS 72 (s) 08-OCT-1999 20-SEP-2000 SL 737-SL-53-051 SKIN PANEL ASSEMBLY REPLACEMENT4AP JOINT FASTNER SIZE INSTALLATION. SERVICE LETTER MOS 04-OCT-2000 SL 737-SL-53-051 REV. A SKIN PANEL ASSEMBLY REPLACEMENT-LAP JOINT FASTENER SIZE INSTALLATION. SERVICE LETTER MOS OI -SEP-2006 - (s) INFORMATIONAL INFORMATIONAL SL 737-SL-53-054 MISSING WING-TO-BODY FAIRING ELECTRICALLY BONDED FASTENERS. SERVICE LETTER INFORMATIONAL MOS 30-OCT-2000 - (s) SL 737-SL-53-055 MISSING FASTENERS COMMON TO EIS 420 STRINGER CLIPS AT S- 19FU22R/23R/24R. SERVICE LETTER RECOMMENDED MOS 28-MAR-2002 SL 737-SL-53-056 ALLOWABLE FUSELAGE SKIN WRINKLING CRITERIA, SERVICE LETTER RECOMMENDED MOS 22-AUG-2001 - (s) SL 737-SL-53-056 REV. A ALLOWABLE FUSELAGE SKIN WRINKLING CRITERIA, SERVICE LETTER MOS I2-MAR-2002 -(s) SL 737-SL-53-057 EXAMINATION OF BS1016 AFT PRESSURE BULKHEAD AND SURROUNDING SECTION 48 STRUCTURE. SERVICE LETTER MOS 25-SEP-2001 - (s) SL 737-SL-53-058 POSSIBLE RIDING CONDITION BETWEEN FASTENER AND RUDDER PEDAL SHAFT NUT P/N BACN1ORF25. SERVICE INFORMATIONAL LETTER MOS I6-NOV-2001 - SL 737-SL-53-058 REV. A POSSIBLE RIDING CONDITION BETWEEN FASTENER AND RUDDER PEDAL SHAFT NUT P/N BACN1ORF25. SERVICE INFORMATIONAL LETTER MOS I2-JUL-2004 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 361 Of 748 @ Camp Systems EFTA00618652 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-53-059 I5-JAN-2002 SL 737-SL-53-060 GREASE EXTRUDING FROM THE SPLIT LINE OF THE BODY STATION 706 MAIN LANDING GEAR SUPPORT FITTING ASSEMBLY.. SERVICE LETTER I8-JUL-2002 SECTION 48- MISSING STRINGER 2AL AND 2AR FASTENERS. SERVICE LETTER MOS - Is) MOS 6 (s) 51 737-SL-53-060 REV. A GREASE EXTRUDING FROM THE SPLIT LINE OF THE BODY STATION 706 MAIN LANDING GEAR SUPPORT FITTING ASSEMBLY. SERVICE LETTER MOS 28-MAR-2003 - (s) INFORMATIONAL 51 737-SL-53-061 POSSIBLE INADEQUATE SEALING BETWEEN THE BODY STATION 1016 BULKHEAD WEB AND VERTICAL FIN ATTACH INFORMATIONAL FITTING. SERVICE LETTER MOS 72-APR-2002 - (s) 51 737-SL-53-062 MISSING FASTENERS COMMON TO FUSELAGE SKIN JUST FORWARD OF BS 1016 (SUPERSEDED BY SL 737-SL-53-062 SUPERSEDED REV. A). SERVICE LETTER MOS - (s) SL 737-SL-53-062 REV. A MISSING FASTENERS COMMON TO FUSELAGE SKIN JUST FORWARD OF BS 1016. SERVICE LETTER RECOMMENDED MOS 30-JUL-2010 51 737-SL-53-064 MISSING FASTNERS COMMON TO BS 360 SHEAR TIE BETWEEN STRINGER 14R AND STRINGER 15R. SERVICE LETTER COMPLIED WITH MOS 29-AUG-2011 31-MAR-2004 3533:32 AFL 863 51 737-SL-53-065 POSSIBLE TOOL MARK ON BSTA 178 BULKHEAD. SERVICE LETTER MOS 06-MAY-2005 51 737-SL-53-066 REV. A CARGO COMPARTMENT CORROSION. SERVICE LETTER MOS 29-JAN-2007 51 737-SL-53-067 TORLON CLIP-ON NUTS FOR FLOOR PANEL INSTALLATION. SERVICE LETTER MOS 07-SEP-2005 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 362 Of 748 @ Camp Systems EFTA00618653 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-53-068 15-SEP-2005 POSSIBLE TOOL MARKS ON PASSENGER WINDOW FRAMES. SERVICE LETTER MOS • SL 737-SL-53-069 BS 294.5 JACK PAD FITTING FASTENER HOLES DISCREPANCY. SERVICE LETTER MOS I4-JUL-2006 SL 737-SL-53-070 SECTION 41 DRAIN PATH PLUGGED. SERVICE LETTER MOS I4-JUL-2006 SL 737-SL-53-071 FUSELAGE SKIN WEAR DAMAGE FROM DORSAL FIN WEAR BETWEEN BS 851.5 TO 853.5. SERVICE LETTER MOS 01 -JUN-2007 SL 737-SL-53-072 POSSIBLE EXCESS THREAD PROTRUSION ON KEEL BEAM BOLTS AT BS540. WL150. LBL10 AND RBL10, SERVICE COMPLIED WITH LETTER MOS 22-AUG-2008 22-JUN-2007 3260:48 AFL 782 SI. 737-SL-53-072 REV. A POSSIBLE EXCESS THREAD PROTRUSION ON KEEL BEAM RECOMMENDED BOLTS AT BS540. WL150. LBL 10 AND RBL10. SERVICE LETTER MOS 13-AUG-2009 SL 737-SL-53-073 MISSING FILLET SEAL AT VACUUM WASTE SERVICE PANEL SUPPORT STRUCTURE. SERVICE LETTER MOS 25-JAN-2007 SL 737-SL-53-075 IN FLIGHT DEPARTURE OF VYING-TO-BODY FAIRING. AFT WHEEL WELL FAIRING PANEL. SERVICE LETTER MOS 05-MAR-2007 SL 737-SL-53-075 REV. A IN FLIGHT DEPARTURE OF VYING-TO-BODY FAIRING. AFT WHEEL WELL FAIRING PANEL. SERVICE LETTER MOS 13-NOV-2007 SL 737-SL-53-076 09-APR-2007 AFL 1000 (s) POSSIBLE MISSING FILLER IN MAIN ENTRY DOOR UPPER SILLAT BS294.5. SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 363 Of 748 @ Camp Systems EFTA00618654 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-53-077 POSSIBLE DRILL START MARKS IN THE OUTBOARD EDGE OF THE PIN 141A1116-10 FRAME WEB AND THE OUTBOARD RADIUS OF THE PIN 141A1115-4 FAIL SAFE CHORD. SERVICE LETTER MOS I2-APR-2007 SL 737-SL-53-078 MAIN CABIN FLOOR BEAM CORROSION. SERVICE LETTER MOS I4-JUN-2007 SL 737-SL-53-078 REV. A MAIN CABIN FLOOR BEAM CORROSION (SUPERSEDED BY 737-SL-53-078 REV. B). SERVICE LETTER MOS SUPERSEDED SL 737-SL-53-078 REV. B 28-FEB-2008 MAIN CABIN FLOOR BEAM CORROSION. SERVICE LETTER MOS SI. 737-SL-53-079 BOLTS INSTALLED WITH GAPS. MISSING WASHERS. AND COMPUED WITH INCORRECT NUTS AT BS 727 AT S-19R AND S-19L.. SERVICE LETTER MOS 22-AUG-2008 21-AUG-2007 3260:48 AFL 782 SL 737-SL-53-080 POSSIBLE DAMAGED HI-LOKS IN MAIN ENTRY DOOR UPPER SILL AT BS303.90. SERVICE LETTER MOS 04-OCT-2007 SL 737-SL-53-081 EXCESSIVE SEALANT IN NOSE LANDING GEAR HINGE CAVITY, SERVICE LETTER MOS 04-DEC-2007 SL 737-SL-53-082 TOOL MARK COMMON TO THE LOWER INBOARD EDGE OF STRAP AT STRINGER 18A. SERVICE LETTER MOS 09-OCT-2007 SL 737-SL-53-083 POSSIBLE GAP COMMON TO THE BODY STATION 203 WATERLINE 234 INNER CHORD SPUCE STRUCTURE (SUPERSEDED BY SL 737-SL-53-083 REV. A). SERVICE LETTER MOS 09-NOV-2007 SL 737-SL-53-083 REV. A POSSIBLE GAP COMMON TO THE BODY STATION 203 WATERLINE 234 INNER CHORD SPLICE STRUCTURE SUPERSEDED (SUPERSEDED BY SL 737-SL-53-083 REV. 8). SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 364 Of 748 @ Camp Systems EFTA00618655 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-53-083 REV. 8 POSSIBLE GAP COMMON TO THE BODY STATION 203 WATERLINE 234 INNER CHORD SPLICE STRUCTURE. SERVICE RECOMMENDED LETTER MOS 23-MAR-2012 a 737-SL-53-084 EXTERNAL GROUND POWER RECEPTACLE SKIN AND DOUBLER - PREVENTIVE MODIFICATION. SERVICE LETTER MOS 10-MAR-2008 SL 737-SL-53-085 MISSING AND MISLOCATED FASTENERS IN SECTION 48 SKIN ASSEMBLY AT APPROXIMATELY STA 1088. S-20L AND S-20R, SERVICE LETTER MOS II -JAN-2010 a 737-SL-53-088 03-OCT-2008 SL 737-SL-53-089 I9-DEC-2008 POSSIBLE MISSING STIFFENER IN TRANSVERSE FLOOR BEAM AT BS 344. RBL 54.6.. SERVICE LETTER MOS REPLACEMENT OF INSULATION BLANKET ATTACHMENT TCLAMPS! SPRING CLIPS WITH BOND-ON PINS AT THE MAIN LANDING SUPPORT FRAME STA 695 AND 716 ABOVE S-17. (SUPERSEDED BY 737-SL-53-089 REVA), SERVICE LETTER MOS SL 737-SL-53-089 REV. A REPLACEMENT OF INSULATION BLANKET ATTACHMENT T-CLAMPS/SPRING CLIPS WITH BOND-ON PINS AT THE MAIN LANDING SUPPORT FRAME STA 695 AND 716 ABOVE S-17. SERVICE LETTER MOS 29-JUN-20I0 SL 737-SL-53-090 SEAL VOIDS AT BS 1016 AND BS 1088 VERTICAL FIN LUGS (SUPERSEDED BY a 737-SL-53-090 REV. A). SERVICE LETTER MOS 24-APR-2009 a 737-SL-53-090 REV. A SEAL VOIDS AT BS 1016 AND BS 1088 VERTICAL FIN LUGS. SERVICE LETTER MOS 08-FEB-20I3 a 737-SL-53-091 EXCESSIVE SEALANT IN APU DOOR HINGE CORNERS. SERVICE LETTER MOS 02-JUL-2009 RECOMMENDED SUPERSEDED RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 365 Of 748 @ Camp Systems EFTA00618656 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-53-093 LOWER AIRSTAIR SILL INSTALLATION GAPPING ON AIRCRAFT WITH AIRSTAJRS AND WITHOUT AIRSTAIRS. SERVICE RECOMMENDED LETTER MOS 22-DEC-2010 SL 737-SL-53-095 POSSIBLE MISSING FASTENERS FROM A GUSSET ASSY AND ANGLE ASSY AT FORWARD INBOARD CORNER OF WALL RECOMMENDED SURROUNDING WASTE TANK IN AFT CARGO BAY. SERVICE LETTER MOS 12-NOv-2010 SL 737-SL-53-097 POTENTIALLY INSUFFICIENT GRIP LENGTH FOR FLIGHT DECK FORWARD PANEL SUPPORT FASTENERS AT STA RECOMMENDED 20.1.v.1208.RBL 8 LBL 29. SERVICE LETTER MOS 25-APR-2011 SL 737-SL-53-098 "AIR STAIR DOOR JUMPER POSSIBLY INSTALLED INCORRECTLY'. SERVICE LETTER RECOMMENDED MOS 20-SEP-201i SL 737-SL-53-099 DIFFICULTY CLOSING AND OPENING THE 141A5130-21 ALTERNATE GEAR EXTENSION DOOR ASSEMBLY DUE TO RECOMMENDED POSSIBLE INTERFERENCE (SUPERSEDED BY SL 737-SL-53-099 REV. A). SERVICE LETTER MOS 09-APR-2012 SL 737-SL-53-099 REV. A DIFFICULTY CLOSING AND OPENING THE 141A5130-21 ALTERNATE GEAR EXTENSION DOOR ASSEMBLY DUE TO RECOMMENDED POSSIBLE INTERFERENCE. SERVICE LETTER MOS 08-APR-2013 SL 737-SL-53-100 POTENTIAL DRILL STARTS COMMON TO BS 540 FRAME. SERVICE LETTER RECOMMENDED MOS 13-APR-2012 SL 737-SL-53-101 POTENTIAL GOUGES FOUND AT BSTA 727 BULKHEAD FRAME. LBL AND RBL 10 (SUPERSEDED BY SL 737-SL-53-101 SUPERSEDED REV. A). SERVICE LETTER MOS SL 737-SL-53-10i REV. A POTENTIAL GOUGES FOUND AT BSTA 727 BULKHEAD FRAME. LBL AND RBL 10. SERVICE LETTER RECOMMENDED MOS 07-AUG-2012 SL 737-SL-53-102 POTENTIALLY MISSING NAS1368 GROMMETS AT STA312 AND STA328. TRANSVERSE FLOOR BEAM. SERVICE LETTER RECOMMENDED MOS 18-SEP-2012 ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 366 Of 748 Camp Systems EFTA00618657 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-53-103 SL 737-SL-53-103 REV. A BS 578 TO 639 STUB BEAM FASTENERS MISSING COUNTER BORE WASHER. SERVICE LETTER 19-AUG-2013 MOS BS 578 T0639 STUB BEAM FASTENERS MISSING COUNTER BORE WASHER (SUPERSEDED BY SL 737-SL-53-103 REV. SUPERSEDED A). SERVICE LETTER MOS RECOMMENDED SL 737-SL-53-104 CLEARING FALSE-POSITIVE CHEM-MILL CRACK INDICATIONS. SERVICE LETTER RECOMMENDED 29-APR-2013 MOS SL 737-SL-53-105 POSSIBLE INADEQUATE SEALANT COMMON TO THE BS 887 RECOMMENDED 30-JAN-2014 STRINGER SPLICES. SERVICE LETTER MOS SL 737-SL-53-106 X-BAND RADOME MOISTURE INGRESSION. SERVICE LETTER RECOMMENDED 25-FEB-2014 MOS SL 737-SL-54-019 POTENTIAL MISSING PRIMER FROM NACELLE STRUT DIAGONAL BRACE. SERVICE LETTER INFORMATIONAL 27-APR-1999 MOS 60 (s) 08-OCT-1999 SL 737-SL-54-021 AFT STRUT MIRING PANEL HEAT DAMAGE. SERVICE LETTER INFORMATIONAL 23-JAN-2004 MOS SL 737-SL-55-019 VERTICAL STABILIZER AFT REAR SPAR-PRIMARY FITTING SHIM MIGRATION. SERVICE LETTER DAYS 180(s) SL 737-SL-55-019 REV. A VERTICAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER DAYS 180(s) 04-MAR-2002 SL 737-SL-55-019 REV. B VERTICAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER MOS 180(s) 02-MAY-2005 SL 737-SL-55-019 REV. C VERTICAL STABILIZER REAR SPAR SHIM MIGRATION (SUPERSEDED BY SL 737-SL-55-019 REV. 0). SERVICE LETTER SUPERSEDED MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 367 Of 748 @ Camp Systems EFTA00618658 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-55-019 REV. D VERTICAL STABILIZER REAR SPAR SHIM MIGRATION (SUPERSEDED BY SL 737-SL-55-019 REV. E). SERVICE LETTER SUPERSEDED MOS - Is) SL 737-SL-55-019 REV. E VERTICAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER MOS 24 (s) 7-JUN-2014 RECOMMENDED AFL 4800 SL 737-SL-55-019 STEP 1 VERTICAL STABILIZER AFT REAR SPAR - PRIMARY FITTING SHIM MIGRATION. SERVICE LETTER INFORMATIONAL MOS 01 -JAN-2000 - (s) SL 737-SL-55-019 STEP 5 VERTICAL STABILIZER AFT REAR SPAR - PRIMARY FITTING SHIM MIGRATION. SERVICE LETTER RECOMMENDED MOS 01 -JAN-2000 - (s) SL 737-SL-55-020 HORIZONTAL STABILIZER HINGE PIN BUSHING RETAINER MISSING. SERVICE LETTER INFORMATIONAL MOS C6-JUL-2001 - (s) SL 737-SL-55-021 CLEANING OF DEICING/ANTI-ICING FLUID RESIDUE ON ELEVATOR TAB EXTERIOR. SERVICE LETTER INFORMATIONAL MOS 05-MAR-2002 -(s) SL 737-SL-55-021 REV. A CLEANING OF DEICING/ANTI-ICING FLUID RESIDUE ON ELEVATOR TAB EXTERIOR. SERVICE LETTER INFORMATIONAL MOS 10-MAY-2002 - (8) SL 737-SL-55-023 VERTICAL STABILIZER REAR SPAR ATTACHMENT-POSSIBLE INCORRECT SPACER INSTALLATION AND FITTING INFORMATIONAL DAMAGE. SERVICE LETTER MOS 25-SEP-2003 SL 737-SL-55-024 HORIZONTAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER MOS 24 (s) 25-SEP-2003 SL 737-SL-55-024 REV. A HORIZONTAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER MOS 24 (s) 03-NOV-2003 SL 737-SL-55-024 REV. B HORIZONTAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER MOS 24 (s) 12-N0V-2003 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 368 Of 748 @ Camp Systems EFTA00618659 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-55-024 REV. C HORIZONTAL STABILIZER REAR SPAR SHIM MIGRATION. SERVICE LETTER 12-SEP-2005 SL 737-SL-55-025 HORIZONTAL STABILIZER REMOVABLE LEADING EDGE ASSEMBLY REWORK, SERVICE LETTER 18-DEC-2006 SL 737-SL-55-025 REV. A HORIZONTAL STABILIZER REMOVEABLE LEADING EDGE ASSEMBLY REWORK. SERVICE LETTER I2-JUN-2008 SL 737-SL-55-026 HORIZONTAL STABILIZER AND HORIZONTAL STABILIZER CENTER SECTION MIGRATED BUSHING INSPECTION. SERVICE LETTER 21-MAY-2007 SL 737-SL-55-027 12-APR-2007 SL 737-SL-55-028 MOS 24 (s) MOS MOS MOS HORIZONTAL STABILIZER FRONT SPAR TERMINAL FITTING BOLTS INSPECTION AND REWORK. SERVICE LETTER MOS HORIZONTAL STABILIZER REAR SPAR TERMINAL FITTING BOLTS INSPECTION AND REWORK (SUPERSEDED BY SL SUPERSEDED 737-SL-55-028 REV. A). SERVICE LETTER MOS SI. 737-SL-55-028 REV. A CANCELLED - HORIZONTAL STABILIZER REAR SPAR TERMINAL FITTING BOLTS INSPECTION AND REWORK (SUPERSEDED BY SL 737-SL-55-028 REV. 8). SERVICE LETTER MOS SUPERSEDED SI. 737-SL-55-028 REV. 8 CANCELLED - HORIZONTAL STABILIZER REAR SPAR TERMINAL FITTING BOLTS INSPECTION AND REWORK. SERVICE CANCELLED LETTER C6-JUN-20I2 SL 737-SL-55-029 24-APR-2007 SL 737-SL-55-030 21-MAY-2009 MOS GAP BETWEEN DORSAL FIN AND VERTICAL STABILIZER. SERVICE LETTER MOS USE OF POLYURETHANE PROTECTIVE TAPE FOR EROSION PROTECTION ON HF ANTENNA. SERVICE LETTER MOS RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 369 Of 748 @ Camp Systems EFTA00618660 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-55-031 IMPROVEMENTS FOR EROSION PROTECTION OF HF ANTENNA FIBERGLASS PANEL LEADING EDGE. SERVICE LETTER RECOMMENDED MOS 31 -JUL-2010 SI. 737-SL-55-033 HORIZONTAL STBILIZER AND HORIZONTAL STABILIZER CENTER SECTION DAMAGED BUSHING ASSESSMENT. RECOMMENDED SERVICE LETTER MOS I8-MAR-2014 SL 737-SL-56-01I INABILITY TO OPEN CO-PILOTS RIGHT HAND NUMBER 2 SLIDING WINDOW WITH EMERGENCY EXIT RELEASE INFORMATIONAL HANDLE. SERVICE LETTER MOS 26-AUG-2004 SL 737-SL-56-012 AVAILICABILITY OF IMPROVED PASSENGER WINDOW ASSEMBLY TO REDUCE FOGGING.. SERVICE LETTER MOS I3-APR-2006 SL 737-SL-56-013 AVAILABILITY OF IMPROVED DOOR WINDOW ASSEMBLY TO REDUCE FOGGING. SERVICE LETTER MOS 28-JUN-2007 SL 737-SL-56-014 AVAILABILITY OF NUMBER 2 TRANSPARENCY WITH IMPROVED TEMPERATURE SENSOR WIRE ROUTING AND RECOMMENDED INTERNAL CONNECTION. SERVICE LETTER MOS 29-JUL-2013 SL 737-SL-57-074 AILERON BALANCE PANEL FASTENERS. SERVICE LETTER RECOMMENDED MOS I2-JUN-2000 - (s) SL 737-SL-57-075 WING TRAILING EDGE FLAP. WBL 201.24 DEFLECTION CONTROL RIB-IMPROVED NUT LOCKINF MECHANISMS. SERVICE LETTER MOS 07-SEP-2000 - (s) SL 737-SL-57-075 REV. A WING TRAILING EDGE FLAP. WBL 201.24 DEFLECTION CONTROL RIB-IMPROVED NUT LOCKINF MECHANISMS. SERVICE LETTER MOS 04-OCT-2000 - (s) SL 737-SL-57-075 REV. E WING TRAILING EDGE FLAP. WBL 201.24 DEFLECTION CONTROL RIB - IMPROVED NUT LOCKING MECHANISMS. SERVICE LETTER MOS 25-SEP-2001 - (s) RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 370 Of 748 @ Camp Systems EFTA00618661 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-57-075 REV. F WING TRAILING EDGE FLAP. WBL 201.24 DEFLECTION CONTROL RIB - IMPROVED NUT LOCKING MECHANISIM. SERVICE LETTER MOS I8-FEB-2002 - (s) 51 737-SL-57-077 WING TRAILING EDGE OUTBOARD AND INBOARD FLAP INSTALLATION. DESIGNANSTALLATION IMPROVEMENTS TO INFORMATIONAL THE CARRIAGE AND GIMBAL ASSEMBLIES.. SERVICE LETTER MOS 07-AUG-2001 - (s) 51 737-SL-57-078 LOOSE FASTNERS IN THE AFT FLAP PROGRAMMING TRACKS. SERVICE LETTER INFORMATIONAL MOS I4-NOV-2001 - (s) 51 737-SL-57-079 WING TRAILING EDGE - INBOARD FIXED PANEL INTERFERENCE WITH GROUND SPOILERS. SERVICE LETTER INFORMATIONAL MOS I4-NOV-2001 - (s) 51 737-SL-57-080 INBOARD AFT FLAP LOWER SERVICE FOREIGN OBJECT DEBRIS (FCC) PROTECTION. SERVICE LETTER INFORMATIONAL MOS 01 -JUL-2002 - (s) 51 737-SL-57-080 REV. A 737-NG INBOARD AFT FLAP LOWER SURFACE FOREIGN OBJECT DEBRIS (F0D) PROTECTION. SERVICE LETTER INFORMATIONAL MOS 09-JAN-2003 SI. 737-SL-57-081 INBOARD TRAILING EDGE FLAP. MAIN INBOARD TRACKS NUMBER 4 & 5 TUNGSTEN-CARBIDE COATING WEAR. INFORMATIONAL SERVICE LETTER MOS 6 (s) 03-OCT-2003 AFL 1000 SL 737-SL-57-081 REV. A 737NG INBOARD TRAILING EDGE FLAP. MAIN INBOARD TRACKS NUMBER 4 & 5 TUNGSTEN-CARBIDE COATING WEAR. INFORMATIONAL SERVICE LETTER MOS 24-AUG-2004 - (s) SL 737-SL-57-081 REV. B 737NG INBOARD TRAILING EDGE FLAP. MAIN INBOARD TRACKS NUMBER 4 & 5 TUNGSTEN-CARBIDE COATING WEAR. SERVICE LETTER I3-NOV-2008 SL 737-SL-57-082 I6-MAY-2005 MOS WING TRAILING EDGES INBOARD MAIN FLAP AND OUTBOARD AFT FLAP DISBONDS. SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 371 Of 748 @ Camp Systems EFTA00618662 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 51 737-SL-57-082 REV. A 737-SL-57-082 REV. B 09-SEP-2013 WING TRAILING EDGE - INBOARD MAIN FLAP AND OUTBOARD AFT FLAP DISBONDS (SUPERSEDED BY SL 737-SL-57-082 REV. B). SERVICE LETTER MOS WING TRAILING EDGE - INBOARD MAIN FLAP AND OUTBOARD AFT FLAP DISBONDS. SERVICE LETTER MOS SUPERSEDED RECOMMENDED 51 737-SL-57-083 LEADING EDGE SLAT ASSEMBLY PART NUMBER IDENTIFICATION. SERVICE LETTER NOT APPLICABLE 51 06-OCT-2005 737-SL-57-084 MOS FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN. SERVICE LETTER 51 15-DEC-2005 737-SL-57-084 REV. A MOS FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN. SERVICE LETTER SL 28-MAR-2006 737-SL-57-084 REV. B MOS FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN. SERVICE LETTER COMPLIED WITH - IA.W. AD 2007-18-52 51 10-JUL-2007 737-SL-57-084 REV. C MOS 05-SEP-2007 2971:33 AFL 703 FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN (SUPERSEDED BY 737-SL-57-084-0). SERVICE LETTER SUPERSEDED SL 01-FEB-2010 737-SL-57-084 REV. D MOS FUEL LEAK FROM NUMBER 5 SLAT. INBOARD TRACK CAN. SERVICE LETTER 51 07-JUN-2010 737-SL-57-085 MOS MESH GASKETS FOR FUEL TANK ACCESS DOORS (SUPERSEDED BY SL 737-SL-57-085 REV. A). SERVICE LETTER SUPERSEDED MOS 51 737-SL-57-085 REV. A MESH GASKETS FOR FUEL TANK ACCESS DOORS (SUPERSEDED BY SL 737-SL-57-085 REV. B). SERVICE LETTER SUPERSEDED COMPLIED WITH MOS 28-SEP-2009 3378:04 AFL 812 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 372 Of 748 @ Camp Systems EFTA00618663 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-57-085 REV. B MESH GASKETS FOR FUEL TANK ACCESS DOORS (SUPERSEDED BY SL 737-SL-57-085 REV. C). SERVICE LETTER SUPERSEDED MOS 51 737-SL-57-085 REV. C MESH GASKETS FOR FUEL TANK ACCESS DOORS. SERVICE LETTER 28-OCT-2011 MOS 51 737-SL-57-087 INBOARD MAIN FLAP-AFT FLAP DRIVE BUSHING. SERVICE LETTER MOS 23-JUL-2007 SL 737-SL-57-088 SLAT TRAILING EDGE WEDGE WEAR. SERVICE LETTER MOS IO-OCT-2007 SL 737-SL-57-088 REV. A SLAT TRAILING EDGE WEDGE WEAR. SERVICE LETTER MOS 24-MAR-2008 RECOMMENDED 51 737-SL-57-089 22-FEB-2008 SLAT TRACK CAN/HOUSING - INADVERTENT DAMAGE. SERVICE LETTER MOS 51 737-SL-57-090 COSMETIC FINISH CRACK OF WINGLET TRAIUNG EDGE. SERVICE LETTER RECOMMENDED 08-DEC-2009 MOS 51 737-SL-57-093 SPAR CORROSION COMMON TO MAIN FUEL TANK BOOST PUMP BONDING JUMPERS. SERVICE LETTER INFORMATIONAL 21-APR-2010 MOS 51 737-SL-57-094 WING FIXED TRAILING EDGE PANEL ELECTRIC BONDING WASHERS. SERVICE LETTER RECOMMENDED 07-SEP-2010 MOS 51 737-SL-57-095 MID SPAN FIXED TRAILING EDGE TURNBUCKLE CLEVIS INSTALLATION. SERVICE LETTER RECOMMENDED 04-NOV-20I0 MOS 51 737-SL-57-097 AFT ROLLER BEARING. OUTBOARD FLAP INBOARD CARRAIGE. SERVICE LETTER RECOMMENDED 06-SEP-2011 MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 373 Of 748 @ Camp Systems EFTA00618664 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-57-098 737NG MAIN FLAP TRACKS UPPER AND LOWER FLANGES WEAR COMMON TO ROLLER CONTACT SURFACES. RECOMMENDED 06-SEP-2011 SERVICE LETTER MOS 51 737-SL-57-099 WING LEADING EDGE? SLAT DETENT ARM AND ROLLER ALIGNMENT (SUPERSEDED BY 51 737-SL-57-099 REV. A), RECOMMENDED 28-FEB-2012 SERVICE LETTER MOS 51 737-SL-57-099 REV. A WING LEADING EDGE SLAT 4 AND 5 DETENT ARM AND ROLLER RECOMMENDED 18-JUN-2012 ALIGNMENT. SERVICE LETTER MOS SL 737-SL-57-101 WEAR OF INBOARD AFT FLAP PROGRAM TRACK EDGE COMMON TO BEARING AND RUB PADS. SERVICE LETTER RECOMMENDED 26-JUN-2012 MOS 51 737-SL-57-101 REV. A WEAR OF INBOARD AFT FLAP PROGRAM TRACK EDGE COMMON TO BEARING AND RUB PADS (SUPERSEDED BY SL SUPERSEDED 737-SL-57-101 REV. B). SERVICE LETTER MOS 51 737-SL-57-101 REV. B WEAR OF INBOARD AFT FLAP PROGRAM TRACK EDGE, SERVICE LETTER RECOMMENDED 20-SEP-2013 MOS 51 737-SL-57-102 MLG FORWARD TRUNNION FITTING BEARING RETAINING NUT INSPECTION. SERVICE LETTER RECOMMENDED 06-SEP-2012 MOS 51 737-SL-57-103 POSSIBLE INCORRECT OR MISSING FASTENERS IN THE WING CENTER SECTION REAR SPAR. SERVICE LETTER RECOMMENDED 19-DEC-2012 MOS 51 737-SL-57-104 POSSIBLE LOOSE HARDWARE ON UPPER TRAILING EDGE PANEL SUPPORT. SERVICE LETTER RECOMMENDED 19-APR-2013 MOS SL 737-SL-57-106 LH AND RH WING NACELLE SUPPORT OUTBOARD SIDELOAD BACKUP FITTING - MISSING FILLET SEAL (SUPERSEDED SUPERSEDED BY SL 737-SL-57-106 REV. A). SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 374 Of 748 @ Camp Systems EFTA00618665 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-57-106 REV. A U-I AND RH WING NACELLE SUPPORT OUTBOARD SIDELOAD BACKUP FITTING - MISSING FILLET SEAL. SERVICE LETTER 07-NOV-20I3 SL 737-SL-57-107 MOS FRONT SPAR WEB CORROSION PREVENTION (SUPERSEDED BY SL 737-SL-57-107 REV. A). SERVICE LETTER MOS 51 737-SL-57-107 REV. A FRONT SPAR WEB CORROSION PREVENTION. SERVICE LETTER 30-SEP-2013 51 737-SL-57-108 FRONT SPAR LEADING EDGE STRAP CORROSION PREVENTION, SERVICE LETTER MOS 20-SEP-2013 51 737-SL-57-109 RESTORATION OF ANTI-STATIC COATING COMMON TO THE AILERON FAIRINGS. SERVICE LETTER MOS MOS 10-OCT-2013 SL 737-SL-71-028 REV. A 737 ENGINE INLET HAZARD ZONE BOUNDRIES PAINTED ON RAMP SURFACES. SERVICE LETTER MOS 25-APR-2002 - Is) 51 737-SL-71-047 ENGINE COWLING PLACARD REVISION, SERVICE LETTER MOS I3-JAN-2000 - (s) 51 737-SL-71-047 REV. A ENGINE COWLING PLACARD REVISION. SERVICE LETTER MOS 03-OCT-2000 - (s) 51 737-SL-71-049 THRUST LINK DESIGN IMPROVEMENT-INTRODUCTION OF ANTI-ROTATION WASHER. SERVICE LETTER MOS 0 I -JUN-2001 - (s) 51 737-SL-71-050 INCORRECT GRIP LENGTH OF AFT ENGINE MOUNT BOLTS. SERVICE LETTER MOS 05-SEP-2001 - Is) 51 737-SL-71-050 REV. A INCORRECT GRIP LENGTH OF AFT ENGINE MOUNT BOLTS. SERVICE LETTER MOS 27-NOV-2001 - (s) RECOMMENDED SUPERSEDED RECOMMENDED RECOMMENDED RECOMMENDED INFORMATIONAL RECOMMENDED INFORMATIONAL RECOMMENDED RECOMMENDED INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 375 Of 748 @ Camp Systems EFTA00618666 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-71-05I SPLIT DUCT PRESSURE DURING HIGH POWER ENGINE OPERATION. SERVICE LETTER MOS I9-OCT-2001 - (s) 51 737-SL-71-053 INLET COWL LIPSKIN CORROSION PREVENTION. SERVICE LETTER 04-AUG-2003 51 737-SL-71-053 REV. A INLET COWL LIPSKIN CORROSION PREVENTION.. SERVICE LETTER 23-MAR-2005 51 737-SL-71-054 ENGINE FAN CASE BRACKET IMPROVEMENT. SERVICE LETTER MOS 30-SEP-2003 51 737-SL-71-054 REV. A ENGINE FAN CASE BRACKET IMPROVEMENT, SERVICE LETTER MOS MOS MOS 20-NOV-2007 INFORMATIONAL INFORMATIONAL 51 737-SL-71-055 ENGINE FIRE DETECTOR WIRE ROUTING CHANGE (SUPERSEDED BY SL 737-SL-71-055 REV. A), SERVICE LETTER SUPERSEDED MOS SL 737-SL-71-055 REV. A ENGINE FIRE DETECTOR WIRE ROUTING CHANGE (SUPERSEDED BY SL 737-SL-71-055 REV. 8), SERVICE LETTER SUPERSEDED MOS SL 737-SL-71-055 REV. 8 ENGINE FIRE DETECTOR WIRE ROUTING CHANGE (SUPERSEDED BY SL 737-SL-71-055 REV. C). SERVICE LETTER SUPERSEDED MOS SL 737-SL-71-055 REV. C ENGINE FIRE DETECTOR WIRE ROUTING CHANGE. SERVICE LETTER RECOMMENDED MOS 03-OCT-2012 SL 737-SL-71-056 GROUND SUPPORT EQUIPMENT(GSE) FITTING ASSEMBLY FOR AFT BOOTSTRAP EQUIPMENT. SERVICE LETTER MOS 20-MAY-2005 SL 737-SL-71-057 FORWARD ENGINE MOUNT DESIGN IMPROVEMENT - INTRODUCTION OF ANTI-ROTATION WASHER, SERVICE LETTER MOS 08-OCT-2007 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 376 Of 748 @ Camp Systems EFTA00618667 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-71-058 24-AUG-2066 SL 737-SL-71-059 ENGINE COWL ANTI-ICE DUCT BOLT RETENTION DISCREPANCY. SERVICE LETTER POWER FEEDER WIRE BUNDLE CHAFED AGAINST FAN COWL HINGE BRACKET. SERVICE LETTER MOS MOS SL 737-SL-71-059 REV. A ENGINE COWL ANTI-ICE DUCT BOLT RETENTION DISCREPANCY. SERVICE LETTER MOS SI. 737-SL-71-059 REV. 8 ENGINE COWL ANTI-ICE DUCT BOLT RETENTION DISCREPANCY. SERVICE LETTER MOS 04-APR-2008 500(s) SI. 737-SL-71-061 INCORRECT MATERIAL USED FOR BACP18BC03808P COTTER SUPERSEDED PINS INSTALLED ON ENGINE MOUNTS. SERVICE LETTER MOS - (s) SL 737-SL-71-061 REV. A INCORRECT MATERIAL USED FOR BACP18BC03808P COTTER PINS INSTALLED ON ENGINE MOUNTS. SERVICE RECOMMENDED LETTER MOS 30-SEP-2009 4000(s) SL 737-SL-71-062 ENGINE-MOUNTED FAN COWL RADIAL SUPPORT BRACKET RECOMMENDED IMPROVEMENT. SERVICE LETTER MOS 12-OCT-2009 SL 737-SL-71-064 INLET COWL LIPSKIN FASTENER IMPROVEMENTS. SERVICE LETTER RECOMMENDED MOS 18-DEC-2013 SL 737-SL-71-065 IMPROVED COWL THERMAL ANTI-ICE (CTAI) DUCT. SERVICE LETTER RECOMMENDED MOS 27-MAR-2014 SL 737-SL-72-009 REDUCED INSPECTION INTERVAL FOR THE AFT SUMP CHIP DETECTOR - CFM56-7B ENGINES. SERVICE LETTER RECOMMENDED MOS 22-FEB-1999 - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 377 Of 748 @ Camp Systems EFTA00618668 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-72-010 28-NOV-2001 St 737-SL-72-010 REV. A ENGINE FAN BLADE LUBRICATION RECOMMENDATION, SERVICE LETTER 05-NOV-2002 St 737-SL-72-012 CFM56-7BE ENGINE INTRODUCTION (SUPERSEDED BY SL 737-SL-72-012 REV. A). SERVICE LETTER MOS ENGINE FAN BLADE LUBRICATION RECOMMENDATION. SERVICE LETTER MOS - Is) MOS St 737-SL-72-012 REV. A CFM56-7BE ENGINE INTRODUCTION. SERVICE LETTER MOS 21-DEC-2011 St 737-SL-73-013 CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER MOS 04-AUG-1998 - (s) St 737-SL-73-013 REV. A CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER MOS 08-OCT-1999 - (s) St 737-SL-73-013 REV. B CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER MOS 08-FEB-1999 - (s) St 737-SL-73-013 REV. C CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER MOS I9-JAN-2000 - (s) St 737-SL-73-013 REV. D CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER MOS 21 -JUN-2060 - (8) SI. 737-SL-73-013 REV. E CFM56-78 ENGINE EEC SOFTWARE INTERCHANGEABILITY. SERVICE LETTER MOS 19-DEC-2000 - Is/ St 737-SL-73-013 REV. F CFM56-78 ENGINE ECC SOFTWARE AND HARDWARE INTERCHANGEABILITY, SERVICE LETTER MOS 26-SEP-2001 - (s) INFORMATIONAL SUPERSEDED RECOMMENDED INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 378 Of 748 @ Camp Systems EFTA00618669 CORP As man wire „veland up AD/SI Status Report 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-73-013 REV. G CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL MOS I7-OCT-2001 - Is) 51 737-SL-73-013 REV. H CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL MOS 27-NOV-2002 51 737-SL-73-013 REV. I CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER MOS 6 (s) 28-APR-2003 51 737-SL-73-013 REV. J CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER MOS 05-MAR-2004 51 737-SL-73-013 REV. K CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL MOS 03-MAR-2005 51 737-SL-73-013 REV. L CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER MOS 07-SEP-2005 51 737-SL-73-013 REV. M CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER MOS 28-MAR-2006 51 737-SL-73-013 REV. N CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER MOS 01-JUN-2007 SL 737-SL-73-013 REV. 0 CFM56-7B ENGINE EEC SOFTWARE AND HARDWARE COMPLIED WITH INTERCHANGEABILITY. SERVICE LETTER MOS 22-AUG-2008 04-OCT-2007 3260:48 AFL 782 SL 737-SL-73-013 REV. P CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY, SERVICE LETTER MOS 28-NOV-2007 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 379 Of 748 @Camp Systems EFTA00618670 CORP As man wire „veland up AD/SI Status Report 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-73-013 REV. R CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER MOS 03-JUN-2008 SL 737-SL-73-013 REV. S CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY (SUPERSEDED BY SL 737-SL-73-013 REV. T). SERVICE LETTER MOS SUPERSEDED SL 737-SL-73-013 REV. T CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY (SUPERSEDED BY SL 737-SL-73-013 REV. SUPERSEDED U). SERVICE LETTER MOS SL 737-SL-73-013 REV. U CFM56-78 ENGINE EEC SOFTWARE AND HARDWARE INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED MOS 22-JUL-2014 SL 737-SL-73-014 ENGINE RATING CHECK. SERVICE LETTER RECOMMENDED MOS 12-AUG-1998 - (s) SL 737-SL-73-017 HYDRO-MECHANICAL UNIT P/N 1853M56P08. SERVICE LETTER MOS 13-MAR-2002 - (s) SI. 737-SL-73-018 IMPROVED FUEL FILTER DIFFERENTIAL PRESSURE SWITCH. TO REDUCE FALSE ENGINE FUEL FILTER BYPASS SUPERSEDED WARNING LIGHT INDICATIONS (SUPERSEDED BY SL 737-SL-73-018 REV. A). SERVICE LETTER MOS SL 737-SL-73-018 REV. A IMPROVED FUEL FILTER DIFFERENTIAL PRESSURE SWITCH TO REDUCE FALSE ENGINE FUEL FILTER BYPASS SUPERSEDED WARNING LIGHT INDICATIONS (SUPERSEDED BY SL 737-SL-73-018 REV. B). SERVICE LETTER MOS SL 737-SL-73-018 REV. B IMPROVED FUEL FILTER DIFFERENTIAL PRESSURE SWITCH RECOMMENDED TO REDUCE FALSE ENGINE FUEL FILTER BYPASS WARNING LIGHT INDICATIONS. SERVICE LETTER MOS 06-SEP-2012 SL 737-SL-73-019 DIODE DECALS MAY BE INCORRECTLY LABELED. (SUPERSEDED BY SL 737-SL-73-019 REV. A). SERVICE LETTER SUPERSEDED MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 380 Of 748 @Camp Systems EFTA00618671 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 51 737-SL-73-019 REV. A I8-SEP-2012 737-SL-76-020 29-NOV-1999 DIODE DECALS MAY BE INCORRECTLY LABELED.. SERVICE LETTER MOS ENGINE START BRAKE ASSEMBLY SWITCH IMPROVEMENTS. SERVICE LETTER MOS - (s) RECOMMENDED INFORMATIONAL 51 737-SL-76-021 AUTOTHROTTLE SWITCHPACK - IMPROVED WIRE ROUTING. SERVICE LETTER INFORMATIONAL 27-NOV-2001 MOS - Is) 51 737-SL-76-021 REV. A AUTOTHROTTLE SWITCHPACK - IMPROVED WIRE ROUTING. SERVICE LETTER INFORMATIONAL 51 I 7-JAN-2002 737-SL-76-022 MOS - (s) CRACKED ROLLER IN REVERSE THRUST LEVER ASSEMBLY. SERVICE LETTER I3-DEC-2007 MOS 51 737-SL-77-014 AIRBORNE VIBRATION MONITORING (AVM) SIGNAL CONDITIONER IMPROVEMENT. SERVICE LETTER RECOMMENDED 29-JUN-1998 MOS - (s) 51 737-SL-77-015 . SERVICE LETTER INFORMATIONAL 21-MAY-1999 MOS -(s) 51 737-SL-77-015 REV. A ENGINE AIRBORNE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGESBILITY. SERVICE LETTER INFORMATIONAL 26-JUN-2060 MOS - (s) 51 737-SL-77-015 REV. 8 ENGINE AIRBORNE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGESBILITY SERVICE LETTER. INFORMATIONAL 26-JUN-2000 SERVICE LETTER MOS - (s) St 737-SL-77-015 REV. C ENGINE AIRBORNE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGESBILITY SERVICE LETTER. INFORMATIONAL 26-APR-2001 SERVICE LETTER MOS - (s) SL 737-SL-77-015 REV. D ENGINE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGEABILITY. SERVICE LETTER INFORMATIONAL I2-APR-2002 MOS - (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 381 Of 748 @ Camp Systems EFTA00618672 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-77-015 REV. E ENGINE VIBRATION MONITORING SIGNAL CONDITIONER INTERCHANGEABILITY. SERVICE LETTER I 3-JAN-2004 MOS SI. 737-SL-77-015 REV. F ENGINE VIBRATION MONITORING SIGNAL CONDITIONER RECOMMENDED INTERCHANGEABILITY. SERVICE LETTER 02-OCT-2009 MOS SL 737-SL-77-016 AIRPLANE OPERATION WITH ENGINE NUMBER 1 BEARING VIBRATION SENSOR DEACTIVATED. SERVICE LETTER INFORMATIONAL MOS 21 -SEP-1999 SL 737-SL-77-018 ADVANCED AIRBORNE VIBRATION MONITOR. SERVICE LETTER RECOMMENDED MOS I9-NOV-2009 - Is) SL 737-SL-78-041 . SERVICE LETTER INFORMATIONAL MOS 27-MAY-1999 - (s) SL 737-SL-78-041 REV. A AUTO THROTTLE SWITCH PACK IMPROVEMENT. SERVICE LETTER INFORMATIONAL MOS I7-SEP-1999 - (s) SL 737-SL-78-042 T/R INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS. SERVICE LETTER INFORMATIONAL MOS I0-SEP-1999 - Is) SL 737-SL-78-042 REV. A T/R INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS. SERVICE LETTER MOS - Is) SL 737-SL-78-042 REV. B THRUST REVERSER INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS. SERVICE LETTER MOS II-MAR-2002 -(s) SL 737-SL-78-042 REV. C THRUST REVERSER INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS (SUPERSEDED BY SL 737-SL-78-042 REV. O). SERVICE LETTER MOS SUPERSEDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 382 Of 748 @ Camp Systems EFTA00618673 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-78-042 REV. D THRUST REVERSER INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS (SUPERSEDED BY SL 737-SL-78-042 REV. E). SERVICE LETTER MOS SUPERSEDED St 737-SL-78-042 REV. E THRUST REVERSER INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS (SUPERSEDED BY St SUPERSEDED 737-SL-78-042 REV. F). SERVICE LETTER MOS St 737-SL-78-042 REV. F THRUST REVERSER INSULATION BLANKET INTERFERENCE WITH ENGINE COMPONENTS. SERVICE LETTER RECOMMENDED MOS I6-APR-2014 St 737-SL-78-044 REV. 8 INCORRECT DOUBLE FLUSH RIVET INSTALLATION ON FAN DUCT COWL AND THRUST REVERSER AFT COWL. INFORMATIONAL SERVICE LETTER MOS 10-JUL-2001 - (s) St 737-SL-78-045 THRUST REVERSER SYSTEM - HINGE FITTING MIS-LOCATION. EXAMINATION AND RE-ALIGNMENT. SERVICE LETTER INFORMATIONAL MOS 14-AUG-2000 - (s) St 737-SL-78-048 THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER INFORMATIONAL MOS 24-SEP-2001 - (s) St 737-SL-78-048 REV. A THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER INFORMATIONAL MOS 25-FEB-2004 St 737-SL-78-048 REV. 8 THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER COMPLIED WITH MOS 07-SEP-2005 05-MAY-2005 2202:24 AFL 541 St 737-SL-78-048 REV. C THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER MOS 14-SEP-2005 St 737-SL-78-048 REV. 0 THRUST REVERSER BLOCKER DOOR SUPPORT SEPARATION. SERVICE LETTER MOS 08-DEC-2005 INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 383 Of 748 @ Camp Systems EFTA00618674 C a liP tAt enand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-78-049 TROUBLESHOOTING OF TH RUST REVERSER SYSTEM ANOMALITI ES. SERVICE LETTER 06-FEB-2002 SL 737-SL-78-049 REV. A TROUBLESHOOTING OF THRUST REVERSER SYSTEM ANOMALIES. SERVICE LETTER INFORMATIONAL 16-APR-2002 SL 737-SL-78-050 THRUST REVERSER INSULATION BLANKET REPAIRS (SUPERSEDED BY SL 737-SL-78-050 REV. A). SERVICE LETTER SUPERSEDED MOS MOS MOS - - (s) SL 737-SL-78-050 REV. A THRUST REVERSER INSULATION BLANKET REPAIRS. SERVICE LETTER MOS II -NOV-20I3 SL 737-SL-78-051 THRUST REVERSER CASCADE ASSEMBLY INSTALLATION ANOMALIES. SERVICE LETTER MOS 6 (s) ISMAR-2004 RECOMMENDED SL 737-SL-78-052 THRUST REVERSER AFT WEB TOROUE BOX CRACKING. SERVICE LETTER INFORMATIONAL MOS 02-JAN-2004 SL 737-SL-78-052 REV. A THRUST REVERSER AFT WEB TORQUE BOX CRACKING. SERVICE LETTER MOS 02-MAY-2005 SL 737-SL-78-052 REV. B TRHUST REVERSER AFT WEB TORQUE BOX CRACKING. SERVICE LETTER MOS 04-MAY-2006 SL 737-SL-78-053 THRUST REVERSER BLOCKER DOOR WEAR PAD SEPARATION. SERVICE LETTER INFORMATIONAL MOS 24-MAR-2004 SL 737-SL-78-053 REV. A THRUST REVERSER BLOCKER DOOR WEAR PAD SEPARATION, SERVICE LETTER COMPUED WITH MOS 28-SEP-2009 17-OCT-2007 3378:04 AFL 812 SL 737-SL-78-054 THRUST REVERSER BLOCKER DOOR COVER IMPROVEMENTS. SERVICE LETTER MOS 13-APR-2004 INFORMATIONAL 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 3M Of 748 @Camp Systems EFTA00618675 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-78-054 REV. A THRUST REVERSER BLOCKER DOOR COVER IMPROVEMENTS. SERVICE LETTER Of-MAR-2005 SL 737-SL-78-055 NUMBER 2 ENGINE THRUST REVERSER INDICATION ANOMALIES - IMPROVED W5160 WIRE ROUTING. SERVICE INFORMATIONAL LETTER 07-MAR-2005 MOS MOS SL 737-SL-78-055 REV. A NUMBER 2 ENGINE THRUST REVERSER INDICATION ANOMALIES - IMPROVED W5160 WIRE ROUTING.. SERVICE LETTER MOS 29-APR-2005 SL 737-SL-78-056 IMPROVED THRUST REVERSER TRANSLATING SLEEVE MAIN TRACK SEAL. SERVICE LETTER MOS I4-SEP-2005 SL 737-SL-78-056 REV. A IMPROVED THRUST REVERSER TRANSLATING SLEEVE MAIN TRACK SEAL. SERVICE LETTER MOS 28-MAR-2006 SL 737-SL-78-056 REV. 8 IMPROVED THRUST REVERSER TRANSLATING SLEEVE MAIN TRACK SEAL. SERVICE LETTER MOS I9-FEB-2009 SL 737-SL-78-057 THRUST REVERSER SYNC-SHAFT TUBE IMPROVEMENT. SERVICE LETTER MOS I8-APR-2006 SL 737-SL-78-057 REV. A THRUST REVERSER SYNC-SHAFT TUBE IMPROVEMENT. SERVICE LETTER MOS 06-DEC-2006 SL 737-SL-78-058 AVAILABILITY OF THRUST REVERSER BLOCKER DOOR DRAG LINK SPHERICAL LINER BEARING 8ACB10ESO6AG. SERVICE LETTER 09-JUN-2006 SL 737-SL-78-059 30-JUN-2006 MOS AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC CONTROL VALVE MODULE. SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 385 Of 748 @ Camp Systems EFTA00618676 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-78-059 REV. A AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC CONTROL VALVE MODULE SERVICE LETTER 09-N0V-2006 SL 737-SL-78-059 REV. 8 AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC CONTROL VALVE MODULE. SERVICE LETTER MOS 30-APR-2008 MOS SL 737-SL-78-059 REV. C AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC CONTROL VALVE MODULE. SERVICE LETTER MOS 24-OCT-2008 SL 737-SL-78-059 REV. D AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC CONTROL VALVE MODULE (SUPERSEDED BY SL 737-SL-78-059 REV. E). SERVICE LETTER MOS SUPERSEDED SL 737-SL-78-059 REV. E AVAILABILITY OF A NEW THRUST REVERSER HYDRAULIC CONTROL VALVE MODULE. SERVICE LETTER RECOMMENDED MOS 30-JUN-2011 SL 737-SL-78-060 CFM56-78 ENGINE PRIMARY EXHAUST NOZZLE FENCE CRACKING. SERVICE LETTER MOS 29-AUG-2066 SL 737-SL-78-060 REV. A CFM56-78 ENGINE PRIMARY EXHAUST NOZZLE FENCE CRACKING. SERVICE LETTER MOS 13-JUL-2007 SL 737-SL-78-060 REV. 8 CFM56-78 ENGINE PRIMARY EXHAUST NOZZLE FENCE CRACKING. SERVICE LETTER MOS 03-OCT-2007 SL 737-SL-78-061 THRUST REVERSER OPENING ACTUATOR HEAT TREATMENT DISCLOSURE. SERVICE LETTER MOS 28-NOV-2007 SL 737-SL-78-061 REV. A THRUST REVERSER OPENING ACTUATOR HEAT TREATMENT DISCLOSURE. SERVICE LETTER MOS 08-JUL-2008 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 386 Of 748 @ Camp Systems EFTA00618677 COMP Astant.frar• Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-78-062 27-JUL-2007 SL 737-SL-78-062 REV. A 21-JAN-2008 AFT FAIRING RIVET TAILS CONTACTING HINGE BEAM. SERVICE LETTER MOS AFT FAIRING RIVET TAILS CONTACTING HINGE BEAM. SERVICE LETTER MOS 14-FEB-2008 3151:22 AFL 746 SL 737-SL-78-062 REV. B AFT FAIRING RIVET TAILS CONTACTING HINGE BEAM. SERVICE LETTER RECOMMENDED MOS 12-MAY-2009 SL 737-SL-78-062 REV. C AFT FAIRING RIVET TAILS CONTACTING HINGE BEAM. SERVICE LETTER RECOMMENDED MOS 30-OCT-2009 SL 737-SL-78-063 THRUST REVERSER OVERHAUL PROGRAM GUIDELINES (SUPERSEDED BY SL 737-SL-78-063 REV. A) SUPERSEDED . SERVICE LETTER MOS SL 737-SL-78-063 REV. A THRUST REVERSER OVERHAUL PROGRAM GUIDELINES. SERVICE LETTER RECOMMENDED MOS 22-APR-20I1 SL 737-SL-78-065 IMPROVED AUTOTHROTTLE SWITCHPACK (SUPERSEDED BY SL 737-SL-78-065 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-78-065 REV. A IMPROVED AUTOTHROTTLE SWITCHPACK SERVICE LETTER RECOMMENDED MOS 08-JUN-2011 SL 737-SL-78-067 UNDER-TOROUED FASTENERS INSTALLED ON THRUST RECOMMENDED REVERSER HINGE BEAM FAIRING. SERVICE LETTER MOS 13-JUL-2009 SL 737-SL-78-068 THRUST REVERSER INTERCHANGEABILITY (SUPERSEDED BY SL 737-SL-78-068 REV. A). SERVICE LETTER SUPERSEDED MOS COMPUED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 387 Of 748 @ Camp Systems EFTA00618678 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-78-068 REV. A THRUST REVERSER INTERCHANGEABILITY. SERVICE LETTER RECOMMENDED MOS 16-MAR-2011 SL 737-SL-78-069 THRUST REVERSER LATCH BEAM FAIRING MISSING SEALANT. SERVICE LETTER RECOMMENDED MOS 05-NOV-2009 SL 737-SL-78-069 REV. A THRUST REVERSER LATCH BEAM FAIRING MISSING SEALANT. SERVICE LETTER RECOMMENDED MOS 07-JAN-2010 SL 737-SL-78-070 15-MAR-2010 THRUST REVERSER CONTROL VALVE MODULE - QUALITY DISCLOSURE. SERVICE LETTER MOS RECOMMENDED SL 737-SL-78-071 THRUST REVERSER LVDT IMPROVEMENT (SUPERSEDED BY SL 737-SL-78-071 REV. A). SERVICE LETTER SUPERSEDED MOS SL 737-SL-78-071 REV. A THRUST REVERSER LVDT IMPROVEMENT. SERVICE LETTER RECOMMENDED MOS 21 -JAN-2011 SI. 737-SL-78-073 "ALTERNATE SPLIT-LINE FASTENERS FOR CFM56-78 EXHAUST SUPERSEDED PRIMARY PLUG' (SUPERSEDED BY SL 737-SL-78-073 REV. A). SERVICE LETTER MOS SL 737-SL-78-073 REV. A ALTERNATE SPLIT-LINE FASTENERS FOR CFM56-76 EXHAUST PRIMARY PLUG. SERVICE LETTER RECOMMENDED MOS 27-FEB-2014 SL 737-SL-78-074 PIP EXHAUST RETROFIT SERVICE BULLETINS 737-78-1089 AND 737-54-1047 PRELIMINARY PLANNING INFORMATION. RECOMMENDED SERVICE LETTER MOS 09-JAN-2012 SL 737-SL-78-076 THRUST REVERSER BLOCKER DOOR SUPPORT LOOSE OR MISSING SCREWS (SUPERSEDED BY SL 737-SL-78-076 SUPERSEDED REV. A). SERVICE LETTER MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 388 Of 748 @ Camp Systems EFTA00618679 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SL 737-SL-78-076 REV. A THRUST REVERSER BLOCKER DOOR SUPPORT LOOSE OR MISSING SCREWS. SERVICE LETTER 02-JUN-2014 SL 737-SL-78-077 THRUST REVERSER PART MARKING RECOMMENDATIONS UNDER FAA AD 2012-05-02. SERVICE LETTER MOS 20-JUN-2014 SL 737-SL-80-001 STARTING. GENREAL. START SYSTEM. RELIABILITY IMPROVEMENT. SERVICE LETTER 15-DEC-1980 SL 737-SL-80-001 REV. A STARTING. GENREAL. START SYSTEM. RELIABILITY IMPROVEMENT. SERVICE LETTER MOS MOS MOS 15-JUN-2000 - (s) - (s) SL 737-SL-80-018 ENGINE PNEUMATIC START VALVE QUALITY DISCLOSURE. SERVICE LETTER MOS 6 (s) 11-OCT-2004 SL BISJ-28-17A AUXILIARY FUEL SYSTEM ALERT AND MAINTENANCE MESSAGES. SERVICE LETTER MOS SL BBJ-28-6 TANK RAIL MODIFICATION. SERVICE LETTER MOS 20-FEB-2000 SL BBJ2-28-04A AUXILIARY FUEL SYSTEM ALERT AND MAINTENENACE MESSAGES, SERVICE LETTER MOS RECOMMENDED RECOMMENDED INFORMATIONAL INFORMATIONAL SL ST00936NY-28-SL-001 CENTER WING FUEL TANK REFUEL LINE B-NUT TORQUE. SERVICE LETTER COMPLIED WITH MOS 18-AUG-2009 IS-JUN-2005 3378:04 AFL 812 SL INSTRUCTIONS FOR BOEING SERVICE BULLETIN 737-26-1121. REV 1. SERVICE LETTER ST00936NY-D-26-SL-007 MOS SL ST01384NY-28-SL-001 CENTER WING FUEL TANK REFUEL LINE B-NUT TORQUE. SERVICE LETTER NOT APPLICABLE MOS 15-JUN-2005 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 389 Of 748 @ Camp Systems EFTA00618680 C O Atiant.fran MP Meowed lip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC VSB 174080-35-04 REV OXYGEN - PASSENGER OXYGEN SYSTEM MASK IN-LINE FLOW INDICATOR REPLACEMENT. VENDOR SERVICE 000 06-SEP-2010 VSB 3289562-36-1909 09-APR-2074 VS8 3289562-36-1911 09-APR-20I4 VSB 4091900-31-0005 27-5IAR-2014 VSB 4091900-31-0006 27-MAR-2014 BULLETIN MOS MANDATORY PNEUMATIC - FOUR INCH DIAMETER PRECOOLER CONTROL VALVE - REWORK FOUR INCH DIAMETER PRECOOLER RECOMMENDED CONTROL VALVE, PN 3289562-7 TO PN 3289562-5. VENDOR SERVICE BULLETIN MOS PNEUMATIC - FOUR INCH DIAMETER PRECOOLER CONTROL VALVE - REWORK FOUR INCH DIAMETER PRECOOLER RECOMMENDED CONTROL VALVE (PCCV). PN 32895624 TO PN 3289562-5, VENDOR SERVICE BULLETIN MOS INDICATING/RECORDING SYSTEMS - PHASE 3 DISPLAY UNIT -MODIFICATION (MOD) B TO PHASE 3 DISPLAY UNIT. P51 RECOMMENDED 4091900-931 THRU -934. -941 THRU -944: REPLACE BOTH BACKLIGHT ASSEMBLY. PN 4091896-902. AND BACKLIGHT ELECTRONICS PRINTED BOARD ASSEMBLY (PBA). PN 4091894-1002. WITH NEW PART NUMBERS IF ONE IS UNSERVICEABLE AND CANNOT BE REPAIRED OR REPLACED WITH THE SAME PART NUMBER. VENDOR SERVICE BULLETIN MOS INDICATING/RECORDING SYSTEMS- PHASE 3 DISPLAY UNIT - MODIFICATION (MOD) C TO PHASE 3 DISPLAY UNIT. PN RECOMMENDED 4091900-931 THRU -934. -941 THRU -944: IMPROVE DISPLAY UNIT CONTROLLER (DUC) SEQUENCER FIRMWARE IN DETECTING WHEN LIGHT EMITTING DIODE (LED) STRING IS OUT. VENDOR SERVICE BULLETIN MOS VS8 930-3000/3001-34-1 NAVIGATION - DA-IA/DA-1B ANTENNA DRIVE ASSEMBLIES - MODIFICATION (MOD) OF THE DA-IA/DA-1B ANTENNA SUPERSEDED DRIVE ASSEMBLIES. PN 930-3000-001 AND PN 930-3001-001: REPLACEMENT OF THE TRANSMITTER RECEIVER (TRyGIMBAL DRIVE INTERCONNECT CABLE ASSEMBLIES AND THE CLOCK SPRING CLAMPS (SUPERSEDED BY S8 930-3000/3001-34-1 Ft1). VENDOR SERVICE BULLETIN MOS VSB 930-300013001-34-1 NAVIGATION - DA-I fvDA-I8 ANTENNA DRIVE ASSEMBLIES - MODIFICATION (MOD) OF THE DA-1A/DA-1B ANTENNA RECOMMENDED RI DRIVE ASSEMBLIES. PN 930-3000-001 AND PN 930-3001-001: REPLACEMENT OF THE TRANSMITTER RECEIVER (TRyGIMBAL DRIVE INTERCONNECT CABLE ASSEMBLIES AND THE CLOCK SPRING CLAMPS. VENDOR SERVICE BULLETIN 15-APR-2014 VSB 964-0052-23-41 MOS COMMUNICATION - XK516D HF RADIO SYSTEM - UNIT MODIFICATION (MOD) 49 TO XK51601 HIGH FREQUENCY (HF) OPTIONAL TRANSCEIVER (TRANSCEIVER). PN 964-0452-011. -022. OR -042: DISABLE TWO DISCRETE COUPLER FAULT INPUT UNES TO REDUCE NUISANCE 'COUPLER NOGG' FAULT MESSAGES (BOEING). VENDOR SERVICE BULLETIN MOS 08-MAY-20I4 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 390 Of 748 @ Camp Systems EFTA00618681 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC VSB TPA-100-34-01 R9 05-JUN-2014 NAVIGATION - TPA-100 TCAS PROCESSOR - TPA-100 TCAS PROCESSOR. TPA-100A. PN 940-0300-001. PN 940-0330-001. RECOMMENDED PN 940-0331-001. PN 940-0400-001. PN 940-0430-001. PN 940-0431-001. PN 941-1431-001. AND TPA-1008. PN 940-0351-001. PN 940-0351-010. PN 940-0451-001. PN 940-0451-010: TO PROVIDE ACCEPTANCE TEST PROCEDURE (ATP) SOFTWARE UPGRADE TO PN 998-3449-537 FOR RETURN-TO-SERVICE (RTS) TESTING OF THE TPA-103 TCAS PROCESSOR. VENDOR SERVICE BULLETIN MOS 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 391 Of 748 @ Camp Systems EFTA00618682 COMP Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 131-494084 27-JUL-2012 SB 131-49-8122 SB 131-49-8122 RI 09-JUL-2014 APU - AUXILIARY AIRBORNE POWER - GAS TURBINE ENGINE - REPLACE THE STARTER/GENERATOR. PN 288545-7A. RECOMMENDED -7B. OR -7C. WITH PN 288545-9A. SERVICE BULLETIN MOS APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - INSPECT THE STARTER/GENERATOR. PN 288545-7 AND SUPERSEDED -9. AND REWORK AS NECESSARY (SUPERSEDED BY SB 131-49-8122 RH. SERVICE BULLETIN MOS MSC APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - INSPECT THE STARTER/GENERATOR. PN 288545-7 AND RECOMMENDED -9. AND REWORK AS NECESSARY ON THE 131-9(BJ APU. SERVICE BULLETIN MOS MSC AR SB 131-49-8128 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - APPROVE THE USE OF IGNITION UNIT. PN 3888058-5. IN OPTIONAL PLACE OF IGNITION UNIT, PN 3888058-7. FOR THE 131-9(8) AUXILIARY POWER UNIT (APU). SERVICE BULLETIN MOS 07-FEB-2014 MSC SB 2024215 APU - TESTING - DATA MEMORY MODULE (DMM) READER - PN 2024215-2: IMPROPER FIRMWARE PROGRAMMING RECOMMENDED WITH PN 2024215-2, SERVICE BULLETIN MOS 09-FEB-20 I 1 MSC SB 24-4232 APU- ELECTRICAL POWER- STARTER/GENERATOR- MODIFICATION OF STARTER/GENERATOR, PN 288545-9 - SUPERSEDED REPLACEMENT OF ROTOR. SERVICE BULLETIN MOS 06-DEC-2012 MSC SB 24-4232 RI APU- ELECTRICAL POWER - STARTER/GENERATOR - MODIFICATION OF STARTER/GENERATOR, PN 28B545-9 - SUPERSEDED REPLACEMENT OF ROTOR. SERVICE BULLETIN MOS 21-DEC-2012 MSC SB 24-4232 R2 APU - ELECTRICAL POWER - STARTER/GENERATOR - MODIFICATION OF STARTER/GENERATOR. PN 288545-9 - RECOMMENDED REPLACEMENT OF ROTOR. SERVICE BULLETIN MOS 10-JAN-2013 MSC DUE (s) SB 24-4232 R3 APU - ELECTRICAL POWER - STARTER/GENERATOR - MODIFICATION OF STARTER/GENERATOR. PN 288545-9 - REPLACEMENT OF ROTOR. SERVICE BULLETIN MOS MSC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 392 Of 748 @ Camp Systems EFTA00618683 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 28B545-2I-4231 26-JUL-2012 SB 28B545-24-4233 09-JUL-2014 SB 3291238.19.7032 22-APR-2014 APU - ELECTRICAL POWER - STARTERiGENEFIATOR - MODIFICATION OF THE STARTENGENERATOR FROM PN 28B545-7 STYLE C TO PN 288545.9 STYLE A. SERVICE BULLETIN MOS MSC APU - ELECTRICAL POWER - STARTERGENERATOR - MODIFICATION OF STARTER;GENERATOR. PN 286545-7 AND -9 - RECOMMENDED REPLACEMENT OF STATOR HOUSING ASSEMBLY. PN 6430800.4. SERVICE BULLETIN MOS MSC APU - AIRBORNE AUXILIARY POWER - 3.0 INCH DIAMETER SURGE CONTROL VALVE - INSPECTION OF THE CHROME CUSTOMER PLATING ON THE BUTTERFLY SHAFT. PN 3180688-1. USED ON THE 3.0 INCH DIAMETER SURGE CONTROL VALVE. PN CONVENIENCE 3291238-2. SERVICE BULLETIN MOS MSC SB 49-0001 APU - FCU INSPECTION FOR MISSING LOAD SPRING. SERVICE BULLETIN MOS MSC SB 49-0002 APU - INCORPORATE AN IMPROVED FCU TORQUE MOTOR METERING VALVE. SERVICE BULLETIN MOS MSC SB 49-2376 APU - SERVICE BULLETIN SB 49-2377 APU - SERVICE BULLETIN MOS 25-JUN-2010 MSC 3001 APUS 2487 MOS 25-JUN-2010 MSC 3001 APUS 2487 SB 49-7031 APU - INSPECT 3291238.2 SCV FOR THE UPPER BUTTERFLY SHAFT BUSHING. SERVICE BULLETIN MOS MSC SB 49-7365 APU - REPLACE IG14// CLEVIC ASSY MD BOLT TO ELIMINATE CAPTIVE BOLT DESIGN. SERVICE BULLETIN MOS MSC SB 49-7366 APU - REPLACE IGV ASSEMBLY 3810821-4 WITH 3810821-5 TO ELIMINATE CAPTIVE BOLT DESIGN. SERVICE BULLETIN MOS MSC COMPLIED WITH COMPLIED WITH ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 393 Of 748 1' Camp Systems EFTA00618684 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SS 49-7373 APU - REPL COMP COUP SHAFT P/N 3822510-1 WI-2 TO ELIMINATE A POTENTIAL TOLERANCE STACK CONDITION THAT WOULD RESULT IN. SERVICE BULLETIN MOS MSC SB 49-7431 APU - REWORK UPPER AND LOWER INLET PLENUM TO EUMINATE RIVETED GROUND STRAPS. SERVICE BULLETIN SB 49-7476 MOS MSC APU - REWORK TURBINE BEARING SUPPORT AND REAR BEARING SEAL RETAINER FOR SOFT HYDRAULIC MOUNT. SB 49-7480 SERVICE BULLETIN MOS MSC APU - REWORK OR REPLACE DRIVEN COMPRESSOR BEARING HOUSING AND COUPLING SHAFT FOR IMPROVED L/C SB 49-7483 SEAL CAVITY DRAINAGE.. SERVICE BULLETIN MOS MSC APU - RPURWK SURGE DUCT P/N 3885003-1 TO 3885003-2. SERVICE BULLETIN MOS MSC SB 49-7513 APU - INSTALL MS25083-5887 GROUND STRAP TO IMPROVE ELECTRICAL PATH BETWEEN PERFORATED INLET COMPUED WITH SB 49-7527 HOUSING AND MAIN APU ELECTRICAL GROUND. SERVICE BULLETIN MOS 25-JUN-2010 MSC 3001 APUS 2487 APU - REPLACE EDUCTOR HOUSING WITH NEW IGNITION UNIT BRACKET THAT ALLOWS ELIMINATION OF 3617110-2 58 49-7541R1 IGNITION UNIT ADAPTER BRACKET.. SERVICE BULLETIN MOS MSC APU - INSTL NEW 3884980-38 3884984-3 STATIC/TOTAL PRESS TUBES HAVING DRAIN HOLES ADDED CLEANING PROC TO REMOVE ALL CONTAM. SERVICE BULLETIN MOS MSC SB 49-7561 APU - RPL TRBN SEAL GSKT P/N 3844707-1 WI 3844707-2. SERVICE BULLETIN COMPUED WITH SB 49-7577 MOS 25-JUN-20I0 MSC 3001 APUS 2487 APU - PROVIDE VE HARDWARE-PWR SECTION ASSY PM 3801103-2 REPLACES 3801103-1. SERVICE BULLETIN MOS MSC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 394 Of 748 @ Camp Systems EFTA00618685 COMP J..,. 64-ern/whip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 49-7597 APU - PROVIDE COST REDUCE TURBINE 8RG CAVITY DESIGN-PWR SECT ASSY PIN 3801103-3 REPLACES 3801103-2. SERVICE BULLETIN MOS MSC SB 49-7667 APU - PROVIDE ADDITIONAL RETENTION FOR PLUG P/N AS9902-6 AND AS169J6L REPLACES MS9901-6. SERVICE COMPLIED WITH - IAW THE SB BULLETIN MOS 22-AUG-2008 MSC 2778 APUS 2287 SB 49-7688 APU - ENHANCE PRODUCIBILITY AND COSTS-FCU P/N 441921-5 REPLACES 4491921-4. SERVICE BULLETIN MOS MSC SB 49-7743 APU - IMPROVES FIELD RELIABIUTY-OIL COOLER PIN 160564-2 REPLACES 160564-1. SERVICE BULLETIN MOS MSC SB 49-7776 APU - IMPROVE PERFORMANCE AND RELIABILITY-ROTATING GRP P/N 38225054 REPLACES PIN 3822505-7. SERVICE BULLETIN MOS MSC SB 49-7857R1 APU - REPLACE/REWORK FIRST STAGE TURBINE ROTOR ASSEMBLY. PART NO. 3840303-1. TO FIRST STAGE TURBINE RECOMMENDED ROTOR ASSEMBLY. PART NO. 3840160-7. SERVICE BULLETIN MOS 20-DEC-2005 MSC SB 49-7860R1 APU - REPLACE FIRST STAGE TURBINE ROTOR ASSEMBLY. RECOMMENDED PART NO. 3840303-1. WITH FIRST STAGE TURBINE ROTOR ASSEMBLY. PART NO. 3840160-8. REPLACE/REWORK FIRST STAGE TURBINE ROTOR ASSEMBLY. PART NO. 3840160-5. WITH/TO FIRST STAGE TURBINE ROTOR ASSEMBLY. PART NO. 3840160-8. SERVICE BULLETIN MOS 20-DEC-2005 MSC SB 49-7881 APU -. SERVICE BULLETIN COMPUED WITH MOS 25-JUN-2010 MSC 3001 APUS 2487 SB 49-7903 APU - REWORK ENGINE WIRING HARNESS. PN 3888449-1. TO PN 3888449-2 (SUPERSEDED BY SB 3888449-49-7903 RI). SUPERSEDED SERVICE BULLETIN MOS MSC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 395 Of 748 @ Camp Systems EFTA00618686 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 49-7903 R1 05-N0V-2013 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REWORK ENGINE WIRING HARNESS. PN 3888449-1 TO RECOMMENDED PN 3888449-2. SERVICE BULLETIN SB 49-7953 APU -. SERVICE BULLETIN SB 49-7971 R3 26-NOV-2012 MOS MSC MOS MSC 25-JUN-2010 3001 APUS 2487 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACE FIRST STAGE TURBINE ASSEMBLY. PN RECOMMENDED 3840160-5. -7. -8 OR PN 3840303-1. AND STATIONARY SEAL ASSEMBLY. PN 3844738-5. WITH FIRST STAGE TURBINE ASSEMBLY. PN 3840310-3 AND STATIONARY SEAL ASSEMBLY. PN 3844738-6. SERVICE BULLETIN MOS MSC SB 49-7988 APU - . SERVICE BULLETIN SB 49-7997 R2 22-DEC-2010 MOS MSC 25-JUN-2010 3001 APUS 2487 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - STANDARD STORAGE AND PRESERVATION GUIDELINES. SERVICE BULLETIN MOS MSC SB 49-7997 R3 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - STANDARD STORAGE AND PRESERVATION GUIDELINES. SERVICE BULLETIN 16-JAN-2014 MOS MSC SB 49-8023 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACE THE FUEL DRAIN TUBE. PN 3883848-3 WITH RECOMMENDED FCU DRAIN TUBE ASSEMBLY. PN 3879078-1. SCV DRAIN TUBE ASSEMBLY. PN 3879078-2. IGV DRAIN TUBE ASSEMBLY. PN 3879078-3. FUEL DRAIN TUBE ASSEMBLY. PN 3879078-4. AND DRAIN TUBE ASSEMBLY. PN 3879078-5. SERVICE BULLETIN 28-OCT-2010 MOS MSC SB 49-8027 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACE THE INLET GUIDE VANE ACTUATOR. PN OPTIONAL 3886188-2 WITH PN 3886188-3. SERVICE BULLETIN MOS 13-DEC-2010 MSC SB 49-8054 APU- AIRBORNE AUXILIARY POWER- GAS TURBINE ENGINE - REPLACE THE FLOW DIVIDER TEE. PN 3883830-1 WITH OPTIONAL PN 3883830-2. SERVICE BULLETIN MOS 07-SEP-2011 MSC COMPLIED WITH COMPUED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 396 Of 748 @ Camp Systems EFTA00618687 C O Mien MPwinin Mernund AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 49-8065 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACE DUPLEX BALL BEARING ASSEMBLY. RECOMMENDED MATCHED SET. PN 3822478-1. WITH PN 3822666-2. COMPRESSOR BEARING HOUSING. PN 3827265-4. WITH PN 3827265-8. COMPRESSOR BEARING RETAINER PLATE. PN 3827385-1. WITH PN 3827385-2. AND COMPRESSION SPRING WASHER. PN 3827075-1. WITH PN 791-548-9301. REMOVE BEARING DAMPER RING. PN 3827173-3. AND SPRING RETAINER. PN 3827074-4. SERVICE BULLETIN MOS 27-JUN-2012 MSC SB 49-8065 RI 10-SEP-2012 APU - GAS TURBINE ENGINE - REPLACE DUPLEX BALL BEARING ASSEMBLY. MATCHED SET. PN 3822478-1. WITH PN RECOMMENDED 3822666-2. COMPRESSOR BEARING HOUSING. PN 38272654. WITH PN 3827265-8. COMPRESSOR BEARING RETAINER PLATE. PN 3827385-1. WITH PN 3827385-2. AND COMPRESSION SPRING WASHER. PN 3827075-1. WITH PN 791-548-9301. REMOVE BEARING DAMPER RING. PN 3827173-3. AND SPRING RETAINER. PN 3827074-4. SERVICE BULLETIN MOS MSC SB 49-8079 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACEMENT OF DISCREPANT DATA MEMORY RECOMMENDED MODULE (DMM). PN 3876287-1. SERVICE BULLETIN MOS 20-JUN-2012 MSC SB 49-8079 RI APU - AIRBORNE AUXILIARY POWER- GAS TURBINE ENGINE - REPLACEMENT OF DISCREPANT DATA MEMORY RECOMMENDED MODULE (DMM). PN 3876287-1. SERVICE BULLETIN MOS I9-NOV-2012 MSC SB 49-8091 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND INSPECT THE SECOND STAGE TURBINE RECOMMENDED ROTOR ASSEMBLY. PN 3840165-4. FOR LINEAR INDICATIONS. SERVICE BULLETIN MOS 27-NOV-2012 MSC APUS 17450 (s) SB 49-8091 RI APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND INSPECT THE SECOND STAGE TURBINE SUPERSEDED ROTOR ASSEMBLY. PN 3840165-4. FOR LINEAR INDICATIONS (SUPERSEDED BY 58 49-8091 R2). SERVICE BULLETIN SB 49-8091 R2 SB 49-8098 19-NOV-2012 MOS MSC - (s) APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND INSPECT THE SECOND STAGE TURBINE ROTOR ASSEMBLY. PN 3840165-4. FOR LINEAR INDICATIONS. SERVICE BULLETIN MOS MSC APUS APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REPLACEMENT OF THE BEARING SET (TURBINE RECOMMENDED ROLLER BEARING). PH 3840242-1. WITH THE INCORRECT ROLLING ELEMENT MATERIAL. SERVICE BULLETIN MOS MSC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 397 Of 748 @ Camp Systems EFTA00618688 CAMP Miatioafra ihrenninthur AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 49-8100 I0-DEC-2012 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND REPLACE STARTER/GENERATOR ASSEMBLY. PN 288545-9. SERVICE BULLETIN MOS MSC RECOMMENDED SB 49-8100 R1 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND REPLACE STARTER/GENERATOR RECOMMENDED ASSEMBLY. PN 288545-9. SERVICE BULLETIN MOS (EFF) 19-DEC-2012 MSC SB 49-8100 R2 APU - AIRBORNE AUXILIARY POWER - GAS TURBINE ENGINE - REMOVE AND REPLACE STARTER/GENERATOR ASSEMBLY. PN 288545-9. SERVICE BULLETIN MOS MSC SIL 126 R3 APU - 131-9(8) WOFtKSCOPE PLANNING GUIDE (WPG). SERVICE INFORMATION LETTER MOS 30-APR-2013 MSC 7-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks --Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 398 Of 748 Camp Systoms EFTA00618689 Meg arroyo' AD/SI Status Report 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC ASB 72-A0328 NO. 1 ENGINE -LOW PRESSURE TURBINE SHAFT - REDUCED INTERVAL FOR AFT SUMP MCD OR DMS INSPECTION. ALERT SERVICE BULLETIN 12-MAR-2002 MOS MSC ASB 72-A0328 RI NO. 1 ENGINE -LOW PRESSURE TURBINE SHAFT - REDUCED INTERVAL FOR AFT SUMP MCD OR DMS INSPECTION. ALERT SERVICE BULLETIN 12-MAR-2002 DAYS I (s) HRSAISC ENC ASB 72-A0329 NO. 1 ENGINE -LOW PRESSURE TURBINE SHAFT - REPLACEMENT OF NO.4 ROLLER BEARING.. ALERT SERVICE BULLETIN 12-MAR-2002 ASB 7340026 15-JAN-1999 MOS HRSAISC - ENC NO. 1 ENGINE - INTRODUCITON OF SOFTWARE VERSION 7.B.J (763A). ALERT SERVICE BULLETIN MOS HRSAISC - ENC ASB S8 73-A0034 RI 72-0000 NO. 1 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH NEW FILTER COVER. ALERT SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 SERVICE BULLETINS. SERVICE BULLETIN SUPERSEDED MOS HRS1SISC ENC SB 72-0000 R1 NO. 1 ENGINE - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 (SUPERSEDED BY 72-0000 SUPERSEDED R2). SERVICE BULLETIN MOS HRSAISC ENC S8 72-0000 R2 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN INFORMATIONAL CFM56-78 SERVICE BULLETINS. SERVICE BULLETIN MOS 11-MAY-2011 HRSJIASC - ENC SB 72-0001 NO. 1 ENGINE - CFM56-78 ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED - INFORMATION ONLY MOS HRSAISC - ENC S8 72-0001 R1 NO. 1 ENGINE - CFM56-78 ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time @Camp Systems 399 Of 748 EFTA00618690 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0001 R2 NO. 1 ENGINE - CFUS6-7B ENGINE MODELS I DENII FICATION.. SERVICE BULLETIN MOS HRSAISC - ENC SUPERSEDED SB 72-0001 R3 NO. 1 ENGINE - CFM56-7B ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED MOS 27-JUL-2006 HRSAISC - ENC SB 72-0001 R4 NO. 1 ENGINE - CFP.156-7B ENGINE MODELS IDENTIFICATION . SERVICE BULLETIN MOS 2S-MAY-2007 HRSAISC ENC SB 72-0001 RS NO. 1 ENGINE - CFM56-7B ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN MOS MRS/P.1SC ENC SB 72-0002 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED - CANCELLED MOS HRS/MSC ENC SB 72-0002 RI NO. I ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED MOS HRS/PASC - ENC SB 72-0003 NO. I ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN - PRODUCT IMPROVEMENT MOS HRSAISC - ENC SB 72-0003 RI NO. 1 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0003 R10 NO. I ENGINE - ENGINE - GENERAL (72-00-60) - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE OPTIONAL DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS 15-JUN-20 1 HRSAISC - ENC SB 72-0003 R2 NO. 1 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0003 R3 NO. 1 ENGINE - CONVERSION OF CFP.456-76 TO DERIVATIVE MODELS. SERVICE BULLETIN MOS MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 400 Of 748 @ Camp Systems EFTA00618691 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0003 R4 NO. ENGINE - CONVERSION OF CR156-76 TO DERIVATIVE MODELS. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0003 Ft5 NO. ENGINE - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0003 R6 NO. ENGINE - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS 17-APR-2007 HRSMSC - ENC SB 72-0003 R7 NO 1 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFm56-78 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS 11-JUN-2009 HRSMSC - ENC SB 72-0003 Re NO. ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFm56-78 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0003 R9 NO ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFNI56-76 MODEL ENGINES TO ALLOWABLE SUPERSEDED DERIVATIVE MODEL DESIGNATIONS (SUPERSEDED BY 72-0003 RIO). SERVICE BULLETIN MOS 10-MAR-2011 HR&MSC - ENC SB 72-0004 NO. 1 ENGINE - INSTALLATION OF CERTIFIED CFM56.7B ENGINE NAMEPLATE. SERVICE BULLETIN MOS HRS.ISC - ENC SB 72-0004 Ri NO 1 ENGINE - CERTIFIED CFP0156-7B ENGINE NAMEPLATE. SERVICE BULLETIN NOT APPLICABLE MOS HRSMSC ENC SB 72-0005 NO. ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED MOS HRSMSC ENC SB 72-0006 R1 NO. ENGINE - CFNI56-7B ENGINE CONVERSION TO CFNI56-7618. SERVICE BULLETIN MOS HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 401 Of 748 Camp Systems EFTA00618692 CIMP Asiant.Inne Attn....14C AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0006 R2 NO. ENGINE - CFLI56-78 ENGINE CONVERSION TO CP356-7618. SERVICE BULLETIN MOS H R Si LI SC ENC SB 72-0006R3 NO. ENGINE - CONVERSION TO CFM56-7B18. SERVICE BULLETIN MOS H R Si LI SC ENC SB 72-0006 R4 NO. ENGINE - CONVERSION TO CFM56-7B18. SERVICE BULLETIN MOS HRS, ?A SC ENC SB 72-0007R1 NO. ENGINE - CFP.I56-7B ENGINE CONVERSION TO CFm56-7620. SERVICE BULLETIN MOS HRSNSC - ENC SB 72-0007 R2 NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7620. SERVICE BULLETIN MOS HRS.,MSC - ENC SB 72-0007 R3 NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7620. SERVICE BULLETIN MOS HRSi MSC - ENC SB 72-0007 R4 NO. ENGINE - CONVERSION TO CFM56-7B20. SERVICE BULLETIN MOS HRSi MSC - ENC SB 72-0008 Ri NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7622. SERVICE BULLETIN MOS H R Si MSC ENC SB 72-0008 R3 NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7622. SERVICE BULLETIN MOS HRS,P.ISC - ENC SB 72-0008 R4 NO. ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7622. SERVICE BULLETIN MOS HRS., kISC - ENC SB 72-0008R5 NO. ENGINE - CONVERSION TO CFNI56-7622. SERVICE BULLETIN MOS H R Si MSC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 402 Of 748 Camp Systems EFTA00618693 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0009 NO. I ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.F (7628). SERVICE BULLETIN MOS HRSiliSC - ENG SB 72-0009 R1 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN MOS HRSikiSC - ENC SB 72-0009 R2 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN MOS HRSASC - ENG SB 72-0009 R3 NO. I ENGINE - CRIS6-7B ENGINE CONVERSION TO CFm56-7624. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0009 R4 NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN MOS HRS4ISC - ENG SB 72-0010 R1 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN MOS HRS.' hiSC - ENC SB 72-0010 R2 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN NOT APPLICABLE MOS HRS.' hiSC - ENC SB 72-0010 R3 NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN MOS HRS.' hiSC - ENG SB 72-0010 R4 NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFm50-7626. SERVICE BULLETIN MOS HRSASC - ENG SB 72-0010 RS NO. I ENGINE - CFNI56-76 ENGINE CONVERSION TO CRI56-7626. SERVICE BULLETIN OPTIONAL MOS 17-FEB-2011 HRSASC - ENG SB 72-0011 R2 NO. I ENGINE - CW56-7E: ENGINE CONVERSION TO CRI56-7627. SERVICE BULLETIN OPTIONAL MOS HRS.' hiSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 403 Of 748 Camp Systems EFTA00618694 C4INIP AsianwftimMetnundieli AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0011 R3 NO 1 ENGINE - CFm56-78 ENGINE CONVERSION TO CR156-7B27. SERVICE BULLETIN MOS H RS' LISC ENC OPTIONAL SB 72-0011 R4 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CP.156-7627. SERVICE BULLETIN OPTIONAL MOS 28-APR-2000 H R Si si SC ENC SB 72-0012 NO. I ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED MOS HRSAISC ENC SB 72-0013 NO. I ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED MOS HRS4.1SC ENC SB 72-0014 NO 1 ENGINE - NUT AND TORQUE CHANGE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS4.1SC 0 ENC 0 SB 72-0015 NO. I ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED MOS HRSLISC ENC SB 72-0016 NO. I ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN MOS 11-JUL-1997 HRS;LISC - ENC SB 72-0016 R1 NO. I ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 05-AUG-1997 HRS;LISC 0 ENC 0 SB 72-0017 NO. I ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS.4.1SC 0 ENC 0 SB 72-0017 R1 NO. I ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN MOS HRS4.1SC - ENC SB 72-0018 NO. I ENGINE - INCREASING OF BOLT LENGTH AND ADDITION OF A WASHER. SERVICE BULLETIN MOS HRS.4.1SC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 404 Of 748 Camp Systems EFTA00618695 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0018 R1 NO. I ENGINE - INCREASING OF BOLT LENGTH AND ADDITION OF A WASHER. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0018 R2 NO. 1 ENGINE - INCREASING OF LENGTH BOLT AND ADDITION OF A WASHER, SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0019 NO. 1 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED MOS HRS/MSC - ENC SB 72-0020 RI NO. 1 ENGINE - ADDITON OF A SPACER ON THE RETAINING CABLE OF THE IDENTIFICATION PLUG NIT. SERVICE COMPUED WITH -AT MANUFACTURE BULLETIN MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0021 NO. 1 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0021 RIO NO. 1 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN SB 72-0021R1 SB 72-0022 SB 72-0022 RI SB 72-0023 SB 72-0023 RI MOS HRS/MSC - ENC NO. 1 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN MOS MRS/MSC - ENC NO. 1 ENGINE - MODIFICATION OF THE J10 WIRING HARNESS. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - MODIFICATION OF THE J10 WIRING HARNESS. SERVICE BULLETIN MOS HRSAISC - ENC NOT APPLICABLE - SUPERSEDED 72-0093 NO. 1 ENGINE - INTERFERENCE BETWEEN THE BODY ACTUATOR AND THE LVDT SENSOR. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 NO. 1 ENGINE - INTERFERENCE BETWEEN THE BODY ACTUATOR AND THE LVDT SENSOR. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 405 Of 748 @ Camp Systems EFTA00618696 ClAkinn the g nd AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0024 NO. 1 ENGINE - REPLACEMENT OF BOLTS ON OIL SENSOR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0024 R1 NO. 1 ENGINE - REPLACEMENT OF BOLTS ON OIL SENSOR. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0025 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION CONNECTOR KITS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0025 R2 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION CONNECTOR KITS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0026 R1 NO. 1 ENGINE - REWORK OF SHROUD PAD. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0027 NO. 1 ENGINE - REPOSITIONING OF VBV HARNNESS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SS 72-0028 R2 NO. 1 ENGINE - THRUST REVERSER KIT MODIFICATION OF INTERNAL VEE GROOVE AND FITTING SHROUDS, SERVICE COMPUED WITH - AT MANUFACTURE BULLETIN MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0029 NO. 1 ENGINE - REPLACEMENT OF BOLTS, SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0030 R1 NO. 1 ENGINE - MODIFICATION OF NAMEPLATE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 MRS/11SC - 0 ENC 0 SB 72-0030 R2 NO. 1 ENGINE - MODIFICATION OF NAMEPLATE. SERVICE BULLETIN MOS HRS/MSC - ENC SS 72-0031 NO. 1 ENGINE - INTRODUCTION OF THE NEW PLATFORM FAN BLADE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 406 Of 748 @Camp Systems EFTA00618697 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0032 NO 1 ENGINE - INTRODUCTION OF A NEW FAN CASE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSisISC 0 ENC 0 SB 72-0033 NO 1 ENGINE - SPARE PARTS RELEASE FOR CFM.56-78 IPC. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HR&MSC - 0 ENC 0 SB 72-0033 R1 NO 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0033 R2 NO. I ENGINE - . SERVICE BULLETIN MOS HR&P.ISC ENC SB 72-0034 R1 NO 1 ENGINE - TURBINE CLEARANCE CONTROL VALVE SUPPORT BRACKET REPLACEMENT. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HR&LISC 0 ENC 0 SB 72-0035 NO 1 ENGINE - MODIFICATION OF BRACKET ASSY AND HARNESS .J5 AND J6. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0101 MOS HRSI.ISC - ENC SB 72-0035 R1 NO 1 ENGINE - MODIFICATION OF BRACKET ASSY AND HARNESS .15 AND J6. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 72-0036 R1 NO 1 ENGINE - INSTALLATION OF A TUBE OIL DRAIN. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSisiSC 0 ENC 0 SB 72-0037 NO. I ENGINE - REPLACEMENT OF ONE BRACKET ASSY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSI.ISC 0 ENC 0 SB 72-0038 NO 1 ENGINE - MODIFICATION OF AXIAL LOAD LINK. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS.P.ISC 0 ENC 0 SB 72-0039 R2 NO 1 ENGINE - INSTALLATION OF NEW BRACKET ASSY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSisISC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 407 Of 748 Camp Systems EFTA00618698 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0040 R1 NO. I ENGINE - MODIFICATION OF BRACKET ASSY. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC 0 ENC 0 SB 72-0040 R2 NO 1 ENGINE - MODIFICATION OF BRACKET ASSY. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0041 NO 1 ENGINE - DELETION OF BRACKETS ASSY FOLOWING PRECOOLER DEFLECTOR AST SIDE PANELS REMOVAL. NOT APPLICABLE SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0042 NO. I ENGINE - HPTCC MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0043 NO. I ENGINE - INTRODUCTION OF NEW BRACKET. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC 0 ENC 0 SB 72-0044 R1 NO. I ENGINE - SUPPORT BRACKET IMPROVEMENTS FOR THE CJ9 HARNESS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC 0 ENC 0 SB 72-0045 R2 NO. I ENGINE - REWORK OF SHROUD PAD OF STRUT N',1 ON 'VEE GROOVE". SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSIASC 0 ENC 0 SB 72-0045 R3 NO. I ENGINE - REWORK OF SHROUD PAD OF STRUT N',1 ON 'VEE GROOVE". SERVICE BULLETIN MOS HRSIASC - ENC SB 72-0046 NO 1 ENGINE - MODIFICATION OF TWO BRACKETS ON BOEING FUEL SUPPLY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSIASC 0 ENC 0 SB 72-0047 NO 1 ENGINE - NEW HPT SHROUD RETAINING CLIP INTRODUCTION. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSIASC - 0 ENC 0 SB 72-0047 R1 NO. I ENGINE - NEW HPT SHROUD RETAINING CLIP INTRODUCTION. SERVICE BULLETIN MOS HRSIASC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 408 Of 748 Camp Systems EFTA00618699 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB SB SB SB SB SB SB SB SB SB SB 72-0047 R2 72-0048 R1 72-0049 R1 72-0050 72-0051 72-0052 72-0053 R1 72-0054 72-0054R1 72-0055 R1 72-0056 NO. I ENGINE - HPT AND LPT NOZZLE STAGE 1 - INTRODUCTION OF NEW LOW STRESS C-CLIPS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ANTI-ICE AND DRAIN MANIFOLD BRACKET REPLACEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - MODIFICATION OF HARNESS MW0304. SERVICE BULLETIN MOS I6-DEC-1998 MRS/MSC - 0 ENC 0 NO. 1 ENGINE - MODIFICATION OF HARNESS MW0301. SERVICE BULLETIN MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 NO. I ENGINE - GENERAL (72-00-00) SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - INSPECTION OF J5. J6. J10. MW0301,MW0302, AND MW0304 HARNESSES. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 NO. I ENGINE - REPLACEMENT OF T49.5 BRACKETS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - REPLACEMENT OF T49.5 BRACKETS. SERVICE BULLETIN MOS HRS(MSC - ENC NO. I ENGINE - CHANGE OF HARDWARE FROM CORE ASSEMBLY TO ENGINE ASSEMBLY. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - VBV FUEL MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0098 COMPUED WITH - AT MANUFACTURE COMPUED WITH - AT MANUFACTURE NOT APPLICABLE COMPUED WITH - PARTIALLY AT MFG 52X CWM-91X NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 409 Of 748 @ Camp Systems EFTA00618700 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0057 NO. 1 ENGINE - INTRODUCTION OF NEW HPT NOZZLE SEGMENTS. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0099 MOS HRSAISC - ENC SB 72-O058 NO. 1 ENGINE - INTRODUCTION OF NEW FRONT FLANGE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0059 NO. 1 ENGINE - NEW VSV FUEL MANIFOLD LOOP CLAMP BOLTS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0080 NO. 1 ENGINE - REPLACEMENT OF OVERHEAT DETECTOR BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0060 R1 NO. 1 ENGINE - REPLACEMENT OF OVERHEAT DETECTOR BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0061 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE 32X,41X.52X91X MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0062 NO. 1 ENGINE - INTRODUCTION OF A REPLACEABLE CUSHION FOR HINGED CLAMP (ELECTRICAL HARNESSES ATTACHMENT). SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0063 R1 NO. 1 ENGINE - REPLACEMENT OF HOLD OPEN ROD BRACKET. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-O064 R1 NO. 1 ENGINE - REPLACEMENT OF TWO BRACKETS ATTACHING THE J12 HARNESS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0065 NO. 1 ENGINE - INTRODUCTION OF A NEW SOURCE FOR THE VIBRATION BRG1. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0066 NO. 1 ENGINE - INTRODUCTION OF NEW SOURCE FOR SENSOR VIBRATION FFCC. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 410 Of 748 @ Camp Systems EFTA00618701 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0067 R1 NO. I ENGINE - INTRODUCTION OF A HEAT SHIELD BETWEEN THE OIL PRESSURE SENSOR AND THE OIL DISTRIBUTION BLOCK. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE 9IX NA-SUPERSEDED 72-0151 - 23X MOS 16-DEC-1998 HRS/MSC 0 ENC 0 SB 72-0068 NO. 1 ENGINE - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0068 RI NO. 1 ENGINE - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0068 R2 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN INFORMATIONAL MOS 03-MAY-2012 HRS/MSC - ENC SB 72-0069 NO. I ENGINE - INTRODUCTION/REWORK OF TWO PS3 BRACKETS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 76-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0070 RI NO. I ENGINE - ECS DUCT BRACKET REPLACEMENT. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0071 NO. 1 ENGINE - MODIFICATION OF BRACKET ATTACHING THE MW0312, SERVICE BULLETIN COMPLIED WITH- AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0072 NO. 1 ENGINE - INTRODUCTION OF A PAINT-MARKED COVER ASSY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0073 NO. 1 ENGINE - DRAIN TUBE SUPPORT CHANGE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0074 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0074 RI NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE 41X,91X MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 411 Of 748 @ Camp Systems EFTA00618702 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (VG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0075 NO 1 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE AND IGNITER HARDWARE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSSISC ENC SB 72-0076 NO 1 ENGINE - INTRODUCTION OF NEW IDG OIL COOLER WITH A NEW GOEMETRY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSI.ISC ENC SB 72-0077 NO 1 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 72-0077 R2 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS.ISC - ENC SB 72-0078 R1 NO 1 ENGINE - INTRODUCTION OF LONGER SCREWS ON LPTACC PANEL. SERVICE BULLETIN COMPLIED WITH - PARTIALLY AT MFG MOS 16-DEC-1998 HR&P.ISC ENC SB 72-0079 NO 1 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HRSSISC - ENC SB 72-0079 R1 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSSISC ENC SB 72-0079 R2 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HRSilASC - ENC SB 72-0079 R3 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 72-0079 R4 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HR&P.ISC - ENC SB 72-0079 RS NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HRSSISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 412 Of 748 11 Camp Systems EFTA00618703 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0079 R6 NO. I ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN RECOMMENDED MOS 23-NOv-2010 HRSMSC ENC SB 72-0080 NO. I ENGINE - . SERVICE BULLETIN CANCELLED MOS HRSMSC ENC SB 72-0081 NO. I ENGINE - CMF56-78 ENGINE CONVERSION TO CW56-7B20:2. SERVICE BULLETIN NOT APPLICABLE MOS HR&MSC - ENC SB 72-0081 Ft1 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7B20:2. SERVICE BULLETIN MOS MRS/4SC - ENC SB 72-0082 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7B22r2. SERVICE BULLETIN NOT APPLICABLE MOS HRSMSC - ENC SB 72-0082 Fel NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CRISS-7822/2. SERVICE BULLETIN MOS HRS.7.ISC - ENC SB 72-0083 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7B24/2. SERVICE BULLETIN NOT APPLICABLE MOS HRS.7.ISC - ENC SB 72-0083 Fel NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7B24/2. SERVICE BULLETIN MOS HRS.7.ISC - ENC SB 72-0084 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7826a. SERVICE BULLETIN NOT APPLICABLE MOS HRS7.ISC - ENC SB 72-0084 Fel NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7826a. SERVICE BULLETIN MOS HRS7.ISC - ENC SB 72-0085 NO. I ENGINE - CFM56-78 ENGINE CONVERSION TO CRISS-7B27a. SERVICE BULLETIN NOT APPLICABLE MOS HRS.7.ISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 413 Of 748 Camp Systems EFTA00618704 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0085 R1 NO. I ENGINE - CFP.156-7B ENGINE CONVERSION TO CR156-7827/2. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0086 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0086 RI NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS 04-DEC-2007 HRS/MSC - ENC SB 72-0087 NO.1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER OUTER LINER. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0103 MOS HRS/MSC - ENC SB 72-0088 NO.1 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0088 RI NO.1 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0088 R2 NO.1 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0089 NO. I ENGINE - LPT MODULE (72-54-00)-INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND COMPUED WITH - AT MANUFACTURE 53X.54X STAGE I SEAL SEGMENT. SERVICE BULLETIN MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0089 RI NO. I ENGINE - LPT MODULE (72-54-00)-INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND STAGE I SEAL SEGMENT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0089 R2 NO.1 ENGINE - REWORK OF OLD LPT STAGE 1 NOZZLE SEGMENT OR INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND NEW STAGE 1 SEAL SEGMENT. SERVICE BULLETIN MOS 27-JAN-2006 MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 414 Of 748 @ Camp Systems EFTA00618705 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0089 R3 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - REWORK OF OLD LPT STAGE 1 NOZZLE SEGMENT OR INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND NEW STAGE 1 SEAL-SEGMENT. SERVICE BULLETIN MOS 10-APR-2009 HRS/MSC ENC SB 72-0090 NO.1 ENGINE - REINFORCEMENT OF FORWARD MOUNTING LUG OF THE LPT COOLING MANIFOLDS. SERVICE BULLETIN MOS 16-DEC-1998 HRSAISC 0 ENC 0 SB 72-0091 NO. 1 ENGINE - REMOVAL OF EXTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU107. 874-110 THRU 112. 874-115 AND -116. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0091 R1 NO. 1 ENGINE - REMOVAL OF EXTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU107. NOT APPLICABLE 874-110 THRU 112. 874-115 AND -116. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0092 NO. 1 ENGINE - INTRODUCTION OF NEW STATIONARY HPT OUTER SEAL. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS(MSC - 0 ENC 0 SB 72-0092 R1 NO. 1 ENGINE - INTRODUCTION OF NEW STATIONARY HPT OUTER SEAL. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0093 NO. 1 ENGINE - INTRODUCTION OF NEW MOUNT HARNESS WITH S. J10. MW0311. MW0315. MW0316 ASSOCIATED COMPLIED WITH - AT MANUFACTURE HARNESSES. SERVICE BULLETIN MOS 16-DEC-1998 MRS/P.1SC - 0 ENC 0 SB 72-0094 NO. 1 ENGINE - INTRODUCTION OF NEW LPT NOZZLE STAGE 2. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS 16-DEC-1998 MRS/P.1SC - 0 ENC 0 SB 72-0094 R1 NO. 1 ENGINE - INTRODUCTION OF NEW LPT NOZZLE STAGE 2. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0095 NO.1 ENGINE - INTRODUCTION OF LARGE BORE TRANSIENT BLEED VALVE. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS 16-DEC-1998 MRS/P.1SC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 415 Of 748 @ Camp Systems EFTA00618706 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0096 NO. I ENGINE - INTRODUCTION OF HPT NOZZLE SUPPORT WITH IMPROVED PINS. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0097 RI NO. 1 ENGINE - INTRODUCTION OF LONGER BOLTS ON ENGINE AND CORE ASSEMBLY. SERVICE BULLETIN COMPUED WITH - PARTIALLY AT MFG MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0098 NO. 1 ENGINE - INTRODUCTION OF A NEW AIR DUCT SUPPORT BRACKET. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0099 NO. 1 ENGINE - INTRODUCTION OF NEW HPT NOZZLE SEGMENTS WITH INNER SEAL. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 76-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0100 NO. 1 ENGINE - CFM56-78 ENGINE NAMEPLATE MARKING. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0101 NO. 1 ENGINE - NEW ROUTING OF JS AND J6 HARNESSES. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0102 NO. 1 ENGINE - INTRODUCTION OF DAC HPT ROTOR ASSEMBLY FOR USE ON THE SAC HPT ROTOR ASSEMBLY. SERVICE BULLETIN MOS MRS/MSC ENC SB 72-0103 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0103 RI NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0103 R2 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN RECOMMENDED MOS I7-FEB-2011 HRS/MSC - ENC SB 72-0101 NO. 1 ENGINE - INTRODUCTION OF A NEW PAINT ON LPT SHAFT. SERVICE BULLETIN - SUPERSEDED SB-PENDING MOS HRSAISC - ENC 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 416 Of 748 @ Camp Systems EFTA00618707 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0104 R1 NO. I ENGINE - INTRODUCTION OF A NEW PAINT ON LPT SHAFT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0105 NO. I ENGINE - ARRANGEMENT OF VBV TURNBUCKLE. BELLCRANK. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-O106 NO. 1 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS. SERVICE BULLETIN MOS HRSIMSC ENC SB 72-O106 R2 NO. 1 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0106 R3 NO. 1 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0106 R4 NO. 1 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS. SERVICE BULLETIN MOS I4-AUG-2007 HRS/MSC ENC SB 72-0107 NO. 1 ENGINE - REPLACEMENT CLAMP FOR DAC AFT SUMP OIL SUPPLY TUBE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0108 NO. 1 ENGINE - NEW VBV FUEL MANIFOLD BOLTS AND VSV FUEL MANIFOLD LOOP CLAMP BOLTS. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0109 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0109 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN MOS MRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 417 Of 748 @ Camp Systems EFTA00618708 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0109 R2 NO. 1 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN MOS HRSO4SC - ENC SB 72-0110 RI NO. 1 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER COMPUED WITH - AT MANUFACTURE WITH ONE LUG KEY. SERVICE BULLETIN MOS 16-DEC-1998 HRS(MSC - 0 ENC 0 SB 72-0110 R2 NO. 1 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER WITH ONE LUG KEY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0110 R3 NO.1 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER WITH ONE LUG KEY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0110 R4 NO.1 ENGINE - COMBUSTION CHAMBER - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER WITH ONE LUG KEY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0111 NO.1 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH INCREASED LIFE LIMIT. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0114 MOS HRS/MSC - ENC SB 72-0112 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0113 NO. 1 ENGINE - INTRODUCTION OF NEW ECS DUCT BRACKET AND FAN COWL SUPPORT BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0113 R1 NO. 1 ENGINE - INTRODUCTION OF NEW ECS DUCT BRACKET AND FAN COWL SUPPORT BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0114 NO.1 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH MODIFIED HUB. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSO4SC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 418 Of 748 @ Camp Systems EFTA00618709 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0114 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH MODIFIED HUB. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0115 NO. 1 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0115 R1 NO. 1 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0115 R2 NO. 1 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-O116 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS MRS/81SC - ENC SB 72-0117 NO.1 ENGINE - LPT COOLING AIR TUBE METERING PLATE DELETION. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0117 R1 NO.1 ENGINE -LPT COOLING AIR TUBE METERING PLATE DELETION. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0118 NO. 1 ENGINE - INTRODUCTION OF A NEW I-PT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0119 NO. 1 ENGINE - RN APPLICATION ADJUSTMENT ON THE NEW VEE GROOV SYSTEM. SERVICE BULLETIN - PRODUCT IMPROVEMENT MOS HRS/MSC - ENC SB 72-0120 NO. 1 ENGINE - WASHERS TO PC FUEL TUBE/MANIFOLD. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 FIRS/MSC - 0 ENC 0 SB 72-0121 R1 NO. 1 ENGINE - CORE ASSEMBLY HARDWARE CHANGE. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 419 Of 748 @ Camp Systems EFTA00618710 COMP Mien wfran Meowed up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0122 NO. 1 ENGINE - DELETION OF THE STAGE 5 BLEED COVER PLATE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0123 RI NO.1 ENGINE - INSPECTION OF TGB AIR/OIL TUBE. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0124 NO. I ENGINE - INTRODUCTION OF A NEW CENTER VENT TUBE (CVI) REMOVABLE AT ENGINE LEVEL. SERVICE COMPLIED WITH - AT MANUFACTURE BULLETIN MOS 16-DEC-1998 FIRS/MSC 0 ENC 0 SB 72-0124 R3 NO. 1 ENGINE - INTRODUCTION OF A NEW CENTER VENT TUBE (CVT) REMOVABLE AT ENGINE LEVEL. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0125 NO. 1 ENGINE - HPT NOZZLE INNER SEAL REPLACEMENT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0126 NO. I ENGINE - CORE CONFIGURATION UPDATES. SERVICE BULLETIN NOT APPLICABLE MOS HRS/MSC - ENC SB 72-0128 NO. 1 ENGINE - REPLACEMENT OF BOLTS AND WASHERS ATTACHING THE REM CONE FLANGE ON THE FAN DISK COMPLIED WITH - AT MANUFACTURE FRONT FLANGE. SERVICE BULLETIN MOS 16-DEC-1998 HRS(MSC 0 ENC 0 SB 72-0129 NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0129 RI NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0130 NO. 1 ENGINE - STARTER GEARSHAFT REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE - BASED ON THE L5 STARTER GEARSHAFT SERIAL NUMBER MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 420 Of 748 @ Camp Systems EFTA00618711 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0130 R1 NO. 1 ENGINE - STARTER GEARSHAFT REPLACEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0131 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0132 NO. 1 ENGINE - REDUCED INTERVAL FOR MAGNETIC CHIP DETECTOR INSPECTION. SERVICE BULLETIN NOT APPLICABLE - BASED ON THE AG8 STARTER GEARSHAFT SERIAL NUMBER MOS HRSIMSC - ENC SB 72-0133 NO. 1 ENGINE - CHANGE OF TRANSFER GEARBOX AIR/OIL TUBE - REPLACEMENT OF RIGID AIR TUBE BY A SEMI-RIGID COMPUED WITH - AT MANUFACTURE 23X.91X AIR TUBE. SERVICE BULLETIN MOS I6-DEC-1998 HRS/MSC 0 ENC 0 SB 72-0133 R1 NO. 1 ENGINE - CHANGE OF TRANSFER GEARBOX AIR/OIL TUBE - REPLACEMENT OF RIGID AIR TUBE BY A SEMI-RIGID AIR TUBE. SERVICE BULLETIN MOS HIRSOASC ENC SB 72-0134 NO. 1 ENGINE - INTRODUCTION OF A NEW CLAMP-LOOP AND ITS BRACKET FOR J12 ELECTRIC HARNESS HOLDING. COMPUED WITH - AT MANUFACTURE SERVICE BULLETIN MOS I6-DEC-1998 HRS/MSC 0 ENC 0 SB 72-0135 NO. 1 ENGINE - RESPONSIBILITY TRANSFER OF THREE FIRE DETECTION BRACKETS FROM BOEING TO CFMI. COMPUED WITH - AT MANUFACTURE SERVICE BULLETIN MOS I6-DEC-1998 MRS/MSC 0 ENC 0 SB 72-0135 R1 NO. 1 ENGINE - RESPONSIBILITY TRANSFER OF THREE FIRE DETECTION BRACKETS FROM BOEING TO CFMI. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0136 R1 NO. 1 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE COMPUED WITH -AT MANUFACTURE BULLETIN MOS 16-DEC-1998 HRS/MSC 0 ENC 0 SB 72-0136 R2 NO. 1 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 421 Of 748 @ Camp Systems EFTA00618712 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0136 R3 NO. I ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0138 NO. 1 ENGINE - INTRODUCTION OF A HEAT SHRINK SLEEVE ON J7 AND J8 HARNESSES. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0146 MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0139 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0140 NO. 1 ENGINE - BONDED CAUTION PLATE ON COVER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0140 R1 NO. 1 ENGINE - BONDED CAUTION PLATE ON COVER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0141 NO. 1 ENGINE - INTRODUCTION OF NEW LPTACC TUBE. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0142 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0143 NO. 1 ENGINE - REPLACEMENT OF SUSPECT J9 HARNESSES .. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0144 NO. 1 ENGINE - INTRODUCTION OF A NEW PS3 AIR TUBE WITH NEW ROUTING. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0145 NO. 1 ENGINE - CLAMP ASSEMBLY ADDITION TO THE TRANSIENT BLEED VALVE DRAIN TUBE. SERVICE BULLETIN NOT APPLICABLE MOS HRS/MSC - ENC SB 72-0146 NO. 1 ENGINE - J8 HARNESS ECU CONNECTION - NEW ROUTING OF TP0808* LEG. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 422 Of 748 @ Camp Systems EFTA00618713 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0147 NO. I ENGINE - N1 MODIFIER SCHEDULE CHANGE FOR CFM56-7826 AND CFM56-7827 ENGINES. SERVICE BULLETIN NOT APPLICABLE MOS MRS/MSC - ENC SB 72-0148 NO. 1 ENGINE - SAFETYING OF OIL RETURN TUBE - INTRODUCTION OF A NEW BOLT PERMITTING INSTALLATION OF COMPUED WITH - AT MANUFACTURE SAFETY WIRE. SERVICE BULLETIN MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0148 R1 NO.1 ENGINE - SAFETYING OF OIL RETURN TUBE - INTRODUCTION OF A NEW BOLT PERMITTING INSTALLATION OF SAFETY WIRE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0149 NO.1 ENGINE - FAN AND BOOSTER ADDITION OF A NEW WASHER ON PT25 AIR TUBE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0150 NO. 1 ENGINE - BRACKETS ASSY DELETION OF ALERNATES. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC ENC SB 72-0151 NO. 1 ENGINE - REPLACEMENT OF SWAGED SPACERS BY WELDED SPACERS ON ELECTRICAL HARNESSES. OIL AND COMPUED WITH - AT MANUFACTURE 9IX FUEL TUBE BRACKETS. SERVICE BULLETIN NA-SUPERSEDED 72-0133 - 23X MOS 16-DEC-1998 HRSAISC 0 ENC 0 SB 72-0151 R1 NO. 1 ENGINE - REPLACEMENT OF SWAGED SPACERS BY WELDED SPACERS ON ELECTRICAL HARNESSES. OIL AND FUEL TUBE BRACKETS. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0152 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN COMPUED WITH- AT MANUFACTURE 9IX OPEN-51X MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0153 NO. I ENGINE - INTRODUCTION OF A NEW J7 HARNESS WITH COIL INTEGRATED. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0154 NO.1 ENGINE - INTRODUCTION OF A NEW VSV FUEL TUBE WITH NEW ROUTING. SERVICE BULLETIN COMPLIED WITH- AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 423 Of 748 @ Camp Systems EFTA00618714 COAtiaheW • fra the clued up' AD/SI Status Report 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0155 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0155 RI NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0156 NO. 1 ENGINE - HPT NOZZLE SHROUD SUPPORT REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0156 RI NO.1 ENGINE - HPT NOZZLE SHRUD SUPPORT REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0156 R2 NO.1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE (72-53-00)- HPT NOZZLE SHROUD SUPPORT OPTIONAL REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN MOS 13-FEB-2012 HRS/MSC - ENC SB 72-0157 NO. 1 ENGINE - IMPROVED SEAL MATERIAL. SERVICE BULLETIN MOS HRS,MSC - ENC SB 72-0158 NO. 1 ENGINE - COMBUSTOR LINER PROOUCIBILITY IMPROVEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0158 RI NO. 1 ENGINE - COMBUSTOR LINER PRODUCIBILTY IMPROVEMENT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0159 NO. 1 ENGINE - INCREASING OF BOLT LENGTH ON T49.5 PROBE BOX. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0160 NO. 1 ENGINE - REMOVAL OF INTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU 874-105. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0161 NO. 1 ENGINE - REPLACEMENT OF ECU BRACKET ASSY ON THE FAN FRAME. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 424 Of 748 @Camp Systems EFTA00618715 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0162 NO. I ENGINE - INSPECT HPT STR MANIFOLD/LPT STAGE I NOZZLE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0163 NO. 1 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH A NEW DESIGN. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 58 72-0164 NO. 1 ENGINE - HPT CLEARANCE CONTROL MANIFOLD. LPT COOLING/TF SENSOR AND ELECTRICAL SUPPORT BRACKET CHANGES. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0165 NO. 1 ENGINE - RETROFIT INSTALLATION FOR COMPLYANCE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0166 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN NOT APPLICABLE - 91X OPEN-56X MOS HRS/MSC - ENC SB 72-0166 R1 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0166 R2 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0167 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627431. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0167 R1 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627431. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0167 R2 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627431. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0168 NO. 1 ENGINE - CONVERSION OF CFM56-7B TO 7827/83. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 425 Of 748 @ Camp Systems EFTA00618716 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0168 R1 NO 1 ENGINE - CONVERSION OF CFM56-7B TO 7827.'63. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0168 R2 NO 1 ENGINE - CFM 56-7B ENGINE CONVERSION TO CFM 56-7827183.. SERVICE BULLETIN MOS HRS/LISC - ENC SB 72-0169 NO. I ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0169 R1 NO 1 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN MOS HRSASC - ENC SB 72-0169 R2 NO 1 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN MOS HRS.,mSC - ENC SB 72-0170 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN NOT APPLICABLE MOS HRSIISC - ENC SB 72-0171 NO. I ENGINE - INTRODUCTION OF A NEW STAGE I VANE ASSY. SERVICE BULLETIN MOS HRS.,mSC - ENC SB 72-0172 NO. I ENGINE - REPLACEMENT OF BRACKET FOR INSTALLATION OF BOEING FLOWMETER KIT. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0173 NO. I ENGINE - LPT SHIFT MARAGING 250 MATERIAL. SERVICE BULLETIN MOS HRS. .ISC - ENC SB 72-0173 R1 NO. I ENGINE - LOW PRESSURE TURBINE SHAFT - INTRODUCTION OF A NEW LPT SHAFT MADE OF MARAGING 250 MATERIAL. SERVICE BULLETIN MOS HRSASC ENC SB 72-0174 NO 1 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN MOS HRSimSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 426 Of 748 1, Camp Systems EFTA00618717 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0175 NO. 1 ENGINE - INTRODUCTION OF TWO WAISTS ON ATTACHMENT STRUT 4 AND STRTUT 10 CLAMPS ASSY. SERVICE BULLETIN MOS HRS(MSC ENC SB 72-0176 NO. 1 ENGINE - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN MOS HRSOASC - ENC SB 72-0176 R1 NO.1 ENGINE - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0176 R2 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN MOS 30-SEP-2009 HRSPASC ENC SB 72-0177 NO. 1 ENGINE - INTRODUCTION OF A NEW I-PT STATOR PIN RETAINER. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0178 NO.1 ENGINE - NEW NO. 5 BEARING SUPPORT. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0179 NO.1 ENGINE - VSV FUEL MANIFOLD AND VSV MANIFOLD BRACKET REPLACEMENT. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0180 NO.1 ENGINE - REDUCED INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DMS INSPECTION. SERVICE BULLETIN MOS HRSOASC - ENC SB 72-0181 NO.1 ENGINE - FAN FRAME -NEW BRACKET ASSEMBLY. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0182 NO.1 ENGINE - PT25 AIR TUBE INSTALLATION IMPROVEMENT. SERVICE BULLETIN MOS HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 427 Of 748 @ Camp Systems EFTA00618718 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0182 R1 10-JAN-2008 NO. 1 ENGINE - PT25 AIR TUBE INSTALLATION IMPROVEMENT. SERVICE BULLETIN MOS HRSISISC - ENG SB 72-0183 NO. 1 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED MOS HR&MSC - ENG SB 72-0184 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HR&MSC - ENG SB 72-0185 NO. 1 ENGINE - INTRODUCTION OF A NEW NO. 4 ROLLER BEARING. SERVICE BULLETIN MOS HRSNSC - ENG SB 72-0185 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW NO. 4 ROLLER BEARING. SERVICE BULLETIN MOS HRSIMSC - ENG SB 72-0186 NO. I ENGINE - NEW LPT STAGE 2 NOZZLE SEGMENTS. SERVICE BULLETIN MOS 23-SEP-1999 HRSIMSC - ENG SB 72-0186 R1 OS-MAR-2005 SB 72-0187 SB 72-0188 SB 72-0188 R1 SB 72-0188 R2 NO. I ENGINE - INTRODUCTION OF NEW LPT STAGE 2 NOZZLE SEGMENTS. SERVICE BULLETIN MOS HRSIMSC - ENG NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSISISC - ENG NO. I ENGINE - DISCONNECTION AND RECONNECTION OF J01 AND J02 HARNESSES. SERVICE BULLETIN MOS HRSNSC - ENG NO. I ENGINE - DISCONNECTION AND RECONNECTION OF J01 AND J02 HARNESSES. SERVICE BULLETIN MOS HRSNSC - ENG NO. 1 ENGINE - FAN FRAME ASSEMBLY - DISCONNECTION AND RECONNECTION OF MW0301 (J01) AND MW0302 (J02) HARNESSES AT THEIR APPROPRIATE LOCATION. SERVICE BULLETIN MOS HRSi MSC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 428 Of 748 Camp Systems EFTA00618719 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0189 NO. 1 ENGINE - INTRODUCTION OF A NEW VSV FUEL MANIFOLD AND VSV MANIFOLD BRACKET CHANGE. SERVICE BULLETIN SB 72-0190 SB 72-0191 SB 72-0191 RI SB 72-0192 SB 72-0193 SB 72-0194 SB 72-0195 SB 72-0196 SB 72-0197 SB 72-0198 MOS HRS/MSC ENC NO. 1 ENGINE - REPLACEMENT OF STAGE 2 SEAL SEGMENTS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - SHORTER BOLT FOR T49.5 ELECTRICAL HARNESS SUPPORT. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - NEW SHORTER BOLT FOR T49.5 ELECTRICAL HARNESS SUPPORT. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - REPLACEMENT OF NOA ROLLER BEARING 335-352-301-0. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH NEW DESIGN ON FLANGE B6. J1 ELECTRIC HARNESS HOLDING, SERVICE BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - INTRODUCTION OF A WAIST ON STRUT PROFILE (9 O'CLOCK). SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF NEW NIPPLE. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ABRADABLE STAGE 3 SEAL SEGMENTS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - CHAMFER ON LOCKS-STAGE 2 SEAL SEGMENTS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - LPT STAGE 2 SEAL SEGMENT WITH NEW LOCK. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time @ Camp Systems 429 Of 748 EFTA00618720 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0199 SB 72-0200 SB 72-0201 SB 72-0202 SB 72-0203 SB 72-0204 SB 72-0205 SB 72-0206 SB 72-0207 SB 72-0208 SB 72-0208 R1 NO. I ENGINE - TWO NEW LONGER BOLTS FOR ELECTRICAL HARNESS SUPPORT (3 O'CLOCK). SERVICE BULLETIN MOS HRSIMSC - ENC NO. I ENGINE - INTRODUCTION OF A NEW ASSY WITH NEW DESIGN ON FLANGE B6. FUEL TUBE HOLDING. SERVICE BULLETIN MOS HRSIMSC ENC NO. I ENGINE - SPARE PARTS RELEASE FOR CFN156-7 PC. SERVICE BULLETIN MOS HRSMSC - ENC NO. I ENGINE - REMOVAL OF SILICONE ELASTOMER SEALS FROM FAN DUCT PANELS. SERVICE BULLETIN MOS HRSMSC - ENC NO. I ENGINE - INTRODUCTION OF A STRAIGHT HEADLESS PIN TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRS.4.1SC - ENC NO. I ENGINE - FUEL TRANSIENT BLEED VALVE MANIFOLD BOLT CHANGE. SERVICE BULLETIN MOS HRS. .ISC - ENC NO. I ENGINE - MODIFICATION OF ONE FIRE DETECTION BRACKET ASSY AND INCREASING OF OVERTAKING BOLTS ON FLANGE B6. SERVICE BULLETIN MOS ENC NO. I ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN MOS HRSIMSC - ENC NO. I ENGINE - RETURN TO CFMI OF NO.4 ROLLER BEARING 335-352-301-0 STORED AS SPARES. SERVICE BULLETIN MOS HRSIMSC - ENC NO. I ENGINE - INTRODUCTION OF NEW NAMEPLATE. SERVICE BULLETIN MOS HRSIMSC - ENC NO. I ENGINE - INTRODUCTION OF NEW NAMEPLATE. SERVICE BULLETIN MOS HRSMSC - ENC 9-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time Camp Systems 430 Of 748 EFTA00618721 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0208 R2 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR MARKING. SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0208 R3 NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR MARKING. SERVICE BULLETIN 08-MAR-2005 MOS HRS/LISC ENC SB 72-0208 R4 NO. 1 ENGINE - INTRODUCTION OF A NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR MARKING. SERVICE BULLETIN 25-MAY-2C07 SB 72-0208 R5 14-JAN-2009 SB 72-0209 R1 SB 72-0209 R2 SB 72-0209 R4 SB 72-0209 R5 SB 72-0209 R6 05-FEB-2010 MOS HRS.4.ISC ENC NO. I ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR MARKING. SERVICE BULLETIN MOS HRSMSC - ENC NO. I ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HRSitISC ENC NO. I ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HR&P.ISC ENC NO. 1 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HRS,MSC - ENC NO. 1 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HRSI.ISC ENC NO. I ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HRSI.ISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 431 Of 748 1' Camp Systems EFTA00618722 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0209 R7 NO 1 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72.41-00) - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY RECOMMENDED AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS 13-FEB-2012 HR&MSC - ENG SB 72-0210 NO. I ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY. NEW PS3 SIGNAL AIR TUBE AND NEW PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN MOS HRS.MSC - ENG SB 72-0210 R2 NO. I ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY. NEW PS3 SIGNAL AIR TUBE AND NEW PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN MOS HRS.P.ISC - ENG SB 72-0211 NO. I ENGINE - INTRODUCTION OF A NEW FORWARD INNER NOZZLE SUPPORT. SERVICE BULLETIN MOS HRS.MSC - ENG SB 72-0212 NO. I ENGINE - SPARE PARTS RELEASE FOR CF51.56-76 IPC. SERVICE BULLETIN MOS HR&MSC - ENG SB 72-0212 Ri NO. I ENGINE - SPARE PARTS RELEASE FOR CF51.56-76 IPC. SERVICE BULLETIN MOS HRS.IISC - ENG SB 72-0213 NO. I ENGINE - INTRODUCTION OF A INTERMEDIATE FLANGE WITH A NEW DESIGN. SERVICE BULLETIN MOS HR&MSC - ENG SB 72-0214 NO. I ENGINE - SPARE PARTS RELEASE FOR CF51.56-76 IPC. SERVICE BULLETIN MOS HR&MSC - ENG SB 72-0215 NO. I ENGINE - SPARE PARTS RELEASE FOR CF51.56-76 IPC. SERVICE BULLETIN MOS HRS.MSC - ENG SB 72-0216 NO. I ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH NEW DESIGN ON THE ACCESSORY GEARBOX. ELECTRIC HARNESSES AND POWERS FEEDERS IDG CABLE HOLDING. SERVICE BULLETIN MOS HRS.P.ISC - ENG 9-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 432 Of 748 '2 Camp Systems EFTA00618723 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0217 SB 72-0218 SB 72-0219 SB 72-0220 SB 72-0221 SB 72-0221 R1 SB 72-0222 SB 72-0223 SB 72-0224 SB 72-0225 SB 72-0225 R1 NO. I ENGINE - LPT BLADES STAGE 4 IMPROVEMENT. SERVICE BULLETIN MOS HRSimSC - ENG NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HRSIISC - ENG NO. I ENGINE - INTRODUCTION OF A NEW FOOL PROOF PLATE. SERVICE BULLETIN MOS HRSIISC - ENG NO 1 ENGINE - INTRODUCTION OF NEW N2 SENSOR. SERVICE BULLETIN MOS HRSI.ISC - ENG NO 1 ENGINE - INTRODUCTION OF NEW OIL INLET COVER ASSY OR REWORK. SERVICE BULLETIN MOS HRSIISC - ENG NO. I ENGINE - INTRODUCTION OF NEW OIL INLET COVER ASSY OR REWORK. SERVICE BULLETIN MOS HRSimSC - ENG NO. I ENGINE - REMOVAL EXTERNAL INSTRUMENTATION. SERVICE BULLETIN MOS HRSimSC - ENG NO. I ENGINE - INTRODUCTION OF A NEW OUTER LINER LUG RING TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRSimSC - ENG NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7-8 IPC. SERVICE BULLETIN MOS HRSIISC - ENG NO. I ENGINE - INTRODUCTION OF NEW LPT COOLING MANIFOLD. SERVICE BULLETIN MOS HRSIISC - ENG NO. I ENGINE - INTRODUCTION OF NEW LPT COOLING AIR MANIFOLD. SERVICE BULLETIN MOS H RS' mSC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 433 Of 748 1, Camp Systems EFTA00618724 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0226 NO. 1 ENGINE - INTRODUCTION OF STAGE 2 AND STAGE 4 BLADE KITS TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS MRS/51SC ENC SB 72-0227 NO. 1 ENGINE - INTRODUCTION OF NEW OUTER COWL WITH INCREASED DURABILITY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0227 RI NO. 1 ENGINE - INTRODUCTION OF NEW OUTER COWL WITH INCREASED DURABILITY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0228 NO. 1 ENGINE - INTRODUCTION OF A NEW NEXT HIGHER ASSEMBLY COOLING MANIFOLD UP AND DOWN. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0229 NO. 1 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0229 RI NO. 1 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN MOS II -FEB-2008 HRS./MSC - ENC SB 72-0229 R2 NO. 1 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN MOS 22-FEB-2011 MRS/51SC - ENC SB 72-0229 R3 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - INNER AND OUTER LINER THICKER TBC FIELD CUSTOMER REWORK. SERVICE BULLETIN CONVENIENCE MOS 13-SEP-2011 MRS/51SC - ENC SB 72-0229 R4 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN MOS 23-FEB-2012 MRS/51SC - ENC SB 72-0230 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS MRS/51SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 434 Of 748 @ Camp Systems EFTA00618725 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0230 R1 SB 72-0231 SB 72-0232 SB 72-0233 SB 72-0234 SB 72-0235 SB 72-0236 SB 72-0237 SB 72-0239 SB 72-0239 R1 SB 72-0240 R1 NO. 1 ENGINE - . SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW TURNBUCKLE ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW HARNESS WITH NEW ROUTING, SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF A FIELD REWORKED HPT NOZZLE STATOR SEGMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF UPPER DRAIN MANIFOLD nASKET, SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT HOUSING. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW FAN FRAME WITH GANGS CHANNEL. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLUGS FOR THE DEACTIVATION OF THE BURNER STAGING VALVE FUNCTION. SERVICE BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLUGS FOR THE DEACTIVATION OF THE BURNER STAGING VALVE FUNCTION. SERVICE BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - INTRODUCTION OF THE NEW MOUNT HARNESS. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 435 Of 748 @ Camp Systems EFTA00618726 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0240 R2 11-MAR-2005 SB 72-0241 NO. I ENGINE - MODIFICATION OF HARNESSES MOUNTS. SERVICE BULLETIN MOS HRS.11ASC - ENC NO. I ENGINE - NEW LPT NOZZLE SEGMENTS STAGE 2 AND STAGE 3 REWORK. SERVICE BULLETIN MOS HRS.i MSC - ENC SB 72-0241 R1 NO. I ENGINE - NEW LPT NOZZLE SEGMENTS STAGE 2 AND STAGE 3 REWORK. SERVICE BULLETIN MOS 08-JAN-2007 HRS1MSC ENC 25000 (s) SB 72-0242 NO 1 ENGINE - INTRODUCTION OF NEW LONGER BOLTS ON KIT CLOSE OMS BOX ATTACHMENT. SERVICE BULLETIN MOS HRSLISC - ENC NO. I ENGINE - INTRODUCTION OF A BRACKET ASSY ON NO .1 AND NO. 2 BEARING SUPPORT OIL SUPPLY TUBE HOLDING. SERVICE BULLETIN SB 72-0243 SB 72-0244 121 SB 72-0245 SB 72-0246 SB 72-0246 R1 MOS HRS,MSC ENC NO. I ENGINE - POSITIONING MODIFICATION OF 2 CLAMPS ATTACHING THE FUEL TUBE AND THE OIL RETURN TUBE TO FACILITATE THE ENGINE COVER INSTALLATION. SERVICE BULLETIN MOS HRS1MSC - ENC NO. I ENGINE - SPARE PARTS RELEASE CFM56-7B IPC. SERVICE BULLETIN MOS HRSLISC - ENC NO. I ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN MOS HRSLISC - ENC NO. I ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN MOS HRS.11ASC - ENC SB 72-0246 R2 NO. I ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN MOS 11-MAR-2005 HRS1MSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 436 Of 748 Camp Systems EFTA00618727 CAMP fin. thermiewlqi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0247 NO. 1 ENGINE - INTRODUCTION OR REWORK OF THE BRACKET ASSY ON ACCESSORY GEARBOX ATTACHING THE J5 ELECTRIC WIRING HARNESS. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0248 NO.1 ENGINE - REPLACEMENT OR REWORK OF BRACKET ASSY ATTACHING THE MW0301 ELECTRICAL HARNESS ON FLANGE 84. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0249 NO. 1 ENGINE - INTRODUCTION OF NEW SEAL SEGMENTS STAGE 1. 2.3. SERVICE BULLETIN MOS HRS1MSC - ENC SB 72-0249 RI NO. 1 ENGINE - INTRODUCTION OF NEW SEAL SEGMENTS STAGE 1. 2.3. SERVICE BULLETIN MOS 23-OCT-2007 HRSAISC - ENC SB 72-0251 NO. I ENGINE - FAN FRAME ASSEMBLY. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0252 NO. 1 ENGINE - INTRODUCTION OF NEW RADIAL SHAFT SUPPORT GUIDE. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0253 NO. 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE COMPLIED WITH UNDERCUT. SERVICE BULLETIN MOS 07-SEP-2005 HRSfMSC 2202:24 ENC 511 SB 72-0253 RI NO. 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0253 R2 NO. 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0253 R3 NO.1 ENGINE - FAN AND BOOSTER. SERVICE BULLETIN MOS HRSfMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 437 Of 748 @ Camp Systems EFTA00618728 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0253 R4 SB 72-0253 R5 SB 72-0253 R6 SB 72-0254 SB 72-0255 SB 72-0255 RI SB 72-0256 SB 72-0257 SB 72-0258 SB 72-0258 RI NO. I ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS HRSimSC ENC NO 1 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS HR&LISC ENC NO 1 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS HR&P.ISC ENC NO. I ENGINE - INTRODUCTION OF A NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN MOS HRSI.ISC - ENC NO 1 ENGINE - INTRODUCTION OF NEW BRACKET ASSY WITH NEW DESIGN FOR T49.5 HARNESS HOLDING. SERVICE BULLETIN MOS HRS.ISC - ENC NO. I ENGINE - ENGINE ASSEMBLY - INTRODUCTION OF NEW BRACKET ASSY WITH NEW DESIGN FOR 749.5 HARNESS ATTACHMENT. SERVICE BULLETIN MOS HRSIISC - ENC NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HR&P.ISC - ENC NO. I ENGINE - FAN FRAME ASSEMBLY - REPLACEMENT OF TWO BRACKETS ASSY TO ATTACH THE mw0315 AND MW0316 ELECTRICAL HARNESSES. SERVICE BULLETIN MOS HRSI.ISC - ENC NO. I ENGINE - NEW FIRE DETECTION HARNESSES MW0325 AND MW0326. SERVICE BULLETIN MOS HRS.ISC - ENC NO. I ENGINE - NEW FIRE DETECTION HARNESSES MW0325 AND MW0326. SERVICE BULLETIN MOS HRSIISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 438 Of 748 Camp Systems EFTA00618729 CIAWInne Met mini AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC 58 72-0259 SB 72-0259 RI SB 72-O259R2 SB 72-0260 SB 72-O26OR1 SB 72-0261 SB 72-0262 SB 72-0262 RI SB 72-0263 SB 72-0264 SB 72-0265 NO. 1 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR WITH DESIGN IMPROVED OR REWORK. SERVICE BULLETIN MOS HRSAISC ENC NO. 1 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR WITH DESIGN IMPROVED OR REWORK. SERVICE BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS MRS/MSC - ENC NO. 1 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - NEW MW0311 ELECTRICAL HARNESSES. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - NEW MW0311 ELECTRICAL HARNESS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS MRS/MSC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - INTRODUCTION OF NEW LPT SHAFT. SERVICE BULLETIN MOS HRSOASC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 439 Of 748 © Camp Systems EFTA00618730 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 72-0266 NO. I ENGINE - INTRODUCTION OF A NEW ASSY ON FLANGE B4 - CJ13 ELECTRICAL HARNESS HOLDING. SERVICE BULLETIN MOS HRS11.1SC ENC SB 72-0266 RI NO. 1 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY ON FLANGE B4 - CJ13 ELECTRICAL HARNESS HOLDING, SERVICE BULLETIN II-MAR-2005 SB 72-0267 SB 72-0267 RI SB 72-0267 R2 77-DEC-2001 SB 72-0267 R3 SB 72-0268 SB 72-0268 RI SB 72-0268 R2 MOS HRS11.1SC ENC NO. 1 ENGINE - INTRODUCTION OF A NEW LOCKS OF STAGE 2.3 AND 4 BLADES. SERVICE BULLETIN MOS HRS11.1SC - ENC NO.1 ENGINE - FAN AND BOOSTER. SERVICE BULLETIN MOS HRSAISC - ENC NO.1 ENGINE - FAN AND BOOSTER - INTRODUCTION OF A NEW LOCK OF STAGE 2. 3 AND 4 BLADES. SERVICE BULLETIN MOS HRS(P.ISC ENC NO.1 ENGINE - FAN AND BOOSTER - INTRODUCTION OF A NEW LOCK OF STAGE 2. 3 AND 4 BLADES. SERVICE BULLETIN MOS HRS11.1SC ENC NO.1 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL. SERVICE BULLETIN MOS MRS/P.1SC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - INTRODUCTION OF NEW BOOSTER SPOOL. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0268 R3 NO. 1 ENGINE - FAN AND BOOSTER- INTRODUCTION OF THE NEW BOOSTER SPOOL. SERVICE BULLETIN MOS 77-DEC-2001 MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 440 Of 748 @ Camp Systems EFTA00618731 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0269 SB 72-0269 Ri SB 72-0270 SB 72-0271 SB 72-0271 R2 SB 72-0271 R3 SB 72-0271 R4 SB 72-0271 R5 SB 72-0272 SB 72-0273 NO. I ENGINE - FIRE DETECTION HARNESSES MW0325 AND MW0326 TERMINAL LUG REPLACEMENT. SERVICE BULLETIN MOS HRS4.ISC ENC NO 1 ENGINE - FIRE DETECTION HARNESSES MW0325 AND MW0326 TERMINAL LUG REPLACEMENT. SERVICE BULLETIN MOS HRSIASC ENC NO 1 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY-J7 HARNESS HOLDING. SERVICE BULLETIN MOS HRS4.ISC - ENC NO. I ENGINE - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRS4.1SC - ENC NO. I ENGINE - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRS4.1SC - ENC NO. I ENGINE - FAN BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRS(IISC ENC 10000 (s) NO. I ENGINE - FAN BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRSAISC ENC 10000 (s) NO. I ENGINE - FAN AND BOOSTER (72-21.00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRSitiSC - ENC NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN MOS HRS4.1SC - ENC NO. I ENGINE - ROUTING OPTIMIZATION AND REMARKING OF THE HARNESSES kiW0301 AND MW0302. SERVICE BULLETIN MOS HRS4.1SC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time Camp Systems 441 Of 748 EFTA00618732 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0273 R1 NO. 1 ENGINE - ROUTING OPTIMIZATION AND REMARKING OF THE HARNESSES MVV0301 AND MW0302. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0274 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRS/MSC ENC SB 72-0275 NO. 1 ENGINE - NO.1 AND NO. 2 BEARING SUPPORT - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY AIRFOIL SEAL. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0275 RI NO.1 ENGINE - NO.1 AND NO. 2 BEARING SUPPORT ASSEMBLY - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0276 NO. 1 ENGINE -SPARE PARTS FOR CFM56-78. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0277 NO. 1 ENGINE - INTRODUCTION OF NEW OIL COLLECTOR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0278 NO. 1 ENGINE - INTRODUCTION OF HPT/LPT NOZZLE SHROUD ASSEMBLY 9324M62G05 AND HPT NOZZLE SHROUD SUPPORT 2002M69G03. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0279 NO. 1 ENGINE - INTRODUCTION OF NEW HPT STATOR AIR MANIFOLD. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0280 NO. 1 ENGINE - INTRODUCTION OF NEW PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0281 NO. 1 ENGINE - HARDWARE TRANSFER TO ENGINE LEVEL FROM CORE LEVEL. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 442 Of 748 @ Camp Systems EFTA00618733 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0283 NO. 1 ENGINE - GENERAL - INTRODUCTION OF CLAMP AND ATTACHING BOLT OF MW0325 HARNESS. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0284 NO. 1 ENGINE - TRANFER OF THE VBV ACTUATORS FROM THE FAN FRAME LEVEL TO THE ENGINE ASSEMBLY LEVEL. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0284 R1 NO. 1 ENGINE - TRANSFER OF THE VBV ACTUATORS FROM THE FAN FRAME LEVEL TO THE ENGINE ASSEMBLY LEVEL. SERVICE BULLETIN II-MAR-2005 SB 72-0285 SB 72-0285 R1 SB 72-0285 R2 SB 72-0286 RI SB 72-0286 R2 SB 72-0287 SB 72-0287 RI MOS HRS/MSC ENC NO. 1 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL THICKNESS INCREASED.. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL THICKNESS INCREASED. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL THICKNESS INCREASED. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - TURBINE LOW PRESSURE. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - INTRODUCTION OF A NEW LPT BLADE STAGE 1. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - ENGINE(72-00-00) - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN MOS MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 443 Of 748 @ Camp Systems EFTA00618734 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0287 R2 NO. I ENGINE - ENGINE - ENGINE(72-O0-00) - ACCIDENT INVOLVED HARDWARE (SUPERSEDED BY SB 72-0287 R3). SERVICE BULLETIN SUPERSEDED MOS HRS/MSC ENC SB 72-0287 R3 NO. I ENGINE - ENGINE - ENGINE (72-00-00) - ACCIDENT INVOLVED HARDWARE (SUPERSEDED BY 58 72-0287 R4). SUPERSEDED SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0287 R4 NO. I ENGINE - ENGINE - ENGINE (72-00-00) - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN INFORMATIONAL MOS I5-OCT-2013 HRS/MSC - ENC SB 72-0288 NO. 1 ENGINE - INTRODUCTION OF NEW HPT INNER STATOR STATIONARY SEAL HEAT SHIELD TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0289 NO. 1 ENGINE - INTRODUCTION OF ALTERNATE INNER DOME. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0290 NO. 1 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0290 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0291 NO. I ENGINE - TRANSFER GEARBOX. SERVICE BULLETIN MOS HRS/S1SC ENC SB 72-0291 R1 NO. I ENGINE - TRANSFER GEARBOX - INSPECTION OF A SPECIFIC POPULATION OF OUTER RADIAL DRIVE SHAFT. SERVICE BULLETIN MOS HRS/S1SC ENC SB 72-0291 R2 NO. I ENGINE - TRANSFER GEARBOX - INSPECTION OF A SPECIFIC POPULATION OF OUTER RADIAL DRIVE SHAFT. SERVICE BULLETIN MOS HRSfMSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 444 Of 748 @ Camp Systems EFTA00618735 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0292 NO. I ENGINE - LOW PRESSURE TURBINE SHAFT - DELETION OF THE PRELIMINARY ATTACHMENT SYSTEM OF THE AIR'OIL SEAL TO THE LPT SHAFT. SERVICE BULLETIN MOS HR&MSC - ENC SB 72-0292 R1 NO. I ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT (72-55-00) - DELETION OF THE PRELIMINARY ATTACHMENT SYSTEM OF THE AINOIL SEAL OF THE LPT SHAFT. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 72-0293 NO 1 ENGINE - INTRODUCTION OF A SELF LOCKING BORESCOPE CAP ASSEMBLY. SERVICE BULLETIN MOS HRSitISC - ENC SB 72-0293 R1 NO. I ENGINE - TURBINE LOW PRESSURE (72-54-00) - INTRODUCTION OF SELF LOCKING BORESCOPE CAP ASSEMBLY. SERVICE BULLETIN MOS HRSIISC ENC SB 72-0294 NO 1 ENGINE - INTRODUCTION OF STAINLESS STEEL NUTS TO REPLACE CADMIUM PLATING NUTS. SERVICE BULLETIN MOS HRSIISC ENC SB 72-0295 NO 1 ENGINE - FAN AND BOOSTER (72-21-00) INSPECTION OF THE BOOSTER SPOOL (SUPERSEDED BY 72-0295 R1). SUPERSEDED SERVICE BULLETIN MOS HRSilISC ENC SB 72-0295 R1 NO 1 ENGINE - FAN AND BOOSTER (72-21.00) INSPECTION OF THE BOOSTER SPOOL (SUPERSEDED BY 72-0295 R2). SUPERSEDED SERVICE BULLETIN MOS HRSAISC -(s) ENC SB 72-0295 R3 NO. I ENGINE - FAN AND BOOSTER (72-21.00) INSPECTION OF THE BOOSTER SPOOL. SERVICE BULLETIN MOS 22-JUN-2007 HRS,IISC ENC 15000 (s) SB 72-0296 NO. I ENGINE - FAN AND BOOSTER (SUPERSEDED BY 72-0296 RI ). SERVICE BULLETIN SUPERSEDED MOS HRSI.ISC - ENC SB 72-0296 R1 NO. I ENGINE - FAN AND BOOSTER (SUPERSEDED BY 72-0296 R2). SERVICE BULLETIN SUPERSEDED MOS HRSitISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 445 Of 748 Camp Systems EFTA00618736 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0296 R2 NO. I ENGINE - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R3). SUPERSEDED SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0296 R3 NO. 1 ENGINE - INTRODUCTION OF COUNTER WEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R4). SUPERSEDED SERVICE BULLETIN MOS HRS/MSC - (s) ENC SB 72-0296 R4 NO. I ENGINE - FAN AND BOOSTER. INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL.(SUPERSEDED SUPERSEDED BY 72-0296 R5). SERVICE BULLETIN MOS MRS/P.1SC - (s) ENC 513 72-0296 R5 NO. 1 ENGINE - FAN AND BOOSTER - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R6). SERVICE BULLETIN MOS I7-DEC-2001 MRS/P.1SC ENC 7000 (s) SB 72-0296 R6 NO. 1 ENGINE - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R7). SUPERSEDED SERVICE BULLETIN MOS HRS/MSC - (s) ENC 513 72-0296 R7 NO. I ENGINE - ENGINE -FAN AND BOOSTER (72-21-00) - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL. SERVICE BULLETIN MOS HRS/MSC ENC 7000 (s) SB 72-0297 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED MOS MRS/P.1SC ENC SB 72-0298 NO. 1 ENGINE - NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN MOS HRS/PASC - ENC SB 72-0298 RI NO. 1 ENGINE - FAN FRAME ASSEMBLY - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0298 R2 NO. 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00)- INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 446 Of 748 @ Camp Systems EFTA00618737 CIMP Asiant.Inne Attn....14C AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0298 R3 NO. ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN MOS HRS4ASC ENC SB 72-0299 NO. I ENGINE - . SERVICE BULLETIN CANCELLED MOS HRSIMSC ENC SB 72-0300 NO. I ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-O300R1 NO 1 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0300 R2 NO 1 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE. SERVICE BULLETIN MOS HRS4.ISC - ENC SB 72-0300 R3 NO. ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FORWARD FLANGE. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0300 R4 NO. I ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FORWARD FLANGE. SERVICE BULLETIN MOS HRSIMSC ENC SB 72-0301 NO. I ENGINE - . SERVICE BULLETIN CANCELLED MOS HRSMSC ENC SB 72-0302 NO. I ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS4.ISC - ENC SB 72-0303 NO. I ENGINE - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN MOS HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 447 Of 748 Camp Systems EFTA00618738 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0303 R1 NO. 1 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0304 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00)-ON-WING BORESCOPE INSPECTION OF THE COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN MOS 13-NOV-2001 HRS/MSC 1700 (s) ENC SB 72-0304 R1 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00)- ON-WING BORESCOPE INSPECTION OF THE COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN MOS HRS/MSC 15000 (s) ENC SB 72-0304 R2 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00)- ON-WING BORESCOPE INSPECTION OF THE COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN MOS HRS/MSC 15000 (s) ENC SB 72-0304 R3 NO.1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00)-ON-WING BORESCOPE INSPECTION OF THE RECOMMENDED COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN MOS 20-MAR-2007 HRS/MSC 15000 (s) ENC SB 72-0305 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0306 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0308 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/81. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0309 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7624/81. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0310 NO.1 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 448 Of 748 @ Camp Systems EFTA00618739 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0311 24-JAN-2001 NO. 1 ENGINE - (PT SHAFT - REPLACEMENT OF THE NO.4 ROLLER BEARING. SERVICE BULLETIN MOS HRSPISC ENC SB 72-0312 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRSPISC ENC SB 72-0313 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRS/hISC ENC SB 72-0314 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRSPASC ENC SB 72-0315 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSPASC - ENC SB 72-0316 NO. 1 ENGINE - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS HRSPASC - ENC SB 72-0316 RI NO. 1 ENGINE - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS HRSPASC - ENC SB 72-0316 R2 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS HRSPASC - ENC SB 72-0316 R3 NO. I ENGINE - ENGINE - GENERAL (72-00-00)- REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS HRSPASC - ENC SB 72-0316R4 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS 24-JUN-2011 HRSPISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 449 Of 748 @ Camp Systems EFTA00618740 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0317 NO. 1 ENGINE - SPARE PARTS INTRODUCTION. SERVICE BULLETIN CANCELLED MOS HRSAISC - ENC SB 72-O318 NO. 1 ENGINE - APPLICATION OF ROOM TEMPERATURE VULCANIZING (RTV) ON THE FAN BLADE RETAING FLANGE. SERVICE BULLETIN MOS MRS/51SC ENC SB 72-O318 RI NO. 1 ENGINE - APPLICATION OF ROOM TEMPERATURE VULCANIZING (R1V) ON THE FAN BLADE RETAINING FLANGE. SERVICE BULLETIN MOS MRS/51SC ENC SB 72-0319 NO. 1 ENGINE - INTRODUCTION OF A MILLED COMBUSTION CASE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0319 RI NO. 1 ENGINE - INTRODUCTION OF A MILLED COMBUSTION CASE. SERVICE BULLETIN MOS 10-DEC-2007 HRSAISC - ENC SB 72-0320 NO. 1 ENGINE - INTRODUCTION OF THE NEW REAR FLANGE AS ALTERNATE ON THE LPT NOZZLE STAGE 1. SERVICE BULLETIN MOS MRS/MSC ENC SB 72-0321 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRSAISC ENC SB 72-0322 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0322 RI NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 20-NOV-2006 MRS/51SC - ENC SB 72-0323 NO. 1 ENGINE - REPLACEMENT OF THE AIR MANIFOLD. SERVICE BULLETIN MOS MRS/51SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 450 Of 748 @ Camp Systems EFTA00618741 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0323 R1 NO. I ENGINE - REPLACEMENT OF THE AIR MANIFOLD. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0324 NO. I ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0324 R2 NO. I ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN MOS HRSiI.ISC - ENC SB 72-0324 R3 NO. I ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN MOS HRS.ISC - ENC SB 72-0324 R5 NO. I ENGINE - ENGINE - FAN AND BOOSTER (72-21.00) - INTRODUCTION OF REWORKED FAN DISKS AND NEW OPTIONAL SPACERS AND SHIMS. SERVICE BULLETIN MOS 03-JAN-202 HRS.ISC - ENC SB 72-0325 NO. I ENGINE - ELASTOMER AXIAL STOP PIN. SERVICE BULLETIN MOS HRS.ISC - ENC SB 72-0325 R1 NO. I ENGINE - ELASTOMETER AXIAL STOP PIN. SERVICE BULLETIN MOS HRSiI.ISC - ENC SB 72-0325 R2 NO. I ENGINE - INTRODUCTION OF ELASTOMETER AXIAL STOP PIN INSTEAD OF RTV ON THE FAN BLADE RETAINING FLANGE. SERVICE BULLETIN MOS 17-DEC-2001 HRSLISC ENC SB 72-0325 R3 NO. I ENGINE - INTRODUCTION OF ELASTOMETER AXIAL STOP PIN INSTEAD OF RTV ON THE FAN BLADE RETAINING FLANGE. SERVICE BULLETIN MOS HRS1P.ISC ENC SB 72-0326 NO. I ENGINE - ON-WING BORESCOPE INSPECTION OF HPT BLADES. SERVICE BULLETIN COMPLIED WITH MOS 22-AUG-2C08 RECURRING 14-NOV-2C01 HRS1.ISC 3260:48 ENC WOO 7.16 1746 ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 451 Of 748 Camp Systems EFTA00618742 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0327 NO. I ENGINE - ENGINE - GENERAL - INSTALLATION OF A SAFETY WIRE OVER THE OIL TEMPERATURE PROBE HOUSING. SERVICE BULLETIN SB 72-0328 SB 72-0328 Fei SB 72-0329 SB 72-0330 SB 72-0330 R1 SB 72-0331 SB 72-0332 SB 72-0332 R1 SB 72-0333 MOS HRSI.ISC ENC NO 1 ENGINE - REDUCE INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR OliiS INSPECTION. SERVICE BULLETIN MOS HRS4ISC ENC NO 1 ENGINE - REDUCE INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DMS INSPECTION. SERVICE BULLETIN MOS HRS,IISC ENC NO. I ENGINE - REPLACEMENT OF NO. 4 ROLLER BEARING 305-355-717-0. SERVICE BULLETIN MOS HRS.ISC - ENC NO. I ENGINE - INSPECTION AND REPLACEMENT OF THE IDENTIFICATION PLATE. SERVICE BULLETIN MOS HR&MSC - ENC NO 1 ENGINE - INSPECTION AND REPLACEMENT OF THE IDENTIFICATION PLATE. SERVICE BULLETIN MOS HRSi siSC - ENC NO 1 ENGINE - DELETION OF BURNER STAGING VALVE PARKING BRACKET. SERVICE BULLETIN MOS HRSisiSC - ENC NO 1 ENGINE - INTRODUCTION OF NEW VSV INNER BUSHING AND WASHERS. SERVICE BULLETIN MOS HR&MSC - ENC NO. I ENGINE - COMPRESSOR FRONT STATOR - INTRODUCTION OF NEW VSV INNER BUSHINGS AND WASHERS. SERVICE BULLETIN MOS HRSAISC ENC NO 1 ENGINE - CORE MODULE AND FAN MODULE. SERVICE BULLETIN MOS HRSi P.ISC - ENC CANCELLED ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 452 Of 748 Camp Systems EFTA00618743 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0333 R1 NO. 1 ENGINE - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0333 R2 NO. 1 ENGINE - CORE MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE HOLES. SERVICE BULLETIN MOS HRSOASC - ENC SB 72-0333 R3 NO. 1 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0333 R4 NO.1 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0334 NO.1 ENGINE - FAN MAJOR MODULE - INTRODUCTION OF A 4-5 O'CLOCK LPYACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0334 R1 NO. 1 ENGINE - INTRODUCTION OF A 4-5 O'CLOCK LPTACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0334 R2 NO. 1 ENGINE - INTRODUCTION OF A 4-5 O'CLOCK LPT ACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED. SERVICE BULLETIN MOS II-MAR-2005 HRS/MSC ENC SB 72-0335 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0336 NO. 1 ENGINE - INSTALLATION OF SAFETY WIRE OVER THE OIL TEMPERATURE PROBE AND HOUSING. SERVICE COMPLIED WITH BULLETIN MOS 07-JUL-2001 HRS/MSC - 782 ENC 54 SB 72-0337 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-78. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 453 Of 748 @ Camp Systems EFTA00618744 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0337 RI SB 72-0338 SB 72-0338 RI SB 72-O339 SB 72-O340 SB 72-O341 SB 72-O341 RI SB 72-0342 SB 72-0342 RI SB 72-0343 SB 72-0344 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - ENGINE FAN AND BOOSTER SPARE PARTS RELEASE FOR CFM56-7B. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - ENGINE FAN AND BOOSTER SPARE PARTS RELEASE FOR CFM56-7B . SERVICE BULLETIN MOS HRS1P.ISC ENC NO. 1 ENGINE - LPT FRAME - REPLACEMENT OF THE CURRENT OIL SUPPLY TUBE BY A REMOVABLE TUBE. SERVICE BULLETIN MOS HRSAISC ENC NO. 1 ENGINE - TURBINE FRAME. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - INTRODUCTION OF BOLTS FOR FUEL TUBE CLAMPS. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - INTRODUCTION OF BOLTS FOR FUEL TUBE CLAMPS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - DELETION OF STAGE 6-8 VANE SECTOR END BLOCKS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - DELETION OF STAGE 6-8 VANE SECTOR END BLOCKS. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - INTRODUCTION OD IMPROVED HPT ROTOR SPOOL WEIGHTS FOR STAGES 6-9. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE SPACER OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 454 Of 748 @ Camp Systems EFTA00618745 CIMP Asiant.Inne Attn....14C AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0344 RI SB 72-0345 RI SB 72-0345 R2 SB 72-0346 SB 72-0346 RI SB 72-0346 R2 02-MAR-2006 NO. I ENGINE - INTRODUCTION OF A NEW FAN BLADE SPACER OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRS'MSC - ENC NO. I ENGINE - TURBINE LOW PRESSURE ( 72-54-00)- INTRODUCTION OF NEW LPT NOZZLE SEGMENTS STAGE 2 AND A NEW SEALING PLATE. SERVICE BULLETIN MOS HRS;LISC ENC NO. I ENGINE - TURBINE LOW PRESSURE ( 72-54-00)- INTRODUCTION OF NEW LPT NOZZLE SEGMENTS STAGE 2 AND A NEW SEALING PLATE. SERVICE BULLETIN MOS HRS.,MSC ENC NO 1 ENGINE - ENGINE - TURBINE LOW PRESSURE - (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS ON THE LPT STAGE I. SERVICE BULLETIN MOS HRS,MSC ENC NO 1 ENGINE - ENGINE - TURBINE LOW PRESSURE - (72-54-CO) - REPLACEMENT OF BLADES AND DEFLECTORS ON THE LPT STAGE I. SERVICE BULLETIN MOS HRSMSC - ENC NO. I ENGINE - ENGINE - TURBINE LOW PRESSURE (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS OF THE LPT STAGE I. SERVICE BULLETIN MOS HRS'MSC - ENC SB 72-0347 NO. I ENGINE - ENGINE - INTRODUCTION OF NEW BALANCING CLIPS ON LPT STAGE 4. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0347 RI NO 1 ENGINE - INTRODUCTION OF NEW BALANCING CLIPS ON LPT STAGE 4 BLADES. SERVICE BULLETIN MOS HRS'MSC - ENC SB 72-0348 NO. I ENGINE - SPARE PARTS RELEASE FOR CRI56-7B IPC. SERVICE BULLETIN MOS HRS'MSC - ENC SB 72-0349 NO. I ENGINE - SPARE PARTS RELEASE FOR CRI56-7B IPC. SERVICE BULLETIN MOS HRS'MSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 455 Of 748 Camp Systems EFTA00618746 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0350 NO. I ENGINE - ENGINE - NIGH PRESSURE TURBINE NOZZLE - INTRODUCTION OF FIELD REWORK FOR HPT AIR MANIFOLD. SERVICE BULLETIN MOS HRS.P.ISC - ENC SB 72-0350 R1 NO. I ENGINE - INTRODUCE A FIELD REWORKED AIR HPT STATOR MANIFOLD PIN 2071M29G02. SERVICE BULLETIN 30-JAN-2009 MOS HRS'MSC - ENC SB 72-0351 RI NO. I ENGINE - INTRODUCTION OF HIGH PRESSURE TURBINE BLADE KIT 737L325G03 AND HPT BLADE 1957M10P01. SERVICE BULLETIN SB 72-0352 SB 72-0352 R1 SB 72-0353 SB 72-0354 SB 72-0355 SB 72-0355 R1 04-AUG-2C05 SB 72-0356 MOS HRSIASC ENC NO 1 ENGINE - INTRODUCTION OF NEW NO. 4 ROLLER BEARINGS WITH NEW OUTER RACE MATERIALS. SERVICE BULLETIN MOS HRS'MSC - ENC NO 1 ENGINE - INTRODUCTION OF NEW NO. 4 ROLLER BEARINGS WITH NEW OUTER RACE MATERIALS. SERVICE BULLETIN MOS HR&MSC - ENC NO. I ENGINE - FAN AND BOOSTER (12-21-O0) - INTRODUCTION OF A NEW FAN BLADE PLATFORM DESIGN 340-001414-0. SERVICE BULLETIN MOS HRS'MSC - ENC NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS.ISC - ENC NO 1 ENGINE - INTRODUCTION OF NEW BRACKETS ASSY ON THE AIR COOLING MANIFOLD ASSY UP AND DOWN. SERVICE BULLETIN MOS HRSI.ISC ENC NO. I ENGINE - INTRODUCTION OF NEW BRACKETS ASSY ON THE AIR COOLING MANIFOLD ASSY UP AND DOWN. SERVICE BULLETIN MOS HRSimSC ENC NO. I ENGINE - . SERVICE BULLETIN MOS HRS'MSC ENC CANCELLED ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 456 Of 748 Camp Systems EFTA00618747 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0357 R1 NO. 1 ENGINE - INTRODUCTION OF NO. 4 STRUT FAIRING WITH NEW MATERIAL ( STEEL VERSION). SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0358 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY WITH AN OBLONG HOLE AND REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSLMSC - ENC SB 72-0359 NO. 1 ENGINE - INTRODUCTION OF NEW LPT REAR FRAME AND NEW OIL COLLECTOR WITH DELETION OF 16 HOLES AND BOLTS OUT OF 32, SERVICE BULLETIN MOS HRSLMSC ENC SB 72-0360 NO. 1 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRS/MSC ENC SB 72-0361 NO. 1 ENGINE - INTRODUCTION OF A NEW IDENTIFICATION PLATE WITH A 2D BARRED MANUFACTURER CODE. SERVICE BULLETIN MOS HRSLMSC ENC SB 72-0362 NO. 1 ENGINE - INTRODUCTION OF NEW AFT ACOUSTICAL PANEL ASSEMBLY AT IDG AIR / OIL COOLER LOCATION. SERVICE BULLETIN MOS HRSLMSC ENC SB 72-0363 NO. 1 ENGINE - INTRODUCTION OF NEW STAGE 4 LOCKING BLADES. SERVICE BULLETIN MOS HRSLMSC - ENC SB 72-0363 RI NO. 1 ENGINE - INTRODUCTION OF NEW STAGE 4 LOCKING BLADES. SERVICE BULLETIN MOS 22-APR-2005 HRS/MSC - ENC SB 72-0364 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSLMSC - ENC SB 72-0365 NO. 1 ENGINE - REPLACEMENT OF BRACKETS BY NEW ONES WITH ERROR PROOFING DEVICE INSTALLATION. SERVICE BULLETIN MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 457 Of 748 @ Camp Systems EFTA00618748 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0365 R1 NO. 1 ENGINE - REPLACEMENT OF BRACKETS BY NEW ONES WITH ERROR PROOFING DEVICE INSTALLATION. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0366 NO. 1 ENGINE - REPLACEMENT OF FAN RETAINING FLANGE OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0366 R1 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - REPLACEMENT OF THE FAN RETAINING FLANGE OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0367 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0368 R1 NO. 1 ENGINE -ENGINE-ACCESSORY GEARBOX (72-63-00) - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0368 R2 NO. I ENGINE -ENGINE-ACCESSORY GEARBOX ASSEMBLY (7263-00)- REPLACEMENT OF BALL BEARING 340-052-602-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS 25-SEP-2006 HRSAISC - ENC SB 72-0368 R3 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (7243-00) - REPLACEMENT OF BALL BEARING SUPERSEDED 340-052-602-0 IN A SUSPECT LOT (SUPERSEDED BY SB 72-0368 R4), SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0368 R4 NO. 1 ENGINE - ACCESSORY GEARBOX ASSEMBLY (7243-00) - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS I8-OCT-2013 HRS/MSC ENC SB 72-0369 NO.1 ENGINE - VGB GUIDE PAD INSPECTION. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0371 R1 NO.1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 458 Of 748 @ Camp Systems EFTA00618749 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0372 NO. 1 ENGINE - OIL TEMP PROBE SAFETYWIRE. SERVICE BULLETIN COMPUED WITH MOS 22-AUG-2008 HRSAISC - 3260:48 ENC 746 SB 72-0374 NO.1 ENGINE - FAN AND BOOSTER - TIGHTENING OF BOOSTER SPOOL FOWARD PINS. SERVICE BULLETIN MOS HRSAISC ENC 1500 (s) SB 72-0375 NO. 1 ENGINE - HPT REAR SHAFT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0376 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0379 NO.1 ENGINE - ENGINE-HIGH PRESSURE TURBINE NOZZLE ( 72-51-00 )- REAR SUPPORT NUT SHIELD MATERIAL CHANGE. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0380 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0381 NO. 1 ENGINE - INTRO HPC STG 4 BLADE KIT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0381 RI NO. 1 ENGINE - INTRODUCTION OF STAGE 4 BLADE KIT TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0382 NO. 1 ENGINE - REPLACEMENT OF NEW NO.5 ROLLER BEARING WITH AN OUTER RACE MODIFIED TO INCREASE THE THICKNESS OF THE OIL FILM OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0382 RI NO. 1 ENGINE - INTRODUCTION OF NEW NO.5 ROLLER BEARING WITH AN OUTER RACE MODIFIED TO INCREASE THE THICKNESS OF THE OIL FILM OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS MRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 459 Of 748 @ Camp Systems EFTA00618750 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SS 72-0383 NO. 1 ENGINE - TURBINE LOW PRESSURE - BORESCOPE INSPECTION FOR STAGE 1 LPT BLADE POSITION. SERVICE BULLETIN MOS HRS/MSC ENC 800(s) SB 72-0384 NO.1 ENGINE - FAN AND BOOSTER - ONE TIME INSPECTION FOR RETAINING FLANGE THREADED PIN PRESENCE. SERVICE BULLETIN MOS HRS/MSC 5000 (s) ENC 3000 SB 72-0385 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0386 NO. 1 ENGINE -FAN AND BOOSTER -ONE TIME TIGHTENING OF FOWARD BOOSTER SPOOL PINS. SERVICE BULLETIN SUPERSEDED MOS HRS/MSC - (s) ENC SB 72-0386 R1 NO.1 ENGINE -FAN AND BOOSTER -ONE TIME TIGHTENING OF FOWARD BOOSTER SPOOL PINS. SERVICE BULLETIN MOS HRSfMSC ENC 1500 (s) SB 72-0388 NO. 1 ENGINE - HPTR FRT DAMPER SLEEVE INSPECT. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0389 NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR (72-52-00)- INTRODUCTION OF HIGH PRESSURE TURBINE BLADE PM I957M72P01 AND PM 1957M72P02 THROUGH FIELD REWORK. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0390 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0391 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - DRAIN TUBE REDUCER ELIMINATION, SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0392 NO. I ENGINE - ENGINE - CORE ENGINE MAJOR MODULE (72-00-02) - FUEL NOZZLE BOLT LENGTH. SERVICE BULLETIN MOS MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 460 Of 748 @ Camp Systems EFTA00618751 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0392 R1 NO. I ENGINE - FUEL NOZZLE BOLT LENGTH OPTIMIZATION. SERVICE BULLETIN MOS I I -JAN-2007 HRS/MSC - ENC SB 72-0392 R2 NO. 1 ENGINE - FUEL NOZZLE BOLT LENGTH OPTIMIZATION. SERVICE BULLETIN I3-JUN-2007 MOS HRS/MSC - ENC SB 72-0393 NO. I ENGINE - ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF A NEW CFM56-7627A ACCESSORY GEARBOX ASSY. SERVICE BULLETIN MOS HRS'MSC ENC SB 72-0393 R1 SB 72-0394 SB 72-0395 SB 72-0395 R1 SB 72-0396 SB 72-0396 R1 SB 72-0396 R2 NO. I ENGINE - ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF A NEW CFM56-7627A ACCESSORY GEARBOX ASSY. SERVICE BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE - BRACKET HARDWARE ELIMINATION. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - REMOVAL AND REPLACEMENT OF NO.4 ROLLER BEARING 340-167-901-0. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - REMOVAL AND REPLACEMENT OF NO.4 ROLLER BEARING 340-167-901-0. SERVICE BULLETIN MOS HRS/MSC - ENC NO. I ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 461 Of 748 @ Camp Systems EFTA00618752 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0398 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0399 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0399 RI NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0000 NO. 1 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARING IN FIELD. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0000 RI NO. 1 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARING IN FIELD. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0000 R2 NO. 1 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARINGS IN SUPERSEDED FIELD (SUPERSEDED BY 72-0000 R3). SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0000 R3 NO. 1 ENGINE - LPT SHAFT ASSEMBLY (72-55-00) - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARINGS IN FIELD. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0001 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0002 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0003 NO. 1 ENGINE - HIGH PRESSURE TURBINE ROTOR REAR SHAFT WITH IMPROVED DAMPING. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 462 Of 748 @ Camp Systems EFTA00618753 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0404 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSiliSC - ENC SB 72-0411 NO. I ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSUMSC - ENC SB 72-0414 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 07-JUL-2008 HRSUMSC - ENC SB 72-0415 NO. I ENGINE - SPARE PARTS RELEASE FOR CF56-78 IPC. SERVICE BULLETIN MOS 20-DEC-2002 HRSUMSC - ENC SB 72-0417 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRS.IISC - ENC SB 72-0419 NO. I ENGINE - SPARE PARTS FOR CFm56-78 IPC. SERVICE BULLETIN MOS HRS.IISC - ENC SB 72-0420 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN MOS HRSUMSC - ENC SB 72-0421 NO. I ENGINE - INTRODUCTION OF HPC REAR STATOR 18871417601. SERVICE BULLETIN MOS HRSiliSC - ENC SB 72-0422 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN MOS 23-NOV-2009 HRSLISC - ENC SB 72-0423 NO. I ENGINE - TURBINE LOW PRESSURE (72-54-00) - REPLACEMENT OF BROKEN STUD OF T49.5 EGT SENSOR RETAINING PLATE. SERVICE BULLETIN MOS HRSLISC ENC SB 72-0423 R1 NO. I ENGINE - ENGINE - LPT ROTOFuSTATOR ASSEMBLY (72-54-00) - REPLACEMENT OF BROKEN STUD OF T49.5 EGT SENSOR RETAINING PLATE. SERVICE BULLETIN MOS 02-SEP-2011 HRSAISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time Camp Systems 463 Of 748 EFTA00618754 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0425 NO. 1 ENGINE - ENGINE-GENERAL-SPARE PARTS RELEASE FOR CFM56-7 PC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0427 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0429 NO. 1 ENGINE - ACCESSORY GEARBOX (72-63-00)- INTRODUCTION OF N2 SENSOR ADJUSTMENT SHIM SCREWS. SERVICE BULLETIN MOS HR/MSC ENC SB 72-0431 NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00)-INTRODUCTION OF IMPROVED DOUBLE ANNULAR COMBUSTION (DAC) CHAMBER INNER LINER. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0432 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56.78 IPC. SERVICE BULLETIN MOS 08-APR-2008 HRSAISC - ENC SB 72-0433 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0434 NO. 1 ENGINE - COMBUSTION CHAMBER (72-42-00) PIN AND MATING SLOT ELIMINATION. SERVICE BULLETIN MOS HRS/LISC - ENC SB 72-0435 NO. 1 ENGINE -CORE ENGINE MAJOR MODULE (72-00-02)- INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0436 NO. I ENGINE - ENGINE FUEL AND CONTROL ( 73-00-00)- FUEL SPRAY SHIELD MATERIAL IMPROVEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0437 NO. 1 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 464 Of 748 @ Camp Systems EFTA00618755 CORP AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC 58 72-0438 10-APR-2006 58 72-0439 SB 72-0439 R1 28-APR-2003 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE -FAN FRAME ASSEMBLY ( 72-23-00 ) - MODIFICATION OF HARDWARE FOR THE NEW BOEING FIRE DETECTION ROUTING. SERVICE BULLETIN MOS MRS/61SC ENC NO. 1 ENGINE -FAN FRAME ASSEMBLY ( 72-23-00 ) - MODIFICATION OF HARDWARE FOR THE NEW BOEING FIRE DETECTION ROUTING. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0440 R1 NO.1 ENGINE - ENGINE (72-00-00) - IDG AIRFOIL COOL ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP INSPECTION OF FAN FRAME SHROUD.. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0440 R3 NO.1 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIR/OIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0440 R4 NO.1 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIR/OIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRS/MSC - ENC 58 72-0440 R6 NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIRFOIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS 25-SEP-2006 HRS/MSC DUE ENC SB 72-0441 NO. 1 ENGINE - ENGINE - HIGH PRESSURE TURBINE SHROUD AND LOW PRESSURE TURBINE NOZZLE STAGE 1 (72-53-00) - INTRODUCTION OF A NEW FRONT FLANGE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0442 NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE SHROUD AND LOW PRESSURE TURBINE NOZZLE STAGE 1 (72-53-00) - INTRODUCTION OF A NEW REAR FLANGE. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 465 Of 748 @ Camp Systems EFTA00618756 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0442 R1 NO. ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW REAR FLANGE ON THE LPT STAGE I NOZZLE. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0444 NO. ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 30-N0v-2666 HRS.1SC - ENG SB 72-0445 NO. ENGINE - ENGINE-TRANSFER GEARBOX (72-62-00) - REPLACEMENT OF BALL BEARING 340.052-502-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0446 NO. 1 ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSASC - ENG SB 72-0446 R1 NO. ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 30.4MAY-2CC6 HRSIASC - ENG SB 72-0447 NO. ENGINE - HIGH PRESSURE COMPRESSOR (72-31.00) - BLADE AND VANE IMPROVEMENT. SERVICE BULLETIN MOS HRSIASC - ENC SB 72-0447 R1 NO. ENGINE - IMPROVE THE DURABILITY OF THE HPC BLADES AND VANES. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0448 NO. ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0449 NO. ENGINE - SPARE PARTS RELEASE FOR CFA156-7B IPC. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0449 R1 NO. I ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CF1A56-78 IPC. SERVICE BULLETIN MOS 26-JUN-2008 HRSIASC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 466 Of 748 Camp Systems EFTA00618757 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0450 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FAN RETAINING FLANGE PINS AND FAN DISK MID-FLANGE LOG PINS ON ALL CFM56078 ENGINES. SERVICE BULLETIN MOS HRS/MSC 5000 (s) ENC 3000 SB 72-0450 RI NO. I ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FAN RETAINING FLANGE PINS AND FAN DISK MID-FLANGE LUG PINS ON ALL CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC 5000 (s) ENC 3000 SB 72-0451 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FORWARD BOOSTER SPOOL PINS ON CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC ENC 1500 (s) SB 72-0451 RI NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FORWARD BOOSTER SPOOL PINS ON CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC ENC 1500 (s) SB 72-0452 NO. I ENGINE - ENGINE - TURBINE LOW PRESSURE (72-54-00) - IN SHOP VISUAL INSPECTION OF STAGE 2 NOZZLE SEGMENTS FOR AXIAL CRACKS ON AIRFOIL LEADING EDGE. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0452 RI NO. 1 ENGINE - IN SHOP VISUAL INSPECTION OF STAGE 2 NOZZLE SEGMENTS FOR AXIAL CRACKS ON AIRFOIL LEADING EDGE. SERVICE BULLETIN MOS HRS/MSC ENC 9000 (s) SB 72-0453 NO. 1 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/S1SC - ENC SB 72-0454 NO. 1 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO PREVENT THE CORROSION. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0454 RI NO. 1 ENGINE - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO PREVENT THE CORROSION IN FIELD ONLY. SERVICE BULLETIN MOS 06-DEC-2007 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 467 Of 748 @ Camp Systems EFTA00618758 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0454 R2 01-JUL-2039 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER (72-21.00) - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO PREVENT THE CORROSION IN FIELD ONLY. SERVICE BULLETIN MOS HRS.,LISC - ENC SB 72-0455 NO. 1 ENGINE - COMBUSTION CHAMBER (72-42-00)- SwIRLERS - THICK FLANGE (SUPERSEDED BY SB 72-0455 RI). SERVICE BULLETIN MOS HRSIASC ENC SB 72-0455 R1 NO. 1 ENGINE - COMBUSTION CHAMBER (72-42-00) - SwiRLERS - THICK FLANGE. SERVICE BULLETIN CATEGORY 7 MOS 02-MAY-2014 HRS,LISC - ENC SB 72-0457 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRS,IISC - ENC NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRSitISC - ENC NO. I ENGINE - ENGINE - GENERAL (72-00-OD) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRSilISC - ENC NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRS,LISC - ENC NO. I ENGINE - ENGINE - HPT ROTOR (72-52-00) - NEW DISK WITH IMPROVED LIFE DESIGN. SERVICE BULLETIN MOS HRS.4.ISC - ENC SB 72-0459 SB 72-0460 SB 72-0460 R1 SB 72-0461 SB 72-0462 SB 72-0462 R1 27-AUG-2C08 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW MW0312 HARNESS WITH A NEW DP1204 CONNECTOR AND REWORK OF THE OLD HARNESS. SERVICE BULLETIN MOS HRSI.ISC - ENC NO. I ENGINE - INTRODUCTION OF A NEW MW0312 HARNESS WITH A NEW DP1204 CONNECTOR AND REWORK OF THE OLD HARNESS. SERVICE BULLETIN MOS HRSASC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 468 Of 748 Camp Systems EFTA00618759 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0463 SB 72-0463 R1 SB 72-0464 SB 72-0465 SB 72-0465 R1 SB 72-0466 SB 72-0466 R1 SB 72-0467 SB 72-0468 SB 72-0469 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR MANIFOLD ASSY AND OF NEW BRACKETS. SERVICE BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - GENERAL - INTRODUCTION OF DAMPERS ON THE ACCESSORY GEARBOX AXIAL LINK ENDS. SERVICE BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - GENERAL - INTRODUCTION OF DAMPERS ON THE ACCESSORY GEARBOX AXIAL LINK ENDS. SERVICE BULLETIN MOS HRS/MSC ENC NO.1 ENGINE - ENGINE - HPT (72-51-00) - NEW NOZZLES - ADDITIONAL COOLING HOLES. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - ENGINE - HPT (72-51-00) - NEW NOZZLES - ADDITIONAL COOLING HOLES. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - DELETION OF THE FLAT WASHERS AT THE MAIN OlUFUEL HEAT EXCHANGER AND FUEL RETURN TUBE LOCATION. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - HPC (72-32-00) - STAGES 2 AND 3 SHROUDS - LEADING EDGE CUTBACK. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 469 Of 748 @ Camp Systems EFTA00618760 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0471 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 PC. SERVICE BULLETIN MOS HRS/MSC - ENC 58 72-0474 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN MOS HRS/MSC - ENC 58 72-0475 NO. 1 ENGINE - INTRODUCTION OF NEW AIR TUBE. A NEW BRACKET ASSY WITH SAFETY WIRE HOLES AND REWORK OF THE PREVIOUS CONFIGURATION. SERVICE BULLETIN MOS HRSAMSC - ENC SB 72-0476 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CRASS-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0477 NO.1 ENGINE - INSPECTION OF NO.5 BEARING SUPPORT NIPPLE WELD. SERVICE BULLETIN MOS HRS/IASC - ENC SB 72-0477 R2 NO. 1 ENGINE - INSPECTION OF NO.5 BEARING SUPPORT NIPPLE WELD. SERVICE BULLETIN MOS 06-FEB-2008 HRS/IASC - ENC SB 72-0480 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFMS6-7B IPC. SERVICE BULLETIN MOS HRS/IASC - ENC SB 72-0481 RI NO.1 ENGINE - IN FIELD INTRODUCTION OF FAN BLADE SHIMS WITH NEW AXIAL STOP. SERVICE BULLETIN DAYS I (s) HRS/MSC ENC SB 72-0482 NO. 1 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM58-713 IPC. SERVICE BULLETIN MOS HRSAMSC - ENC SB 72-0483 NO. 1 ENGINE - ENGINE - HPT (72-51-00) - NEW STATIONARY SEAL. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0483 RI NO. I ENGINE - ENGINE - HPT (72-51-00) - NEW STATIONARY SEAL. SERVICE BULLETIN MOS HRSAMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 470 Of 748 @ Camp Systems EFTA00618761 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0484 11-MAR-200.5 SB 72-0485 SB 72-0485 I21 13-AUG-2094 SB 72-0486 NO. I ENGINE - INTRODUCTION OF A NEW FUEL SUPPLY TUBE. SERVICE BULLETIN MOS HRSisiSC - ENG NO. I ENGINE - INTRODUCTION OF NEW FAN DISK AND NEw SPACERS AND NEW SHIMS. SERVICE BULLETIN MOS HRSisiSC - ENC NO. I ENGINE - INTRODUCTION OF NEW FAN DISK AND NEw SPACERS AND NEW SHIMS. SERVICE BULLETIN MOS HR&MSC - ENG NO. I ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS.I.ISC - ENG SB 72-0487 NO. 1 ENGINE - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL AND NEW NO.1 BEARING VIBRATION SENSOR ATTACHING PARTS. SERVICE BULLETIN MOS C9-NOV-2C01 HRS.I.ISC - ENG SB 72-0487121 NO. 1 ENGINE - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL AND INTRODUCTION OF A NEw NO.1 BEARING VIBRATION SENSOR ATTACHING PARTS. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0488 RI NO. I ENGINE - REPLACEMENT OF IDENTIFICATION PLATES ON THE TRANSFER GEARBOX ASSEMBLY AND THE ACCESSORY GEARBOX ASSEMBLY. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0489 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HR&MSC - ENG SB 72-0489 RI NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS.I.ISC - ENG SB 72-0490 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSI.ISC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 471 Of 748 Camp Systems EFTA00618762 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0491 NO. 1 ENGINE - NEW MATERIAL (N5-) TO ELIMINATE YTTRIUM AND REDUCE SULFUR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0493 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0494 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0495 R2 NO. 1 ENGINE - REWORK AND REIDENTIFICATION OF FAN FRAME SHROUD WITH AN ALUMINUM DOUBLER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0495 R3 NO. 1 ENGINE - REWORK AND REIDENTIFICATION OF FAN FRAME SHROUD WITH AN ALUMINUM DOUBLER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0497 NO. 1 ENGINE - INTRODUCTION OF VESPEL NUTS. SERVICE BULLETIN MOS HRS(MSC - ENC 513 72-0498 NO. 1 ENGINE - REDUCE INSPECTION INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING SYSTEM. SERVICE BULLETIN MOS HRS/MSC 50 (s) ENC 513 72-0498 R1 NO. 1 ENGINE - REDUCE INSPECTION INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING SYSTEM. SERVICE BULLETIN MOS HRS/MSC 50 (s) ENC SB 72-0499 R1 NO. 1 ENGINE - INTRODUCTION OF NEW NO.5 BEARING SUPPORT NIPPLE DESIGN OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS 16-DEC-2006 HRS/MSC ENC SB 72-0500 NO. 1 ENGINE - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN SUPERSEDED MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 472 Of 748 @ Camp Systems EFTA00618763 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0500 R2 02-MAR-2011 NO. I ENGINE - ENGINE - HPC (72-31-00) - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN MOS HRSAISC - ENC OPTIONAL SB 72-0500 R3 NO.1 ENGINE - ENGINE - HPC (72-31-00)- REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN OPTIONAL MOS I7-AUG-2011 HRSAISC - ENC SB 72-0501 R1 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - DELETION OF THE BLANKING PLATE AND INTRODUCTION OF A NEW OIL SUPPLY TUBE WITH ITS NEW ATTACHMENT BRACKETS.. SERVICE BULLETIN MOS I4-OCT-2008 HRS/MSC - ENC SB 72-0502 R1 NO. 1 ENGINE - REPLACEMENT OF NO.10 STRUT FAIRING (STEEL VERSION ) 8Y STRUT FAIRING ( ALUMINUM VERSION ). SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0502 R2 NO.1 ENGINE - REPLACEMENT OF NO.10 STRUT FAIRING (STEEL VERSION ) 8Y STRUT FAIRING ( ALUMINUM VERSION ). SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0503 NO. I ENGINE - FORWARD INNER NOZZLE SUPPORT - FORWARD FLANGE REPLACEMENT AND COATING. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0503 R1 NO. I ENGINE - FORWARD INNER NOZZLE SUPPORT- FORWARD FLANGE REPLACEMENT AND COATING. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0503 R2 NO. I ENGINE - 81/65279:ENGINE -HPT (7241-00) -FORWARD INNER NOZZLE SUPPORT -FORWARD FLANGE REPLACEMENT AND COATING . SERVICE BULLETIN MOS 29-JUN-2007 HRS/MSC ENC SB 72-0506 NO. 1 ENGINE - INSPECTION OF COMBUSTION CHAMBER OUTER LINER. SERVICE BULLETIN MOS 30-JUL-2004 HRSAISC - (s) ENC SB 72-0506 R1 NO. 1 ENGINE - INSPECTION OF OUTER LINER COOLING HOLES. SERVICE BULLETIN MOS 23-AUG-2006 HRSAISC - ENC SUPERSEDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time @ Camp Systems 473 Of 748 EFTA00618764 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0507 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B ENGINES. SERVICE BULLETIN MOS H R m SC E NC SB 72-0509 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSG-78 IPC. SERVICE BULLETIN MOS HRSNSC - ENG SB 72-0509 R1 . NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156,78 IPC. SERVICE BULLETIN MOS 11-APR-2008 HRSitISC - ENG SB 72-0510 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN MOS HRS.ISC - ENG NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN MOS HRSitISC - ENG NO. I ENGINE - INTRODUCTION OF A NEW FAN FRAME SHROUD WITH NEW MG AIRCilL COOLER PANEL IN TWO PARTS. SERVICE BULLETIN SB 72-0511 SB 72-0512 SB 72-0512 R2 CG-OCT-2000 MOS HRS/P.ISC - ENG NO 1 ENGINE - INTRODUCTION OF A NEW FAN FRAME SHROUD WITH NEW MG AIRCilL COOLER PANEL IN TWO PARTS AND REWORK OF THE PREVIOUS CONFIGURATION. SERVICE BULLETIN MOS HRS.ISC - ENG SB 72-0513 NO 1 ENGINE - SPARE PARTS INFORMATION. SERVICE BULLETIN MOS HRSitISC - ENG SB 72-0514 RI NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B IPC (SUPERSEDED BY SB SUPERSEDED 72-0514 R2). SERVICE BULLETIN MOS HRSUMSC - ENG SB 72-0514 R2 NO 1 ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN MOS 22-NOv-2013 HRSIASC - ENG CATEGORY 8 ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 474 Of 748 Camp Systems EFTA00618765 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0515 NO. I ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS HIRSAISC 24000 (s) ENC SB 72-0515 RI NO. 1 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS HIRSAISC 24000 (s) ENC SB 72-0515 R2 NO. 1 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS I8-APR-2006 HRS/MSC 24000 (s) ENC SB 72-0515 R3 NO. 1 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS HRS/MSC 24000 (s) ENC SB 72-0515 R4 NO. 1 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS I2-FEB-2009 HRS/MSC 24000 (s) ENC SB 72-0515 R5 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS HRS/MSC 24000 (s) ENC SB 72-0515 R6 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS 03-OCT-2011 HRS/MSC 24000 (s) ENC SB 72-0515 R7 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS 21-OCT-2011 HIRSAISC 24000 (s) ENC SB 72-0520 NO. 1 ENGINE - INSPECTION OF THE FORWARD LPT SHAFT FOR MISSING PAINT, SERVICE BULLETIN MOS 08-FEB-2066 HRS(MSC - ENC SB 72-0521 NO. 1 ENGINE - INSPECTION OF INNER AND OUTER LINER NUGGET THICKNESS. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 475 Of 748 @ Camp Systems EFTA00618766 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0521 R1 NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INSPECTION OF INNER AND OUTER LINER NUGGET THICKNESS. SERVICE BULLETIN RECOMMENDED MOS 13-JUN-2012 HRS/PASC ENC SB 72-0522 NO. I ENGINE - INTRODUCTION OF AN IDENTIFICATION PLATE COMPLYING WITH THE NEW EUROPEAN REGULATION. SERVICE BULLETIN MOS HRS/PASC ENC SB 72-0523 NO. I ENGINE - INTRODUCTION OF A NEW CONNECTING TUBE WITH A NEW COATING. SERVICE BULLETIN MOS HRS/PASC - ENC SB 72-0523 RI NO. 1 ENGINE - INTRODUCTION OF A NEW CONNECTING TUBE WITH A NEW COATING. SERVICE BULLETIN MOS 29-NOV-2006 HRS/MSC - ENC SB 72-0524 NO. 1 ENGINE - ENGINE - COMBUSTOR (7242-00) - NEW DOME. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0525 NO. 1 ENGINE -FAN DISK DOVETAIL FACES WEAR DEPTH INSPECTION. SERVICE BULLETIN MOS 25-MAR-2005 HRS/PASC ENC 3000 (s) SB 72-0525 R2 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - FAN DISK PRESSURE FACES INSPECTION. SERVICE BULLETIN RECOMMENDED MOS HRS/PASC - ENC SB 72-0525 R2 PARA D (1) NO. 1 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000410-0) MOS HRS/MSC ENC 2000 (s) SB 72-0525 R2 PARA D (2) NO. 1 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-420-0) MOS HRS/PASC ENC 7000 (s) SB 72-0525 R2 PARA D (3) NO. 1 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-471/472/473/474) MOS HRS/PASC ENC 7000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 476 Of 748 @ Camp Systems EFTA00618767 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 58 72-0525 R2 PARA D (4) NO. 1 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-485/486/490-0) MOS HRS/MSC ENC 7000 (s) 72-0527 NO.1 ENGINE - INTRODUCTION OF NEW LOW PRESSURE TURBINE (LPT) REAR FRAMES WITH A NEW OIL SCAVENGE TUBE. SERVICE BULLETIN RECOMMENDED MOS HRS/MSC ENC SB 72-0527 RI NO. 1 ENGINE - INTRODUCTION OF NEW LOW PRESSURE TURBINE (LPT) REAR FRAMES WITH A NEW OIL SCAVENGE TUBE. SERVICE BULLETIN MOS 29-SEP-2005 HRS/P.1SC ENC SB 72-0527 R2 NO. 1 ENGINE - INTRODUCTION OF THE NEW OR REWORKED LPT REAR FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN MOS 2I-JAN-2008 MRS/P.1SC ENC SB 72-0527 R3 NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF THE NEW OR REWORKED LPT REAR FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN MOS 22-DEC-2009 HRSfMSC - ENC SB 72-0527 R4 NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF THE NEW OR REWORKED LPT REAR CUSTOMER FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN CONVENIENCE MOS 04-JUL-2013 HRS/MSC - ENC SB 72-0528 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0529 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0530 NO. 1 ENGINE - BELLCRANK SUPPORT NUT LENGTH. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0531 RI NO.1 ENGINE - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS 26-SEP-2006 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 477 Of 748 @ Camp Systems EFTA00618768 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0531 R2 10-APR-2008 SB 72-0531 R3 25-MAY-2C09 SB 72-0531 R4 18-APR-2013 SB 72-0533 SB 72-0536 NO. I ENGINE - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRSi MSC -(s) ENC NO. I ENGINE - ENGINE - GENERAL (72-00-00) - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRSi MSC - ENC NO. I ENGINE - ENGINE - GENERAL (72-00-00) - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRS/MSC ESV ENC NO. I ENGINE - ENGINE - COMBUSTOR (72-41-00) - SWIRLER. SERVICE BULLETIN MOS HRS. .ISC - ENC NO. I ENGINE - INNER LINER EXTENSION FOR REPAIR. SERVICE BULLETIN MOS HRS,IISC - ENC SB 72-0539 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-76 ENGINES. SERVICE BULLETIN MOS HRSi MSC ENC SB 72-0540 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS.i'MSC - ENC SB 72-0540 R1 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS 18-APR-2005 HRS.i'MSC - ENC SB 72-0540 R2 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS 29-AUG-2C07 HRS.I.ISC - ENC SB 72-0541 NO. I ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0542 NO 1 ENGINE - HPT NOZZLE FORWARD INNER NOZZLE SUPPORT (FINS) WITH IMPROVED EROSION COATING. SERVICE BULLETIN MOS HRSilISC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 478 Of 748 Camp Systems EFTA00618769 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0543 NO. 1 ENGINE - INTRODUCTION OF A NEW OIL INLET COVER 0-RING. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0545 NO. 1 ENGINE -FAN DISK LIFE LIMIT INCREASE. SERVICE BULLETIN MOS HRSAISC ENC 16000 (s) SB 72-0547 NO. 1 ENGINE - ON WING INSPECTION AND SHOP LEVEL ACTION FOT INNER AND OUTER LINERS. SERVICE BULLETIN MOS HRSAISC ENC 1600 (s) SB 72-0547 RI NO. 1 ENGINE - ON WING INSPECTION AND SHOP LEVEL ACTION FOR INNER AND OUTER LINERS. SERVICE BULLETIN MOS 08-MAR-2006 HRS/MSC ENC 1600 (s) SB 72-0548 NO. 1 ENGINE - INTRODUCTION OF A NEW ELASTOMER SPACER. SERVICE BULLETIN MOS 17-FEB-2006 HRS/MSC 5000 (s) ENC 3000 SB 72-0548 RI NO. 1 ENGINE - INTRODUCTION OF A NEW ELASTOMER SPACER. SERVICE BULLETIN MOS 25-OCT-2006 HRSAISC 5000 (s) ENC 3000 SB 72-0550 NO. 1 ENGINE - INTRODUCTION OF A NEW REAR VENT TUBE. SERVICE BULLETIN MOS 16-FEB-2007 HRSAISC - ENC SB 72-0552 NO. 1 ENGINE -LOW PRESSURE TURBINE ROTOR/STATOR ASSEMBLY (72-54-00) - REIDENTIFICATION OF LPT CASE IN FIELD. SERVICE BULLETIN 27-JAN-2006 MOS HRSAISC ENC SB 72-0552 RI NO. 1 ENGINE -LOW PRESSURE TURBINE ROTOR/STATOR ASSEMBLY (72-54-00) - REIDENTIFICATION OF LPT CASE IN FIELD. SERVICE BULLETIN 16-FEB-2012 SB 72-0553 20-OCT-2006 MOS HRSAISC ENC NO. 1 ENGINE - INTRODUCTION OF AN ANTI-EROSION PAINT ON THE FAN FRAME ASSEMBLY, SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 479 Of 748 @ Camp Systems EFTA00618770 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0553 RI S8 72-0554 SB 72-0554 RI SB 72-0555 SB 72-0556 SB 72-0557 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF AN ANTI-EROSION PAINT ON THE FAN FRAME ASSEMBLY. SERVICE BULLETIN MOS HRSAISC ENC NO. 1 ENGINE - REDUCED INSPECTION INTERVAL FOR FORWARD SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING SYSTEM. SERVICE BULLETIN MOS HRSAISC 50 (s) ENC NO. 1 ENGINE - REDUCED INSPECTION INTERVAL FOR FORWARD SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING SYSTEM. SERVICE BULLETIN MOS HRSAISC 50 (s) ENC NO.1 ENGINE - ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS‘MSC - ENC NO. 1 ENGINE - FORWARD INNER NOZZLE SUPPORT (FINS) - WITH IMPROVED EROSION COATING. SERVICE BULLETIN MOS HRSAISC - ENC NO.1 ENGINE - ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0558 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS 18-JAN-2006 HRSfMSC - ENC SB 72-0558 RI NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS 21-SEP-2007 HRSAISC ENC 16350 (s) SB 72-0558 R2 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS 02-DEC-2008 HRS1MSC ENC 16350 (s) SB 72-0558 R3 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS HRSfMSC ENC 16350 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 480 Of 748 @ Camp Systems EFTA00618771 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0558 R4 21-MAY-2013 SB 72-0559 NO. 1 ENGINE - INTRODUCTION OF NEW MW0316 FIRE DETECTION HARNESS. SERVICE BULLETIN MOS MRS/P.1SC - ENC NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS HRS1MSC - ENC 06-JUN-2007 SB 72-0560 NO. 1 ENGINE - INTRODUCTION OF A NEW MW0301 HARNESS WITH A NEW ROUTING. SERVICE BULLETIN MOS OI -MAR-2007 HRSAISC - ENC SB 72-0561 NO. 1 ENGINE - INTRODUCTION OF OLD NO.1 BEARING VIBRATION SENSOR ATTACHING PARTS WITH NEW STATIONARY SEAL. SERVICE BULLETIN MOS HRS(MSC ENC SB 72-0562 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS I7-JAN-2006 HRS(MSC - ENC SB 72-0563 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 22-MAY-2006 HRSAISC - ENC SB 72-0564 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION IN PRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW STARTER DRIVE PAD AND NEW HANDCRANCKING COVER. SERVICE BULLETIN MOS 3-OCT-2009 HRS(MSC - ENC SB 72-0564 R1 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0564 R2 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN MOS 16-NOV-2010 HRS1MSC - ENC S8 72-0564 R3 NO. I ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A SUPERSEDED NEW STARTER DRIVE PAD AND REWORK OF THE OLD AG8 TO THE NEW ONE (SUPERSEDED BY S8 72-0564 R4). SERVICE BULLETIN CUSTOMER CONVENIENCE MOS HRS(MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 481 Of 748 @ Camp Systems EFTA00618772 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0564 R4 SB 72-0564 R5 14-JAN-2014 NO 1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE (SUPERSEDED BY SB 72-0564 R5). SERVICE BULLETIN MOS HRSMSC ENC NO 1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A CATEGORY 3 NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN MOS HRSMSC ESV ENC SB 72-0565 RI NO. I ENGINE - ENGINE - LPT ROTOR ?STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE. SERVICE BULLETIN MOS 04-MAY-2CO9 ENC SB 72-0566 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS 23-MAY-2C06 HRSMSC - ENC SB 72-0567 NO. I ENGINE - INTRODUCTION OF A NEW OR REWORKED STAGE I SEAL SEGMENT. SERVICE BULLETIN MOS 10-MAY-2C07 HRS.P.ISC - ENC SB 72-0567 RI NO. I ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW OR REWORKED STAGE I SEAL SEGMENT. SERVICE BULLETIN MOS 12-MAY-2C09 HRSMSC - ENC SB 72-0568 NO. I ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 20-MAR-2006 HRS4.ISC - ENC SB 72-0568 RI NO 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 21-SEP-2007 HRSMSC ENC 17400 (s) SB 72-0568 R2 NO 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR CUSTOMER FRAME ON SAC ENGINES. SERVICE BULLETIN CONVENIENCE MOS HRSI.ISC ENC 17400 (s) SB 72-0569 NO 1 ENGINE - INTRODUCTION OF NEW SPACERS ON THE B6 FRONT FLANGE OF THE FAN FRAME. SERVICE BULLETIN 23-VAR.23D7 - HRSMSC MOS ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 482 Of 748 Camp Systems EFTA00618773 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0569 R1 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF NEW SPACERS ON THE 86 FRONT FLANGE OF THE FAN FRAME. SERVICE BULLETIN MOS 14-OCT-2008 HRSTASC - ENC SB 72-0570 RI NO. 1 ENGINE - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD. SERVICE BULLETIN MOS 03-JUL-2008 HRS9(1SC ENC SB 72-0570 R2 NO. 1 ENGINE - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD, SERVICE BULLETIN MOS 02-SEP-2008 HRSOASC ENC SB 72-0570 R3 NO. 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD (SUPERSEDED BY SB 72-0570 R4). SERVICE BULLETIN MOS 13-JUN-2012 HRSO,ISC - ENC SB 72-0570 R4 NO. 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND CATEGORY 7 FAN FRAME SHROUD. SERVICE BULLETIN MOS 26-JUN-2014 HRSO4SC ENC SB 72-0571 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN 23-MAR-2007 SB 72-0572 SB 72-0573 24-JAN-2008 SB 72-0574 I0-APR-2066 SB 72-0574 RI 24-JUL-2006 MOS HRSOASC - ENC NO. 1 ENGINE - HPT OUTER STATIONARY SEAL WITH INTEGRAL NUT SHIELD. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - NEW NO.3 BEARING REAR STATIONARY AlFUOIL SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRSO4SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 483 Of 748 @ Camp Systems EFTA00618774 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0574 R2 20-SEP-2006 SB 72-0574 R3 24-OCT-2006 SB 72-0574 R4 31-AUG-2007 SB 72-0575 SB 72-0576 20-JUL-2006 SB 72-0578 NO. 1 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - REPAIR PARTS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0579 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 04-JUL-2006 HRSAISC - ENC SB 72-0579 R1 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 27-OCT-2006 HRS,MSC ENC 19000 (s) SB 72-0579 R2 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS HRS,MSC ENC 19000 (s) SB 72-0579 R3 NO. 1 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 09-APR-2008 HRS/MSC ENC 19000 (s) SB 72-0579 R4 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN 01-DEC-2008 MOS HRSIMSC ENC 19000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 484 Of 748 @ Camp Systems EFTA00618775 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0579 R5 SB 72-0579 R6 15-DEC-2009 SB 72-0579 R7 I9-FEB-2010 SB 72-0579 Re NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS HRSAISC ENC 19000 (s) NO. 1 ENGINE - ENGINE -LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00)- INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS HRS1MSC ENC 19000 (s) NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00)- INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS HRSAISC ENC 19000 (s) NO. 1 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 25-JAN-2012 HRS1MSC ENC 19000 (s) SB 72-0580 NO. 1 ENGINE - REWORK FOR FAN CONTAINMENT CASE BI FLANGE AT FIRE DETECTOR LOCATION. SERVICE BULLETIN 25-MAY-2007 MOS HRSfMSC ENC SB 72-0580 R1 NO. 1 ENGINE - REWORK FOR FAN CONTAINMENT CASE BI FLANGE AT FIRE DETECTOR LOCATION. SERVICE BULLETIN 25-MAY-2008 MOS I-IRS/MSC - ENC SB 72-0580 R2 NO. 1 ENGINE - REWORK FOR FAN CONTAINMENT CASE B1 FLANGE AT FIRE DETECTOR LOCATION. SERVICE BULLETIN 27-APR-2009 SB 72-0580 R3 MOS HRSAISC - ENC NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - REWORK FOR FAN CONTAINMENT CASE 81 FLANGE AT FIRE DETECTOR LOCATION. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0581 NO. 1 ENGINE -STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE BULLETIN 26-JUL-2006 MOS HRS1MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 485 Of 748 @ Camp Systems EFTA00618776 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0581 RI 12-JAN-2007 SB 72-0581 R2 14-AUG-2009 NO. I ENGINE - STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE BULLETIN MOS HRSIISC ENC NO. I ENGINE - ENGINE - HPC STATOR FORWARD ASSEMBLY t72-32-00)- STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 72-0582 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM.56-7B ENGINES. SERVICE BULLETIN MOS 07-AUG-2C06 HR&MSC - ENC SB 72-0582 R1 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM.56-7B ENGINES. SERVICE BULLETIN MOS 25-SEP-2006 HRS,IISC - ENC SB 72-0584 RI NO. I ENGINE - INTRODUCTION OF NEW ENHANCED DURABILITY HPT BLADES. SERVICE BULLETIN MOS 04-JUN-2007 HRSilISC - ENC SB 72-0584 R2 NO. I ENGINE - INTRODUCTION OF NEW ENHANCED DURABILITY HPT BLADES. SERVICE BULLETIN MOS 31-AUG-2C07 HRSimSC - ENC SB 72-0585 NO. I ENGINE - FIELD INTRODUCTION OF REWORKED FAN DISK. SPACERS AND SHIMS. SERVICE BULLETIN MOS 04-SEP-2006 HRSI.ISC - ENC SB 72-0585 R1 NO. I ENGINE - FIELD INTRODUCTION OF REWORKED FAN DISK. SPACERS AND SHIMS. SERVICE BULLETIN OPTIONAL MOS 25-APR-2008 HR&MSC - ENC SB 72-0585 R2 NO 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - FIELD INTRODUCTION OF REWORKED FAN DISK. OPTIONAL SPACERS AND SHIMS. SERVICE BULLETIN MOS 03-JAN-2012 HRSI.ISC ENC SB 72-0586 NO 1 ENGINE - INTRODUCTION OF A NEW FAN BLADE PLATFORM WITH A NEW ELASTOMER SEAL. SERVICE BULLETIN 24-NOV-2CC6 MOS HR&MSC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 486 Of 748 Camp Systems EFTA00618777 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0586 R1 02-JAN-2007 SB 72-0587 04-JUL-2008 SB 72-0588 NO. I ENGINE - INTRODUCTION OF A NEW FAN BLADE PLATFORM WITH A NEW ELASTOMER SEAL. SERVICE BULLETIN MOS HRSAISC ENC NO. 1 ENGINE - LPT FRAME ASSEMBLY (72-56-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7618/3. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0589 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0589 RI NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN MOS 24-OCT-2007 HRSAISC - ENC SB 72-0589 R2 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-7B ENGINE CONVERSION TO CFM56-7620f3. SERVICE BULLETIN MOS 04-MAY-2009 HRSAISC - ENC SB 72-0590 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/3. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0591 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/381. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0591 RI NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/381. SERVICE BULLETIN MOS 24-OCT-2007 HRSAISC - ENC SB 72-0593 NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7624/3. SERVICE BULLETIN MOS I3-APR-2007 HRS1MSC - ENC SB 72-0593 RI NO. 1 ENGINE - CONVERSION OF ANY AFFECTED CFM56-7/3 MODEL ENGINE TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS I3-APR-2007 HRS1MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 487 Of 748 @ Camp Systems EFTA00618778 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0593 R2 24-OCT-2007 SB 72-0594 NO. 1 ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7624:3. SERVICE BULLETIN MOS HRSimSC - ENG NO 1 ENGINE - CFm56-78 ENGINE CONVERSION TO CW56-7824:381. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0594 R1 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFM56-7624:381. SERVICE BULLETIN MOS 24-OCT-2007 HRSUMSC - ENG SB 72-0595 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7626:3. SERVICE BULLETIN MOS 13-APR-2007 HRS.I.ISC - ENG SB 72-0595 RI NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7626:3. SERVICE BULLETIN MOS 13-AUG-2C07 HRS,IISC - ENG SB 72-0595 R2 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFM56-762&3. SERVICE BULLETIN MOS 24-OCT-2007 HRSimSC - ENC SB 72-0596 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7626:3F. SERVICE BULLETIN MOS 17-APR-2007 HRSimSC - ENC SB 72-0596 RI NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7826:3F. SERVICE BULLETIN MOS 24-OCT-2007 HRSimSC - ENG SB 72-0597 NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CW56-7826:381. SERVICE BULLETIN MOS HRSUMSC - ENG SB 72-0597 RI NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFM56-7626:381. SERVICE BULLETIN MOS 24-OCT-2007 HRSUMSC - ENG SB 72-0600 NO. I ENGINE - CFm56-76 ENGINE CONVERSION TO CFM56-7827t3. SERVICE BULLETIN MOS 17-APR-2007 HRSimSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 488 Of 748 Camp Systems EFTA00618779 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0601 RI 24-OCT-2037 SB 72-0602 SB 72-0603 SB 72-0603 RI SB 72-0604 NO. 1 ENGINE - CFm56-78 ENGINE CONVERSION TO CFMSG-7627:3B1. SERVICE BULLETIN MOS HRSMSC - ENC NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t383. SERVICE BULLETIN MOS HRSMSC - ENC NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t3F. SERVICE BULLETIN MOS HR&MSC - ENC NO. I ENGINE - CRIS6-78 ENGINE CONVERSION TO CFNI56-7827t3F. SERVICE BULLETIN MOS HRS.ISC - ENC NO. I ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7827/381F. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0604 RI NO. I ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t3Bi F. SERVICE BULLETIN MOS 24-OCT-2007 HRSMSC - ENC SB 72-0605 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 07-NOV-2C06 HR&MSC - ENC SB 72-0606 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 31-MAY-2C07 HRSMSC - ENC SB 72-0607 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 01-SEP-2006 HR&P.ISC - ENC SB 72-0608 NO. I ENGINE - INSPECTION OF THE LOw PRESSURE TURBINE (LPT) CASE. SERVICE BULLETIN MOS 23-AUG-2C07 HR&MSC - ENC SB 72-0608 RI NO. I ENGINE - ENGINE - GENERAL (72-00-03) - INSPECTION OF THE LOW PRESSURE TURBINE (LPT) CASE ON ASSEMBLED LPT MODULE. SERVICE BULLETIN I2-MAY-2C09 MOS HRSMSC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time Camp Systems 489 Of 748 EFTA00618780 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0609 NO. I ENGINE - INTRODUCTION OF N5 HPT SHROUDS WITH HEAT TRANSFER ENHANCEMENT (HTE) BUMPS. SERVICE BULLETIN 25-SEP-2006 SB 72-0610 I5-NOV-2006 SB 72-0611 31-OCT-2006 SB 72-0612 I2-OCT-2006 SB 72-0613 25-SEP-2006 SB 72-0611 09-NOV-2006 SB 72-0615 08-FEB-2007 SB 72-0616 MOS HRS11.1SC ENC NO. 1 ENGINE - INTRODUCTION OF 8 MIL THICK HPC GUIDE SECTORS. SERVICE BULLETIN MOS MRS/P.1SC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS MRS/P.1SC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS11.1SC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS11.1SC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0617 NO. I ENGINE - CLEANING OF THE CONTROL ALTERNATOR AND CHANGE OF THE NUTS ATTACHING THE LINE NO. I BEARING OUTER RACE ON THE AGB HOUSING. SERVICE BULLETIN MOS 03-JUL-2007 HRSAISC 10000 (s) ENC 5000 SB 72-0617 R2 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (726100)-f FAKING OF THE CONTROL ALTERNATOR RECOMMENDED AND INSPECTION OF THE KEY-LOCKED STUDS ATTACHING THE LINE NO. 1 BEARING OUTER RACE ON THE AGB HOUSING, SERVICE BULLETIN MOS MRS/P.1SC 10000 (s) ENC 5000 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 490 Of 748 @ Camp Systems EFTA00618781 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0618 25-JAN-2007 SB 72-0618 RI SB 72-0618 R2 09-OCT-2008 SB 72-0619 27-SEP-2007 SB 72-0619 RI NO. 1 ENGINE - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW STAGE 3 ROTATING RING. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW STAGE 3 ROTATING RING. SERVICE BULLETIN MOS 02-DEC-2008 HRS/MSC - ENC SB 72-0619 R2 NO.1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW STAGE 3 ROTATING RING. SERVICE BULLETIN MOS 04-MAY-2009 HRS/MSC - ENC SB 72-0620 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFMS6-7B ENGINES. SERVICE BULLETIN MOS 19-DEC-2006 HRSAISC - ENC SB 72-0621 NO. I ENGINE -FIELD INTRODUCTION OF A NEW PLATE WITH TECH INSERTION KITS INSTALLED AND NI TRIM INFORMATION. SERVICE BULLETIN MOS I6-JUL-2007 HRS/MSC ENC SB 72-0621 R2 NO.1 ENGINE - ENGINE - GENERAL (72-00-00)- FIELD INTRODUCTION OF A NEW PLATE WITH TECH INSERTION KITS INSTALLED AND NI TRIM INFORMATION. SERVICE BULLETIN MOS Of-DEC-2011 HRS/MSC - ENC SB 72-0622 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 20-SEP-2007 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 491 Of 748 @ Camp Systems EFTA00618782 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0623 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 20-JUN-2007 MRS/MSC - ENC SB SB 72-0626 28-SEP-2007 72-0626 RI 21-APR-2008 NO. 1 ENGINE - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN MOS HRS/hISC - ENC SB 72-0626 R2 NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN MOS 04-MAY-2009 HRS/MSC - ENC 58 72-0626 R3 NO. I ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE AND NEW CUSTOMER STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN CONVENIENCE MOS 30-MAR-2012 FIRSAISC - ENC SB 72-0627 NO. 1 ENGINE - DELETION IN PRODUCTION OF THE ALTERNATE STAGE 3 ROTATING AIR SEAL RING. SERVICE BULLETIN MOS 28-SEP-2007 FIRSAISC - ENC SB 72-0627 RI NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - DELETION IN PRODUCTION OF THE ALTERNATE STAGE 3 ROTATING AIR SEAL RING. SERVICE BULLETIN 02-DEC-2008 SB 72-0630 07-MAR-2008 SB 72-0631 13-OCT-2008 SB 72-0632 22-JUN-2007 MOS HRS/MSC ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC ENC NO. I ENGINE - BOOSTER SPOOL FORWARD FLANGE INSPECTION, SERVICE BULLETIN MOS HRS/MSC ENC 15000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 492 Of 748 @ Camp Systems EFTA00618783 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0634 22-JUN-2007 SB 72-0631 RI 30-JUL-2007 SB 72-0631 R2 SB 72-0635 I6-FEB-2007 NO. I ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - INTRODUCTION OF LOW PRESSURE TURBINE AIR COOLING TUBES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0636 NO. 1 ENGINE - INSPECTION FOR ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION. SERVICE BULLETIN MOS HRS/MSC ENC 4800 (s) SB 72-0636 R1 NO. 1 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR RECOMMENDED ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND NORTH AFRICA SERVICE BULLETIN MOS 09-FEB-2012 HRSAISC ENC 800(s) SB 72-0636 R2 NO. 1 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR SUPERSEDED ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND NORTH AFRICA (SUPERSEDED BY 72-0636 R3). SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0636 R3 NO. 1 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR RECOMMENDED ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND NORTH AFRICA SERVICE BULLETIN MOS HRSAISC ENC SB 72-0637 NO. 1 ENGINE - INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 493 Of 748 @ Camp Systems EFTA00618784 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0637 PART I SB 72-0637 PART 2 SB 72-0637 Fel 16-AUG-2C07 NO 1 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS HRS4ISC ENC 9600 (s) NO. ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES MOS HRSI.ISC ENC 6400 (s) NO. ENGINE - INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN MOS HR&MSC ENC SB 72-0637 RI PART I NO. ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS HRSAISC ENC 9600(s) SB 72-0637 RI PART 2 NO. ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES MOS HRSI.ISC ENC 6400 (s) SB 72-0637 R2 NO ENGINE - STAGE I NOZZLES. SERVICE BULLETIN MOS OS-SEP-2007 HRS.i.ISC - ENC SB 72-0637 R2 PART I NO 1 ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN HPT MOS HRSI.ISC ENC 9600 (s) SB 72-0637 R2 PART 2 NO. ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN LPT MOS HRS.1.ISC ENC 6400 (s) SB 72-0637 R3 NO. ENGINE - STAGE I NOZZLES. SERVICE BULLETIN MOS Oa-APR-2008 HRSIASC - ENC SB 72-0637 R3 PART I NO. ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN HPT MOS HRSI.ISC ENC 9600 (s) ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 494 Of 748 Camp Systems EFTA00618785 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0637 R3 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 NOZZLES. SERVICE BULLETIN LPT MOS HRSAISC ENC 6400 (s) SB 72-0637 R5 NO. I ENGINE - ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT RECOMMENDED NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN MOS 24-JUN-2011 HRS/MSC ENC SB 72-0637 R5 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION ENGINE - STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - RECOMMENDED INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN HPT MOS 24-JUN-2011 HRSAISC -(s) ENC SB 72-0637 R5 PART 2 NO. I ENGINE - BORESCOPE INSPECTION ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - RECOMMENDED INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN !PT MOS 24-JUN-2011 HRS/MSC -(s) ENC SB 72-0637 R6 NO. I ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R7). SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0637 Ft6 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 I-PT AND !PT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF RECOMMENDED STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R7). SERVICE BULLETIN HPT MOS HRSAISC ENC 800(x) SB 72-0637 R6 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 I-PT AND LPT NOZZLES (7241-01 AND 72-53-01)- INSPECTION OF RECOMMENDED STAGE 1 HPT NOZZLES AND STAGE 1 (PT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R7). SERVICE BULLETIN LPT MOS HRS/MSC ENC 800(s) 58 72-0637 R7 NO. I ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R8). SERVICE BULLETIN MOS I-IRStAISC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 495 Of 748 @ Camp Systems EFTA00618786 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0637 R7 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF SUPERSEDED STAGE 1 HPT NOZZLES AND STAGE 1 (PT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R8). SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS HRS/MSC - ENC SB 72-0637 R7 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF SUPERSEDED STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R8). SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES MOS HRS/MSC - ENC SS 72-0637 R8 NO.1 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R9). SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0637 R8 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF SUPERSEDED STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R9). SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS HRS/MSC - ENC SS 72-0637 R8 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF SUPERSEDED STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SS 72-0637 R9). SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES MOS HRS/MSC - ENC SS 72-0637 R9 NO.1 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES CATEGORY 7 AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN MOS 31-MAR-2014 I-ROO/1SC - ENC SB 72-0637 R9 PART 1 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF CATEGORY 7 STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS 31-MAR-2014 HRS/MSC ENC 58 72-0637 R9 PART 2 NO. 1 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF CATEGORY 7 STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES 31-MAR-2014 MOS MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 496 Of 748 @ Camp Systems EFTA00618787 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0638 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0639 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN 09-APR-2007 MOS HRS(MSC - ENC SB 72-0640 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 27-JUN-2007 HRS/MSC - ENC SB 72-0640 RI NO. 1 ENGINE - INTRODUCTION OF PRE-GROUND HPT BLADE KIT (SPD). SERVICE BULLETIN MOS 18-FEB-2008 HRS/MSC - ENC SB 72-0643 NO. 1 ENGINE - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS. SERVICE BULLETIN MOS 28-JUN-2007 HRS/MSC - ENC SB 72-0643 RI NO. 1 ENGINE - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0643 R3 NO. I ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING RECOMMENDED PARTS. SERVICE BULLETIN MOS 24-JUN-2011 HRS/MSC ENC SB 72-0645 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 17-APR-2007 HRS(MSC - ENC SB 72-0646 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 17-APR-2007 HRS(MSC - ENC SB 72-0647 NO. 1 ENGINE - COMBUSTION CHAMBER OUTER LINER REWORK. SERVICE BULLETIN MOS IS-JUN-2007 HRS/MSC - ENC SB 72-0647 RI NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK. SERVICE BULLETIN 05-JUN-2009 MOS MRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 497 Of 748 @ Camp Systems EFTA00618788 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0647 R2 20-NOV-2009 SB 72-0647 R3 30-MAY-20I4 SB 72-0648 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-751 ENGINES. SERVICE BULLETIN MOS I4-JUN-2007 HRS./MSC - ENC SB 72-0649 NO. 1 ENGINE - INTRODUCTION OF NEW FAN BLADE SHIM ASSY. SERVICE BULLETIN MOS 08-FEB-2008 HRSAISC - (s) ENC SB 72-0649 RI NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE SHIM RECOMMENDED ASSY. SERVICE BULLETIN MOS I8-JAN-2011 HRS.0.1SC ESV ENC SB 72-0650 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 25-JUN-2007 HRSAISC - ENC SB 72-0652 NO. I ENGINE - INTRODUCTION OF NEW MAGNETIC SEAL AND NEW SEALOL SEAL WITH NEW 0-RING MATERIAL AND REWORK OF OLD MAGNETIC SEAL AND OLD SEALOL SEAL TO THE NEW ONE. SERVICE BULLETIN MOS 29-JUL-2008 MRS/MSC 8000 (s) ENC SB 72-0652 R2 NO.1 ENGINE - ACCESSORY GEARBOX ASSEMBLY (726100)- INTRODUCTION OF NEW MAGNETIC SEAL AND NEW SEALOL SEAL WITH NEW 0 -RING MATERIAL AND REWORK OF OLD SEALOL SEAL TO THE NEW ONE. SERVICE BULLETIN NO. I ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK. SERVICE BULLETIN MOS HRS.0.1SC - ENC NO. 1 ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK SERVICE BULLETIN CATEGORY 7 MOS HRS.0.1SC - ENC I2-JAN-2011 SB 72-0653 MOS HRS.0.1SC 8000 8000 ENC NO. 1 ENGINE - ENGINE - NO.1 AND NO.2 BEARING SUPPORT ASSEMBLY (72-22-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 02-OCT-2008 HRS.0.1SC - ENC SB 72-0655 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS I I -SEP-2007 HRS.0.1SC - ENC 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 498 Of 748 @ Camp Systems EFTA00618789 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0656 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMSS-7B IPC. SERVICE BULLETIN MOS 11-SEP-2007 HRS7ASC - ENC SB 72-0657 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN 11-SEP-2007 MOS HRS(MSC - ENC SB 72-0658 NO. I ENGINE - INTRODUCTION OF NEW ALTERNATE LOOP CLAMP. SERVICE BULLETIN 24-JAN-2008 MOS HRS4.ISC - ENC SB 72-0659 NO 1 ENGINE - DELETION OF THE ALTERNATE TRIM BALANCE BOLTS IN PRODUCTION ONLY. SERVICE BULLETIN 13-DEC-2007 MOS HRS.ISC - ENC SB 72-0661 NO 1 ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM AND OIL FILTER DUE TO N 4 ROLLER BEARING SUSPECTED BATCH. SERVICE BULLETIN MOS 23-AUG-2C07 HRS,MSC 5C0 (s) ENC SB 72-0661 RI NO. I ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM AND OIL FILTER DUE TO NO a ROLLER BEARING SUSPECTED BATCH.. SERVICE BULLETIN MOS HRS(MSC 500(s) ENC SB 72-0661 R2 NO. I ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM AND OIL FILTER DUE TO NO.4 ROLLER BEARING SUSPECTED BATCH. SERVICE BULLETIN MOS 21-JAN-2008 HRS(MSC 500(s) ENC SB 72-0662 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 29-APR-2008 HRS,MSC - ENC SB 72-0663 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP(156-78 ENGINES. SERVICE BULLETIN MOS 26-FEB-2008 HRS4.ISC - ENC SB 72-0663 RI NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP01.56-78 ENGINES. SERVICE BULLETIN MOS 12-JAN-2009 HRS7ASC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 499 Of 748 Camp Systems EFTA00618790 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0665 27-SEP-2007 SB 72-0665 R1 10-DEC-2007 NO. I ENGINE - INTRODUCTION OF NEW METALLIC-COMPOSITE VSV BUSHING. SERVICE BULLETIN MOS HRSimSC - ENC NO. I ENGINE - INTRODUCTION OF NEW METALLIC-COMPOSITE VSV BUSHING. SERVICE BULLETIN MOS HRSUMSC - ENC SB 72-0666 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 15-JAN-2008 HRSUMSC - ENC SB 72-0667 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN MOS 09-OCT-2007 HRSUMSC - ENC SB 72-0667 R1 NO 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC. SERVICE BULLETIN MOS 11-MAY-2012 HRSUMSC - ENC SB 72-0668 NO. I ENGINE - ENGINE - GENERAL (72-00-01) - INTRODUCTION OF A NEW FLAT WASHER AT THE JUNCTION OF RADIAL DRIVE SHAFT SLEEVE AND THE FAN FRAME SHROUD. SERVICE BULLETIN MOS 11-JUN-2008 HRSUMSC - ENC SB 72-0669 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 16-JAN-2008 HRS.I.ISC - ENC SB 72-0670 NO. I ENGINE - SPARE PARTS RELEASE FOR CFNI56-78 IPC. SERVICE BULLETIN MOS 25-JAN-2008 HRSUMSC - ENC SB 72-0670 R1 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 09-JAN-2009 HRSUMSC - ENC SB 72-0671 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMS6-78 IPC. SERVICE BULLETIN MOS 04-DEC-2007 HRSUMSC - ENC SB 72-0673 NO. I ENGINE - INTRODUCTION OF A NEW ANTI-ROTATION STRAIGHT HEADED PIN. SERVICE BULLETIN MOS 02-NOV-2007 HRSUMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time Camp Systems 500 Of 748 EFTA00618791 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0673 R1 NO. 1 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - NEW VSV SHROUD HEADED ANTI- ROTATION PIN - INTRODUCTION. SERVICE BULLETIN MOS 5-MAY-2009 HRSAISC ENC SB 72-0674 NO. I ENGINE - ELIMINATION OF HPT STATOR MIDDLE HEAT SHIELD (SUPERSEDED BY 72-0674 RI), SERVICE SUPERSEDED BULLETIN MOS HRSAISC ENC SB 72-0674 RI NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE SHROUD AND STAGE 1 LOW PRESSURE TURBINE NOZZLE ASSEMBLY (72-53-00) - ELIMINATION OF HPT STATOR MIDDLE HEAT SHIELD. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0676 NO. 1 ENGINE - INTRODUCTION OF A NEW LOW PRESSURE TURBINE (LPT) REM FRAME AND OF A NEW RANGE ASSEMBLY. SERVICE BULLETIN MOS 30-JUN-2008 HRSAISC ENC SB 72-0676 RI NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (7256-00)- INTRODUCTION OF A NEW LOW PRESSURE TURBINE (LPT) REM FRAME AND OF A NEW FLANGE ASSEMBLY. SERVICE BULLETIN MOS I7-NOV-2008 HRSAISC - ENC SB 72-0676 R2 NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF A NEW LOW PRESSURE TURBINE (LPT) REM FRAME AND OF A NEW FLANGE ASSEMBLY. SERVICE BULLETIN MOS I6-JUN-2009 HRSAISC - ENC SB 72-0677 NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC AND CMM. SERVICE BULLETIN MOS 31 -JAN-2008 HRSAISC - ENC SB 72-0678 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF A NEW AXIAL STOP PIN. SERVICE BULLETIN C6-JAN-2008 MOS HRSAISC - ENC SB 72-0679 NO.1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY. SERVICE BULLETIN 29-AUG-2008 MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 501 Of 748 @ Camp Systems EFTA00618792 CAMP fra the enund up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0680 29-JAN-2008 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HIRS(MSC - ENC SB 72-0680 R1 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 09-JUL-2008 HRS(MSC - ENC SB 72-0681 NO. I ENGINE - CONVERSION OF ANY AFFECTED ENGINE MODELS TO CFM56-7818.CFM.56-7820.CFM.56-7/322.CFM56-7/324.CFM.56-7/326 OR CFM56-7827. SERVICE BULLETIN MOS I4-MAY-2008 HRS/MSC - ENC SB 72-0682 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS I 7-JAN-2008 HRS/MSC - ENC SB 72-0683 NO. 1 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - REWORK OF HPT NOZZLES TO DOUBLE VERTICAL SEAL SLOT CONFIGURATION. SERVICE BULLETIN MOS 25-FEB-2008 HRS(MSC - ENC SB 72-0683 R1 NO. I ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - REWORK OF HPT NOZZLES TO DOUBLE SUPERSEDED VERTICAL SEAL SLOT CONFIGURATION (SUPERSEDED BY SB 72-0683 R2). SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0683 R2 NO. 1 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - SPLIT VANE REPAIR AND REWORK TO CATEGORY 7 DOUBLE VERTICAL SEAL SLOT CONFIGURATION. SERVICE BULLETIN MOS 2I-JAN-2014 HRS(MSC - ENC SB 72-0684 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 19-DEC-2007 HRS/MSC - ENC SB 72-0685 NO. 1 ENGINE - DELETION OF SOME ALTERNATE NO.4 ROLLER BEARINGS. SERVICE BULLETIN MOS 0I-APR-2008 HRS(MSC - ENC SB 72-0686 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 05-MAR-2008 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 502 Of 748 @ Camp Systems EFTA00618793 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0687 06-FEB-2008 SB 72-0689 I9-AUG-2008 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF NEW ACCESSORY GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0689 RI NO. I ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72423-00) - INTRODUCTION OF NEW ACCESSORY GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN MOS 04-DEC-2009 MRS/51SC - ENC SB 72-0689 R2 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - INTRODUCTION OF NEW ACCESSORY GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN MOS 22-DEC-2011 HRS/MSC ENC SB 72-0690 NO. 1 ENGINE - BOLTS COMMONALITY FOR AIR LPT COOLING TUBE RETAINING STRAPS. SERVICE BULLETIN MOS 20-MAR-2008 HRS/MSC - ENC SB 72-0694 RI NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF THE INNER COMBUSTION RECOMMENDED CHAMBER LINER. SERVICE BULLETIN 21-OCT-2011 SB 72-0696 21-MAR-2008 SB 72-0696 RI 28-MAR-2008 SB 72-0696 R2 02-SEP-2011 MOS HRS/MSC ENC NO. 1 ENGINE - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 503 Of 748 @ Camp Systems EFTA00618794 CAMP Ael...imp.= taken...lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0698 23-MAR-2009 NO. 1 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF ALTERNATE LPT REAR FRAMES ON SAC ENGINES IN FIELD. SERVICE BULLETIN MOS HRS(MSC ENC SB 72-0699 NO. 1 ENGINE - CONVERSION OF ANY AFFECTED ENGINE MODELS TO FCM.56-78/3 TI ENGINE MODEL. SERVICE BULLETIN 14-MAY-2008 MOS HRSPASC ENC SB 72-0699 R2 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFM56-78 (SAC) TO CFM56-78/3 (TI). SERVICE BULLETIN MOS 03-NOV-2009 HRS(MSC ENC SB 72-0700 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - IMPROVEMENT OF THE FUEL SUPPLY TUBE WITH NEW INSERTS. SERVICE BULLETIN MOS 24-FEB-2009 HRS(MSC ENC SB 72-0701 NO. 1 ENGINE - NEW SPARE PARTS THAT ARE INTERCHANGABLE WITH THE OLD PARTS THEY REPLACE. SERVICE BULLETIN MOS 13-MAY-2008 HRS(MSC ENC SB 72-0702 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 06-JUN-2008 HRS(MSC - ENC SB 72-0704 NO. 1 ENGINE - INSPECTION OF OIL SCAVENGE FILTER TO DETECT NO. 3 BEARING DETERIORATION. SERVICE BULLETIN MOS 23-JUN-2008 HRS(MSC 1000 (s) ENC SB 72-0704 R1 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) INSPECTION OF OIL SCAVENGE FILTER TO DETECT NO. 3 BEARING DETERIORATION. SERVICE BULLETIN MOS HRSOASC 500(s) ENC SB 72-0706 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7626A32. SERVICE BULLETIN 11-JUN-2009 MOS HRS(MSC - ENC RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 504 Of 748 @ Camp Systems EFTA00618795 CAMP Asicitiomfra AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0707 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CFP.156-78 ENGINE CONVERSION TO CR156-7826/382. SERVICE BULLETIN I I -JUN-2009 SB 72-0707 RI NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382. SERVICE BULLETIN 22-FEB-2011 SB 72-0708 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382F. SERVICE BULLETIN MOS II-JUN-2009 HRS/MSC - ENC SB 72-0708 RI NO. 1 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382F. SERVICE BULLETIN RECOMMENDED MOS 22-FEB-2011 HRS/MSC - ENC SB 72-0709 RI NO. 1 ENGINE - INTRODUCTION OF NEW BOLT FOR RECOMMENDED COMPLIED WITH HPTACC MANIFOLD ASSEMBLY. SERVICE BULLETIN MOS 28-SEP-2009 29-OCT-2008 HRSAISC - (s) 3378:01 ENC 776 SB 72-0711 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS I6-OCT-2008 HRS/MSC ENC SB 72-0712 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 06-NOV-2008 MRS/P.1SC - ENC SB 72-0713 RI NO. I ENGINE - FUEL NOZZLE COUPLING NUT INSPECTION. SERVICE BULLETIN NOT APPLICABLE - BY EFFECTIVITY MOS 28-SEP-2009 25-JUL-2008 HRS,MSC - 3378:04 ENC 776 SB 72-0716 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC MOS MRS/P.1SC - ENC RECOMMENDED 20-OCT-2008 SB 72-0718 RI 04-JUN-2013 MOS HRS(MSC ENC NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - REWORK OF THE LPT CALF RAIL "0° SUPPORT RING AND REIDENTIFICATION OF THE LPT CASE. SERVICE BULLETIN MOS HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 505 Of 748 @ Camp Systems EFTA00618796 CANIP Asiatic, film Ow imam, up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0720 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF A NEW FAN BLADE SPACER. SERVICE BULLETIN 28-APR-2009 MOS HRS/MSC ENC SB 72-0720 RI NO.1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- INTRODUCTION OF A NEW FAN BLADE SPACER. SERVICE BULLETIN I1 -JAN-2010 SB 72-0722 I0-DEC-2008 SB 72-0724 I0-AUG-2009 SB 72-0725 29-JAN-2009 MOS HRS/MSC ENC NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF TWO NEW BRACKETS ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0726 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF TWO BRACKETS ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS 26-FEB-2009 HRS/MSC - ENC SB 72-0727 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW SILVER PLATED NUT FOR THE LPT ROTOR SUPPORT I LPT SHAFT ATTACHMENT FLANGE JUNCTION. SERVICE BULLETIN MOS 28-MAY-2009 MRS/P.1SC - ENC SB 72-0728 NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS. SERVICE BULLETIN 06-MAR-2009 MOS 12 (s) HRSfMSC ENC SB 72-0728 RI NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS. SERVICE BULLETIN MOS 12 (s) HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 506 Of 748 @ Camp Systems EFTA00618797 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0728 R2 NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS. SERVICE BULLETIN MOS 12 (s) 09-FEB-2010 HRS/MSC ENC SB 72-0730 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - REIDENTIFICATION OF THE CONTAINMENT CASE 340-059-813-0 AND 300-059-814-0. SERVICE BULLETIN MOS 13-FEB-2009 HRS1MSC ENC SB 72-0731 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - REPLACEMENT OF BALL BEARING 301-080-320-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS 26-FEB-2009 HRSAISC - ENC SB 72-0732 NO. 1 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 02-JUN-2009 HRS1MSC ENC 19000 (s) SB 72-0732 RI NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC RECOMMENDED ENGINES. SERVICE BULLETIN MOS HRSAISC ENC 19000 (s) SB 72-0733 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 14-APR-2009 HRS/MSC - ENC SB 72-0734 NO.1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00)- INTRODUCTION OF NEW LPT STAGE 1 NOZZLE SEGMENTS. SERVICE BULLETIN MOS 13-AUG-2009 HRS1MSC ENC SB 72-0734 RI NO. I ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF NEW LPT STAGE 1 NOZZLE SEGMENTS. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0735 NO. 1 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY - (72-53-00) - MODIFICATION OF HPT STATOR SHROUD- ENHANCED DURABILITY PUCK REPAIR. SERVICE BULLETIN 26-JUN-2009 MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 507 Of 748 @ Camp Systems EFTA00618798 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0735 R1 04-DEC-2009 NO. I ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY - (72-53-00) - MODIFICATION OF HPT STATOR SHROUD - ENHANCED DURABILITY PUCK REPAIR. SERVICE BULLETIN MOS HRSOASC - ENC SB 72-0737 NO.1 ENGINE - ENGINE - ENGINE (72-00-00) - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS TO CFM56-7827A ENGINES. SERVICE BULLETIN MOS FIRS1MSC ENC 15-MAY-2009 SB 72-0738 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC, SERVICE BULLETIN 28-JAN-2009 MOS HRSOASC ENC SB 72-0738 RI NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 30-JUN-2011 HRSOASC ENC SB 72-0739 NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - PRECAUTIONS TO BE FOLLOWED CONCERNING INSULATION BLANKETS CONTAINING RCF. SERVICE BULLETIN MOS 08-FEB-20I3 HRSAISC - ENC SB 72-0740 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN INFORMATIONAL MOS 17-FEB-2009 HRSOASC - ENC SB 72-0742 NO. 1 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE ASSEMBLY (72-00-02) - HPC FRONT CASE BLEED PORT REMOVAL AND SIMPLIFICATION. SERVICE BULLETIN MOS 30-JUN-2009 HRSAISC - ENC SB 72-0743 NO. I ENGINE - ENGINE - LPT ROTOR I STATOR ASSEMBLY (72-54-00) - REPLACEMENT OF SUSPECT STAGE 3 LPT DISK 336-002-006-0. SERVICE BULLETIN 26-OCT-2009 SB 72-0743 RI 09-NOV-20I0 MOS HRSAISC ENC 9500 (s) NO.1 ENGINE - ENGINE - LPT ROTOR/ STATOR ASSEMBLY (72-54-00) - REPLACEMENT OF SUSPECT STAGE 3 LPT RECOMMENDED DISK 336-002-006-0, SERVICE BULLETIN MOS HRSOASC ENC 9500 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 508 Of 748 @ Camp Systems EFTA00618799 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0744 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF THREE BRACKETS ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS 12-MAY-2009 HRS/MSC - ENC SB 72-0745 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF AN ALTERNATE PROVISIONING SOURCE FOR THE NO. 1.2 AND 5 BEARINGS. SERVICE BULLETIN 26-AUG-2009 MOS HRS.0.1SC ENC SB 72-0747 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE SERIALIZATION-MANUFACTURING SEQUENCE. SERVICE BULLETIN 04-JUN-2009 MOS HRSfMSC ENC SB 72-0747 R1 NO. I ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE SERIALIZATION-MANUFACTURING SEQUENCE. SERVICE CATEGORY 9 BULLETIN MOS 03-MAR-2014 HRS/MSC ENC S8 72-0748 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 30-JUN-2009 HRSfMSC - ENC SB 72-0749 NO. 1 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW RETAINING PLATE. SERVICE BULLETIN MOS 01-FEB-2011 HRS/MSC - ENC SB 72-0750 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 08-OCT-2009 HRS/P.1SC - ENC S8 72-0751 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 08-OCT-2009 HRS/MSC - ENC SB 72-0752 NO. I ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 02-JUL-2009 HRS/MSC - ENC SB 72-0753 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REWORK IN FIELD OF THE FAN BLADE REAR SHANK FOR WEAR. SERVICE BULLETIN 14-OCT-2009 MOS HRSfMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 509 Of 748 @ Camp Systems EFTA00618800 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0753 R1 03-DEC-2012 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - REWORK IN FIELD OF THE FAN BLADE REAR SHANK FOR WEAR. SERVICE BULLETIN MOS HRS‘MSC ENC SB 72-0750 NO.1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF ONE BRACKET ON THE FLANGE Al RECOMMENDED AND THREE BRACKETS ASSY ON THE FLANGE 86 WITH A NEW DESIGN. SERVICE BULLETIN MOS I0-NOV-2010 HRS1MSC - ENC SB 72-0756 NO. I ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS HRSfMSC ENC SB 72-0757 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 28-AUG-2009 HRSfMSC - ENC SB 72-0758 NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR BLADES. SERVICE BULLETIN 22-SEP-2009 MOS HRSfMSC ENC SB 72-0759 NO. I ENGINE - ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION OPTIONAL HARNESSES. SERVICE BULLETIN 27-OCT-2010 MOS HRS/MSC ENC SB 72-0759 R1 NO. 1 ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION HARNESSES SUPERSEDED (SUPERSEDED BY SB 72-0759 R2). SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0759 R2 NO. 1 ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION HARNESSES. CUSTOMER SERVICE BULLETIN CONVENIENCE MOS 22-OCT-2013 HRS1MSC ENC SB 72-0760 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS 03-SEP-2009 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 510 Of 748 @ Camp Systems EFTA00618801 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0761 NO 1 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN 08-OCT-2009 MOS HR&MSC - ENC SB SB 72-0762 29-SEP-2009 72-0763 NO 1 ENGINE - ENGINE - TRANSFER GEARBOX ASSEMBLY (72-62-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC. SERVICE BULLETIN MOS HRS.ISC ENC NO 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC. SERVICE BULLETIN MOS HRS.ISC ENC SB 72-0764 RI NO. I ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF PREFORMED PACKING O-RINGS IN THE LPT ROTOR r STATOR ASSEMBLY. SERVICE BULLETIN MOS HRS'MSC - ENC SB 72-0764 R2 NO. I ENGINE - GENERAL (72-00-00) - REPLACEMENT OF PREFORMED PACKING O-RINGS IN THE LPT ROTOR r OPTIONAL STATOR ASSEMBLY. SERVICE BULLETIN MOS 25-JUL -2012 HRSitISC ENC SB 72-0767 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP01.56-78 ENGINES. SERVICE BULLETIN MOS 28-OCT-2009 HRS'MSC - ENC SB 72-0768 NO. I ENGINE - NOT ISSUED. SERVICE BULLETIN MOS HRS.ISC - ENC SB 72-0769 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-.12-00) - INTRODUCTION OF INNER AND OUTER SEGMENT LINER SPARE PARTS. SERVICE BULLETIN MOS 06-FEB-2010 HRS'MSC - ENC SB 72-0772 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP01.56-78 ENGINES. SERVICE BULLETIN MOS 04-DEC-2009 HRS'MSC - ENC SB 72-0773 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS 25-NOV-2009 HRS'MSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 511 Of 748 Camp Systems EFTA00618802 C O Atiant.fran MP Ad-own/lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0774 20-JAN-2010 SB 72-0775 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS MRS/MSC - ENC NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0776 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0777 NO. 1 ENGINE - ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00)- FAN DISK MIDDLE LUG REWORK IN FIELD. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0778 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0779 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW MW0311 ELECTRICAL HARNESS AND IN FIELD REWORK OF THE OLD MW0311 ELECTRICAL HARNESS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0780 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-23-00)- REWORK IN FIELD OF FAN CONTAINMENT CASE B1 FLANGE AT HOLES NO. 84 AND 85. SERVICE BULLETIN MOS I8-JAN-2011 HRS/MSC - ENC SB 72-0780 RI NO. 1 ENGINE - FAN AND BOOSTER ASSEMBLY (72-23-00) - REWORK IN FIELD OF FAN CONTAINMENT CASE BI FLANGE AT HOLES NO. 84 AND 85. SERVICE BULLETIN MOS 1 1 -MAY-20I2 HRS/MSC - ENC SB 72-0781 NO. I ENGINE - GENERAL (72-00-00) - INTRODUCTION OF NEW LPT COOLING MANIFOLDS. SERVICE BULLETIN CUSTOMER CONVENIENCE MOS 26-JUN-2073 HRSAISC - ENC SB 72-0783 NO. 1 ENGINE - ENGINE - HPT ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR BLADES. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 512 Of 748 @ Camp Systems EFTA00618803 C O Atiant.fran MP Ad-own/lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 72-0784 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PART RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC 58 72-0785 NO. 1 ENGINE - ENGINE - ENGINE (72-00-00) - DAC FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS. SERVICE BULLETIN MOS HRSOASC - ENC SS 72-0786 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW OUTER LINER FOR HARSH ENVIRONMENT OPERATORS. SERVICE BULLETIN MOS HRS/MSC - ENC SS 72-0787 NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS0ASC - ENC SS 72-0789 NO. 1 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - ENGINE OPERATION IN THE ENHANCED PROCEDURES ZONE FROM VOLCANO EYJAFJALLAJOKULL. SERVICE BULLETIN MOS HRSOASC - ENC SS 72-0789 R1 NO. I ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-03) - ENGINE OPERATION IN THE ENHANCED PROCEDURES ZONE RECOMMENDED FROM VOLCANO EYJAFJALLAJOKULL. SERVICE BULLETIN MOS 21 -JUL-2011 HRS/MSC - ENC 58 72-0789 R2 NO.1 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - INTRODUCTION OF A LEADING INDICATOR PROGRAM FOR RECOMMENDED ENGINE OPERATION IN LOW CONCENTRATIONS OF VOLCANIC ASH, SERVICE BULLETIN MOS I4-DEC-2011 HRS/MSC - ENC 58 72-0790 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS HRSOASC - ENC 58 72-0791 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS0ASC - ENC SS 72-0792 NO. 1 ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (7261-00)- NEW BALL THRUST NO.3 BEARING OPTIONAL WITH NITRIDE HARDENING . SERVICE BULLETIN 30-JUL-2010 MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 513 Of 748 @ Camp Systems EFTA00618804 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 72-0794 NO. 1 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 15-OCT-2010 HRSAISC ENC SB 72-0795 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY OPTIONAL FOR HARSH ENVIRONMENT OPERATORS . SERVICE BULLETIN 03-NOV-2010 SB 72-0795 R2 16-APR-2012 MOS HRS1MSC ENC NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY RECOMMENDED FOR HARSH ENVIRONMENT OPERATORS. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0795 R3 NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY FOR HARSH RECOMMENDED ENVIRONMENT OPERATORS. SERVICE BULLETIN MOS 18-JUN-2012 HRSAISC - ENC SB 72-0796 NO. 1 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - FAN BLADE INTERCHANGEABILITY LIMITATIONS ( SUPERSEDED SUPERSEDED BY SB 72-0796 R1). SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0796 R1 NO. 1 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - FAN BLADE INTERCHANGEABILITY LIMITATIONS. SERVICE CATEGORY 4 BULLETIN 18-FEB-2013 MOS HRS1MSC ENC SB 72-0797 NO. 1 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- FAN BLADE MOMENT-WEIGHT MISMARKING. SERVICE BULLETIN 27-JAN-2011 MOS HRS1MSC ENC SB 72-0798 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00)- REWORK OF HPC STAGE I THROUGH STAGE RECOMMENDED 9 BLADES. SERVICE BULLETIN 24-JAN-2011 MOS HRS1MSC ENC SB 72-0799 NO. I ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - REWORK OF HPC TECH INSERTION HPC BLADES. RECOMMENDED SERVICE BULLETIN 20-JAN-2011 MOS HRSfMSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 514 Of 748 @ Camp Systems EFTA00618805 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0801 NO. 1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW FRONT FLANGE WITH 6 VENTILATION HOLES AND REWORK OF THE OLD PART. SERVICE BULLETIN MOS 30-JUN-2011 HRS/MSC - ENC SB 72-0802 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0803 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN 12-OCT-2010 MOS HRS/MSC - ENC 513 72-0801 NO. I ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED BULLETIN 09-NOV-2010 SS 72-0804 RI MOS HRS/MSC - ENC NO. 1 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED BULLETIN MOS 24-MAR-2011 HRS/MSC - ENC SS 72-0805 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 02-NOV-2010 HRS/MSC - ENC 513 72-0806 NO. I ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF NEW SUPPORT WITH CAPTNE NUT. SERVICE BULLETIN 18-JUL-2011 MOS HRS/MSC - ENC SS 72-0807 NO. I ENGINE - ENGINE - LPT FRAME ASSEMBLY (7256-00)- INSPECTION OF TURBINE REAR FRAME ON CFM56-7827A OPTIONAL ENGINES. SERVICE BULLETIN MOS 19-JAN-2012 HRS/MSC ENC 11200 (s) SS 72-0808 NO.1 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00)- INSPECTION OF STAGE 1 CUSTOMER LPT NOZZLES DUE TO INDIA ENVIRONMENTAL DISTRESS. SERVICE BULLETIN CONVENIENCE 27-SEP-2013 MOS HRS/MSC - ENC SB 72-0809 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF CFM56-7BE LPT HARDWARE ON CFM56-76. SERVICE BULLETIN MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 515 Of 748 @ Camp Systems EFTA00618806 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0810 09-JUN-2011 SB 72-0811 20-JAN-2011 NO. I ENGINE - SPARE PARTS RELEASE FOR CFMGS-7B IPC. SERVICE BULLETIN MOS HRSiliSC - ENG NO. I ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ACTUATION COMPRESSOR STATOR INLET RECOMMENDED GUIDE VANE RING ASSEMBLY DURABILITY IMPROVEMENT. SERVICE BULLETIN MOS HRSitiSC - ENG SB 72-0811 R1 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ACTUATION COMPRESSOR STATOR RECOMMENDED INLET GUIDE VANE RING ASSEMBLY DURABILITY IMPROVEMENT. SERVICE BULLETIN MOS 29-NOV-2011 HRS,IISC - ENG SB 72-0812 NO. I ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (72-61-00)- NEW BALL THRUST NO 3 BEARING RECOMMENDED WITH NITRIDE HARDENING. SERVICE BULLETIN MOS 26-SEP-2011 HRS.1SC - ENG SB 72-0812 R1 NO. I ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (72-61-00)- NEW BALL THRUST NO 3 BEARING RECOMMENDED WITH NITRIDE HARDENING. SERVICE BULLETIN MOS CS-FEB-2012 HRSI.1SC - ENG SB 72-0813 NO. I ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - INTRODUCTION OF HPT BLADE INFORMATIONAL PIN 2403M91P02. SERVICE BULLETIN MOS 30-JAN-2012 HR&P.ISC - ENG SB 72-0814 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS 11-APR-2011 HR&P.ISC - ENG SB 72-0815 20-DEC-2011 SB 72-0816 NO. I ENGINE - HPTILPT NOZZLE SHROUD ASSEMBLY (72-53-00) - NEW SHROUD HPT STATOR HANGER WITH RECOMMENDED MODIFIED AIR FILTER. SERVICE BULLETIN MOS 19-JAN-2011 HRSI.1SC - ENG SB 72-0817 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-12-00) - REWORK OF COMBUSTION CHAMBER RECOMMENDED OUTER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS 03-OCT-2011 HR&LISC - ENG NO. I ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRS.,LISC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 516 Of 748 Camp Systems EFTA00618807 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0817 R1 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF COMBUSTION CHAMBER OUTER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0818 RI NO.1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR. RECOMMENDED SERVICE BULLETIN 24-MAR-2011 SB 72-0819 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN 03-N0V-2011 SB 72-0820 NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - REPLACEMENT OF NO. 4 MIRING STEEL VERSION. SERVICE BULLETIN CUSTOMER CONVENIENCE MOS 31 -JUL-2012 HRS/MSC ENC SB 72-0821 NO.1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN MOS 04-JUL-2011 HRSOASC ENC SB 72-0821 RI NO.1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN 610S 26-MAR-2013 HRSOASC ENC SB 72-0822 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00)- INTRODUCTION OF NEW BOLT TO ATTACH THE MW0325 HARNESS. SERVICE BULLETIN MOS HRS/MSC ENC MOS HRS/MSC - ENC I8-AUG-201 I MOS HRS/MSC ENC SB 72-0822 RI NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF NEW BOLTS TO ATTACH THE MW0325 HARNESS. SERVICE BULLETIN 26-APR-20I2 MOS HRSIMSC ENC RECOMMENDED RECOMMENDED SB 72-0823 NO. I ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE P/N 2080M35G05 SUPERSEDED (SUPERSEDED BY 72-0823 R1). SERVICE BULLETIN MOS 11-APR-2011 HRSIMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 517 Of 748 @ Camp Systems EFTA00618808 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0823 R1 NO. 1 ENGINE - ENGINE - I-IPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE P/N 2080M35G05. INFORMATIONAL SERVICE BULLETIN MOS I1-MAY-2011 HRS/MSC ENC SB 72-0823 R2 NO. I ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE PM 2080M35G05. INFORMATIONAL SERVICE BULLETIN MOS 23-JUN-20I1 HRS/MSC ENC SB 72-0824 NO.1 ENGINE - CORE ENGINE MAJOR MODULE (72-00-02)- MANIFOLD HPT CLEARANCE CONTROL BRACKET OPTIONAL CHANGE. SERVICE BULLETIN 2I -NOV-20I 1 MOS HRS/MSC ENC SB 72-0825 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF RECOMMENDED PRE-CFM56-78 SIB 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE BULLETIN MOS I-IRS/NISC ENC 25000 (s) SB 72-0825 R1 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF RECOMMENDED PRE-CFM56-7B SiB 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE BULLETIN MOS 29-NOV-2011 HRS/MSC ENC 15000 (s) SB 72-0825 R2 NO. I ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (7232-00)- ON WING INSPECTION OF PRE-CFM56-7B SB SUPERSEDED 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES (SUPERSEDED BY SB 72-0825 R3). SERVICE BULLETIN MOS HIRSAISC - (s) ENC SB 72-0825 R3 NO. 1 ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF PRE-CFM56-7B SB CATEGORY 2 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE BULLETIN MOS 30-APR-2014 HIRSAISC - ENC SB 72-0826 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0827 NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REWORK OF THE BOOSTER SPOOL. SERVICE CUSTOMER BULLETIN CONVENIENCE MOS 27-MAY-20I3 HRSO4SC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 518 Of 748 @ Camp Systems EFTA00618809 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0829 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - RELEASE OF CFM56-78E HPT ROTOR HARDWARE TO EARLIER CFM56-78 ENGINE MODELS. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0830 NO.1 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - RELEASE OF CFM56-7BE COMBUSTION CASE TO RECOMMENDED EARLIER CFM56-7B ENGINE MODELS. SERVICE BULLETIN MOS 10-JAN-2012 HRS(MSC - ENC SB 72-0831 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN MOS 02-DEC-2011 HRS(MSC - ENC SB 72-0832 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN 30-JAN-2012 05-JUL-2011 MOS HRS(MSC - ENC SB 72-0833 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B TURBOFAN ENGINES. SERVICE BULLETIN 31 -AUG-20I1 MOS HRSOASC - ENC SB 72-0833 RI NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 TURBOFAN ENGINES. SERVICE BULLETIN MOS 28-N0V-2011 HRSOASC - ENC SB 72-0834 NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE PART CUSTOMER NUMBERS AND CONVENIENCE REIDENTIFICATION OF OLD FAN BLADES IN FIELD. SERVICE BULLETIN MOS 08-JUN-2011 HIRSAISC - ENC SB 72-0834 RI NO. I ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE PART NUMBERS AND CUSTOMER REIDENTIFICATION OF OLD FAN BLADES IN FIELD. SERVICE BULLETIN CONVENIENCE MOS 20-JUL-2012 HRSOASC - ENC SB 72-0835 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION RECOMMENDED COMBUSTION CHAMBER INNER LINER WITH THIN TBC. SERVICE BULLETIN MOS 01-DEC-2011 HRS/1,1SC - ENC RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 519 Of 748 @ Camp Systems EFTA00618810 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0836 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF COMBUSTION CHAMBER RECOMMENDED INNER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS 23-SEP-2011 HRS0ASC - ENC SB 72-0837 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B20E, SERVICE BULLETIN OPTIONAL MOS I6-JUN-2011 HRSOASC - ENC SB 72-0838 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7622E. SERVICE BULLETIN OPTIONAL MOS 76-JUN-2011 HRS/MSC - ENC SB 72-0839 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B228B1. SERVICE OPTIONAL BULLETIN MOS I6-JUN-2011 HRS/MSC - ENC SB 72-0840 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B24E, SERVICE BULLETIN OPTIONAL MOS I5-JUN-2011 HRS/MSC - ENC SB 72-0841 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B24E/B1. SERVICE OPTIONAL BULLETIN 15-JUN-20 1 MOS HRS/MSC - ENC SB 72-0842 R1 NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7626E. SERVICE BULLETIN RECOMMENDED MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0843 R1 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B26E/B1. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0844 R1 NO. I ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B268B2. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0845 R1 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B26E/F. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRSOASC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 520 Of 748 @ Camp Systems EFTA00618811 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0846 RI NO. I ENGINE - ENGINE - GENERAL (72-00-03) - CFP.156-7B ENGINE CONVERSION TO CFP.156-7826E62F. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0848 RI NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - CFMS6-7B ENGINE CONVERSION TO CFM56-7627E431, SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0850 RI NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - CFMS6-7B ENGINE CONVERSION TO CFM56-7627E/F. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0852 NO. I ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW I.PT ROTOR CUSTOMER SUPPORT. SERVICE BULLETIN CONVENIENCE MOS I6-OCT-2012 HRS/MSC ENC SB 72-0853 NO. I ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE MATE FACE RECOMMENDED SURFACE INSPECTION. SERVICE BULLETIN MOS 72-SEP-2011 HRS/MSC ENC SB 72-0854 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY ON THE FILTER SUPPORT. SERVICE BULLETIN 15-N0V-2011 MOS HRS/MSC - ENC SB 72-0856 NO. I ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY. SERVICE BULLETIN MOS 28-FEB-20 I 2 HRS/MSC ENC SB 72-0857 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 21-DEC-2011 HRSfMSC - ENC SB 72-0858 NO. 1 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INSPECTION OF SUSPECT FAN CONTAINMENT CASE FOR MISSING OR MISLOCATED ANODIZATION. SERVICE BULLETIN MOS 72-SEP-2011 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 521 Of 748 @ Camp Systems EFTA00618812 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0859 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF COMBUSTION CHAMBER RECOMMENDED DOME WITH RETAINERLESS SWIRL NOZZLES. SERVICE BULLETIN 21 -SEP-2011 MOS HRS/PASC - ENC SB 72-0859 RI NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF COMBUSTION CHAMBER RECOMMENDED DOME WITH RETAINERLESS SWIRL NOZZLES. SERVICE BULLETIN MOS 28-JAN-2013 HRS/MSC - ENC SB 72-0861 NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION OUTER RECOMMENDED COMBUSTION CHAMBER UNER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS 09-JAN-2012 HRS/PASC - ENC SB SB 72-0862 I2-JAN-2012 72-0863 NO. I ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION OUTER COMBUSTION CHAMBER UNER WITHOUT MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS HRS/MSC - ENC NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD EROSION COATING (SUPERSEDED BY 72-0863 RI). SERVICE BULLETIN MOS RECOMMENDED SUPERSEDED HRS/MSC - ENC SB 72-0863 RI NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD SUPERSEDED EROSION COATING (SUPERSEDED BY 72-0863 R2). SERVICE BULLETIN MOS HRStAISC - ENC SB 72-0863 R2 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD RECOMMENDED EROSION COATING. SERVICE BULLETIN MOS 22-MAY-2012 HRS/MSC ENC SB 72-0864 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - INTRODUCTION OF NEW STAGE 2 RECOMMENDED AND STAGE 3 SHROUDS AND STAGE 4 THROUGH 8 VANE ASSEMBLIES AND SECTORS. SERVICE BULLETIN MOS 25-AUG-2011 HRS/PASC - ENC SB 72-0865 NO. 1 ENGINE - ENGINE - LPT ROTORISTATOR ASSEMLY (72-54-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN 08-DEC-2011 MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 522 Of 748 @ Camp Systems EFTA00618813 COMP Atant.fre• therrnit4 up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0866 NO. I ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY FOR ATTACHMENT OF J5 HARNESS. CUSTOMER SERVICE BULLETIN CONVENIENCE 14-FEB-2012 MOS HRS1MSC ENC SB 72-0867 NO. I ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-53-00) - RELEASE OF NEW HPT STATOR SHROUD. RECOMMENDED SERVICE BULLETIN 20-APR-2072 SB 72-0868 07-FEB-2012 MOS HRS1MSC ENC NO. 1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF TECH INSERTION OUTER RECOMMENDED COMBUSTION CHAMBER LINER WITHOUT MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS HRS1MSC - ENC SB 72-0869 NO. 1 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - RELEASE OF SPD AIR DUCT SLEEVE PIN 1812M68G02. SERVICE BULLETIN MOS 02-NOV-2011 MRS/P.1SC - ENC SB 72-0871 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - HPC STAGE 4 THROUGH STAGE 9 BLADE RECOMMENDED LOCK ON-WING INSPECTION. SERVICE BULLETIN MOS 6 (s) 19-OCT-2011 HRSAISC ENC SB 72-0871 R1 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - HPC STAGE 4 THROUGH STAGE 9 BLADE RECOMMENDED LOCK ON-WING INSPECTION. SERVICE BULLETIN MOS I I -APR-2012 HRSOISC DUE (s) ENC SB 72-0872 NO. I ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 3 BLADES. CUSTOMER SERVICE BULLETIN CONVENIENCE MOS 12-DEC-2012 HRSAISC ENC SB 72-0873 NO. 1 ENGINE - LPT SHAFT ASSEMBLY (72-55-00) - INTRODUCTION OF A NEW SEAL ON THE CENTER VENT TUBE. SERVICE BULLETIN 27-FEB-20I2 MOS HRS(MSC ENC SB 72-0874 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS. RECOMMENDED SERVICE BULLETIN 20-OCT-2011 MOS HRS1MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 523 Of 748 @ Camp Systems EFTA00618814 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0874 R1 08-FEB-2012 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS RECOMMENDED (SUPERSEDED BY SI3 72-0874 R2). SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0870 R2 NO. 1 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS, SERVICE CATEGORY 4 BULLETIN 14-JUL-2014 MOS HRS11.1SC ENC SB 72-0875 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 23-APR-2072 HRS/MSC - ENC SB 72-0876 NO. I ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-03-02) - INSPECTION OF FUEL NOZZLE SUPPLY TUBE NO. 7 RECOMMENDED FOR WEAR OR CLOSE CLEARANCE, SERVICE BULLETIN MOS 12 (s) 27-DEC-2011 HRS11.1SC ENC SB 72-0877 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN MOS 18-007-2012 HRS/MSC - ENC SB 72-0878 NO. I ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - FUEL MANIFOLD SUPPORT BRACKETS AND IGNITER CABLE OPTIONAL BRACKET ASSEMBLY REDESIGN. SERVICE BULLETIN MOS 21-NOV-2011 HRS/MSC - ENC SB 72-0879 RI NO.1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW HOUSING ASSEMBLY AND NEW STARTER DRIVE PAD ASSEMBLY AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN 12-APR-2012 SB 72-0879 R3 MOS MRS/P.1SC ENC NO. I ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW CATEGORY 6 HOUSING ASSEMBLY AND NEW STARTER DRIVE PAD ASSEMBLY AND REWORK OF THE OLD AG8 TO THE NEW ONE. SERVICE BULLETIN MOS 15-JAN-2014 HRSAISC ENC SB 72-0880 NO.1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF TECH INSERTION INNER RECOMMENDED COMBUSTION CHAMBER LINER INTO MULTI-HOLE COOLING PATCH WITH THIN IBC CONFIGURATION. SERVICE BULLETIN 22-FEB-2012 MOS MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 524 Of 748 @ Camp Systems EFTA00618815 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC 58 72-0881 NO. 1 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - HPT STATOR AIR IMPINGEMENT MANIFOLD REWORK. SERVICE RECOMMENDED BULLETIN II-APR-2012 SB 72-0882 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0884 NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REPETITIVE ON-WING INSPECTION OF THE FAN RECOMMENDED BLADE PLATFORMS. SERVICE BULLETIN MOS 12 (s) 24-JAN-2012 FIRS/MSC ENC SB 72-0885 NO. 1 ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 2 BLADES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0886 NO. I ENGINE - ENGINE - HPT BLADES (7242-01) - INSPECTION OF HPT BLADES - INDIA REGION. SERVICE BULLETIN RECOMMENDED MOS 27-FEB-20I2 HRS/MSC ENC 400(s) SB 72-0886 RI NO. 1 ENGINE - ENGINE - HPT BLADES (7242-01) - INSPECTION OF HPT BLADES - INDIA REGION. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0888 NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER WITH A RECOMMENDED MORE DURABLE AFT OUTER SUPPORT AND THICK TBC. SERVICE BULLETIN MOS 30-AUG-2012 HRS(MSC - ENC SB 72-0888 RI NO. I ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF NEW OUTER LINERS WITH A CUSTOMER MORE DURABLE AFT OUTER SUPPORT AND THICK TBC. SERVICE BULLETIN CONVENIENCE MOS 03-JAN-2013 HRS/MSC - ENC SB 72-0889 NO.1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER RECOMMENDED WITH A MORE DURABLE AFT OUTER SUPPORT AND THIN TBC. SERVICE BULLETIN MOS 23-AUG-2012 HRS/MSC - ENC SB 72-0889 RI NO.1 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER CUSTOMER WITH A MORE DURABLE AFT OUTER SUPPORT AND THIN TBC. SERVICE BULLETIN CONVENIENCE MOS 17-OCT-2012 HRS/MSC - ENC 26-SEP-2012 MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 525 Of 748 @ Camp Systems EFTA00618816 CAMP Aviation/nem the ernit4 up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0890 23-AUG-20I2 SB 72-0892 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 13-FEB-20 I 2 HRSOASC - ENC SB 72-0893 NO. 1 ENGINE - INTRODUCTION OF A NEW BOLT-WASHER ASSEMBLY TO IMPROVE THE FLANGE ASSEMBLY ATTACHMENT. SERVICE BULLETIN MOS HRS/1.1SC ENC SB 72-0894 NO. I ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF A NEW COMPRESSOR RECOMMENDED ROTOR STAGES 4 THROUGH 9 SPOOL ASSEMBLY. SERVICE BULLETIN MOS 14-MAR-2012 HRS/MSC - ENC SB 72-0894 R1 NO. I ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION Of A NEW COMPRESSOR ROTOR RECOMMENDED STAGES 4 THROUGH 9 SPOOL ASSEMBLY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0895 NO. 1 ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF 76 BLADE HPT RECOMMENDED ROTOR KIT. SERVICE BULLETIN NO. 1 ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION CHAMBER ASSEMBLY. RECOMMENDED SERVICE BULLETIN MOS HRS/MSC ENC 10-MAY-2012 MOS HRS/MSC ENC 58 72-0895 R1 NO. 1 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF 76 BLADE HPT ROTOR KIT. SERVICE BULLETIN MOS HRS/MSC ENC 58 72-0897 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT ASSEMBLY (72-55-00) - REPETITIVE REPAIR OF THE AIR/OIL SEPARATOR IN SHOP. SERVICE BULLETIN MOS 20-MAR-2012 HRS/MSC - ENC 58 72-0897 R1 NO. 1 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT ASSEMBLY (72-55-00) - REPETITIVE REPAIR OF THE AIR/OIL SEPARATOR IN SHOP. SERVICE BULLETIN MOS 28-MAR-2013 HRS/MSC - ENC SB 72-0898 NO. 1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS 12-MAR-2012 HRS/MSC - ENC 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 526 Of 748 @ Camp Systems EFTA00618817 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0699 NO. 1 ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE SPLIT VANE RECOMMENDED REPAIR. SERVICE BULLETIN 17-OCT-2012 SB 72-0900 MOS HRS/MSC - ENC NO. 1 ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 1 BLADES. SERVICE BULLETIN MOS HRS.4.1SC ENC SB 72-0902 NO. I ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - DELETION OF ALTERNATE COMBUSTION CHAMBER RECOMMENDED ASSEMBLY. SERVICE BULLETIN MOS 20-APR-2012 HRS/MSC ENC SB 72-0903 NO. I ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-5340) - REWORK OF N500 MATERIAL HPT STATOR RECOMMENDED SHROUDS. SERVICE BULLETIN MOS 12-APR-20I3 HRSOASC ENC SB 72-0904 RI NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW AIR/OIL SEPARATOR AND REWORK OF THE OLD ONE. SERVICE BULLETIN 17-OCT-2012 MOS HRS/MSC ENC SB 72-0907 NO. 1 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-7BE BASELINE CONFIGURATION HARDWARE RELEASED TO INFORMATIONAL EARLIER CFM56-76 SAC ENGINE MODELS. SERVICE BULLETIN MOS 04-JUN-2013 HRS/MSC - ENC SB 72-0909 NO. I ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- INTRODUCTION OF A NEW FAN BLADE CUSTOMER PLATFORM. SERVICE BULLETIN CONVENIENCE MOS 20-NOV-2012 HRS/PASC ENC SB 72-0911 NO.1 ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN MOS 17-JUL-2012 HRSfMSC - ENC SB 72-0912 NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 27-SEP-2012 HRS/MSC - ENC SB 72-0913 NO.1 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED BULLETIN OS-NOV-2012 MOS HRSfMSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 527 Of 748 @ Camp Systems EFTA00618818 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 72-0914 25-MAR-2013 58 72-0914 RI NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN 12-APR-2013 58 72-0915 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN 30-NOV-2012 SS 72-0916 NO. 1 ENGINE - ENGINE -HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE SPLIT VANE REPAIR. SERVICE BULLETIN 15-JAN-2013 NO. 1 ENGINE - ENGINE - GENERAL (72-00-W) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS MRS/MSC - ENC MOS HRSAISC - ENC MOS HRSAISC - ENC MOS HRSAISC - ENC SS 72-0917 NO. I ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW OIL SCAVENGE TUBE CLAMP. SERVICE RECOMMENDED BULLETIN MOS 16-OCT-2012 HRSAISC - ENC SS 72-0918 NO. I ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00)- HPT ROTOR BLADE MANAGEMENT SUPERSEDED (SUPERSEDED BY 93 72-0918 RI). SERVICE BULLETIN SB 72-0918 RI 11-JUN-2014 MOS HRSAISC - ENC NO. 1 ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. CATEGORY 4 SERVICE BULLETIN MOS HRSAISC ENC SB 72-0920 NO. 1 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT NOZZLE KIT. SERVICE LIMITED BULLETIN DISTRIBUTION MOS 15-NOV-20I3 HRS/MSC ENC SB 72-0921 NO.1 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW CENTER VENT TUBE (SUPERSEDED BY SUPERSEDED 72-0921 RI). SERVICE BULLETIN SB 72-0921 RI MOS HRS/MSC - ENC NO. 1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE (SUPERSEDED BY SB 72-0921 SUPERSEDED R2). SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 528 Of 748 @ Camp Systems EFTA00618819 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0921 R2 NO. 1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE. SERVICE BULLETIN MOS 09-DEC-2013 HRSAISC - ENC SB 72-0922 NO.1 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN 25-FEB-2013 MOS HRSAISC - ENC CATEGORY 5 SB 72-0924 NO.1 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF NEW BRACKET ASSEMBLIES, SERVICE BULLETIN CATEGORY 7 23-JUL-2014 MOS HRS/MSC - ENC SB 72-0926 NO. I ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON-WING INSPECTION OF VSV STAGE SUPERSEDED 3 OUTER BUSHINGS (SUPERSEDED BY SB 72-0926 R1). SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0926 R1 NO. 1 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON-WING INSPECTION OF VSV STAGE 3 OUTER BUSHINGS. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0927 NO. 1 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - DELETION OF BALL BEARING 335-304-401-0 ALTERNATIVE FOR THE liANDCRANKING LINE (SUPERSEDED BY SB 72-0927 R1). SERVICE BULLETIN MOS 03-JUL-2013 HRS/MSC - ENC SB 72-0927 R1 NO. I ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - DELETION OF BALL BEARING 335-304-401-0 CATEGORY 3 ALTERNATIVE FOR THE liANDCRANKING LINE. SERVICE BULLETIN MOS I4-APR-2014 HRS/MSC ESV ENC SB 72-0928 NO. 1 ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - REPLACEMENT OF LPT STAGE 1 NOZZLE SEGMENTS DUE TO ENVIRONMENTAL DISTRESS, SERVICE BULLETIN MOS 22-JUL-2013 HRSIMSC - ENC SB 72-0929 NO. 1 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR DISK AIR SLOT REDESIGN. SERVICE CUSTOMER BULLETIN CONVENIENCE MOS 06-AUG-2013 HRS/MSC - ENC SB 72-0930 NO. 1 ENGINE - ENGINE - HPT/LPT SHROUD NOZZLE ASSEMBLY (72-53-00)- FORWARD FLANGE WEAR GROOVE CUSTOMER HPT/LPT SHROUD NOZZLE SUPPORT REWORK. SERVICE BULLETIN CONVENIENCE MOS 02-OCT-2013 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 529 Of 748 @ Camp Systems EFTA00618820 CAMP fin. thermiewlqi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0931 NO. 1 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW THICKER FAN CONTAINMENT CASE SUPERSEDED (SUPERSEDED BY SI3 72-0931 RH. SERVICE BULLETIN MOS FIRS/MSC - ENC SB 72-0931 RI NO. 1 ENGINE -FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW THICKER FAN CONTAINMENT CASE. CATEGORY 7 SERVICE BULLETIN MOS 10-JAN-2014 MRS/51SC ENC SB 72-0933 NO. I ENGINE - FAN FRAME ASSEMBLY (72-23-00)- INTRODUCTION OF A NEW CUP TO ATTACH THE OUTER CATEGORY 7 PLATFORM OF THE OGV TO THE CONTAINMENT CASE. SERVICE BULLETIN MOS 20-FEB-2014 HRS/MSC - ENC SB 72-0931 NO. I ENGINE - COMBUSTION ASSEMBLY (72-41-00) - REWORK OF THE COMBUSTION CASE PM 2002MM G09. SERVICE CATEGORY 7 BULLETIN 14-FEB-2014 MOS FIRS/MSC ENC SB 72-0935 NO. 1 ENGINE - 1-PT ROTOR ASSEMBLY (72-52-00) - INTRODUCTION OF HPT ROTOR BLADE P/N 2403M91P03 AND CUSTOMER 76-BLADE HPT ROTOR KIT. SERVICE BULLETIN CONVENIENCE MOS 03-SEP-2013 HRSfMSC - ENC SB 72-0938 NO. I ENGINE - CORE ENGINE MAJOR MODULE (72-00-02)- INTRODUCTION OF A NEW METALLIC C-SEAL TO THE RECOMMENDED SPARE PARTS LIST. SERVICE BULLETIN MOS 04-SEP-2013 HRS/MSC ENC 58 72-0939 NO. 1 ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-53-00)- INTRODUCTION OF HPT STATOR SHROUD P/N CATEGORY 7 2080M28P06. SERVICE BULLETIN MOS 21-NOV-2013 HRS/MSC ENC SB 72-0940 NO. I ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - FORWARD INNER NOZZLE SUPPORT REWORK BY FORWARD SUPERSEDED FLANGE REPLACEMENT AND APPLICATION OF EROSION COATING (SUPERSEDED BY SB 72-0940 R1). SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0940 RI NO. I ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - FORWARD INNER NOZZLE SUPPORT REWORK BY FORWARD CATEGORY 7 FLANGE REPLACEMENT AND APPLICATION OF EROSION COATING. SERVICE BULLETIN MOS 04-FEB-2014 HRSfMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 530 Of 748 @ Camp Systems EFTA00618821 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0946 NO. 1 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00) - REPLACEMENT OF FORWARD DAMPER SLEEVE FOR THE CATEGORY 4 HPT ROTOR FRONT SHAFTS P/N 2048M21P01 AND PM 2048M21P03 (SUPERSEDED BY SB 72-0946 R1). SERVICE BULLETIN 29-JAN-2014 MOS HRS/MSC ENC SB 72-0946 R1 NO. I ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00)- REPLACEMENT OF FORWARD DAMPER SLEEVE FOR THE CATEGORY 4 HPT ROTOR FRONT SHAFTS P/N 2048M21P01 AND P/N 2048M21P03. SERVICE BULLETIN MOS 06-KWY-2014 HRS/MSC - ENC SB 72-0952 NO. I ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF IMPROVED CAST INCO 718 BLADE CATEGORY 7 LOCKS FOR STAGES 4 THROUGH 9. SERVICE BULLETIN MOS 14-JUL-2014 HRSO4SC - ENC SB SB 72-223 02-FEB-2000 72-A0140 R1 25-JUN-1999 NO. 1 ENGINE - INTRODUCTION OF A NEW OUTER LINER LUG RING TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS MRS/P.1SC - ENC NO.1 ENGINE - INTRODUCTION OF A BONDED CAUTION PLATE ON HANDCRANKING COVER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-A0336 NO. 1 ENGINE - INSTALLATION OF SAFETY WIRE OVER THE OIL TEMPERATURE PROBE AND HOUSING. SERVICE SB 72-A0368 BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - ACCESSORY GEARBOX - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A DEFECTIVE BATCH. SERVICE BULLETIN MOS HRS/MSC ENC SB 73-0001 NO.1 ENGINE - INTRODUCTION OF NEW IGNITER PLUG. SERVICE BULLETIN NOT APPLICABLE MOS HRS/MSC - ENC SB 73-0002 NO. I ENGINE - EEC-SOFTWARE VERSION 7.B.D. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73-0008R1 SB 73-0003 MOS HRS/MSC - ENC NO.1 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 531 Of 748 @ Camp Systems EFTA00618822 COMP Alisanwilm• the greyly, up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0003 R1 NO. 1 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRSAISC - ENC NOT APPLICABLE - SUPERSEDED 73-0007 SB 73-0003 R2 NO. 1 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0004 NO.1 ENGINE - HMU 1853M56P05(VIN 442026). SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 73-0020 MOS HRSAISC - ENC SB 73-0005 NO. 1 ENGINE - ELECTRONIC CONTROL UNIT (73-00-00) PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0005 R1 NO. 1 ENGINE - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL MANIFOLDS (SUPERSEDED BY SB SUPERSEDED NOT APPLICABLE 73-0005 R2). SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0005 R2 NO. 1 ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL CATEGORY 3 MANIFOLDS. SERVICE BULLETIN MOS 29-OCT-2013 HRSAISC - ENC SB 73-0005 R3 NO. I ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL SUPERSEDED MANIFOLDS (SUPERSEDED BY SB 73-0005 R4). SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0005 R4 NO. I ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL CATEGORY 3 MANIFOLDS. SERVICE BULLETIN MOS I4-JUL-2014 HRS/MSC ESV ENC SB 73-0006 R1 NO. 1 ENGINE - TRANSFER OF THE COOLING AIR ORIFICE PLATE TO THE EEC COMPONENT ASSEMBLY LEVEL. COMPLIED WITH - AT MANUFACTURE SERVICE BULLETIN MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 73-0007 NO.1 ENGINE - INTRODUCTION OF NEW MAIN FUEL PUMP WITH A NEW STATIONARY SHAFT SEAL. SERVICE COMPLIED WITH - AT MANUFACTURE BULLETIN MOS I6-DEC-1998 HRSAISC 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 532 Of 748 @ Camp Systems EFTA00618823 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0008 Fti NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.E.. SERVICE BULLETIN MOS HRSI.ISC - ENC NOT APPLICABLE - SUPERSEDED 73.0009 SB 73-0009 NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.F (782B). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0012 MOS HRSitiSC - ENC SB 73-0010 NO 1 ENGINE - DRAIN TUBE AND FUEL MANIFOLD REPLACEMENT. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRSLISC • 0 ENC 0 SB 73-0011 NO 1 ENGINE - INTRODUCTION OF A SERVO FUEL HEATER. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS le-DEC-1998 HRS.ISC • 0 ENC 0 SB 73-001 NO 1 ENGINE - INTRODUCTION OF A SERVO FUEL HEATER. SERVICE BULLETIN MOS HR&P.ISC - ENC SB 73-0012 NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.F3 (782E). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0015 MOS HRSuSC - ENC SB 73-0013 NO. ENGINE - OPERATE CFLI USING CIS TS-1 FUELS. SERVICE BULLETIN MOS HRSuSC - ENC SB 73-0014 R2 NO. ENGINE - INTRODUCTION OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRSI.ISC • 0 ENC 0 SB 73-0015 NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.F4 (7831). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0018R1 MOS HRS.ISC - ENC SB 73-0017 NO. ENGINE - INTRODUCTION OF ECUIEEC HARDWARE/SOFTWARE KITS. SERVICE BULLETIN NOT APPLICABLE MOS HR&P.ISC - ENC SB 73-0018R1 NO. ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.G (7B30). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0021R1 MOS HRSuSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 533 Of 748 '2 Camp Systems EFTA00618824 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0019 NO. I ENGINE - NEW FUEL TRANSIENT BLEED VALVE MANIFOLD AND SUPPORTING BRACKET. SERVICE BULLETIN MOS HRSi 1.1SC - ENC SB 73-0020 NO. I ENGINE - INTRODUCTION OF HMU VIN 442098 (GE 18535156P06). SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSilISC - 0 ENC 0 SB 73-0021 R1 NO. I ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.H2 (7B36). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0023R1 MOS HRSMSC - ENC SB 73-0022 NO 1 ENGINE - MODIFICATION OF FUEL NOZZLE FILTER. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSP.ISC 0 ENC 0 SB 73-0023 NO 1 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 (7B37). SERVICE BULLETIN MOS HR&P.ISC - ENC SB 73-0023 R1 NO. I ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.I(7837). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0024 MOS HRSilISC - ENC SB 73-0024 NO. I ENGINE - EEC-SOFTWARE VERSION 7.8.11 (7B38). SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSilISC - 0 ENC SB 73-0025 NO. 1 ENGINE - MODIFICATION OF THE FUEL NOZZLE FILTER. SERVICE BULLETIN MOS HRSNSC - ENC SB 73-0026 NO. I ENGINE - INTRODUCTION OF EEC- SOFTWARE VERSION 7.B.J(7133A). SERVICE BULLETIN MOS HRSIISC ENC SB 73-0027 NO. I ENGINE - . SERVICE BULLETIN CANCELLED MOS HRSIISC ENC SB 73-0028 NO. I ENGINE - INTRODUCTION TO HMU 18535156P07 WIN 442124). SERVICE BULLETIN MOS HRSilISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 534 Of 748 11 Camp Systems EFTA00618825 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0028 R1 NO. 1 ENGINE - INTRODUCTION TO HMU 1853M56P07 (VIN 442124). SERVICE BULLETIN MOS MRS/MSC - ENC SB 73-0029 NO.1 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN MOS MRS/MSC - ENC SB 73-0029 R1 NO.1 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0029 R2 NO. 1 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN MOS MRS/51SC - ENC SB 73-0030 NO. I ENGINE - ECU/EECS WITH DPM-3 CONVERSION. SERVICE BULLETIN MOS MRS/51SC - ENC SB 73-0030 R1 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC ENGINE CONTROL (73-00-00)- INTRODUCTION OF NEW OPTIONAL ECU/EECS WITH NEW DPM-3 AND CONVERSION, SERVICE BULLETIN MOS 22-FEB-20 I 1 MRS/51SC ENC SB 73-0031 NO.1 ENGINE -. SERVICE BULLETIN CANCELLED MOS MRS/51SC ENC SB 73-0032 NO.1 ENGINE - REPLACEMENT OF VESPEL BALL PM 1419-240. SERVICE BULLETIN MOS FIRSAISC - ENC SB 73-0033 NO. 1 ENGINE - CONVERSION NON-PMUX ENGINE AND PMUX TO NON-PMUX ENGINE. SERVICE BULLETIN MOS MRS/MSC - ENC SB 73-0034 NO. 1 ENGINE - INTRODUCTION OF NEW FIEL PUMP WITH NEW FILTER COVER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0035 NO. 1 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.J1 (7820). SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 535 Of 748 @ Camp Systems EFTA00618826 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0036 NO. I ENGINE - . SERVICE BULLETIN CANCELLED MOS HRSI.ISC - ENC SB 73-0037 NO. I ENGINE - ENGINE FUEL CONTROL (73-00.00) HMU HPSOV SWITCH. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 73-0037 R1 NO. I ENGINE - ENGINE FUEL CONTROL (73-00-C0) HMU HPSOV SWITCH. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 73-0037 R2 NO. I ENGINE - ENGINE FUEL CONTROL (73-00-C0) HMU HPSOV SWITCH. SERVICE BULLETIN MOS HRSIASC - ENG SB 73-0037 R3 NO. ENGINE - HPSOV SWITCH. SERVICE BULLETIN MOS 19-DEC-2001 HR&MSC - ENG SB 73-0037 R4 NO. I ENGINE - HYDROMECHANICAL UNIT - HPSOV SWITCH. SERVICE BULLETIN MOS HRSi MSC - ENG SB 73-0037 RS NO. I ENGINE - HYDROMECHANICAL UNIT - HPSOV SWITCH. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 73-0038 NO. I ENGINE - INTRODUCTION OF NEW FUEL FLOW TRANSMITTER. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 73-0039 NO. I ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HR&MSC - ENG SB 73-0040 NO. I ENGINE - ENGINE FUEL CONTROL INTRODUCTION OF SOFTWARE 1853M78P16 (7B41). SERVICE BULLETIN MOS HRS.,MSC - ENG SB 73-0041 NO. I ENGINE - INTRODUCTION OF A NEW VSV RIGHT SIDE DRAIN MANIFOLD. SERVICE BULLETIN MOS HRSi MSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 536 Of 748 Camp Systems EFTA00618827 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 73-0042 SB 73-0042 RI SB 73-0043 SB 73-0043 RI SB 73-0043 R2 SB 73-0044 SB 73-0044 RI SB 73-0044 R2 SB 73-0045 SB 73-0046 NO. 1 ENGINE - NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - NEW FUEL DIFFERNTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN MOS HRSAISC - ENC NO.1 ENGINE - ELECTRONIC CONTROL UNIT - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN MOS HRSAISC ENC NO. 1 ENGINE - ELECTRONIC FUEL CONTROL - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN MOS HRSAISC ENC NO. 1 ENGINE - BURNER STAGING VALVE SYSTEM DELETION. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - BURNER STAGING VALVE SYSTEM DELETION. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - BURNER STAGING VALVE SYSTEM DELETION, SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - NEW HPTCC VALVE FUEL MANIFOLD INTRODUCTION. SERVICE BULLETIN MOS HRSAISC - ENC NO.1 ENGINE - ENGINE FUEL CONTROL INTRODUCTION OF SOFTWARE 1853M78P17 (7842). SERVICE BULLETIN MOS HRS,MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 537 Of 748 @ Camp Systems EFTA00618828 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0047 SB 73-0047 RI SB 73-0049 SB 73-0050 SB 73-0050 F21 SB 73-0051 SB 73-0052 SB 73-0052 R2 SB 73-0053 NO. ENGINE - LOWER DRAIN MANIFOLD IDENTIFICATION PLATE FIELD REPLACEMENT AND NEW LOWER DRAIN MANIFOLD INTRODUCTION. SERVICE BULLETIN MOS HRS.LISC - ENG NO 1 ENGINE - LOWER DRAIN MANIFOLD IDENTIFICATION PLATE FIELD REPLACEMENT AND NEW LOWER DRAIN MANIFOLD INTRODUCTION. SERVICE BULLETIN MOS HRSLISC - ENG NO 1 ENGINE - INSPECTION OF HMU MAIN BODY FOR HPT2 THIN WALL CASTING. SERVICE BULLETIN MOS HRSMSC - ENG NO 1 ENGINE - ELECTRONIC ENGINE CONTROL INTRODUCTION OF SOFTWARE 1853M78P18 (7B46). SERVICE BULLETIN MOS HRS.1.ISC - ENG NO 1 ENGINE - ELECTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 1853M78P18 (7946). SERVICE BULLETIN MOS - ENG NO 1 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS.1.ISC - ENG NO 1 ENGINE - INTRODUCTION OF A NEW IMPELLER DRIVE SHAFT AND IMPELLER DRIVE SHAFT PREFORMED PACKING. SERVICE BULLETIN MOS HRS.1.ISC ENC NO 1 ENGINE - ENGINE FUEL CONTROL (73-00-C0) - MAIN FUEL PUMP - INTRODUCTION OF A NEW IMPELLER DRIVE SHAFT AND IMPELLER DRIVE SHAFT PREFORMED PACKING. SERVICE BULLETIN MOS HRSLISC - ENG NO. 1 ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN MOS HRSLISC - ENG SB 73-0053 RI NO. ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN MOS 19-DEC-2001 HRSisISC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 538 Of 748 Camp Systems EFTA00618829 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0053 R2 SB 73-0053 R3 SB 73-0054 SB 73-0054 RI SB 73-0055 SB 73-0055 RI SB 73-0056 SB 73-0057 SB 73-0058 SB 73-0058 Ft1 NO 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN MOS HRSI.ISC ENC NO. I ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN MOS HRSMSC - ENC NO 1 ENGINE - FIELD DELETION BURN STAGE VALVE. SERVICE BULLETIN MOS HRSMSC - ENC NO 1 ENGINE - CORE ENGINE MAJOR MODULE - FIELD DELETION OF THE BURNER STAGING VALVE SYSTEM. SERVICE BULLETIN MOS HRSIASC ENC NO 1 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P19 (7B4A). SERVICE BULLETIN MOS HRSMSC - ENC NO 1 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P19 (7B4A). SERVICE BULLETIN MOS HRSI.ISC ENC NO. 1 ENGINE - . SERVICE BULLETIN MOS HR&LISC ENC NO 1 ENGINE - SPARE PARTS RELEASE FOR BAE SYSTEMS CONTROLS. SERVICE BULLETIN MOS HR&P.ISC - ENC NO 1 ENGINE - ENGINE FUEL AND CONTROL - CFm56-78 SAC ENGINE CONFIGURATIONS J9 AND J10 HARNESS WITH IMPROVED OR REWORKED DESIGN. SERVICE BULLETIN MOS HRSI.ISC - ENC NO 1 ENGINE - CFm56-78 SAC ENGINE CONFIGURATIONS Jr9 AND Ji 0 HARNESSES WITH IMPROVED OR REWORKED DESIGN. SERVICE BULLETIN MOS HR&P.ISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 539 Of 748 1, Camp Systems EFTA00618830 C14 Akinn Meg whip' AD/SI Status Report 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0059 SB 73-0060 SB 73-0061 SB 73-O061R1 19-DEC-2001 NO. 1 ENGINE - ECU DPM INSPECTION. SERVICE BULLETIN MOS MRS/MSC - ENC NO. 1 ENGINE - ENGINE FUEL CONTROL - INTRODUCTION OF A NEW SERVO FUEL HEATER. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - ENGINE FUEL AND CONTROL. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM INSTALLED. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0061 R2 NO. I ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM INSTALLED. SERVICE BULLETIN SB 73-0061 R3 SB 73-0062 SB 73-O062R1 SB 73-0063 SB 73-0064 MOS HRSAISC - ENC NO. 1 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM INSTALLED. SERVICE BULLETIN MOS MRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF NEW/REWORKED ECU WITH LOCKWIRE CAPABILITY. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF NEW OR REWORKED ELECTRONIC CONTROL UNIT WITH LOCKWIRE CAPABILITY. SERVICE BULLETIN MOS HRSIMSC ENC NO. 1 ENGINE - INTRODUCTION OF FUEL MANIFOLDS WITH INTERNAL DRAIN PLUGS. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P20. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 540 Of 748 @Camp Systems EFTA00618831 COMP Moan. Aim thernand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0064 R1 SB 73-0065 SB 73-0066 19-DEC-2001 SB 73-0066 R1 SB 73-0067 SB 73-0067 R1 SB 73-0067 R2 SB 73-0067 R3 SB 73-0068 SB 73-0069 NO. 1 ENGINE - ELCTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 1853M78P20. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - ELECTRONIC ENGINE CONTROL - PRESSURE SUBSYSTEM. SERVICE BULLETIN MOS HRS/MSC - ENC NO. I ENGINE - REMOVAL AND REPLACEMENT OF SPEED SERVO (MATCHED) VALVE AND SLEEVE ASSEMBLY AND THRUST WASHER.. SERVICE BULLETIN MOS HRS/MSC ENC NO. I ENGINE - REMOVAL AND REPLACEMENT OF SPEED SERVO (MATCHED) VALVE AND SLEEVE ASSEMBLY AND THRUST WASHER. SERVICE BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN MOS MRS/51SC - ENC NO. 1 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN MOS MRS/51SC - ENC NO.1 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN MOS MRS/51SC - ENC NO. 1 ENGINE - REWORK OF THE HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) TO HYDROMECHANICAL UNIT VIN 442124 ( GE 1853M56P07). SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 541 Of 748 @ Camp Systems EFTA00618832 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0069 R1 SB 73-0069 R2 SB 73-0070 SB 73-0071 R2 SB 73-0073 SB 73-0074 SB 73-0074 RI SB 73-0074 R2 SB 73-0074 R3 SB 73-0075 NO. 1 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRSIASC ENC NO. 1 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRS4.ISC ENC NO. 1 ENGINE - ELECTRONIC CONTROL UNIT - PRESSURE SUBSYSTEM CONVERSION. SERVICE BULLETIN MOS HRS.uSC - ENC NO. I ENGINE - INTRODUCTION OF SOFTWARE 7. B. 01 1853m78P23. SERVICE BULLETIN MOS HRSimSC - ENC NO. I ENGINE - ENGINE FUEL CONTROL - ENGINE FUEL CONTROL (73-00-00) - RESISTOR MODIFICATION FOR PSS TRANSDUCER INCOMPATIBILITY. SERVICE BULLETIN MOS HRSimSC - ENC NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - INSPECTION OF SHUTOFF SPACER FOR PROPER INSTALLATION. SERVICE BULLETIN MOS HRSI.ISC - ENC NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - INSPECTION OF SHUTOFF SPACER FOR PROPER INSTALLATION. SERVICE BULLETIN MOS HRSI.ISC - ENC NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) INSPECTION OF SHUTOFF SPACER PIN 2687048 FOR PROPER INSTALLATION. SERVICE BULLETIN MOS HRSP.ISC - ENC NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) INSPECTION OF SHUTOFF SPACER PIN 2687048 FOR PROPER INSTALLATION. SERVICE BULLETIN MOS HRSi MSC - ENC NO. I ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00.00) - HYDROMECHANICAL UNIT - INTRODUCTION OF IMPROVED VALVE EXTENSION AND FEEDBACK DRIVERS. SERVICE BULLETIN MOS HRSi MSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time Camp Systems 542 Of 748 EFTA00618833 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0075 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00-00)- HYDROMECHANICAL UNIT - INTRODUCTION OF IMPROVED VALVE EXTENSION AND FEEDBACK DRIVERS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0076 NO. 1 ENGINE - MEC SERVO FUEL HTR LEAKS. SERVICE BULLETIN MOS HRSOASC - ENC SB 73-0077 NO. 1 ENGINE - FIELD REWORK OF SINGLE ANNULAR COMBUSTOR (SAC) FUEL MANIFOLDS TO ELIMINATE DEAD-END ZONE. SERVICE BULLETIN MOS HRS/MSC ENC SB 73-0078 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00-00) - INTRODUCTION OF A NEW FUEL COMPLIED WITH FILTER ELEMENT. SERVICE BULLETIN MOS 0I -MAR-2007 HRS0ASC - 2871:05 ENC 646 SB 73-0079 NO. 1 ENGINE - REPLACEMENT OF THE CURRENT DEFECTIVE SIXTH ATTACHMENT OF THE FUEL FILTER COVER OF THE MAIN FUEL PUMP EQUIPPED WITH 0-HEAD BOLT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0080 NO.1 ENGINE - ENGINE AND FUEL CONTROL - HYDROMECHANICAL UNIT (73-21-10) - REPLACEMENT OF SHUTOFF SPACER 2687048 WITH NEW DESIGN. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0081 NO. 1 ENGINE - HYDROMECHANICAL UNIT (HMU) (73-21-10)- INTRODUCTION OF HONEYWELL HMU VIN 442317 (GE 1853M56P09). SERVICE BULLETIN MOS HRS/MSC ENC SB 73-0082 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 7.B.N 1853M78P21. SERVICE BULLETIN MOS HRS(MSC ENC SB 73-0083 NO. 1 ENGINE - REMOVAL AND TEST OF ELECTROHYDRAULIC SERVO VALVE FOR TEMPERATURE SENSITIVITY. SERVICE BULLETIN MOS HRS(MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 543 Of 748 @ Camp Systems EFTA00618834 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0083 R1 SB 73-0084 SB 73-0084 RI SB 73-0085 RI SB 73-0086 SB 73-0088 SB 73-0089 SB 73-0090 SB 73-0090 RI SB 73-0093 NO. 1 ENGINE - REMOVAL AND TEST OF ELECTROHYDRAULIC SERVO VALVE FOR TEMPERATURE SENSITIVITY. SERVICE BULLETIN MOS HRSAISC ENC NO. 1 ENGINE - INTRODUCTION OF SOFTWARE 7.8.0 1853M78P22. SERVICE BULLETIN MOS 6 (s) HRSAISC ENC NO. 1 ENGINE - INTRODUCTION OF SOFTWARE 7.8.0 1853M78P22. SERVICE BULLETIN MOS 6 (s) HRSAISC ENC NO. 1 ENGINE - INTRODUCTION OF NEW J10 HARNESSES OR REWORK OF THE OLD ONES. SERVICE BULLETIN MOS HRS1MSC - ENC NO. 1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - IMPROVED FUEL FLOW TRANSMITTER, SERVICE BULLETIN MOS FIRS/MSC - ENC NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ENGINE HARNESSES CJ9. CJIO (73-24-05) - INTRODUCTION OF A NEW CS HARNESS OR REWORK OF THE OLD ONE AND DELETION OF THE DUMMY RECEPTACLE BRACKET. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - ENGINE FUEL AND CONTROL - GENERAL ( 73-00-00) - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - ENGINE FUEL AND CONTROL - GENERAL ( 73-00-00)- REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - HYDROMECHANICAL UNIT ( 73-21-10) -INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE ELECTROHYDRAULIC SERVO VALVE. SERVICE BULLETIN MOS HRSfMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 544 Of 748 @ Camp Systems EFTA00618835 Cli tagiren Meg' nehip. AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0094 SB 73-0094 RI SB 73-0094 R2 SB 73-0095 SB 73Ø96R1 NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF NEW METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN MOS HRSPASC - ENC NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF NEW METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN MOS FIRS,MSC - ENC NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF NEW METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN MOS FIRSAISC - ENC NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF IMPROVED BURNER STAGING VALVE (BSV) SOLENOID AND VALVE ASSEMBLY. SERVICE BULLETIN MOS HRS(MSC - ENC NO. I ENGINE - REPLACEMENT OF FLUOROSILICONE PREFORMED PACKINGS WITH FLUOROCARBON PREFORMED SUPERSEDED PACKINGS (SUPERSEDED BY 73-0096 R2). SERVICE BULLETIN MOS FIRSAISC - ENC SB 73-0096 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HMU (73-21-79) - REPLACEMENT OF FLUOROSILICONE PREFORMED RECOMMENDED PACKINGS WITH FLUOROCARBON PREFORMED PACKINGS. SERVICE BULLETIN MOS O5-JAN-2012 FIRS/MSC - ENC SB 73-0097 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-00-03) - NEW 7.B.P SOFTWARE, SERVICE BULLETIN MOS 6 (s) HRS(MSC ENC SB 73-0097 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-00-03) - NEW 7.B.P SOFTWARE, SERVICE BULLETIN MOS 6 (s) 08-MAR-2005 FIRS/MSC ENC SB 73-0098 NO.1 ENGINE - ECU CHASSIS MODIFICATION (SUPERSEDED BY SB 73-0098 RI). SERVICE BULLETIN MOS FIRS/MSC - ENC SB 73-0098 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU CHASSIS MODIFICATION. CATEGORY 7 SERVICE BULLETIN MOS 01-APR-2014 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 545 Of 748 @Camp Systems EFTA00618836 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0099 NO. 1 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED ADJUSTMENT SCREW (PN 2689127). SERVICE BULLETIN MOS HRS/1,1SC ENC SB 73-01 NO. 1 ENGINE - FUEL FLOW TRANSMITTER CAUBRATION IMPROVEMENT. SERVICE BULLETIN MOS HRS(MSC - ENC SB 73-0100 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0102 NO. 1 ENGINE - BUCK POWER SUPPLY ROBUSTNESS MODIFICATION FOR 11W 400HZ DISCONNECTS. SERVICE BULLETIN MOS HRS/MSC ENC SB 73-0102 R1 NO. 1 ENGINE - ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY ROBUSTNESS MODIFICATION FOR 115V 400HZ DISCONNECTS. SERVICE BULLETIN MOS 07-MAR-2006 HRS(MSC - ENC SB 73-0102 R2 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY RECOMMENDED ROBUSTNESS MODIFICATION FOR 115V 400 HZ DISCONNECTS (SUPERSEDED BY SB 73-0102 R3). SERVICE BULLETIN MOS 10-N0V-2010 HRS/MSC - ENC SB 73-0102 R3 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY CATEGORY 7 ROBUSTNESS MODIFICATION FOR 11W 400 HZ DISCONNECTS. SERVICE BULLETIN MOS 20-JUN-2014 HRS/MSC - ENC SB 73-0103 NO.1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT(73-21-10) - LOW PRESSURE LEAK CHECK, SERVICE BULLETIN MOS HRS/MSC ENC SB 73-0104 NO. I ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - ONE TIME INSPECTION OF 3 FUEL SUPPLY COMPUED WITH - IAW THE SB TUBES FOR WEAR AND INTRODUCTION OF KEVLAR CUSHION CLAMPS. SERVICE BULLETIN MOS 22-AUG-2008 HRS/MSC - 3260:48 ENC 746 SB 73-0106 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ECU PMUX (73-00-00) - PRESSURE SUBSYSTEM REDESIGN. SERVICE BULLETIN MOS HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 546 Of 748 @ Camp Systems EFTA00618837 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0106 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ECU PMUX (73-00-00) - PRESSURE SUBSYSTEM REDESIGN. SERVICE BULLETIN MOS HRSAISC ENC S8 73-0107 NO. 1 ENGINE - INSPECTION OF PUMP COVER. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0108 RI NO.1 ENGINE - BURNER STAGING VALVE SOLENOID REMOVAL FROM HMU. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0108 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- HMU (73-21-79) - BURNER STAGING VALVE SOLENOID REMOVAL FROM RECOMMENDED HMU. SERVICE BULLETIN MOS I6-FEB-2012 HRSAISC ENC SB 73-0109 RI NO. I ENGINE - NEW SOLENOID AND VALVE. SERVICE BULLETIN MOS 07-MAR-2006 HRSfMSC - ENC SB 73-0111 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ECU/EEC (73-00-00) - INTRODUCTION OF FADEC3 HARDWARE AND SOFTWARE. SERVICE BULLETIN MOS HRSfMSC - ENC SB 73-0113 NO. 1 ENGINE - INSPECTION OF MAIN-STAGE CHECK VALVE SPRING (SUPERSEDED BY 73-0113 R1). SERVICE SUPERSEDED BULLETIN MOS HRSAISC - ENC SB 73-0113 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - FUEL NOZZLES (73-00-00) - INSPECTION OF MAIN-STAGE CHECK RECOMMENDED VALVE SPRING. SERVICE BULLETIN MOS 13-JAN-2012 HRSAISC - ENC SB 73-0115 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW 713.O SOFTWARE. SERVICE BULLETIN MOS 6 (s) 06-JUN-2005 HRSAISC ENC SB 73-0115 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW 7.8.O SOFTWARE. SERVICE BULLETIN MOS 6 (s) 30-MAY-2008 HRSAISC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 547 Of 748 @ Camp Systems EFTA00618838 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0116 NO. I ENGINE - INTRODUCTION OF NEW ELECTRONIC CONTROL UNIT WITH SAFETYWIRE CAPABILITY TO THE IPC. SERVICE BULLETIN SB 73-0116 R1 I3-NOV-2009 MOS HRSAISC ENC NO.1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-2140) - INTRODUCTION OF NEW ELECTRONIC CONTROL UNIT WITH SAFETYWIRE CAPABILITY TO THE IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0117 NO. 1 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0118 RI NO. 1 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH A NEW COVER. SERVICE BULLETIN MOS 23-FEB-2006 HRSAISC - ENC SB 73-0120 NO.1 ENGINE -NEW SOFTWARE VERSION 7.8.01F3. SERVICE BULLETIN MOS HRSfMSC - ENC SB 73-0120 RI NO.1 ENGINE -NEW SOFTWARE VERSION 7.8.01F3. SERVICE BULLETIN MOS 30-MAY-2008 HRS1MSC - ENC SB 73-0121 NO.1 ENGINE - FRONT PANEL ASSEMBLY ALIGNMENT PIN MODIFICATION PROCEDURE. SERVICE BULLETIN MOS 27-JUN-2007 HRSAISC - ENC SB 73-0122 NO.1 ENGINE - FADEC3 -SIA CONNECTOR HARDWARE RETENTION, SERVICE BULLETIN MOS 27-JUN-2007 HRSAISC - ENC SB 73-0123 NO.1 ENGINE - VSV SYSTEM (72-00-02) - NEW FUEL MANIFOLDS. SERVICE BULLETIN MOS I2-APR-2006 HRSAISC - ENC SB 73-0124 NO.1 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS 21-APR-2008 HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 548 Of 748 @ Camp Systems EFTA00618839 CAMP Aviation/nem the ernit4 up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0126 NO. 1 ENGINE - ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS . SERVICE BULLETIN I 7-JUL-2006 MOS HRS.0.1SC ENC SB 73-0126 RI NO.1 ENGINE - ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS. SERVICE BULLETIN MOS I4-AUG-2007 HRMISC ENC SB 73-0126 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU MODIFICATION. ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS. SERVICE BULLETIN MOS 02-OCT-2009 HRSfMSC - ENC SB 73-0127 NO. 1 ENGINE - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN SB I 7-JUL-2006 73-0127 RI 26-FEB-2008 MOS MRS/P.1SC - ENC NO.1 ENGINE - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN MOS HRS/LISC - ENC SB 73-0127 R2 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU MODIFICATION - SUPERSEDED REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS 9SUPERSEDED BY 73-0127 R3). SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0127 R3 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC ENGINE CONTROL (73-00-00) - ECU/EEC MODIFICATION - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN MOS HRS/P.1SC - ENC SB 73-0128 RI NO.1 ENGINE - INTRODUCTION OF FADEC3 HARDWARE FOR DAC ENGINES. SERVICE BULLETIN MOS 02-APR-2007 HRS/MSC - ENC SB 73-0130 NO.1 ENGINE - INSPECTION OF HYDROMECHANICAL UNIT FOR NON-HYDROCARBON CONTAMINATION. SERVICE RECOMMENDED BULLETIN 07-MAY-2007 MOS 6 (s) MRS/P.1SC 1500 ENC SB 73-0132 NO. 1 ENGINE - INTRODUCTION OF FUEL NOZZLE WITH REVISED 0 -RING MATERIAL FOR HIGHER TEMPERATURE CAPABILITY. SERVICE BULLETIN MOS 13-JUN-2007 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 549 Of 748 @ Camp Systems EFTA00618840 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0132 R2 13-JUN-20I2 SB 73-0133 12-APR-2007 58 73-0134 08-JUN-2007 SB 73-0134 RI NO. I ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00)- INTRODUCTION OF FUEL NOZZLE WITH REVISED RECOMMENDED 0 -RING MATERIAL FOR HIGHER TEMPERATURE CAPABILITY. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - REPLACEMENT OF SUSPECT T12 SENSOR. SERVICE BULLETIN MOS HRS/MSC 1200 (s)/DUE 08-NOV-2007 ENC NO. I ENGINE - INTRODUCTION OF NEW UNISON ALTERNATOR STATOR VIN 506569-1 (2123M63P02) AND ALTERNATOR ROTOR VIN 505344-1 (2123M62P01). SERVICE BULLETIN MOS HRS/MSC - ENC NO.1 ENGINE - ENGINE FUEL AND CONTROL - POWERPLANT - ALTERNATOR (73-00-00) - INTRODUCTION OF NEW UNISON ALTERNATOR STATOR VIN 506569-1 (2123M63P02) AND ALTERNATOR ROTOR VIN 505344-1 (2123M62P01). SERVICE BULLETIN MOS 04-MAY-2009 HRS/MSC - ENC SB 73-0135 NO.1 ENGINE -NEW SOFTWARE VERSION 7.B.R3. SERVICE BULLETIN MOS 22-AUG-2008 30-MAR-2007 HRS/MSC - 3260:48 ENC 746 SB 73-0135 RI NO.1 ENGINE -NEW SOFTWARE VERSION 7.B.R3. SERVICE BULLETIN MOS 30-MAY-2008 HRS/MSC - ENC SB 73-0136 NO.1 ENGINE - INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE ELECTROHYDRAULIC SERVOVALVE. SERVICE BULLETIN 20-JUN-2007 MOS HRS/MSC - ENC SB 73-0136 RI NO. 1 ENGINE - INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE ELECTROHYDRAULIC SERVOVALVE. SERVICE BULLETIN MOS I8-FEB-2008 HRS/MSC - ENC SB 73-0137 NO. 1 ENGINE - HMU OVER-FUEL THRESHOLD MARGIN INCREASE. SERVICE BULLETIN MOS 20-JUN-2007 HRS,MSC - ENC RECOMMENDED NOT APPLICABLE - BY SERIAL NUMBER S/N 874437 N/A COMPLIED WITH - IAW THE SB 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 550 Of 748 @ Camp Systems EFTA00618841 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0137 R1 I8-FEB-2008 SB 73-0138 NO. 1 ENGINE - HMU OVER-FUEL THRESHOLD MARGIN INCREASE. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0138 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - (73-00-00)- USE OF CIS FUELS IN CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/AISC ENC SB 73-0138 R1 PARA 3.A NO. 1 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL - (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. (2) SERVICE BULLETIN AND CLEAN HMU MOS HRSAISC ENC 10000 (s) SB 73-0138 R1 PARA 3.A NO. 1 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL - (73-00-00) - USE OF CIS FUELS IN (3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS MOS HRS/LISC 3000 (s) ENC SB 73-0138 R2 NO.1 ENGINE - ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN 20-DEC-2010 MOS HRS/MSC ENC SB 73-0138 R2 PARA 3.A NO.1 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL (73-03-00)- USE OF CIS FUELS IN CFM58-78 ENGINES. (2) SERVICE BULLETIN AND ('I FANHMU MOS 20-DEC-2010 HRS/MSC 10000 (s) ENC SB 73-0138 R2 PARA 3.A NO.1 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN (3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS MOS 20-DEC-2010 HRS/L1SC 3000 (s) ENC SB 73-0138 R3 NO.1 ENGINE - ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN I2-SEP-2011 MOS HRS/MSC ENC SB 73-0138 R3 PARA 3.A NO. 1 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL (73-03-00)- USE OF CIS FUELS IN CFM56-78 ENGINES. (2) SERVICE BULLETIN AND CLEAN HMU MOS HRS/MSC 10000 (s) ENC SUPERSEDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 551 Of 748 @ Camp Systems EFTA00618842 C O Atiant.fran MP Meowed lip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB (3) 73-0138 R3 PARA 3.A NO. 1 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS MOS HRS/MSC 3000 (s) ENC RECOMMENDED SB 73-0138 R4 NO.1 ENGINE - ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED BULLETIN 25-SEP-2012 MOS HRS/MSC ENC SB 73-0138 R4 PARA 3.A NO.1 ENGINE -FLOW ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFMSG-7B ENGINES. SERVICE RECOMMENDED (1) BULLETIN CHECK OF ALL FUEL NOZZLES MOS 25-SEP-2012 HRSAISC ESV (s) ENC SB 73-0138 R4 PARA 3.A NO. 1 ENGINE - CLEAN ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED (2) BULLETIN AND OVERHAUL HMU 25-SEP-2012 MOS MRS/P.1SC 10000 (syESV ENC SB 73-0138 R4 PARA 3.A NO. I ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN RECOMMENDED (3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS MOS 25-SEP-2012 MRS/P.1SC 3000 (s) ENC SB 73-0139 NO.1 ENGINE - NEW SOFTWARE VERSION 7.8.S. SERVICE BULLETIN COMPLIED WITH MOS 22-AUG-2008 12-OCT-2007 HRS/MSC - 3260:48 ENC 746 SB 73-0140 NO. 1 ENGINE - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS 28-NOV-2007 MRS/P.1SC - ENC SB 73-0140 RI NO. 1 ENGINE - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 12-FEB-2008 HRS/MSC - ENC SB 73-0140 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ECU/EEC (73-21-60) - REPLACEMENT OF K1 AND K2 RELAY ON FADEC3 FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS I3-APR-2009 HRS/MSC - ENC SB 73-0140 R3 NO. I ENGINE - ENGINE FUEL AND CONTROL - ECU1EEC (73-21-60) - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 RECOMMENDED FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS 23-FEB-2012 HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 552 Of 748 @ Camp Systems EFTA00618843 CAMAsiont.P /nrro Megnsind•O' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0141 NO 1 ENGINE - FRONT TRANSIENT PROTECTION BOARD FUSE INSPECTION AND REWORK ON FADEC3 FOR CFM.56-78 RECOMMENDED ENGINES. SERVICE BULLETIN 28-NOV-2C07 SB 73-0142 R1 MOS 4 (5) HR&MSC ENC NO 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRICAL HARNESS CJ9. CJ10 (73-24-05) - DELETION OF CJ9 WIRING HARNESS TS BRANCH FOR NON-PMUX ENGINE IN THE FIELD. SERVICE BULLETIN MOS HRSi MSC - ENC SB 73-0143 NO 1 ENGINE - PRESSURE SUBSYSTEM (PSS) TRANSDUCER RELIABILITY IMPROVEMENT. SERVICE BULLETIN MOS 21-FEB-2008 HRS/MSC - ENC SB 73-0144 NO. I ENGINE - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN MOS 04-APR-2008 HR&MSC ENC SB 73-0145 NO. I ENGINE - ENGINE FUEL AND CONTROL SYSTEM (73-00-00) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN MOS 25-AUG-2e08 HRSMSC ENC SB 73-0146 NO. I ENGINE - REPLACEMENT OF SUSPECTED J7 WIRING HARNESS. SERVICE BULLETIN MOS 08-APR-2008 HRS,IISC ENC 5(s) SB 73-0151 R1 NO. I ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW 7.8.T SOFTWARE VERSION. SERVICE BULLETIN MOS 27-FEB-2009 HRSilISC ENC SB 73-0152 NO. I ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B CMM. SERVICE BULLETIN 08-OCT-2009 MOS HR&MSC ENC SB 73-0153 NO. I ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INSPECTION OF MAIN BODY ASSEMBLY. SERVICE BULLETIN SB 73-0154 C4-VAY.2CC9 MOS HRSIISC - ENC NO. I ENGINE - FADEC3 - CFMS6-78 - EEOECU CONVERSION FROM PIN 2042M67P02 TO P.'N 2042M67P04. SERVICE BULLETIN MOS HRSLISC - ENC ?-insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 553 Of 748 Camp Systems EFTA00618844 flP Megnand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0154 R1 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - FADEC3 - CFM56-78 - EEC/ECU CONVERSION FROM PIN 2042M67P02 TO P/N 2042M67PO4. SERVICE BULLETIN MOS HRS/MSC - ENC S8 73-0156 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ENGINE HARNESSES CJ9. CJ10 (73-24-05)- SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN MOS 16-NOV-2011 HRS/MSC - ENC S8 73-0157 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60)- NEW SOFTWARE VERSION 7.B.UI. SERVICE BULLETIN RECOMMENDED MOS 6 (s) 27 -JUL-2009 HRS/MSC ENC S8 73-0157 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.U1. SERVICE BULLETIN MOS 6 (s) 14-AUG-2009 HRS/MSC ENC S8 73-0157 R2 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.U1. SERVICE BULLETIN MOS 6 (s) 02-FEB-2010 HRS/MSC ENC S8 73-0158 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF MODIFIED METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN MOS 15-MAY-2009 HRS/MSC - ENC S8 73-0159 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - INTRODUCTION OF FADEC3 ECU/EEC WITH NEW MAIN CHANNEL BOARD. SERVICE BULLETIN MOS 09-DEC-2009 HRS/MSC - ENC S8 73-016 R2 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-00-00)- SCHEDULED INSPECTION. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0161 NO.1 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00)- SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 27 -JUL-2009 HRS/MSC - ENC S8 73-0163 NO.1 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00)- SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN 05-OCT-2009 MOS HIRSAISC - ENC NOT APPLICABLE - BASED ON THE HYDROMECHANICAL UNIT (HMU) PART NUMBER 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 554 Of 748 @Camp Systems EFTA00618845 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0167 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - ECU MODIFICATION -REPLACEMENT OF CR1 AND CR14 RECTIFIERS ON THE PSM (SUPERSEDED BY 73-0167 RI). SERVICE BULLETIN MOS SUPERSEDED HRS1MSC - ENC SB 73-0167 RI NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - ECU MODIFICATION - RECOMMENDED REPLACEMENT OF CR1 AND CR14 RECTIFIERS ON THE PSM. SERVICE BULLETIN MOS 04-JAN-2012 HRS1MSC - ENC SB 73-0169 NO.1 ENGINE - ENGINE FUEL AND CONTROL-ELECTRONIC CONTROL UNIT (73-00-00)-DIGITAL INTERFACE UNIT MODIFICATION. SERVICE BULLETIN MOS HRS1MSC ENC SB 73-0169 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT OPTIONAL MODIFICATION. SERVICE BULLETIN MOS I3-JUL-2011 HRS1MSC ENC SB 73-0169 R2 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT RECOMMENDED MODIFICATION (SUPERSEDED BY SB 73-0169 R3). SERVICE BULLETIN MOS 22-SEP-2011 HRSfMSC - ENC SB 73-0169 R3 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT CATEGORY 7 MODIFICATION. SERVICE BULLETIN MOS I7-APR-2014 HRSMSC ENC SB 73-0170 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10)- HYDROMECHANICAL UNIT BODY SUPERSEDED NON-FERROUS RING CHIP CONTAMINATION (SUPERSEDED BY 73-0170 RI ). SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0170 RI NO. I ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10)- HYDROMECHANICAL UNIT BODY RECOMMENDED NON-FERROUS RING CHIP CONTAMINATION. SERVICE BULLETIN MOS 16-MAY-2011 HRSAISC - ENC SB 73-0171 NO.1 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10)- HYDROMECHANICAL UNIT OPTIONAL MANUFACTURABILITY IMPROVEMENTS. SERVICE BULLETIN MOS 24-SEP-2010 HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 555 Of 748 @ Camp Systems EFTA00618846 COMP Asicreimfra therm...1W AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0172 NO. 1 ENGINE - ENGINE AND FUEL CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF FUEL METERING VALVE RESOLVER MODIFICATION . SERVICE BULLETIN MOS 17-DEC-2010 HRSPASC ENC SB 73-0172 RI NO. I ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF FUEL RECOMMENDED METERING VALVE RESOLVER MODIFICATION. SERVICE BULLETIN MOS 15-FEB-2012 HRSPASC - ENC SB 73-0173 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - CFM56-7B ECU INSPECTION - RECOMMENDED IOM SOLDER JOINT CRACKING (SUPERSEDED BY SB 73-0173 R1). SERVICE BULLETIN MOS 20-JAN-2011 HRS04SC - ENC SB 73-0173 RI NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - CFM56-7B ECU INSPECTION - CATEGORY 5 IOM SOLDER JOINT CRACKING. SERVICE BULLETIN MOS I7-APR-2014 HRS(MSC - ENC SB 73-0174 NO. I ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-W-00)- INCORPORATION OF NEW RECOMMENDED INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN MOS 23-NOV-2010 HRSPASC - ENC SB 73-0174 RI NO.1 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-03-00)- INCORPORATION OF NEW CUSTOMER INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN CONVENIENCE MOS I9-JUL-2011 HRSPASC - ENC SB 73-0174 R2 NO.1 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-03-00)- INCORPORATION OF NEW SUPERSEDED INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE (SUPERSEDED BY SB 73-0193). SERVICE BULLETIN MOS Of-MAY-2013 HRS/MSC - ENC SB 73-0175 NO. I ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT SUPERSEDED BYPASS VALVE ROTATION (SUPERSEDED BY 73-0175 R1) . SERVICE BULLETIN OPTIONAL SB 73-0175 RI I6-MAY-2011 MOS HRSPASC - ENC NO.1 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10)- HYDROMECHANICAL UNIT RECOMMENDED BYPASS VALVE ROTATION. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 556 Of 748 @ Camp Systems EFTA00618847 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0175 R2 Of-MAY-2013 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT BYPASS VALVE ROTATION (SUPERSEDED BY SB 73-0194). SERVICE BULLETIN MOS HRS/MSC - ENC SUPERSEDED S8 73-0178 07-JUN-2011 NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V2. SERVICE BULLETIN MOS HRSAISC - ENC RECOMMENDED SB 73-0178 R2 NO. I ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V2. SERVICE BULLETIN RECOMMENDED COMPLIED WITH- ENGINE #1 ECU SOFTWARE PIN 1853M78P33, VERSION 7B98 (7.B.V2 F2) MOS 28-AUG-2013 17-AUG-2011 HRS/MSC - 3728:53 ENC 875 SB 73-0180 NO. I ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - INTRODUCTION SUPERSEDED OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY 73-0180 IR). SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0180 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) -INTRODUCTION OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS 23-MAY-2012 HRS/MSC - ENC SB 73-0181 NO.1 ENGINE - ENGINE FUEL AND CONTROL-IDENTIFICATION PLUG (73-21.83) - INTRODUCTION OF NEW CODING COMBINATIONS FOR -78E LPT HARDWARE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0182 NO. I ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MN76 SUPERSEDED BRIDGE BGA ON ASELEC MANUFACTURED MAIN CHANNEL BOARDS (SUPERSEDED BY SB 73-0182 R1). SERVICE BULLETIN MOS HRS(MSC - (s) ENC SB 73-0182 RI NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MN76 BRIDGE BGA ON ASELEC MANUFACTURED MAIN CHANNEL BOARDS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0184 NO.1 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF T2 AND T4 RECOMMENDED TRANSFORMER ON THE PSM. SERVICE BULLETIN MOS 16-FEB-2012 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 557 Of 748 @ Camp Systems EFTA00618848 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0185 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - BUCK POWER SUPPLY U540 RECOMMENDED MODIFICATION. SERVICE BULLETIN 18-OCT-2011 MOS HRS1MSC ENC SB 73-0186 NO.1 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - REPETITIVE SUPERSEDED INSPECTION OF THE FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY SB 73-0192). SERVICE BULLETIN MOS 28-N0V-2011 HRS1MSC 15000 (s) ENC SB 73-0186 RI NO. 1 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - REPETITIVE INSPECTION OF THE FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY SB 73-0192). SERVICE BULLETIN MOS 29-MAR-2013 MRS/MSC - ENC SB 73-0188 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED RECOMMENDED TRANSIENT BLEED VALVE THREE WAY TWO STAGE ELECTROHYDAULIC SERVO VALVE WITH VENTED SLEEVE. SERVICE BULLETIN MOS 14-FEB-2012 HRSAISC ENC SB 73-0189 NO. 1 ENGINE - ENGINE FUEL AND CONTROL- IDENTIFICATION PLUG (73-24-06)- SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS I8-JUN-2012 HRSAISC ENC SB 73-0190 NO.1 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - REPLACEMENT Of SUPERSEDED THE FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS 20-JUL-2012 HRS/MSC - (s) ENC SB 73-0190 RI NO. 1 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - REPLACEMENT OF THE FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS HRS1MSC - ENC SB 73-0191 NO. I ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V3, SERVICE BULLETIN CUSTOMER CONVENIENCE 11-DEC-2012 SB 73-0191 RI 72-APR-2073 MOS HRS1MSC ENC NO.1 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V3. SERVICE BULLETIN RECOMMENDED MOS HRS1MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 558 Of 748 @ Camp Systems EFTA00618849 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0192 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - FUEL DIFFERENTIAL PRESSURE SWITCH MANAGEMENT. SERVICE BULLETIN MOS MRS/51SC - ENC SB 73-0193 NO.1 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10) - INCORPORATION OF NEW CUSTOMER INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN CONVENIENCE MOS Of-MAY-2013 MRS/51SC - ENC SB 73-0194 NO.1 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT RECOMMENDED BYPASS VALVE IMPROVEMENT. SERVICE BULLETIN MOS 01-MAY-2013 MRS/51SC ESV ENC SB 73-0195 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - ADDMON OF ARINC SERIES OPTIONAL RESISTORS ON TX3 LINES TO ACCOMMODATE NEWER MCB MN52 DEVICE. SERVICE BULLETIN MOS 14-JUN-2013 MRS/51SC - ENC SB 73-0196 NO. I ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MNS2 RECOMMENDED ARINCICCDL/IMS8 CONTROLLER ON TRONICO MANUFACTURED MAIN CHANNEL BOARDS. SERVICE BULLETIN MOS 25-JUL-2013 HRSfMSC - ENC SB 73-0198 20-FEB-2014 NO. I ENGINE - ENGINE FUEL AND CONTROL- GENERAL (73-00-00) - INTRODUCTION OF NEW CONNECTORS FOR ELECTRICAL HARNESSES. SERVICE BULLETIN MOS HRS/MSC - ENC CATEGORY 6 SB 73-0199 NO. I ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V4 (SUPERSEDED BY SUPERSEDED SB 73-0199 RI). SERVICE BULLETIN MOS HRS/MSC ENC SB 73-0199 RI NO.1 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V4. SERVICE BULLETIN CATEGORY 7 MOS 28-JAN-2014 HRSfMSC - ENC 58 73-0203 NO. I ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - NEW SOFTWARE VERSION CATEGORY 2 7.B.WF2 FOR DAC ENGINES. SERVICE BULLETIN MOS 12 (s) 09-JUN-2014 HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 559 Of 748 @ Camp Systems EFTA00618850 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB SS 73-0204 09-JUN-2014 73-A002 NO. 1 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - NEW SOFTWARE VERSIONS 7.B.WF3 FOR SAC AND DAC ENGINES AND 7.B.WF2 FOR SAC ENGINES. SERVICE BULLETIN MOS 12 (s) HRS/MSC ENC NO. 1 ENGINE - SERCK AVIATION SERVO FUEL HEATERS - IDENTIFICATION OF POTENTIAL LEAKING UNITS. SERVICE BULLETIN CATEGORY 2 MOS HRS/MSC ENC SB 73-A0024 NO. 1 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.8.11 (7838), SERVICE BULLETIN MOS 02-SEP-1998 HRS/MSC - ENC SB 73-A0034 NO. 1 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH NEW FILTER COVER. SERVICE BULLETIN MOS 23-JUL-1999 HRS/MSC - ENC SS 73-A0076 NO. 1 ENGINE - SERVO FUEL HEATERS - IDENTIFICATION OF POTENTIAL LEAKING UNITS. SERVICE BULLETIN DAYS 30 (s) MRS/P.1SC ENC SB 73-A0091 NO. I ENGINE - INSPECTION OF 3 FUEL SUPPLY TUBES FOR WEAR AT CLAMP LOCATIONS. SERVICE BULLETIN CANCELLED NOT APPLICABLE MOS 22-AUG-2008 HRS/MSC - (s) 3260:48 ENC 746 SS 73-A0091 R1 NO. 1 ENGINE - INSPECTION OF 3 FUEL SUPPLY TUBES FOR WEAR AT CLAMP LOCATIONS. SERVICE BULLETIN MOS HRS/MSC - ENC SS 74-0001 NO. 1 ENGINE - INTRODUCTION OF NEW IGNITER PLUG. SERVICE BULLETIN MOS HRS,MSC - ENC SB 74-0002 NO. 1 ENGINE - INTRODUCTION OF A NEW UNISON IGNITER PLUG. SERVICE BULLETIN MOS HRS(MSC - ENC 58 74-0003 NO. I ENGINE - IGNITION - IGNITION SYSTEM (74-00-00) - SCREENING OF IGNITION UNIT EXCITER VIN 10-631045-2 (PIN 9238M66P08) FOR SUSPECT DIODES. SERVICE BULLETIN MOS 18 (s) MRS/P.1SC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 560 Of 748 @ Camp Systems EFTA00618851 CORP Asmant sre the enand AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 74-0004 NO. 1 ENGINE - IGNITION - IGNITION SYSTEM (74-00-00) - INTRODUCTION OF NEW IGNITION UNIT EXCITER VIN 10-631045-3 (PIN 9238M66P11). SERVICE BULLETIN MOS HRSAISC - ENC SB 75-0001 R1 NO. 1 ENGINE - LPT ACC FUEL MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 75-0002 NO. 1 ENGINE - INTRODUCTION OF HPTC VALVE VIN 3291186-6 (CFMI 1821M59P06). SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-0003 NO. 1 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE ANO TCC AIR MANIFOLD CHECK VALVE FLANGE ASSEMBLIES. SERVICE BULLETIN MOS HRS/MSC ENC SB 75-0003 R1 NO. 1 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE ASSEMBLIES. SERVICE BULLETIN MOS HRSAISC ENC SB 75-0003 R2 NO. 1 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE ASSEMBLIES. SERVICE BULLETIN MOS HRSAISC ENC SB 75-0004 NO. 1 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN MOS HRSAISC - ENC SB 75-0004 R1 NO. 1 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-0004 R2 NO. 1 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN MOS HRSAISC - ENC SB 75-0005 NO. 1 ENGINE - INSPECTION OF PS3 LINE FITTING. SERVICE BULLETIN MANDATORY SCRAP MOS 14-NOV-2001 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 561 Of 748 @Camp Systems EFTA00618852 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 75-0025 R1 NO. 1 ENGINE - INTRODUCTION OF REWORKED VBV ACUTATOR. SERVICE BULLETIN MOS HRSMSC - ENC SB 75-0027 NO. 1 ENGINE - MODIFICATION OF THE PS3 LINE FITTING CONNECTIONS TORQUE SEQUENCE AND ADDITION OF PERMANENT BONDING TO THE CAP. SERVICE BULLETIN MOS HRSMISC - ENC SB 75-0027 RI NO. 1 ENGINE - AIR - COOLING AIR - MODIFICATION OF PS3 LINE FITTING CONNECTIONS TORQUE SEQUENCE AND ADDITION OF PERMANENT BONDING OF THE CAP. SERVICE BULLETIN MOS HRSMISC - ENC SB 75-0030 NO.1 ENGINE - ENGINE AIR-TRANSIENT BLEED VALVE (72-00-02)- REWORK TRANSIENT BLEED VALVE PN 3291390-1 TO PN 3291390-3, SERVICE BULLETIN MOS HRS/MSC ENC SB 75-0030 RI NO.1 ENGINE - AIR - AIR TRANSIENT BLEED VALVE (75-21-10) - REWORK OF TRANSIENT BLEED VALVE VIN 3291390-1 (PIN 1821M60P02) TO VIN 3291390-3 (PM 1821M60P04). SERVICE BULLETIN MOS I4-JUL-2009 HRS/LISC - ENC SB 75-0032 NO.1 ENGINE - REPLACEMENT OF VBV TURNBUCKLE (STEEL VERSION) BY NEW ONES WITH NEW MATERIAL (ALUMINIUM VERSION). SERVICE BULLETIN MOS 21 -JUN-2005 HRS/MSC - ENC SB 75-0033 NO. 1 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION ON THE FAN MAJOR MODULE. SERVICE BULLETIN SB 75-0033 RI SB 75-0033 R2 SB 75-0035 MOS HRS/MSC - ENC NO. 1 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION ON THE FAN MAJOR MODULE. SERVICE BULLETIN MOS HRSMSC - ENC NO. 1 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN MOS HRSMSC - ENC NO. 1 ENGINE - INTRODUCTION OF A NEW AIR SUPPLY DUCT. SERVICE BULLETIN MOS HRSMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 562 Of 748 @ Camp Systems EFTA00618853 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 75-0036 NO. 1 ENGINE - REWORK TURBINE CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186.6 (1821M59PC6) TO REDUCE FUEL LEAKAGE (SUPERSEDED BY SB 75-0036 RI) . SERVICE BULLETIN MOS HRS/MSC ENC SB 75-0036 RI NO. 1 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVES (75-22-10) - REWORK TURBINE CATEGORY 7 CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186-6 (1821M59P06) TO REDUCE FUEL LEAKAGE (SUPERSEDED BY SB 75-0036 R2). SERVICE BULLETIN MOS 25-APR-2014 HRS/MSC - ENC SB 75-0036 R2 NO. 1 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVES (75-22-10) - REWORK TURBINE CATEGORY 7 CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186-6 (1821M59P06) TO REDUCE FUEL LEAKAGE. SERVICE BULLETIN MOS 09-JUN-2014 HRS/MSC - ENC SB 75-0037 NO. 1 ENGINE - INTRODUCTION OF NEW VBV TURNBUCKLE. SERVICE BULLETIN MOS 08-SEP-2006 HRS/MSC - ENC SB 75-0037 RI NO.1 ENGINE - INTRODUCTION OF NEW VBV TURNBUCKLE. SERVICE BULLETIN MOS 13-FEB-2007 HRS/MSC - ENC SB 75-0038 NO. 1 ENGINE - INTRODUCTION OF PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN MOS 14-DEC-2006 HRS/MSC - ENC SB 75-0039 NO.1 ENGINE - AIR - LPTACC VALVE (75-23-15) -INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN MOS 15-DEC-2008 HRSfMSC - ENC SB 75-0041 NO.1 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN MOS 05-FEB-2009 MRS/P.1SC - ENC SB 75-0041 RI NO.1 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN MOS 15-JUN-2009 HRS/MSC - ENC SB 75-0042 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFMS6-7B IPC. SERVICE BULLETIN MOS 20-FEB-2008 MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 563 Of 748 @ Camp Systems EFTA00618854 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 75-0043 NO. 1 ENGINE - REWORK OF THE AIR MANIFOLD AND THE BRACKET OF THE COOLING MANIFOLD IN FIELD. SERVICE BULLETIN 05-SEP-2008 SB 75-0044 C6-FEB-2010 MOS HRS/MSC ENC NO. 1 ENGINE - MR-ACTUATOR VBV (75-32-14) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-0045 NO. 1 ENGINE - AIR - ACTUATOR VBV (75-32-14) - INTRODUCTION OF THE LVDT SENSOR VIN 8070287(325-500-002-0). SERVICE BULLETIN 09-JAN-2009 MOS HRS/MSC ENC SB 75-0047 NO.1 ENGINE - AIR - LPTACC VALVE (75-23-15) - IN FIELD REIDENTIFICATION OF LPTACC VALVE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-0048 NO. I ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF A NEW LPTACC VALVE WITH A NEW OPTIONAL IDENTIFICATION PLATE. SERVICE BULLETIN MOS I9-JAN-2012 HRS/MSC ENC SB 75-0050 NO. I ENGINE - AIR - COOLING (75-22-10) - REWORK OF TURBINE CLEARANCE CONTROL VALVES VIN 3291186-5 (P/N RECOMMENDED 1821M59P05) AND VIN 3291186-6 (P/N 1821M59P06), SERVICE BULLETIN MOS 23-FEB-20I2 HRS/MSC - ENC SB 75-0051 NO. I ENGINE - AIR - GENERAL - INTRODUCTION OF NEW TBV TUBE AND BRACKET. SERVICE BULLETIN RECOMMENDED MOS 03-SEP-2012 HRS/MSC - ENC SB 75-0052 NO. 1 ENGINE - AIR - VARIABLE STATOR ACTUATOR (75-32-10) - REPLACEMENT OF LVDT FOR FAULTY VSV ACTUATORS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-1040 NO. 1 ENGINE - REWORK HIGH PRESSURE TURBINE CLEARANCE VALVE. PN 3291186-5. TO PN 3291186-6. SERVICE BULLETIN MOS HRS/MSC - ENC SB 77-0001 NO.1 ENGINE - CONTROL UNIT ALTERNATOR - REPLACEMENT OF CONNECTOR SF41 C. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 564 Of 748 @ Camp Systems EFTA00618855 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 77-0002 NO. 1 ENGINE - SPARE PARTS RELEASE FOR ENGINE CFM56-78 IPC. SERVICE BULLETIN MOS HRS(MSC - ENC SB 77-0003 NO. 1 ENGINE - ENGINE INDICATING - T49.5 THERMOCOUPLE LEAD ASSY (77-21-10) - INTRODUCTION OF NEW OR REWORKED T49.5 PROBE. SERVICE BULLETIN MOS MRS/51SC - ENC SB 77-0004 NO. 1 ENGINE - ENGINE INDICATING- T5 SENSOR REMOVAL (77-22-10) - INTRODUCTION OF NEW TEMPERATURE SENSOR. SERVICE BULLETIN SB 77-0004 RI 04-MAR-2005 SB 77-0005 MOS MRS/51SC - ENC NO. 1 ENGINE - INTRODUCTION OF NEW TEMPERATURE SENSOR. SERVICE BULLETIN MOS HRS(MSC - ENC NO. 1 ENGINE - ELIMINATE CHAFING OF BOEING ECS TUBE. SERVICE BULLETIN MOS HRS(MSC - ENC SB 77-0007 NO. 1 ENGINE - INTRODUCTION OF A NEW NI SPEED SENSOR. SERVICE BULLETIN MOS OI -DEC-2006 HRS/MSC - ENC SB 77-0008 NO. 1 ENGINE - INTRODUCTION OF A NEW N2 SPEED SENSOR. SERVICE BULLETIN MOS 20-OCT-2006 HRS/MSC - ENC SB 77-0008 RI NO. 1 ENGINE - INTRODUCTION OF A NEW N2 SPEED SENSOR. SERVICE BULLETIN MOS 27-FEB-2008 MRS/51SC - ENC SB 77-0009 NO. 1 ENGINE - ENGINE INDICATING - (77-00-00) - SPARES PARTS RELEASE FOR CFM56-78. SERVICE BULLETIN MOS I2-JAN-2009 HRS(MSC - ENC SB 77-0010 NO. 1 ENGINE - ENGINE INDICATING -NI SPEED SENSOR (77-12-19) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN I 7-DEC-2009 MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 565 Of 748 @ Camp Systems EFTA00618856 C O Atiant.fran MP Ad-own/lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0001 NO. 1 ENGINE - APPROVED OILS FOR CFM56-76 ENGINES. SERVICE BULLETIN - INFORMATION ONLY MOS HRSAISC - ENC SB 79-0001 RI NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC SB 79-0001 RIO NO. I ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-76 ENGINES. SERVICE BULLETIN CATEGORY 9 MOS 14-APR-2014 FIRSAISC - ENC SB 79-0001 R2 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0001 R3 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0001 R4 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC SB 79-0001 R5 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC SB 79-0001 R6 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 07-JUL-2006 HRSAISC - ENC SB 79-0001 R7 NO. 1 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 10-JUL-2008 FIRSAISC - ENC SB 79-0001 R8 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 14-MAY-2009 HRS/MSC - ENC SB 79-0001 R9 NO. 1 ENGINE - OIL - GENERAL (79.00-00) - APPROVED OILS FOR CFM56-7B ENGINES (SUPERSEDED BY SB 79-0001 INFORMATIONAL R10). SERVICE BULLETIN MOS 19-AUG-2011 FIRSAISC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 566 Of 748 @ Camp Systems EFTA00618857 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0002 R1 NO. 1 ENGINE - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 79-0002 R2 NO. 1 ENGINE - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN MOS HRSAISC - ENC SB 79-0002 R3 NO. 1 ENGINE - OIL - LUBRICATION UNIT (79-00-00) - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN MOS 14-MAY-2009 HRSAISC ENC SB 79-0003 NO. 1 ENGINE - INTRODUCTION OF A NEW OIL CLOGGING INDICATOR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0004 RI NO. 1 ENGINE - ADDITION OF A CAUTION LABEL ON OIL SCAVENGE FILTER BOWL. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0005 NO. 1 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN COMPUED WITH - NO REWORK REQUIRED MOS 22-AUG-2008 HRS/MSC - 3260:48 ENC 746 SB 79-0006 NO. 1 ENGINE - OIL - OIL SYSTEM (79-00-00) - INTRODUCTION OF AN IMPROVED OIL SCAVENGE FILTER ASSY WITH MODIFIED BOWL AND HEAD. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0008 NO. 1 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL HEATER. SERVICE BULLETIN MOS HRS/MSC 1500 (s) ENC SB 79-0008 RI NO. 1 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL HEATER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0008 R2 NO. 1 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL HEATER. SERVICE BULLETIN MOS HRSAISC 1500 (s) ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 567 Of 748 @ Camp Systems EFTA00618858 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0009 SB 79-0009 R1 SB 79-0009 R2 SB 79-0010 SB 79-O010 RI NO. ENGINE - LUBRICATION UNIT REMOVAL (79.21-10) - INTRODUCTION OF NEW PACKING PREFORMED O-RINGS AND REWORK OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRIFICATION UNIT.. SERVICE BULLETIN MOS HR&MSC - ENC NO 1 ENGINE - LUBRICATION UNIT (79-21-10)-INTRODUCTION OF NEW PACKING PERFORMED O-RINGS AND REWORK OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRICATION UNIT. SERVICE BULLETIN MOS HRS.P.ISC - ENC NO 1 ENGINE - LUBRICATION UNIT (79-21-10)-INTRODUCTION OF NEW PACKING PERFORMED O-RINGS AND REWORK OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRIFICATION UNIT. SERVICE BULLETIN MOS HRS.P.ISC - ENC NO. ENGINE - INTRODUCTION OF NEW FLUOROCARBONE O-RINGS ON OIL FUEL HEAT EXCHANGER. SERVICE BULLETIN MOS HRSMSC ENC NO 1 ENGINE - OlLiFUEL HEAT EXCHANGER ( 79-21-20) - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RINGS. SERVICE BULLETIN MOS HRSMSC - ENC SB 79-0010 R2 NO 1 ENGINE - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RINGS. SERVICE BULLETIN MOS 20-DEC-2000 HRSMSC - ENC SB 79-0011 NO. I ENGINE - OlliFUEL HEAT EXCHANGER (79-21-20) - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RINGS. SERVICE BULLETIN SB 79-O011 RI 20-DEC-2000 SB 79-0012 MOS HRSMSC - ENC NO. ENGINE - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RING. SERVICE BULLETIN MOS HRS.P.ISC - ENC NO. I ENGINE - REWORK OF A SPECIFIC BATCH OF OIL LEVEL SENSORS. SERVICE BULLETIN MOS HRSMSC - ENC SB 79-0013 NO. ENGINE - INTRODUCTION OF A NEW OIL BYPASS VALVE. SERVICE BULLETIN MOS HRSi sISC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 568 Of 748 Camp Systems EFTA00618859 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0014 NO. 1 ENGINE - OIL - OIL SYSTEM ( 79-00-00 ) - DELETION OF THE OIL BYPASS VALVE AND ITS HARDWARE. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 79-0017 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES, SERVICE BULLETIN MOS 6 (s) HRS/MSC ENC SB 79-0017 RI NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES, SERVICE BULLETIN MOS 6 (s) MRS/P.1SC ENC SB 79-0017 R2 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES. SERVICE BULLETIN MOS 6 (s) MRS/P.1SC ENC SB 79-0017 R3 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES (SUPERSEDED RECOMMENDED BY SB 79-0017 R4). SERVICE BULLETIN MOS 6 (s) 16-FEB-2007 HRS/MSC ENC SB 79-0017 R4 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES. SERVICE BULLETIN MOS 14-APR-2014 HRS/MSC - ENC SB 79-0018 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING. SERVICE BULLETIN DAYS 30 (s) HRSfMSC ENC SB 79-0018 RI NO. 1 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING (SUPERSEDED BY SB 79-0018 R2). SERVICE BULLETIN DAYS 30 (s) MRS/P.1SC ENC SB 79-0018 R2 NO.1 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING. SERVICE BULLETIN MOS 14-APR-2014 HRS/P.1SC - ENC SB 79-0020 NO.1 ENGINE - OIL - DEBRIS MONITORING SYSTEM (DMS) (79-21-S4) - INTRODUCTION OF NEW OMS DETECTOR AND REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSfMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 569 Of 748 @ Camp Systems EFTA00618860 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0020 R1 NO. I ENGINE - INTRODUCTION OF NEW DOS DETECTOR AND REWORK OF THE OLD ONE. SERVICE BULLETIN MOS I6-JAN-2006 HRS/MSC - ENC SB 79-0021 R2 NO. I ENGINE - INTRODUCTION OF A NEW OIL SCAVENGE HOSE TUBE WITH A NEW ROUTING AND A NEW BRACKET. SERVICE BULLETIN MOS -MAR-2005 HRS/MSC - ENC SB 79-0022 NO.1 ENGINE - OIL - DMS JUNCTION BOX (79-21-53) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN 26-NOV-2008 MOS HRS/MSC - ENC SB 79-0023 NO. 1 ENGINE - OIL/FUEL HEAT EXCHANGER (79-21-25) - INTRODUCTION OF A NEW MAIN OlUFUEL HEAT EXCHANGER WITH KEY LOCKED INSERTS. SERVICE BULLETIN MOS HRS,MSC - ENC SB 79-0023 RI NO. 1 ENGINE - INTRODUCTION OF A NEW MAIN OIL/FUEL HEAT EXCHANGER WITH KEY LOCKED INSERTS. SERVICE BULLETIN MOS 20-DEC-2006 HRS/MSC - ENC SB 79-0024 NO. 1 ENGINE - INTRODUCTION OF NEW PACKING PREFORMED 0 -RINGS IN FLUOROCARBONE WITH BETTER PERFORMANCE AT LOW TEMPERATURE. SERVICE BULLETIN MOS HRS/MSC 500(s) ENC SB 79-0025 NO. I ENGINE - NEW FORWARD TUBE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0026 NO.1 ENGINE - INTRODUCTION OF NEW OUTER SEALING SPOOL. SERVICE BULLETIN MOS 25-OCT-2007 HRS/MSC - ENC SB 79-0027 NO. 1 ENGINE - OIL CONSUMPTION MONITORING. SERVICE BULLETIN DAYS 30 (s) 10-JUL-2008 HRS/MSC ENC SB 79-0029 NO. I ENGINE - OIL - OIL SCAVENGE FILTER ASSEMBLY (79-21-42) - INTRODUCTION OF A NEW BYPASS VALVE SPRING. SERVICE BULLETIN 08-OCT-2009 MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 570 Of 748 @ Camp Systems EFTA00618861 CAMP Ael...imp.= taken...lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0030 05-N0V-2010 SB 79-0031 IO-DEC-2010 NO. 1 ENGINE - OIL - GENERAL (79-00-00) - INTRODUCTION OF AN OIL SUPPLY TUBE WITH A NEW DESIGN. SERVICE RECOMMENDED BULLETIN MOS HRS1MSC - ENC NO. 1 ENGINE - OIL - LUBRICATION UNIT (79-21-16) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN INFORMATIONAL MOS HRS(MSC - ENC SB SB 79-0032 22-JAN-2013 79-0069 NO. 1 ENGINE - OIL - GENERAL (79-0000) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC NO. 1 ENGINE - DELETION OF ELECTRICAL CHIP DETECTOR KIT. SERVICE BULLETIN MOS HRS1MSC - ENC SB 80-0001 NO. 1 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN MOS HRS1MSC - ENC SB 80-0001 R1 NO. 1 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 80-0003R1 MOS HRS,MSC - ENC SB 80-0001 R3 NO. 1 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN MOS PIRS1MSC - ENC SB 80-0001 R4 NO. 1 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN MOS 13-AUG-1999 HRSAISC - ENC SB 80-0002 NO. I ENGINE - AIR TURBINE STARTER CLAMP ROTATION, SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 26-MAR-1998 HRSAISC - 0 ENC 0 SB 80-0003 R1 NO. I ENGINE - INTRODUCTION OF A NEW MR TURBINE STARTER. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS1MSC - 0 ENC 0 SB 80-0004 NO. 1 ENGINE - REPLACE THE GEAR SHAFT P/N 3507167-1 WITH P/N 3507167-2. SERVICE BULLETIN MOS HRS1MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 571 Of 748 @ Camp Systems EFTA00618862 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 80-0004 R1 SB 80-0005 SB 80-0006 SB 80-0006 R1 -MAR-2004 NO. 1 ENGINE - REPLACE THE GEAR SHAFT P/N 3507167-1 WITH P/N 3507167-2. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - AIR TURBINE STARTER. SERVICE BULLETIN MOS HRS/MSC - ENC NO. 1 ENGINE - STARTING - INTRODUCTION OF NEW TURBINE AIR STARTER VIN 3505945-9 (GE 1851M36P09) FIELD UPGRADE. SERVICE BULLETIN MOS HRS/MSC ENC NO. 1 ENGINE - STARTING - INTRODUCTION OF NEW TURBINE AIR STARTER VIN 3505945-9 (GE 1851M36P09) FIELD UPGRADE. SERVICE BULLETIN MOS HRS/MSC ENC SB 80-0007 NO. 1 ENGINE - INTRODUCTION OF AIR TURBINE STARTER VIN 3505945-10 (GE 1851M36P10). SERVICE BULLETIN MOS HRS/MSC - ENC SB 80-0008 NO. 1 ENGINE - INSPECTION AND REPLACEMENT OF NONCONFORMING MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN 06-AUG-2002 MOS 22-AUG-2008 HRS/MSC - (s) 326048 ENC 746 SB 80-0009 NO. I ENGINE - STARTING - STARTING (80-00-00) - AIR TURBINE STARTER VIN 3505945-9 (GE 1851M36P09) TO VIN 3505945-10 (GE 1851M36P10) REWORK. SERVICE BULLETIN MOS HRSAISC - ENC SB 80-0010 NO.1 ENGINE - PACKINGS FOR HTS OILS. SERVICE BULLETIN MOS HRS/MSC DUE ENC SB 80-0010 RI NO.1 ENGINE - PACKINGS FOR HTS OILS AND NEW MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN MOS HRSAISC - ENC SB 80-0010 R2 NO.1 ENGINE - PACKINGS FOR HTS OILS AND NEW MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN MOS 25-JUL-2006 HRS,MSC - (s) ENC COMPUED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 572 Of 748 @ Camp Systems EFTA00618863 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 80-0011 SB 80-0012 SB 80-0013 14-FEB-2012 NO. 1 ENGINE - MAGNETIC DRAIN PLUG WITH LARGER KNOB TO EASE REMOVAL. SERVICE BULLETIN MOS HRSIMSC - ENC NO. 1 ENGINE - REPLACEMENT OF THE SPRING WASHER IN AIR TURBINE STARTERS VIN 3505945-9 (1851M36P09) AND VIN 3505945-10 (1851M36P10). SERVICE BULLETIN MOS HRSIMSC - ENC NO. 1 ENGINE - STARTING - GENERAL (80-00-00)-ALLOW THE CHANGE IN THE FIELD OF THE AIR TURBINE STARTER SUPERSEDED DECOUPLER ASSEMBLY VIN 3504835-1 (SUPERSEDED BY 80-0013 RI). SERVICE BULLETIN MOS HRS/MSC - ENC SB 80-0013 RI NO. I ENGINE - STARTING - GENERAL (80-00-00)- ALLOW THE CHANGE IN THE FIELD OF THE AIR TURBINE STARTER RECOMMENDED DECOUPLER ASSEMBLY VIN 3504835-1. SERVICE BULLETIN MOS 28-MAR-2012 HRS/MSC - ENC SB 80-0014 NO.1 ENGINE - STARTING - STARTER (80-11-00) - INTRODUCTION OF NEW AIR TURBINE STARTERS VIN 3505945-11 OPTIONAL (P/N 1851M36P11) AND VIN 3505945-12 (PIN 1851M36P12). SERVICE BULLETIN MOS 17-APR-2013 HRS/MSC - ENC SB 80-0015 NO.1 ENGINE - STARTING - STARTER (80-11-00) - RETURN SUSPECT AIR TURBINE STARTERS. P/N 3505945-10. FOR SUPERSEDED INSPECTION AND EVALUATION (SUPERSEDED BY SB 80-0015 RI). SERVICE BULLETIN MOS HRS/MSC - ENC SB 80-0015 RI NO. 1 ENGINE - STARTING - STARTER (80-11-00) - RETURN SUSPECT AIR TURBINE STARTERS. P/N 3505945-10. FOR CATEGORY 2 INSPECTION AND EVALUATION. SERVICE BULLETIN MOS 09-JAN-2014 HRS/MSC - ENC SB 80-1709 NO. 1 ENGINE - REWORK THE AIR TURBINE ENGINE STARTER. PN 3505945-5/-6 TO PN 3505945-7/-8. SERVICE BULLETIN MOS HRS/MSC - ENC SI SER 79-0001 NO. 1 ENGINE - SERVICE EVALUATION REQUEST OF FLIGHT EVALUATION OF OILS, SERVICE INSTRUCTIONS MOS HRS/MSC ENC 5000 (s) VSB 3291186-75-1074 R1 NO. I ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVE- REWORK HIGH PRESSURE TURBINE RECOMMENDED CLEARANCE VALVES. PN 3291186-5 AND PN 3291186-6 TO REDUCE FUEL LEAKAGE. VENDOR SERVICE BULLETIN MOS 19-FEB-2014 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 573 Of 748 @ Camp Systems EFTA00618864 Meg arroyo' AD/SI Status Report 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC ASB 72-A0328 NO.2 ENGINE -LOW PRESSURE TURBINE SHAFT - REDUCED INTERVAL FOR AFT SUMP MCD OR DMS INSPECTION. ALERT SERVICE BULLETIN 12-MAR-2002 MOS HRSNSC ENC ASB 72-A0328 RI NO.2 ENGINE -LOW PRESSURE TURBINE SHAFT - REDUCED INTERVAL FOR AFT SUMP MCD OR DMS INSPECTION. ALERT SERVICE BULLETIN 12-MAR-2002 DAYS I (s) HRSAISC ENC ASB 72-A0329 NO.2 ENGINE -LOW PRESSURE TURBINE SHAFT - REPLACEMENT OF NO.4 ROLLER BEARING.. ALERT SERVICE BULLETIN 12-MAR-2002 ASB 7340026 15-JAN-1999 MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCITON OF SOFTWARE VERSION 7.B.J (763A). ALERT SERVICE BULLETIN MOS HRSAISC - ENC ASB SB 73-A0034 RI 72-0000 NO.2 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH NEW FILTER COVER. ALERT SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 SERVICE BULLETINS. SERVICE BULLETIN SUPERSEDED MOS HRS1SISC ENC SB 72-O000R1 NO.2 ENGINE - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN CFM56-78 (SUPERSEDED BY 72-0000 SUPERSEDED R2). SERVICE BULLETIN MOS HRSAISC ENC SB 72-O000R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - COMPLIANCE AND INTERCHANGEABILITY STATEMENTS USED IN INFORMATIONAL CFM56-78 SERVICE BULLETINS. SERVICE BULLETIN MOS II -MAY-2011 HRSJIASC - ENC SB 72-0001 NO.2 ENGINE - CFM56-78 ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED - INFORMATION ONLY MOS HRSAISC - ENC S8 72-0001 R1 NO.2 ENGINE - CFM56-78 ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time @Camp Systems 574 Of 748 EFTA00618865 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0001 R2 NO.2 ENGINE - CFUS6-7B ENGINE MODELS I DENII FICATION.. SERVICE BULLETIN MOS FIRSAISC - ENC SUPERSEDED SB 72-0001 R3 NO.2 ENGINE - CFM56-7B ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN SUPERSEDED MOS 27-JUL-2006 HRSAISC - ENC SB 72-0001 R4 NO.2 ENGINE - CF1456-7B ENGINE MODELS IDENTIFICATION . SERVICE BULLETIN MOS 2S-MAY-2007 FIRSAISC ENC SB 72-0001 RS NO.2 ENGINE - CFM56-7B ENGINE MODELS IDENTIFICATION. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0002 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED - CANCELLED MOS HRS/SISC ENC SB 72-0002 RI NO.2 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED MOS HRS/A1SC - ENC SB 72-0003 NO.2 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN - PRODUCT IMPROVEMENT MOS FIRSAISC - ENC SB 72-0003 RI NO.2 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN MOS FIRSAISC - ENC SB 72-0003 R10 NO.2 ENGINE - ENGINE - GENERAL (72-00-60) - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE OPTIONAL DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS 15-JUN-2011 HRSAISC - ENC SB 72-0003 R2 NO.2 ENGINE - CONVERSION OF CFM56-7B TO DERIVATIVE MODEL SERVICE BULLETIN MOS HRSOJSC - ENC SB 72-0003 R3 NO.2 ENGINE - CONVERSION OF CFM56-76 TO DERIVATIVE MODELS. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 575 Of 748 @ Camp Systems EFTA00618866 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0003 R4 NO 2 ENGINE - CONVERSION OF CR156-76 TO DERIVATIVE MODELS. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0003 R5 NO 2 ENGINE - CONVERSION OF CFM56-7B MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0003 R6 NO 2 ENGINE - CONVERSION OF CFM56-76 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS 17-APR-2007 HRSMSC - ENC SB 72-0003 R7 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFm56-78 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS 11-JUN-2009 HR&MSC - ENC SB 72-0003 Re NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFm56-78 MODEL ENGINES TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0003 R9 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFNI56-76 MODEL ENGINES TO ALLOWABLE SUPERSEDED DERIVATIVE MODEL DESIGNATIONS (SUPERSEDED BY 72-0003 RIO) SERVICE BULLETIN MOS 10-MAR-2011 HR&MSC - ENC SB 72-0004 NO .2 ENGINE - INSTALLATION OF CERTIFIED CFM56.7B ENGINE NAMEPLATE. SERVICE BULLETIN MOS HRS.ISC - ENC SB 72-0004 RI NO 2 ENGINE - CERTIFIED CFP0156-76 ENGINE NAMEPLATE. SERVICE BULLETIN NOT APPLICABLE MOS HRSMSC ENC SB 72-0005 NO 2 ENGINE - SERVICE BULLETIN CANCELLED - CANCELLED MOS HRSMSC ENC SB 72-0006 R1 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFNI56-7618. SERVICE BULLETIN MOS HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 576 Of 748 Camp Systems EFTA00618867 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0006 R2 SB 72-0006 R3 SB 72-0006 R4 SB 72-0007 R1 SB 72-0007 R2 SB 72-0007 R3 SB 72-0007 R4 SB 72-0008 Ri SB 72-0008 R3 SB 72-0008 R4 SB 72-0008 R5 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CRIBS-7818. SERVICE BULLETIN MOS HRSisiSC - ENG NO 2 ENGINE - CONVERSION TO CFM56-7618. SERVICE BULLETIN MOS HRSisiSC - ENG NO 2 ENGINE - CONVERSION TO CFM56-7818. SERVICE BULLETIN MOS HRS4.ISC - ENG NO .2 ENGINE - CFP.I56-7B ENGINE CONVERSION TO CFNI56-7820. SERVICE BULLETIN MOS HRS.ISC - ENG NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7820. SERVICE BULLETIN MOS HRS1ISC - ENG NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7820. SERVICE BULLETIN MOS HRSisiSC - ENG NO 2 ENGINE - CONVERSION TO CFM56-7820. SERVICE BULLETIN MOS HRSisiSC - ENG NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7822. SERVICE BULLETIN MOS HRSisiSC - ENG NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7822. SERVICE BULLETIN MOS HRS4.ISC - ENG NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7822. SERVICE BULLETIN MOS HRSLISC - ENG NO 2 ENGINE - CONVERSION TO CRISS-7822. SERVICE BULLETIN MOS HRSisiSC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 577 Of 748 1, Camp Systems EFTA00618868 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0009 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.F (7628). SERVICE BULLETIN MOS HRSiliSC - ENG SB 72-0009 R1 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFMSS-7624. SERVICE BULLETIN MOS HRSikiSC - ENC SB 72-0009 R2 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN MOS HRSASC - ENG SB 72-0009 R3 NO 2 ENGINE - CRIS6-7B ENGINE CONVERSION TO CFm56-7624. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0009 R4 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7624. SERVICE BULLETIN MOS HRS4ISC - ENG SB 72-0010 R1 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN MOS HRS.' hiSC - ENC SB 72-0010 R2 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN NOT APPLICABLE MOS HRS.' hiSC - ENC SB 72-0010 R3 NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CFm56-7626. SERVICE BULLETIN MOS HRS.' hiSC - ENG SB 72-0010 R4 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFm50-7626. SERVICE BULLETIN MOS HRSASC - ENG SB 72-0010 RS NO 2 ENGINE - CFNI56-76 ENGINE CONVERSION TO CRI56-7626. SERVICE BULLETIN OPTIONAL MOS 17-FEB-2011 HRSASC - ENG SB 72-0011 R2 NO 2 ENGINE - CW56-7E: ENGINE CONVERSION TO CRI56-7627. SERVICE BULLETIN OPTIONAL MOS HRS.' hiSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 578 Of 748 Camp Systems EFTA00618869 C4INIP AsianwftimMetnundieli AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0011 R3 NO. 2 ENGINE - CFL156-78 ENGINE CONVERSION TO CR156-7B27. SERVICE BULLETIN MOS HRS.' LISC - ENC OPTIONAL SB 72-0011 R4 NO. 2 ENGINE - CP.156-78 ENGINE CONVERSION TO GP.156-7627. SERVICE BULLETIN OPTIONAL MOS 28-APR-2000 HRS.' LISC ENC SB 72-0012 NO 2 ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED MOS HRSMSC ENC SB 72-0013 NO.2 ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED MOS HRSILISC ENC SB 72-0014 NO. 2 ENGINE - NUT AND TORQUE CHANGE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC 0 ENC 0 SB 72-0015 NO.2 ENGINE - . SERVICE BULLETIN CANCELLED - CANCELLED MOS HRSMSC ENC SB 72-0016 NO. 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN MOS 11-JUL-1997 HRSMSC - ENC SB 72-0016 R1 NO. 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 05-AUG-1997 HRSMSC 0 ENC 0 SB 72-0017 NO. 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS4.1SC 0 ENC 0 SB 72-0017 R1 NO. 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN MOS HRSILISC - ENC SB 72-0018 NO. 2 ENGINE - INCREASING OF BOLT LENGTH AND ADDITION OF A WASHER. SERVICE BULLETIN MOS HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 579 Of 748 Camp Systems EFTA00618870 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0018 R1 NO.2 ENGINE - INCREASING OF BOLT LENGTH AND ADDITION OF A WASHER. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0018 R2 NO.2 ENGINE - INCREASING OF LENGTH BOLT AND ADDITION OF A WASHER, SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0019 NO.2 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED MOS HRS/MSC - ENC SB 72-0020 RI NO.2 ENGINE - ADDITON OF A SPACER ON THE RETAINING CABLE OF THE IDENTIFICATION PLUG NIT. SERVICE COMPUED WITH -AT MANUFACTURE BULLETIN MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0021 NO.2 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0021 RIO NO.2 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN SB 72-0021R1 SB 72-0022 SB 72-0022 RI SB 72-0023 SB 72-0023 RI MOS HRS/MSC - ENC NO.2 ENGINE - REPLACEMENT OF STAGE 9 BLADES. SERVICE BULLETIN MOS MRS/MSC - ENC NO.2 ENGINE - MODIFICATION OF THE J10 WIRING HARNESS. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - MODIFICATION OF THE J10 WIRING HARNESS. SERVICE BULLETIN MOS HRSAISC - ENC NOT APPLICABLE - SUPERSEDED 72-0093 NO.2 ENGINE - INTERFERENCE BETWEEN THE BODY ACTUATOR AND THE LVDT SENSOR. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 NO.2 ENGINE - INTERFERENCE BETWEEN THE BODY ACTUATOR AND THE LVDT SENSOR. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 580 Of 748 @ Camp Systems EFTA00618871 CORP Mianwpwre AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SS 72-0024 NO. 2 ENGINE - REPLACEMENT OF BOLTS ON OIL SENSOR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0024 RI NO. 2 ENGINE - REPLACEMENT OF BOLTS ON OIL SENSOR. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0025 NO. 2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION CONNECTOR KITS. SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0025 R2 NO. 2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION CONNECTOR KITS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 MRS/51SC - 0 ENC 0 SB 72-0026 RI NO. 2 ENGINE - REWORK OF SHROUD PAD. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 MRS/51SC - 0 ENC 0 SB 72-0027 NO. 2 ENGINE - REPOSITIONING OF VBV HARNNESS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SS 72-0028 R2 NO. 2 ENGINE - THRUST REVERSER KIT MODIFICATION OF INTERNAL VEE GROOVE AND FITTING SHROUDS, SERVICE COMPUED WITH - AT MANUFACTURE BULLETIN MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0029 NO. 2 ENGINE - REPLACEMENT OF BOLTS, SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0030 RI NO. 2 ENGINE - MODIFICATION OF NAMEPLATE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0030 R2 NO. 2 ENGINE - MODIFICATION OF NAMEPLATE. SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0031 NO. 2 ENGINE - INTRODUCTION OF THE NEW PLATFORM FAN BLADE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 581 Of 748 @Camp Systems EFTA00618872 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0032 NO 2 ENGINE - INTRODUCTION OF A NEW FAN CASE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSisISC 0 ENC 0 SB 72-0033 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSI.ISC 0 ENC 0 SB 72-0033 R1 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0033 R2 NO. 2 ENGINE - . SERVICE BULLETIN MOS HR&P.ISC ENC SB 72-0034 R1 NO 2 ENGINE - TURBINE CLEARANCE CONTROL VALVE SUPPORT BRACKET REPLACEMENT. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HR&MSC 0 ENC 0 SB 72-0035 NO 2 ENGINE - MODIFICATION OF BRACKET ASSY AND HARNESS .J5 AND J6. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0101 MOS HRSI.ISC - ENC SB 72-0035 R1 NO 2 ENGINE - MODIFICATION OF BRACKET ASSY AND HARNESS .15 AND J6. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 72-0036 R1 NO 2 ENGINE - INSTALLATION OF A TUBE OIL DRAIN. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSisiSC 0 ENC 0 SB 72-0037 NO 2 ENGINE - REPLACEMENT OF ONE BRACKET ASSY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSI.ISC 0 ENC 0 SB 72-0038 NO 2 ENGINE - MODIFICATION OF AXIAL LOAD LINK. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS.P.ISC 0 ENC 0 SB 72-0039 R2 NO 2 ENGINE - INSTALLATION OF NEW BRACKET ASSY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSisISC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 582 Of 748 Camp Systems EFTA00618873 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0040 R1 NO 2 ENGINE - MODIFICATION OF BRACKET ASSY. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC 0 ENC 0 SB 72-0040 R2 NO 2 ENGINE - MODIFICATION OF BRACKET ASSY. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0041 NO 2 ENGINE - DELETION OF BRACKETS ASSY FOLOWING PRECOOLER DEFLECTOR AST SIDE PANELS REMOVAL. NOT APPLICABLE SERVICE BULLETIN MOS HRSIASC ENC SB 72-0042 NO 2 ENGINE - HPTCC MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0043 NO 2 ENGINE - INTRODUCTION OF NEW BRACKET. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC 0 ENC 0 SB 72-0044 R1 NO. 2 ENGINE - SUPPORT BRACKET IMPROVEMENTS FOR THE CJ9 HARNESS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC 0 ENC 0 SB 72-0045 R2 NO 2 ENGINE - REWORK OF SHROUD PAD OF STRUT Nsi ON 'VEE GROOVE". SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSIASC 0 ENC 0 SB 72-0045 R3 NO 2 ENGINE - REWORK OF SHROUD PAD OF STRUT Nsi ON 'VEE GROOVE". SERVICE BULLETIN MOS HRSIASC - ENC SB 72-0046 NO 2 ENGINE - MODIFICATION OF TWO BRACKETS ON BOEING FUEL SUPPLY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSIASC 0 ENC 0 SB 72-0047 NO 2 ENGINE - NEW HPT SHROUD RETAINING CLIP INTRODUCTION. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS IC-DEC-1998 HRSIASC - 0 ENC 0 SB 72-0047 R1 NO 2 ENGINE - NEW HPT SHROUD RETAINING CLIP INTRODUCTION. SERVICE BULLETIN MOS HRSIASC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 583 Of 748 Camp Systems EFTA00618874 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0047 R2 NO.2 ENGINE - HPT AND LPT NOZZLE STAGE 1 - INTRODUCTION OF NEW LOW STRESS C-CLIPS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0048 R1 NO.2 ENGINE - ANTI-ICE AND DRAIN MANIFOLD BRACKET REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0098 MOS HRS/MSC - ENC SB 72-0049 R1 NO.2 ENGINE - MODIFICATION OF HARNESS MW0304. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/hISC - 0 ENC 0 SB 72-0050 NO.2 ENGINE - MODIFICATION OF HARNESS MW0301. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0051 NO.2 ENGINE - GENERAL (72-00-00) SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/hISC - ENC SB 72-0052 NO.2 ENGINE - INSPECTION OF J5. J6. J10. MW0301,MW0302, AND MW0304 HARNESSES. SERVICE BULLETIN NOT APPLICABLE MOS HRS/MSC - ENC SB 72-0053 R1 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN COMPUED WITH - PARTIALLY AT MFG 52X CWM-91X MOS HRS/hISC - ENC SB 72-0054 NO.2 ENGINE - REPLACEMENT OF T49.5 BRACKETS. SERVICE BULLETIN NOT APPLICABLE MOS HRS/MSC - ENC SB 72-0054R1 NO.2 ENGINE - REPLACEMENT OF T49.5 BRACKETS. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0055 R1 NO.2 ENGINE - CHANGE OF HARDWARE FROM CORE ASSEMBLY TO ENGINE ASSEMBLY. SERVICE BULLETIN NOT APPLICABLE MOS HRS/hISC - ENC SB 72-0056 NO.2 ENGINE - VBV FUEL MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 584 Of 748 @ Camp Systems EFTA00618875 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0057 NO.2 ENGINE - INTRODUCTION OF NEW HPT NOZZLE SEGMENTS. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0099 MOS HRSAISC - ENC SB 72-0058 NO.2 ENGINE - INTRODUCTION OF NEW FRONT FLANGE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0059 NO.2 ENGINE - NEW VSV FUEL MANIFOLD LOOP CLAMP BOLTS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-O060 NO.2 ENGINE - REPLACEMENT OF OVERHEAT DETECTOR BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0060 R1 NO.2 ENGINE - REPLACEMENT OF OVERHEAT DETECTOR BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0061 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE 32X,41X.52X91X MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0062 NO.2 ENGINE - INTRODUCTION OF A REPLACEABLE CUSHION FOR HINGED CLAMP (ELECTRICAL HARNESSES ATTACHMENT). SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0063 R1 NO.2 ENGINE - REPLACEMENT OF HOLD OPEN ROD BRACKET. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0064 R1 NO.2 ENGINE - REPLACEMENT OF TWO BRACKETS ATTACHING THE J12 HARNESS. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0065 NO.2 ENGINE - INTRODUCTION OF A NEW SOURCE FOR THE VIBRATION BRG1. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0066 NO.2 ENGINE - INTRODUCTION OF NEW SOURCE FOR SENSOR VIBRATION FFCC. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 585 Of 748 @ Camp Systems EFTA00618876 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0067 R1 NO.2 ENGINE - INTRODUCTION OF A HEAT SHIELD BETWEEN THE OIL PRESSURE SENSOR AND THE OIL DISTRIBUTION BLOCK. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE 91X NA-SUPERSEDED 72-0151 MOS 16-DEC-1998 HRS/MSC 0 ENC 0 SB 72-0068 NO.2 ENGINE - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0068 RI NO.2 ENGINE - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0068 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - REPLACEMENT OF THE HMU BOLTS. SERVICE BULLETIN INFORMATIONAL MOS 03-MAY-2012 HRS/MSC - ENC SB 72-0069 NO.2 ENGINE - INTRODUCTION/REWORK OF TWO PS3 BRACKETS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 76-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0070 RI NO.2 ENGINE - ECS DUCT BRACKET REPLACEMENT. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0071 NO.2 ENGINE - MODIFICATION OF BRACKET ATTACHING THE MW0312, SERVICE BULLETIN COMPLIED WITH- AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0072 NO.2 ENGINE - INTRODUCTION OF A PAINT-MARKED COVER ASSY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0073 NO.2 ENGINE - DRAIN TUBE SUPPORT CHANGE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0074 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0074 RI NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE 41X,91X MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 586 Of 748 @ Camp Systems EFTA00618877 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (VG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0075 NO 2 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE AND IGNITER HARDWARE. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSimSC - 0 ENC 0 SB 72-0076 NO 2 ENGINE - INTRODUCTION OF NEW IDG OIL COOLER WITH A NEW GOEMETRY. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS.mSC 0 ENC 0 SB 72-0077 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HRSIASC - ENC SB 72-0077 R2 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSIASC - ENC SB 72-0078 RI NO 2 ENGINE - INTRODUCTION OF LONGER SCREWS ON LPTACC PANEL. SERVICE BULLETIN COMPLIED WITH - PARTIALLY AT MFG MOS 16-DEC-1998 HR&P.ISC ENC SB 72-0079 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0079 RI NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS IC-DEC-1998 HRSimSC 0 ENC 0 SB 72-0079 R2 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0079 R3 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 72-0079 R4 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HR&P.ISC - ENC SB 72-0079 RS NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HRSimSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 587 Of 748 Camp Systems EFTA00618878 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0079 R6 23-NOv-2010 SB 72-0080 NO 2 ENGINE - NEW OR REWORKED HPT SHROUD AND SHROUD HANGERS. SERVICE BULLETIN MOS HRSMSC ENC NO 2 ENGINE - . SERVICE BULLETIN MOS HRSMSC ENC SB 72-0081 NO 2 ENGINE - CMF56-78 ENGINE CONVERSION TO GFM56-7B20+2. SERVICE BULLETIN MOS HR&MSC - ENC SB 72-0081 fel NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO MI56-7B20:2. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0082 NO 2 ENGINE - CFM56-78 ENGINE CONVERSION TO GFP456-7B22r2. SERVICE BULLETIN NOT APPLICABLE MOS HRSMSC - ENC SB 72-0082 ft1 NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO MI56-7B22,2. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0083 NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO GFP456-7B24/2. SERVICE BULLETIN NOT APPLICABLE MOS HRSMSC - ENC SB 72-0083 ft1 NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO GFP456-7B24/2. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0084 NO 2 ENGINE - CFM56-78 ENGINE CONVERSION TO GFM56-7B26a. SERVICE BULLETIN NOT APPLICABLE MOS HR&MSC - ENC SB 72-0084 fel NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO GFM56-7B2&2. SERVICE BULLETIN MOS HR&MSC - ENC SB 72-0085 NO 2 ENGINE - CFM56-7B ENGINE CONVERSION TO MISS-7B27a. SERVICE BULLETIN NOT APPLICABLE RECOMMENDED CANCELLED NOT APPLICABLE MOS HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 588 Of 748 Camp Systems EFTA00618879 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0085 R1 NO.2 ENGINE - CF5156-7B ENGINE CONVERSION TO CP.156-7827/2. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0086 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0086 RI NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS 04-DEC-2007 MRS/51SC - ENC SB 72-0087 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER OUTER LINER. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0103 MOS MRS/51SC - ENC SB 72-0088 NO.2 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 MRS/51SC - 0 ENC 0 SB 72-0088 RI NO.2 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0088 R2 NO.2 ENGINE - EGT BRACKET ASSEMBLY AND BOLT REPLACEMENT. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0089 NO.2 ENGINE - LPT MODULE (72-54-00)-INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND COMPUED WITH - AT MANUFACTURE 53X.54X STAGE I SEAL SEGMENT. SERVICE BULLETIN MOS 16-DEC-1998 HRSIMSC - 0 ENC 0 SB 72-0089 RI NO.2 ENGINE - LPT MODULE (72-54-00)-INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND STAGE I SEAL SEGMENT. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0089 R2 NO.2 ENGINE - REWORK OF OLD LPT STAGE 1 NOZZLE SEGMENT OR INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND NEW STAGE 1 SEAL SEGMENT. SERVICE BULLETIN MOS 27-JAN-2006 MRS/51SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 589 Of 748 @ Camp Systems EFTA00618880 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0089 R3 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - REWORK OF OLD LPT STAGE 1 NOZZLE SEGMENT OR INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT AND NEW STAGE 1 SEAL-SEGMENT. SERVICE BULLETIN MOS 10-APR-2009 HRS/MSC ENC SB 72-0090 NO.2 ENGINE - REINFORCEMENT OF FORWARD MOUNTING LUG OF THE LPT COOLING MANIFOLDS. SERVICE COMPLIED WITH - AT MANUFACTURE BULLETIN MOS 16-DEC-1998 HRSAISC 0 ENC 0 SB 72-0091 NO.2 ENGINE - REMOVAL OF EXTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU107. 874-110 THRU 112. 874-115 AND -116. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0091 RI NO.2 ENGINE - REMOVAL OF EXTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU107. NOT APPLICABLE 874-110 THRU 112. 874-115 AND -116. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0092 NO.2 ENGINE - INTRODUCTION OF NEW STATIONARY HPT OUTER SEAL. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRS(MSC - 0 ENC 0 SB 72-0092 RI NO.2 ENGINE - INTRODUCTION OF NEW STATIONARY HPT OUTER SEAL. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0093 NO.2 ENGINE - INTRODUCTION OF NEW MOUNT HARNESS WITH S. J10. MW0311. MW0315. MW0316 ASSOCIATED COMPLIED WITH - AT MANUFACTURE HARNESSES. SERVICE BULLETIN MOS 16-DEC-1998 MRS/P.1SC - 0 ENC 0 SB 72-0094 NO.2 ENGINE - INTRODUCTION OF NEW LPT NOZZLE STAGE 2. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS 16-DEC-1998 MRS/P.1SC - 0 ENC 0 SB 72-0094 RI NO.2 ENGINE - INTRODUCTION OF NEW LPT NOZZLE STAGE 2. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0095 NO.2 ENGINE - INTRODUCTION OF LARGE BORE TRANSIENT BLEED VALVE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 MRS/P.1SC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 590 Of 748 @ Camp Systems EFTA00618881 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0096 NO.2 ENGINE - INTRODUCTION OF HPT NOZZLE SUPPORT WITH IMPROVED PINS. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0097 RI NO.2 ENGINE - INTRODUCTION OF LONGER BOLTS ON ENGINE AND CORE ASSEMBLY. SERVICE BULLETIN COMPUED WITH - PARTIALLY AT MFG MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0098 NO.2 ENGINE - INTRODUCTION OF A NEW AIR DUCT SUPPORT BRACKET. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0099 NO.2 ENGINE - INTRODUCTION OF NEW HPT NOZZLE SEGMENTS WITH INNER SEAL. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0100 NO.2 ENGINE - CFM56-78 ENGINE NAMEPLATE MARKING. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0101 NO.2 ENGINE - NEW ROUTING OF JS AND J6 HARNESSES. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0102 NO.2 ENGINE - INTRODUCTION OF DAC HPT ROTOR ASSEMBLY FOR USE ON THE SAC HPT ROTOR ASSEMBLY. SERVICE BULLETIN MOS MRS/MSC ENC SB 72-0103 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0103 RI NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0103 R2 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER WITH ONE CLOCKING LUG. SERVICE BULLETIN RECOMMENDED MOS I7-FEB-2011 HRS/MSC - ENC SB 72-0101 NO.2 ENGINE - INTRODUCTION OF A NEW PAINT ON LPT SHAFT. SERVICE BULLETIN - SUPERSEDED - SB PENDING MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 591 Of 748 @ Camp Systems EFTA00618882 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0104 R1 NO.2 ENGINE - INTRODUCTION OF A NEW PAINT ON LPT SHAFT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0105 NO.2 ENGINE - ARRANGEMENT OF VBV TURNBUCKLE. BELLCRANK. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0106 NO.2 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS. SERVICE BULLETIN MOS HRSIMSC ENC SB 72-O106 R2 NO.2 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0106 R3 NO.2 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0106 R4 NO.2 ENGINE - INTRODUCTION OF RECONFIGURABLE HYBRID TECHNOLOGY IDENTIFICATION CONNECTORS. SERVICE BULLETIN MOS I4-AUG-2007 HRS/MSC ENC SB 72-0107 NO.2 ENGINE - REPLACEMENT CLAMP FOR DAC AFT SUMP OIL SUPPLY TUBE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0108 NO.2 ENGINE - NEW VBV FUEL MANIFOLD BOLTS AND VSV FUEL MANIFOLD LOOP CLAMP BOLTS. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0109 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0109 R1 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN MOS MRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 592 Of 748 @ Camp Systems EFTA00618883 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0109 R2 NO.2 ENGINE - INTRODUCTION OF A NEW COMBUSTION CHAMBER LUG RING. SERVICE BULLETIN MOS HRSO4SC - ENC SB 72-0110 R1 NO.2 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER COMPUED WITH - AT MANUFACTURE WITH ONE LUG KEY. SERVICE BULLETIN MOS 16-DEC-1998 MRS/51SC - 0 ENC 0 SB 72-0110 R2 NO.2 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER WITH ONE LUG KEY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0110 R3 NO.2 ENGINE - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER WITH ONE LUG KEY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0110 R4 NO.2 ENGINE - COMBUSTION CHAMBER - BIRD BUMPER (SWIRLER SUPPORT) ELIMINATION AND INTRODUCTION OF COMBUSTION CHAMBER WITH ONE LUG KEY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0111 NO.2 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH INCREASED LIFE LIMIT. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 72-0114 MOS HRS/MSC - ENC SB 72-0112 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0113 NO.2 ENGINE - INTRODUCTION OF NEW ECS DUCT BRACKET AND FAN COWL SUPPORT BRACKET. SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0113 R1 NO.2 ENGINE - INTRODUCTION OF NEW ECS DUCT BRACKET AND FAN COWL SUPPORT BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0114 NO.2 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH MODIFIED HUB. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSO4SC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 593 Of 748 @ Camp Systems EFTA00618884 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0114 R1 NO.2 ENGINE - INTRODUCTION OF A NEW LPT REAR FRAME WITH MODIFIED HUB. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0115 NO.2 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0115 R1 NO.2 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN MOS HRSBASC - ENC SB 72-0115 R2 NO.2 ENGINE - INTRODUCTION OF NEW HPT BLADES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-O116 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0117 NO.2 ENGINE -LPT COOLING AIR TUBE METERING PLATE DELETION. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0117 R1 NO.2 ENGINE -LPT COOLING AIR TUBE METERING PLATE DELETION. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0118 NO.2 ENGINE - INTRODUCTION OF A NEW I-PT NOZZLE ASSEMBLY. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0119 NO.2 ENGINE -RN APPLICATION ADJUSTMENT ON THE NEW VEE GROOV SYSTEM. SERVICE BULLETIN - PRODUCT IMPROVEMENT MOS HRS/MSC - ENC SB 72-0120 NO.2 ENGINE - WASHERS TO PC FUEL TUBE/MANIFOLD. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 FIRS/MSC - 0 ENC 0 SB 72-0121 R1 NO.2 ENGINE - CORE ASSEMBLY HARDWARE CHANGE. SERVICE BULLETIN NOT APPLICABLE MOS MRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 594 Of 748 @ Camp Systems EFTA00618885 CAMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0122 NO.2 ENGINE - DELETION OF THE STAGE 5 BLEED COVER PLATE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0123 RI NO.2 ENGINE - INSPECTION OF TGB AIR/OIL TUBE. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0124 NO.2 ENGINE - INTRODUCTION OF A NEW CENTER VENT TUBE (CVI) REMOVABLE AT ENGINE LEVEL. SERVICE COMPLIED WITH - AT MANUFACTURE BULLETIN MOS 16-DEC-1998 HR/MSC 0 ENC 0 SB 72-0124 R3 NO.2 ENGINE - INTRODUCTION OF A NEW CENTER VENT TUBE (CVT) REMOVABLE AT ENGINE LEVEL. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0125 NO.2 ENGINE - HPT NOZZLE INNER SEAL REPLACEMENT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0126 NO.2 ENGINE -CORE CONFIGURATION UPDATES. SERVICE BULLETIN NOT APPLICABLE MOS HRS/MSC - ENC SB 72-0128 NO.2 ENGINE - REPLACEMENT OF BOLTS AND WASHERS ATTACHING THE REM CONE FLANGE ON THE FAN DISK COMPLIED WITH - AT MANUFACTURE FRONT FLANGE. SERVICE BULLETIN MOS 16-DEC-1998 HRS/MSC 0 ENC 0 SB 72-0129 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0129 RI NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0130 NO.2 ENGINE - STARTER GEARSHAFT REPLACEMENT. SERVICE BULLETIN NOT APPLICABLE - BASED ON THE L5 STARTER GEARSHAFT SERIAL NUMBER MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 595 Of 748 @ Camp Systems EFTA00618886 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0130 R1 SB 72-0131 SB 72-0132 SB 72-0133 SB 72-0133 R1 SB 72-0134 SB 72-0135 SB 72-0135 R1 SB 72-0136 R1 SB 72-0136 R2 NO.2 ENGINE - STARTER GEARSHAFT REPLACEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - REDUCED INTERVAL FOR MAGNETIC CHIP DETECTOR INSPECTION. SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - CHANGE OF TRANSFER GEARBOX AIR/OIL TUBE - REPLACEMENT OF RIGID AIR TUBE BY A SEMI-RIGID AIR TUBE. SERVICE BULLETIN MOS I6-DEC-1998 HRS/MSC 0 ENC 0 NO.2 ENGINE - CHANGE OF TRANSFER GEARBOX AIR/OIL TUBE - REPLACEMENT OF RIGID AIR TUBE BY A SEMI-RIGID AIR TUBE. SERVICE BULLETIN MOS HIRSOASC ENC NOT APPLICABLE - BASED ON THE AG8 STARTER GEARSHAFT SERIAL NUMBER COMPUED WITH - AT MANUFACTURE 23X.91X NO.2 ENGINE - INTRODUCTION OF A NEW CLAMP-LOOP AND ITS BRACKET FOR J¶2 ELECTRIC HARNESS HOLDING. COMPUED WITH - AT MANUFACTURE SERVICE BULLETIN MOS HRS/MSC ENC I6-DEC-1998 NO.2 0 0 ENGINE - RESPONSIBILITY TRANSFER OF THREE FIRE DETECTION BRACKETS FROM BOEING TO CFMI. COMPUED WITH - AT MANUFACTURE SERVICE BULLETIN MOS I6-DEC-1998 MRS/MSC 0 ENC 0 NO.2 ENGINE - RESPONSIBILITY TRANSFER OF THREE FIRE DETECTION BRACKETS FROM BOEING TO CFMI. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE COMPUED WITH -AT MANUFACTURE BULLETIN MOS 16-DEC-1998 HRS/MSC 0 ENC 0 NO.2 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 596 Of 748 @ Camp Systems EFTA00618887 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0136 R3 NO.2 ENGINE - IMPROVEMENT OF LUG AND WIRE CONNECTION FOR THE FIRE DETECTION HARNESS. SERVICE BULLETIN MOS HRS1MSC - ENC SB 72-0138 NO.2 ENGINE - INTRODUCTION OF A HEAT SHRINK SLEEVE ON J7 AND J8 HARNESSES. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 72-0146 MOS FIRSAISC - ENC SB 72-0139 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0140 NO.2 ENGINE - BONDED CAUTION PLATE ON COVER. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0140 R1 NO.2 ENGINE - BONDED CAUTION PLATE ON COVER. SERVICE BULLETIN MOS HRS1MSC - ENC SB 72-0141 NO.2 ENGINE - INTRODUCTION OF NEW LPTACC TUBE. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 FIRS1MSC - 0 ENC 0 SB 72-0142 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0143 NO.2 ENGINE - REPLACEMENT OF SUSPECT J9 HARNESSES .. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0144 NO.2 ENGINE - INTRODUCTION OF A NEW PS3 AIR TUBE WITH NEW ROUTING. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 HRSfMSC - 0 ENC 0 SB 72-0145 NO.2 ENGINE - CLAMP ASSEMBLY ADDITION TO THE TRANSIENT BLEED VALVE DRAIN TUBE. SERVICE BULLETIN NOT APPLICABLE MOS HRS1MSC - ENC SB 72-0146 NO.2 ENGINE - J8 HARNESS ECU CONNECTION - NEW ROUTING OF TP0808* LEG. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS I6-DEC-1998 FIRS1MSC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 597 Of 748 @ Camp Systems EFTA00618888 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0147 NO.2 ENGINE - N1 MODIFIER SCHEDULE CHANGE FOR CFM56-7826 AND CFM56-7827 ENGINES. SERVICE BULLETIN NOT APPLICABLE MOS MRS/MSC - ENC SB 72-0148 NO.2 ENGINE - SAFETYING OF OIL RETURN TUBE - INTRODUCTION OF A NEW BOLT PERMITTING INSTALLATION OF COMPUED WITH - AT MANUFACTURE SAFETY WIRE. SERVICE BULLETIN MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0148 R1 NO.2 ENGINE - SAFETYING OF OIL RETURN TUBE - INTRODUCTION OF A NEW BOLT PERMITTING INSTALLATION OF SAFETY WIRE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0149 NO.2 ENGINE - FAN AND BOOSTER ADDITION OF A NEW WASHER ON PT25 AIR TUBE. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS I6-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0150 NO.2 ENGINE - BRACKETS ASSY DELETION OF ALERNATES. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC ENC SB 72-0151 NO.2 ENGINE - REPLACEMENT OF SWAGED SPACERS BY WELDED SPACERS ON ELECTRICAL HARNESSES. OIL AND COMPUED WITH - PARTIALLY AT MFG FUEL TUBE BRACKETS. SERVICE BULLETIN MOS 16-DEC-1998 HRSAISC 0 ENC 0 SB 72-0151 R1 NO.2 ENGINE - REPLACEMENT OF SWAGED SPACERS BY WELDED SPACERS ON ELECTRICAL HARNESSES. OIL AND FUEL TUBE BRACKETS. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0152 NO.2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN COMPUED WITH- AT MANUFACTURE 9IX OPEN-51X MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 72-0153 NO.2 ENGINE - INTRODUCTION OF A NEW J7 HARNESS WITH COIL INTEGRATED. SERVICE BULLETIN NOT APPLICABLE MOS HRSAISC - ENC SB 72-0154 NO.2 ENGINE - INTRODUCTION OF A NEW VSV FUEL TUBE WITH NEW ROUTING. SERVICE BULLETIN COMPLIED WITH- AT MANUFACTURE MOS 76-DEC-1998 HRSAISC - 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 598 Of 748 @ Camp Systems EFTA00618889 C4IMAtianageP fra AD/SI Status Report 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0155 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0155 RI NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0156 NO.2 ENGINE - HPT NOZZLE SHROUD SUPPORT REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0156 RI NO.2 ENGINE - HPT NOZZLE SHRUD SUPPORT REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0156 R2 NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE (72-53-00)- HPT NOZZLE SHROUD SUPPORT OPTIONAL REWORK FROM 2002M69G02 TO 1784M36G01. SERVICE BULLETIN MOS 13-FEB-2012 HRS/MSC - ENC SB 72-0157 NO.2 ENGINE - IMPROVED SEAL MATERIAL. SERVICE BULLETIN MOS HRS,MSC - ENC SB 72-0158 NO.2 ENGINE - COMBUSTOR LINER PROOUCIBILITY IMPROVEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0158 RI NO.2 ENGINE - COMBUSTOR LINER PRODUCIBILTY IMPROVEMENT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0159 NO.2 ENGINE - INCREASING OF BOLT LENGTH ON T49.5 PROBE BOX. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRSAISC - 0 ENC 0 SB 72-0160 NO.2 ENGINE - REMOVAL OF INTERNAL INSTRUMENTED HARDWARE ON COMPLIANCE ENGINES: 874-101 THRU 874-105. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0161 NO.2 ENGINE - REPLACEMENT OF ECU BRACKET ASSY ON THE FAN FRAME. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 599 Of 748 @Camp Systems EFTA00618890 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0162 NO.2 ENGINE - INSPECT HPT STR MANIFOLD/LPT STAGE I NOZZLE. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0163 NO.2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH A NEW DESIGN. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS I6-DEC-1998 MRS/MSC - 0 ENC 0 SB 72-0164 NO.2 ENGINE - HPT CLEARANCE CONTROL MANIFOLD. LPT COOLING/TF SENSOR AND ELECTRICAL SUPPORT BRACKET CHANGES. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0165 NO.2 ENGINE - RETROFIT INSTALLATION FOR COMPLYANCE. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0166 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/8 1 . SERVICE BULLETIN NOT APPLICABLE - 91X OPEN-56X MOS HRS/MSC - ENC SB 72-0166 R1 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/8 1 . SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0166 R2 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/81. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0167 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627/8 1 . SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0167 R1 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627/8 1 . SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0167 R2 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7627/8 1 . SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0168 NO.2 ENGINE - CONVERSION OF CFM56-7B TO 7827/83. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 600 Of 748 @ Camp Systems EFTA00618891 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0168 R1 NO 2 ENGINE - CONVERSION OF CFM56-7B TO 7827.'63. SERVICE BULLETIN MOS HRSuSC - ENC SB 72-0168 R2 NO 2 ENGINE - CFM 56-7B ENGINE CONVERSION TO CFM 56-7827183.. SERVICE BULLETIN MOS HRS/LISC - ENC SB 72-0169 NO 2 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0169 R1 NO 2 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN MOS HRSASC - ENC SB 72-0169 R2 NO 2 ENGINE - INTRODUCTION OF NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN MOS HRS.,mSC - ENC SB 72-0170 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN NOT APPLICABLE MOS HRSIISC - ENC SB 72-0171 NO 2 ENGINE - INTRODUCTION OF A NEW STAGE I VANE ASSY. SERVICE BULLETIN MOS HRS.,mSC - ENC SB 72-0172 NO 2 ENGINE - REPLACEMENT OF BRACKET FOR INSTALLATION OF BOEING FLOWMETER KIT. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0173 NO 2 ENGINE - LPT SHIFT MARAGING 250 MATERIAL. SERVICE BULLETIN MOS HRS. .ISC - ENC SB 72-0173 R1 NO 2 ENGINE - LOW PRESSURE TURBINE SHAFT - INTRODUCTION OF A NEW LPT SHAFT MADE OF MARAGING 250 MATERIAL. SERVICE BULLETIN MOS HRSASC ENC SB 72-0174 NO 2 ENGINE - INCREASING OF BOLT LENGTH. SERVICE BULLETIN MOS HRSimSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 601 Of 748 1, Camp Systems EFTA00618892 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0175 NO.2 ENGINE - INTRODUCTION OF TWO WAISTS ON ATTACHMENT STRUT 4 AND STRTUT 10 CLAMPS ASSY. SERVICE BULLETIN SB 72-0176 SB 72-0176 R1 SB 72-0176 R2 30-SEP-2009 MOS HRS(MSC ENC NO.2 ENGINE - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN MOS HRSOASC - ENC NO.2 ENGINE - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - NEW OUTER DOME AND INNER DOME INTRODUCTION. SERVICE BULLETIN MOS HRSPASC ENC SB 72-0177 NO.2 ENGINE - INTRODUCTION OF A NEW I-PT STATOR PIN RETAINER. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0178 NO.2 ENGINE - NEW NO. 5 BEARING SUPPORT. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0179 NO.2 ENGINE - VSV FUEL MANIFOLD AND VSV MANIFOLD BRACKET REPLACEMENT. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0180 NO.2 ENGINE - REDUCED INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DMS INSPECTION. SERVICE BULLETIN MOS HRSOASC - ENC SB 72-0181 NO.2 ENGINE - FAN FRAME -NEW BRACKET ASSEMBLY. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0182 NO.2 ENGINE - PT25 AIR TUBE INSTALLATION IMPROVEMENT. SERVICE BULLETIN MOS HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 602 Of 748 @ Camp Systems EFTA00618893 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0182 R1 10-JAN-2008 NO 2 ENGINE - PT25 AIR TUBE INSTALLATION IMPROVEMENT. SERVICE BULLETIN MOS HRSimSC - ENG SB 72-0183 NO 2 ENGINE - CANCELLATION NOTICE. SERVICE BULLETIN CANCELLED MOS HRS,mSC - ENG SB 72-0184 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN MOS HRSIASC - ENG SB 72-0185 NO 2 ENGINE - INTRODUCTION OF A NEW N0. 4 ROLLER BEARING. SERVICE BULLETIN MOS HRS.ISC - ENG SB 72-0185 R1 NO 2 ENGINE - INTRODUCTION OF A NEW NO. 4 ROLLER BEARING. SERVICE BULLETIN MOS HRSIISC - ENG SB 72-0186 NO 2 ENGINE - NEW LPT STAGE 2 NOZZLE SEGMENTS. SERVICE BULLETIN MOS 23-SEP-1999 HRSIISC - ENG SB 72-0186 R1 OS-MAR-2005 SB 72-0187 SB 72-0188 SB 72-0188 R1 SB 72-0188 R2 NO 2 ENGINE - INTRODUCTION OF NEW LPT STAGE 2 NOZZLE SEGMENTS. SERVICE BULLETIN MOS HRSimSC - ENG NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-76 IPC. SERVICE BULLETIN MOS HRSilASC - ENG NO 2 ENGINE - DISCONNECTION AND RECONNECTION OF J01 AND J02 HARNESSES. SERVICE BULLETIN MOS HRSI.ISC - ENG NO 2 ENGINE - DISCONNECTION AND RECONNECTION OF J01 AND J02 HARNESSES. SERVICE BULLETIN MOS HRSIASC - ENG NO 2 ENGINE - FAN FRAME ASSEMBLY - DISCONNECTION AND RECONNECTION OF MW0301 (J01) AND MW0302 (J02) HARNESSES AT THEIR APPROPRIATE LOCATION. SERVICE BULLETIN MOS HRSimSC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 603 Of 748 1, Camp Systems EFTA00618894 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0189 NO.2 ENGINE - INTRODUCTION OF A NEW VSV FUEL MANIFOLD AND VSV MANIFOLD BRACKET CHANGE. SERVICE BULLETIN SB 72-0190 SB 72-0191 SB 72-0191 RI SB 72-0192 SB 72-0193 SB 72-0194 SB 72-0195 SB 72-0196 SB 72-0197 SB 72-0198 MOS HRS/MSC ENC NO.2 ENGINE - REPLACEMENT OF STAGE 2 SEAL SEGMENTS. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - SHORTER BOLT FOR T49.5 ELECTRICAL HARNESS SUPPORT. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - NEW SHORTER BOLT FOR T49.5 ELECTRICAL HARNESS SUPPORT. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - REPLACEMENT OF NOA ROLLER BEARING 335-352-301-0. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH NEW DESIGN ON FLANGE B6. J1 ELECTRIC HARNESS HOLDING, SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - INTRODUCTION OF A WAIST ON STRUT PROFILE (9 O'CLOCK). SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF NEW NIPPLE. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ABRADABLE STAGE 3 SEAL SEGMENTS. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - CHAMFER ON LOCKS-STAGE 2 SEAL SEGMENTS. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - LPT STAGE 2 SEAL SEGMENT WITH NEW LOCK. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time @ Camp Systems 604 Of 748 EFTA00618895 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0199 SB 72-0200 SB 72-0201 SB 72-0202 SB 72-0203 SB 72-0204 SB 72-0205 SB 72-0206 SB 72-0207 SB 72-0208 SB 72-0208 R1 NO 2 ENGINE - TWO NEW LONGER BOLTS FOR ELECTRICAL HARNESS SUPPORT (3 O'CLOCK). SERVICE BULLETIN MOS HRSIMSC - ENC NO. 2 ENGINE - INTRODUCTION OF A NEW ASSY WITH NEW DESIGN ON FLANGE B6. FUEL TUBE HOLDING. SERVICE BULLETIN MOS HRSIMSC ENC NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7 PC. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - REMOVAL OF SILICONE ELASTOMER SEALS FROM FAN DUCT PANELS. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - INTRODUCTION OF A STRAIGHT HEADLESS PIN TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRS.4.ISC - ENC NO. 2 ENGINE - FUEL TRANSIENT BLEED VALVE MANIFOLD BOLT CHANGE. SERVICE BULLETIN MOS HRS. .ISC - ENC NO 2 ENGINE - MODIFICATION OF ONE FIRE DETECTION BRACKET ASSY AND INCREASING OF OVERTAKING BOLTS ON FLANGE B6. SERVICE BULLETIN MOS ENC NO 2 ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN MOS HRSIMSC - ENC NO 2 ENGINE - RETURN TO CFMI OF NO.4 ROLLER BEARING 335-352-301-0 STORED AS SPARES. SERVICE BULLETIN MOS HRSIMSC - ENC NO 2 ENGINE - INTRODUCTION OF NEW NAMEPLATE. SERVICE BULLETIN MOS HRSIMSC - ENC NO 2 ENGINE - INTRODUCTION OF NEW NAMEPLATE. SERVICE BULLETIN MOS HRSMSC - ENC 11-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time Camp Systems 605 Of 748 EFTA00618896 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0208 R2 NO .2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR MARKING. SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0208 R3 NO. 2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR MARKING. SERVICE BULLETIN 08-MAR-2005 MOS HRSILISC ENC SB 72-0208 R4 NO. 2 ENGINE - INTRODUCTION OF A NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR MARKING. SERVICE BULLETIN 25-MAY-2C07 SB 72-0208 R5 14-JAN-2009 SB 72-0209 RI SB 72-0209 R2 SB 72-0209 R4 SB 72-0209 R5 SB 72-0209 R6 05-FEB-2010 MOS HRSiLISC ENC NO .2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW IDENTIFICATION PLATE AND NEW ACCOMPLISHMENT INSTRUCTIONS FOR MARKING. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HRSIASC ENC NO 2 ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HRSMSC ENC NO 2 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HRS,MSC - ENC NO 2 ENGINE - ENGINE-COMBUSTION ASSEMBLY (72-41-00)-INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HRSI.ISC ENC NO 2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 606 Of 748 Camp Systems EFTA00618897 CAMP Asiont.inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0209 R7 NO 2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY RECOMMENDED AND HPT NOZZLE ASSEMBLY. SERVICE BULLETIN MOS 13-FEB-2012 HRS1MSC - ENG SB 72-0210 NO 2 ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY. NEW PS3 SIGNAL AIR TUBE AND NEW PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN MOS HRS./.1SC - ENG SB 72-0210 R2 NO 2 ENGINE - INTRODUCTION OF A NEW COMBUSTION ASSEMBLY. NEW PS3 SIGNAL AIR TUBE AND NEW PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN MOS HRSASC - ENG SB 72-0211 NO. 2 ENGINE - INTRODUCTION OF A NEW FORWARD INNER NOZZLE SUPPORT. SERVICE BULLETIN MOS HRS./.1SC - ENG SB 72-0212 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFN1.56-76 IPC. SERVICE BULLETIN MOS HRS1MSC - ENG SB 72-0212 R1 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFN1.56-76 IPC. SERVICE BULLETIN MOS HRSMSC - ENG SB 72-0213 NO 2 ENGINE - INTRODUCTION OF A INTERMEDIATE FLANGE WITH A NEW DESIGN. SERVICE BULLETIN MOS HRS1MSC - ENG SB 72-0214 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFN1.56-76 IPC. SERVICE BULLETIN MOS HRS1MSC - ENG SB 72-0215 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFN1.56-7B IPC. SERVICE BULLETIN MOS HRS./.1SC - ENG SB 72-0216 NO 2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY WITH NEW DESIGN ON THE ACCESSORY GEARBOX. ELECTRIC HARNESSES MD POWERS FEEDERS IDG CABLE HOLDING. SERVICE BULLETIN 11,1OS HRS./.1SC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 607 Of 748 Camp Systems EFTA00618898 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0217 SB 72-0218 SB 72-0219 SB 72-0220 SB 72-0221 SB 72-0221 R1 SB 72-0222 SB 72-0223 SB 72-0224 SB 72-0225 SB 72-0225 R1 NO 2 ENGINE - LPT BLADES STAGE 4 IMPROVEMENT. SERVICE BULLETIN MOS HRSitiSC - ENG NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HRS.IISC - ENG NO 2 ENGINE - INTRODUCTION OF A NEW FOOL PROOF PLATE. SERVICE BULLETIN MOS HR&MSC - ENG NO 2 ENGINE - INTRODUCTION OF NEW N2 SENSOR. SERVICE BULLETIN MOS HRSI.ISC - ENG NO 2 ENGINE - INTRODUCTION OF NEW OIL INLET COVER ASSY OR REWORK. SERVICE BULLETIN MOS HRSI.ISC - ENG NO 2 ENGINE - INTRODUCTION OF NEW OIL INLET COVER ASSY OR REWORK. SERVICE BULLETIN MOS HRSiliSC - ENG NO 2 ENGINE - REMOVAL EXTERNAL INSTRUMENTATION. SERVICE BULLETIN MOS HRSiliSC - ENG NO 2 ENGINE - INTRODUCTION OF A NEW OUTER LINER LUG RING TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRSitiSC - ENG NO.2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7-8 IPC. SERVICE BULLETIN MOS HRSI.ISC - ENG NO 2 ENGINE - INTRODUCTION OF NEW LPT COOLING MANIFOLD. SERVICE BULLETIN MOS HRSI.ISC - ENG NO 2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR MANIFOLD. SERVICE BULLETIN MOS HRSi mSC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 608 Of 748 '2 Camp Systems EFTA00618899 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0226 NO.2 ENGINE - INTRODUCTION OF STAGE 2 AND STAGE 4 BLADE KITS TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0227 NO.2 ENGINE - INTRODUCTION OF NEW OUTER COWL WITH INCREASED DURABILITY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0227 RI NO.2 ENGINE - INTRODUCTION OF NEW OUTER COWL WITH INCREASED DURABILITY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0228 NO.2 ENGINE - INTRODUCTION OF A NEW NEXT HIGHER ASSEMBLY COOLING MANIFOLD UP AND DOWN. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0229 NO.2 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0229 RI NO.2 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN MOS II -FEB-2008 HRSIMSC - ENC SB 72-0229 R2 NO.2 ENGINE - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN MOS 22-FEB-2011 HRS/MSC - ENC SB 72-0229 R3 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - INNER AND OUTER LINER THICKER TBC FIELD CUSTOMER REWORK. SERVICE BULLETIN CONVENIENCE MOS 13-SEP-2011 MRS/51SC - ENC SB 72-0229 R4 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - INNER AND OUTER LINER THICKER TBC FIELD REWORK. SERVICE BULLETIN MOS 23-FEB-2012 MRS/51SC - ENC SB 72-0230 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS MRS/51SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 6O Of 748 @ Camp Systems EFTA00618900 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0230 R1 SB 72-0231 SB 72-0232 SB 72-0233 SB 72-0234 SB 72-0235 SB 72-0236 SB 72-0237 SB 72-0239 SB 72-0239 R1 SB 72-0240 R1 NO.2 ENGINE - . SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW TURNBUCKLE ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW HARNESS WITH NEW ROUTING, SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF A FIELD REWORKED HPT NOZZLE STATOR SEGMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF UPPER DRAIN MANIFOLD nASKET, SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT HOUSING. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW FAN FRAME WITH GANGS CHANNEL. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLUGS FOR THE DEACTIVATION OF THE BURNER STAGING VALVE FUNCTION. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - INTRODUCTION OF NEW IDENTIFICATION PLUGS FOR THE DEACTIVATION OF THE BURNER STAGING VALVE FUNCTION. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - INTRODUCTION OF THE NEW MOUNT HARNESS. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 610 Of 748 @ Camp Systems EFTA00618901 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0240 R2 11-MAR-2005 SB 72-0241 NO 2 ENGINE - MODIFICATION OF HARNESSES MOUNTS. SERVICE BULLETIN MOS HRSi'MSC - ENC NO 2 ENGINE - NEW LPT NOZZLE SEGMENTS STAGE 2 AND STAGE 3 REWORK. SERVICE BULLETIN MOS HRSi MSC - ENC SB 72-0241 R1 NO 2 ENGINE - NEW LPT NOZZLE SEGMENTS STAGE 2 AND STAGE 3 REWORK. SERVICE BULLETIN MOS 08-JAN-2007 HRSi'MSC ENC 25000 (s) SB 72-0242 NO 2 ENGINE - INTRODUCTION OF NEW LONGER BOLTS ON KIT CLOSE OMS BOX ATTACHMENT. SERVICE BULLETIN MOS HRS,LISC - ENC NO 2 ENGINE - INTRODUCTION OF A BRACKET ASSY ON NO .1 AND NO. 2 BEARING SUPPORT OIL SUPPLY TUBE HOLDING. SERVICE BULLETIN SB 72-0243 SB 72-0244 R1 SB 72-0245 SB 72-0246 SB 72-0246 R1 MOS HRS,MSC ENC NO.2 ENGINE - POSITIONING MODIFICATION OF 2 CLAMPS ATTACHING THE FUEL TUBE AND THE OIL RETURN TUBE TO FACILITATE THE ENGINE COVER INSTALLATION. SERVICE BULLETIN MOS HRSilISC - ENC NO.2 ENGINE - SPARE PARTS RELEASE CFM56-7B IPC. SERVICE BULLETIN MOS HRS,LISC - ENC NO 2 ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN MOS HRS,LISC - ENC NO 2 ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN MOS HRSitISC - ENC SB 72-0246 R2 NO 2 ENGINE - INTRODUCTION OF A NEW HOSE FUEL TUBE WITH A NEW ROUTING. SERVICE BULLETIN MOS 11-MAR-2005 HRSi'MSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 611 Of 748 1, Camp Systems EFTA00618902 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0247 NO.2 ENGINE - INTRODUCTION OR REWORK OF THE BRACKET ASSY ON ACCESSORY GEARBOX ATTACHING THE J5 ELECTRIC WIRING HARNESS. SERVICE BULLETIN MOS HRSOASC - ENC SB 72-0248 NO.2 ENGINE - REPLACEMENT OR REWORK OF BRACKET ASSY ATTACHING THE MW0301 ELECTRICAL HARNESS ON FLANGE B4. SERVICE BULLETIN MOS FIRS/MSC ENC SB 72-0249 NO.2 ENGINE - INTRODUCTION OF NEW SEAL SEGMENTS STAGE 1. 2.3. SERVICE BULLETIN MOS FIRS/MSC - ENC SB 72-0249 RI NO.2 ENGINE - INTRODUCTION OF NEW SEAL SEGMENTS STAGE 1. 2.3. SERVICE BULLETIN MOS 23-OCT-2007 HRSAISC - ENC SB 72-0251 NO.2 ENGINE - FAN FRAME ASSEMBLY. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0252 NO.2 ENGINE - INTRODUCTION OF NEW RADIAL SHAFT SUPPORT GUIDE. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0253 NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE COMPLIED WITH UNDERCUT. SERVICE BULLETIN MOS 07-SEP-2005 HRSfMSC 2202:24 ENC 511 SB 72-0253 RI NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS NRS1MSC ENC SB 72-0253 R2 NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0253 R3 NO.2 ENGINE - FAN AND BOOSTER. SERVICE BULLETIN MOS HRSfMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 612 Of 748 @ Camp Systems EFTA00618903 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0253 R4 SB 72-0253 R5 SB 72-0253 R6 SB 72-0254 SB 72-0255 SB 72-0255 Ri SB 72-0256 SB 72-0257 SB 72-0258 SB 72-0258 Ri NO. 2 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS HRSimSC ENC NO. 2 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS HRS4ASC ENC NO 2 ENGINE - INTRODUCTION OF NEW FAN BLADE AND REWORK OF THE FAN BLADE PRESSURE FACE UNDERCUT. SERVICE BULLETIN MOS HRS4.ISC ENC NO.2 ENGINE - INTRODUCTION OF A NEW LPT FRAME WITH SYMMETRICAL STRUTS. SERVICE BULLETIN MOS HRSI.ISC - ENC NO 2 ENGINE - INTRODUCTION OF NEW BRACKET ASSY WITH NEW DESIGN FOR T49.5 HARNESS HOLDING. SERVICE BULLETIN MOS HRSIASC - ENC NO 2 ENGINE - ENGINE ASSEMBLY - INTRODUCTION OF NEW BRACKET ASSY WITH NEW DESIGN FOR 749.5 HARNESS ATTACHMENT. SERVICE BULLETIN MOS HRSIISC - ENC NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRS4.ISC - ENC NO 2 ENGINE - FAN FRAME ASSEMBLY - REPLACEMENT OF TWO BRACKETS ASSY TO ATTACH THE mw0315 AND MW0316 ELECTRICAL HARNESSES. SERVICE BULLETIN MOS HRSI.ISC - ENC NO.2 ENGINE - NEW FIRE DETECTION HARNESSES MW0325 AND MW0326. SERVICE BULLETIN MOS HRS.ISC - ENC NO 2 ENGINE - NEW FIRE DETECTION HARNESSES MW0325 AND MW0326. SERVICE BULLETIN MOS HRSIISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 613 Of 748 '2 Camp Systems EFTA00618904 CIAWInne Met mini AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC 58 72-0259 SB 72-0259 RI SB 72-O259R2 SB 72-0260 SB 72-O26OR1 SB 72-0261 SB 72-0262 SB 72-0262 RI SB 72-0263 SB 72-0264 SB 72-0265 NO.2 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR WITH DESIGN IMPROVED OR REWORK. SERVICE BULLETIN MOS HRSAISC ENC NO.2 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR WITH DESIGN IMPROVED OR REWORK. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - INTRODUCTION OF NEW N2 SPEED SENSOR. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS MRS/MSC - ENC NO.2 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - NEW MW0311 ELECTRICAL HARNESSES. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - NEW MW0311 ELECTRICAL HARNESS. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS MRS/MSC - ENC NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCTION OF NEW LPT SHAFT. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 614 Of 748 © Camp Systems EFTA00618905 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 72-0266 NO.2 ENGINE - INTRODUCTION OF A NEW ASSY ON FLANGE B4 - CJ13 ELECTRICAL HARNESS HOLDING. SERVICE BULLETIN MOS HRS11.1SC ENC SB 72-0266 RI NO.2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY ON FLANGE B4 - CJ13 ELECTRICAL HARNESS HOLDING, SERVICE BULLETIN II-MAR-2005 SB 72-0267 SB 72-0267 RI SB 72-0267 R2 77-DEC-2001 SB 72-0267 R3 SB 72-0268 SB 72-0268 RI SB 72-0268 R2 MOS HRS11.1SC ENC NO.2 ENGINE - INTRODUCTION OF A NEW LOCKS OF STAGE 2.3 AND 4 BLADES. SERVICE BULLETIN MOS HRS11.1SC - ENC NO.2 ENGINE - FAN AND BOOSTER. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - FAN AND BOOSTER - INTRODUCTION OF A NEW LOCK OF STAGE 2. 3 AND 4 BLADES. SERVICE BULLETIN MOS HRSAISC ENC NO.2 ENGINE - FAN AND BOOSTER - INTRODUCTION OF A NEW LOCK OF STAGE 2. 3 AND 4 BLADES. SERVICE BULLETIN MOS HRS11.1SC ENC NO.2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL. SERVICE BULLETIN MOS FIRSAISC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCTION OF NEW BOOSTER SPOOL. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0268 R3 NO.2 ENGINE - FAN AND BOOSTER- INTRODUCTION OF THE NEW BOOSTER SPOOL. SERVICE BULLETIN MOS 77-DEC-2001 MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 615 Of 748 @ Camp Systems EFTA00618906 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0269 SB 72-0269 RI SB 72-0270 SB 72-0271 RI SB 72-0271 R2 SB 72-0271 R3 SB 72-0271 R4 58 72-0271 R5 58 72-0272 SB 72-0273 NO.2 ENGINE - FIRE DETECTION HARNESSES MW0325 AND MW0326 TERMINAL LUG REPLACEMENT. SERVICE BULLETIN MOS HRS1MSC ENC NO.2 ENGINE - FIRE DETECTION HARNESSES MW0325 AND ~326 TERMINAL LUG REPLACEMENT. SERVICE BULLETIN MOS HRS,MSC ENC NO.2 ENGINE - INTRODUCTION OF A NEW BRACKET ASSY-J7 HARNESS HOLDING. SERVICE BULLETIN MOS HRS1MSC - ENC NO.2 ENGINE - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRS1MSC ENC NO.2 ENGINE - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRS1MSC ENC NO.2 ENGINE - FAN BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRS1MSC ENC 10000 (s) NO.2 ENGINE - FAN BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRSfMSC ENC 10000 (s) NO.2 ENGINE - FAN AND BOOSTER (72-21-00) - REPLACEMENT OF THE FAN BLADE PLATFORM AND REWORK OF THE FAN BLADE PLATFORM BUSHING. SERVICE BULLETIN MOS HRSfMSC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS1MSC - ENC NO.2 ENGINE - ROUTING OPTIMIZATION AND REMARKING OF THE HARNESSES MW0301 AND MW0302. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 616 Of 748 @ Camp Systems EFTA00618907 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0273 R1 NO.2 ENGINE - ROUTING OPTIMIZATION AND REMARKING OF THE HARNESSES MVV0301 AND MW0302. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0274 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRS/MSC ENC SB 72-0275 NO.2 ENGINE - NO.1 AND NO. 2 BEARING SUPPORT - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY AIRFOIL SEAL. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0275 RI NO.2 ENGINE - NO.1 AND NO. 2 BEARING SUPPORT ASSEMBLY - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0276 NO.2 ENGINE -SPARE PARTS FOR CFM56-78. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0277 NO.2 ENGINE - INTRODUCTION OF NEW OIL COLLECTOR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0278 NO.2 ENGINE - INTRODUCTION OF HPT/LPT NOZZLE SHROUD ASSEMBLY 93241,462G05 AND HPT NOZZLE SHROUD SUPPORT 2002M69G03. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0279 NO.2 ENGINE - INTRODUCTION OF NEW HPT STATOR AIR MANIFOLD. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0280 NO.2 ENGINE - INTRODUCTION OF NEW PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0281 NO.2 ENGINE - HARDWARE TRANSFER TO ENGINE LEVEL FROM CORE LEVEL. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 617 Of 748 @ Camp Systems EFTA00618908 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0283 NO.2 ENGINE - GENERAL - INTRODUCTION OF CLAMP AND ATTACHING BOLT OF 13W0325 HARNESS. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0284 NO.2 ENGINE - TRANFER OF THE VBV ACTUATORS FROM THE FAN FRAME LEVEL TO THE ENGINE ASSEMBLY LEVEL. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0284 R1 NO.2 ENGINE - TRANSFER OF THE VBV ACTUATORS FROM THE FAN FRAME LEVEL TO THE ENGINE ASSEMBLY LEVEL. SERVICE BULLETIN II-MAR-2005 SB 72-0285 SB 72-0285 R1 SB 72-0285 R2 SB 72-0286 RI SB 72-0286 R2 SB 72-0287 SB 72-0287 RI MOS HRS/MSC ENC NO.2 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL THICKNESS INCREASED.. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL THICKNESS INCREASED. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - GENERAL - REPLACEMENT OF CURRENT CLAMPS BY NEW CLAMPS WITH INNER DIAMETER MATERIAL THICKNESS INCREASED. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - TURBINE LOW PRESSURE. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW LPT BLADE STAGE 1. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - ENGINE(72-00-00) - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 618 Of 748 @ Camp Systems EFTA00618909 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0287 R2 NO.2 ENGINE - ENGINE - ENGINE(72-00-00) - ACCIDENT INVOLVED HARDWARE (SUPERSEDED BY SB 72-0287 R3). SERVICE BULLETIN SUPERSEDED MOS HRS/MSC ENC SB 72-0287 R3 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - ACCIDENT INVOLVED HARDWARE (SUPERSEDED BY 58 72-0287 R4). SUPERSEDED SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0287 R4 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - ACCIDENT INVOLVED HARDWARE. SERVICE BULLETIN INFORMATIONAL MOS I5-OCT-2013 HRS/MSC - ENC SB 72-0288 NO.2 ENGINE - INTRODUCTION OF NEW HPT INNER STATOR STATIONARY SEAL HEAT SHIELD TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0289 NO.2 ENGINE - INTRODUCTION OF ALTERNATE INNER DOME. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0290 NO.2 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0290 R1 NO.2 ENGINE - INTRODUCTION OF A NEW RADIAL DRIVE SHAFT. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0291 NO.2 ENGINE - TRANSFER GEARBOX. SERVICE BULLETIN MOS HRS/S1SC ENC SB 72-0291 R1 NO.2 ENGINE - TRANSFER GEARBOX - INSPECTION OF A SPECIFIC POPULATION OF OUTER RADIAL DRIVE SHAFT. SERVICE BULLETIN MOS HRS/S1SC ENC SB 72-0291 R2 NO.2 ENGINE - TRANSFER GEARBOX - INSPECTION OF A SPECIFIC POPULATION OF OUTER RADIAL DRIVE SHAFT. SERVICE BULLETIN MOS HRSfMSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 619 Of 748 @ Camp Systems EFTA00618910 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0292 NO 2 ENGINE - LOW PRESSURE TURBINE SHAFT - DELETION OF THE PRELIMINARY ATTACHMENT SYSTEM OF THE AIR'OIL SEAL TO THE LPT SHAFT. SERVICE BULLETIN MOS HRS4ISC - ENC SB 72-0292 R1 NO 2 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT (72-55-00) - DELETION OF THE PRELIMINARY ATTACHMENT SYSTEM OF THE AINOIL SEAL OF THE LPT SHAFT. SERVICE BULLETIN MOS HRS.I.ISC - ENC SB 72-0293 NO 2 ENGINE - INTRODUCTION OF A SELF LOCKING BORESCOPE CAP ASSEMBLY. SERVICE BULLETIN MOS HRSIISC - ENC SB 72-0293 R1 NO 2 ENGINE - TURBINE LOW PRESSURE (72-54-00) - INTRODUCTION OF SELF LOCKING BORESCOPE CAP ASSEMBLY. SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0294 NO 2 ENGINE - INTRODUCTION OF STAINLESS STEEL NUTS TO REPLACE CADMIUM PLATING NUTS. SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0295 NO 2 ENGINE - FAN AND BOOSTER (72-21-00) INSPECTION OF THE BOOSTER SPOOL (SUPERSEDED BY 72-0295 R1). SUPERSEDED SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0295 R1 NO 2 ENGINE - FAN AND BOOSTER (72-21.00) INSPECTION OF THE BOOSTER SPOOL (SUPERSEDED BY 72-0295 R2). SUPERSEDED SERVICE BULLETIN MOS HRSoliSC -(s) ENC SB 72-0295 R3 NO 2 ENGINE - FAN AND BOOSTER (72-21.00) INSPECTION OF THE BOOSTER SPOOL. SERVICE BULLETIN MOS 22-JUN-2007 HRSi P.ISC ENC 15000 (s) SB 72-0296 NO .2 ENGINE - FAN AND BOOSTER (SUPERSEDED BY 72-0296 RI ). SERVICE BULLETIN SUPERSEDED MOS HRS.I.ISC - ENC SB 72-0296 R1 NO 2 ENGINE - FAN AND BOOSTER (SUPERSEDED BY 72-0296 R2). SERVICE BULLETIN SUPERSEDED MOS HRSimSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 620 Of 748 1, Camp System s EFTA00618911 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0296 R2 NO.2 ENGINE - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R3). SUPERSEDED SERVICE BULLETIN MOS HRS1MSC ENC SB 72-0296 R3 NO.2 ENGINE - INTRODUCTION OF COUNTER WEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R4). SUPERSEDED SERVICE BULLETIN MOS HRS/MSC - (s) ENC SB 72-0296 R4 NO.2 ENGINE - FAN AND BOOSTER. INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL.(SUPERSEDED SUPERSEDED BY 72-0296 R5). SERVICE BULLETIN MOS MRS/P.1SC - (s) ENC 513 72-0296 R5 NO.2 ENGINE - FAN AND BOOSTER - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R6). SERVICE BULLETIN MOS I7-DEC-2001 MRS/P.1SC ENC 7000 (s) SB 72-0296 R6 NO.2 ENGINE - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL (SUPERSEDED BY 72-0296 R7). SUPERSEDED SERVICE BULLETIN MOS HRS(MSC - (s) ENC 513 72-0296 R7 NO.2 ENGINE - ENGINE -FAN AND BOOSTER (72-21-00) - INTRODUCTION OF COUNTERWEIGHTS ON THE BOOSTER SPOOL. SERVICE BULLETIN MOS HRS(MSC ENC 7000 (s) SB 72-0297 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED MOS MRS/P.1SC ENC SB 72-0298 NO.2 ENGINE-NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN MOS HRS11.1SC - ENC SB 72-0298 RI NO.2 ENGINE - FAN FRAME ASSEMBLY - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0298 R2 NO.2 ENGINE -FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN MOS HRS(MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks %Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 621 Of 748 @ Camp Systems EFTA00618912 CIMP Asiant.Inne Attn....14C AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0298 R3 NO 2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW PROBE HOUSING WITH INCREASED LENGTH INSERTS. SERVICE BULLETIN MOS HRS1MSC ENC SB 72-0299 NO 2 ENGINE - . SERVICE BULLETIN CANCELLED MOS HRSTASC ENC SB 72-0300 NO 2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE. SERVICE BULLETIN MOS HRS.4.ISC - ENC SB 72-O300R1 NO 2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE. SERVICE BULLETIN MOS HRS.4.ISC - ENC SB 72-0300 R2 NO 2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FOWARD FLANGE. SERVICE BULLETIN MOS HRS.4.ISC - ENC SB 72-0300 R3 NO 2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FORWARD FLANGE. SERVICE BULLETIN MOS HRSTASC - ENC SB 72-0300 R4 NO.2 ENGINE - INTRODUCTION OF A NEW BOOSTER SPOOL WITH THE INCREASED THICKNESS FORWARD FLANGE. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0301 NO. 2 ENGINE - . SERVICE BULLETIN CANCELLED MOS HRS;MSC ENC SB 72-0302 NO. 2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS4.ISC - ENC SB 72-0303 NO 2 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN MOS HRSTASC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 622 Of 748 '2 Camp Systems EFTA00618913 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0303 R1 NO.2 ENGINE - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0304 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - ON-WING BORESCOPE INSPECTION OF THE COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN MOS 13-NOV-2001 HRS,MSC 15000 (s) ENC SB 72-0304 R1 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - ON-WING BORESCOPE INSPECTION OF THE COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN MOS HRS/MSC 15000 (s) ENC SB 72-0304 R2 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - ON-WING BORESCOPE INSPECTION OF THE COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN MOS HRS/MSC 15000 (s) ENC SB 72-0304 R3 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - ON-WING BORESCOPE INSPECTION OF THE RECOMMENDED COMBUSTION CHAMBER OUTER COWL. SERVICE BULLETIN MOS 20-MAR-2007 HRS/MSC 15000 (s) ENC SB 72-0305 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0306 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0308 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622A31. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0309 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7624831. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0310 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRSAISC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 623 Of 748 @ Camp Systems EFTA00618914 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0311 24-JAN-2001 NO.2 ENGINE - (PT SHAFT - REPLACEMENT OF THE NO.4 ROLLER BEARING. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0312 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRS/MSC ENC SB 72-0313 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRS/hISC ENC SB 72-0314 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRS/MSC ENC SB 72-0315 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/51SC - ENC SB 72-0316 NO.2 ENGINE - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS HRS/51SC - ENC SB 72-0316 RI NO.2 ENGINE - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0316 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0316 R3 NO.2 ENGINE - ENGINE - GENERAL (72-00-00)- REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0316R4 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF THE POWER FEEDER BRACKET ASSY AND DRAIN TUBE BRACKET. SERVICE BULLETIN MOS 24-JUN-20 I I HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 624 Of 748 @ Camp Systems EFTA00618915 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0317 NO.2 ENGINE - SPARE PARTS INTRODUCTION. SERVICE BULLETIN CANCELLED MOS HRSAISC - ENC SB 72-0318 NO.2 ENGINE - APPLICATION OF ROOM TEMPERATURE VULCANIZING (RTV) ON THE FAN BLADE RETAING FLANGE. SERVICE BULLETIN MOS MRS/51SC ENC SB 72-0318 RI NO.2 ENGINE - APPLICATION OF ROOM TEMPERATURE VULCANIZING (R1V) ON THE FAN BLADE RETAINING FLANGE. SERVICE BULLETIN MOS MRS/51SC ENC SB 72-0319 NO.2 ENGINE - INTRODUCTION OF A MILLED COMBUSTION CASE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0319 RI NO.2 ENGINE - INTRODUCTION OF A MILLED COMBUSTION CASE. SERVICE BULLETIN MOS I0-DEC-2007 HRSAISC - ENC SB 72-0320 NO.2 ENGINE - INTRODUCTION OF THE NEW REAR FLANGE AS ALTERNATE ON THE LPT NOZZLE STAGE 1. SERVICE BULLETIN MOS MRS/MSC ENC SB 72-0321 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRSAISC ENC SB 72-0322 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0322 RI NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 20-NOV-2006 MRS/51SC - ENC SB 72-0323 NO.2 ENGINE - REPLACEMENT OF THE AIR MANIFOLD. SERVICE BULLETIN MOS MRS/51SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 625 Of 748 @ Camp Systems EFTA00618916 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0323 R1 NO. 2 ENGINE - REPLACEMENT OF THE AIR MANIFOLD. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0324 NO. 2 ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN MOS HRSimSC - ENC SB 72-0324 R2 NO. 2 ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN MOS HRSiI.ISC - ENC SB 72-0324 R3 NO. 2 ENGINE - INTRODUCTION OF REWORKED FAN DISKS AND NEW SPACERS AND SHIMS. SERVICE BULLETIN MOS HRS.ISC - ENC SB 72-0324 R5 NO 2 ENGINE - ENGINE - FAN AND BOOSTER (72-21.00) - INTRODUCTION OF REWORKED FAN DISKS AND NEW OPTIONAL SPACERS AND SHIMS. SERVICE BULLETIN MOS 03-JAN-2012 HRS.ISC - ENC SB 72-0325 NO.2 ENGINE - ELASTOMER AXIAL STOP PIN. SERVICE BULLETIN MOS HRS.ISC - ENC SB 72-0325 R1 NO 2 ENGINE - ELASTOMETER AXIAL STOP PIN. SERVICE BULLETIN MOS HRSiI.ISC - ENC SB 72-0325 R2 NO.2 ENGINE - INTRODUCTION OF ELASTOMETER AXIAL STOP PIN INSTEAD OF RTV ON THE FAN BLADE RETAINING FLANGE. SERVICE BULLETIN MOS 17-DEC-2001 HRSLISC ENC SB 72-0325 R3 NO 2 ENGINE - INTRODUCTION OF ELASTOMETER AXIAL STOP PIN INSTEAD OF RTV ON THE FAN BLADE RETAINING FLANGE. SERVICE BULLETIN MOS HRS1P.ISC ENC SB 72-0326 NO 2 ENGINE - ON-WING BORESCOPE INSPECTION OF HPT BLADES. SERVICE BULLETIN COMPLIED WITH MOS 22-AUG-2C08 RECURRING 14-NOv-2801 HRSIASC 3260:48 ENC WOO 746 1746 ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 626 Of 748 11 Camp Systems EFTA00618917 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0327 NO 2 ENGINE - ENGINE - GENERAL - INSTALLATION OF A SAFETY WIRE OVER THE OIL TEMPERATURE PROBE HOUSING. SERVICE BULLETIN SB 72-0328 SB 72-0328 Fei SB 72-0329 SB 72-0330 SB 72-0330 R1 SB 72-0331 SB 72-0332 SB 72-0332 R1 SB 72-0333 MOS HRSI.ISC ENC NO 2 ENGINE - REDUCE INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR OliiS INSPECTION. SERVICE BULLETIN MOS HRS4ISC ENC NO 2 ENGINE - REDUCE INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DMS INSPECTION. SERVICE BULLETIN MOS HRS,IISC ENC NO. 2 ENGINE - REPLACEMENT OF NO. 4 ROLLER BEARING 305-355-717-0. SERVICE BULLETIN MOS HRS. .ISC - ENC NO 2 ENGINE - INSPECTION AND REPLACEMENT OF THE IDENTIFICATION PLATE. SERVICE BULLETIN MOS HR&MSC - ENC NO 2 ENGINE - INSPECTION AND REPLACEMENT OF THE IDENTIFICATION PLATE. SERVICE BULLETIN MOS HRSi siSC ENC NO 2 ENGINE - DELETION OF BURNER STAGING VALVE PARKING BRACKET. SERVICE BULLETIN MOS HRSisiSC - ENC NO 2 ENGINE - INTRODUCTION OF NEW VSV INNER BUSHING AND WASHERS. SERVICE BULLETIN MOS HR&MSC - ENC NO 2 ENGINE - COMPRESSOR FRONT STATOR - INTRODUCTION OF NEW VSV INNER BUSHINGS AND WASHERS. SERVICE BULLETIN MOS HRSAISC ENC NO 2 ENGINE - CORE MODULE AND FAN MODULE. SERVICE BULLETIN MOS HRSi P.ISC - ENC CANCELLED ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 627 Of 748 Camp Systems EFTA00618918 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0333 R1 NO.2 ENGINE - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0333 R2 NO.2 ENGINE - CORE MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE HOLES. SERVICE BULLETIN MOS HRSOASC - ENC SB 72-0333 R3 NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0333 R4 NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE AND FAN FRAME - INTRODUCTION OF NEW AND REWORKED PS3 AIR TUBES AND TUBE NIPPLE WITH SAFETY WIRE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0334 NO.2 ENGINE - FAN MAJOR MODULE - INTRODUCTION OF A 4-5 O'CLOCK LPYACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0334 R1 NO.2 ENGINE - INTRODUCTION OF A 4-5 O'CLOCK LPTACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0334 R2 NO.2 ENGINE - INTRODUCTION OF A 4-5 O'CLOCK LPT ACC STRUT PANEL WITH DESIGN IMPROVED OR REWORKED. SERVICE BULLETIN MOS II-MAR-2005 HRS/MSC ENC SB 72-0335 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0336 NO.2 ENGINE - INSTALLATION OF SAFETY WIRE OVER THE OIL TEMPERATURE PROBE AND HOUSING. SERVICE COMPUED WITH BULLETIN MOS 07-JUL-2001 HRS/MSC - 782 ENC 54 SB 72-0337 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-78. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 628 Of 748 @ Camp Systems EFTA00618919 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0337 R1 SB 72-0338 SB 72-0338 R1 SB 72-O339 SB 72-0340 SB 72-O341 SB 72-0341 R1 SB 72-0342 SB 72-0342 R1 SB 72-0343 SB 72-0344 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - ENGINE FAN AND BOOSTER SPARE PARTS RELEASE FOR CFM56-7B. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - ENGINE FAN AND BOOSTER SPARE PARTS RELEASE FOR CFM56-7B . SERVICE BULLETIN MOS NRS1MSC ENC NO.2 ENGINE - LPT FRAME - REPLACEMENT OF THE CURRENT OIL SUPPLY TUBE BY A REMOVABLE TUBE. SERVICE BULLETIN MOS HRSAISC ENC NO.2 ENGINE - TURBINE FRAME. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCTION OF BOLTS FOR FUEL TUBE CLAMPS. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCTION OF BOLTS FOR FUEL TUBE CLAMPS. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - DELETION OF STAGE 6-8 VANE SECTOR END BLOCKS. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - DELETION OF STAGE 6-8 VANE SECTOR END BLOCKS. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCTION OD IMPROVED HPT ROTOR SPOOL WEIGHTS FOR STAGES 6-9. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE SPACER OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 629 Of 748 @ Camp Systems EFTA00618920 CIMP Asiant.Inne Attn....14C AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0344 RI SB 72-0345 RI SB 72-0345 R2 SB 72-0346 SB 72-0346 RI SB 72-0346 R2 02-MAR-2006 NO 2 ENGINE - INTRODUCTION OF A NEW FAN BLADE SPACER OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - TURBINE LOW PRESSURE ( 72-54-00)- INTRODUCTION OF NEW LPT NOZZLE SEGMENTS STAGE 2 AND A NEW SEALING PLATE. SERVICE BULLETIN MOS HRSMSC ENC NO.2 ENGINE - TURBINE LOW PRESSURE ( 72-54-00)- INTRODUCTION OF NEW LPT NOZZLE SEGMENTS STAGE 2 AND A NEW SEALING PLATE. SERVICE BULLETIN MOS HRS.,MSC ENC NO 2 ENGINE - ENGINE - TURBINE LOW PRESSURE - (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS ON THE LPT STAGE I. SERVICE BULLETIN MOS HRS,MSC ENC NO 2 ENGINE - ENGINE - TURBINE LOW PRESSURE - (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS ON THE LPT STAGE I. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - ENGINE - TURBINE LOW PRESSURE (72-54-00) - REPLACEMENT OF BLADES AND DEFLECTORS OF THE LPT STAGE I. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0347 NO. 2 ENGINE - ENGINE - INTRODUCTION OF NEW BALANCING CLIPS ON LPT STAGE 4. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0347 RI NO. 2 ENGINE - INTRODUCTION OF NEW BALANCING CLIPS ON LPT STAGE 4 BLADES. SERVICE BULLETIN MOS HRSIMSC - ENC SB 72-0348 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0349 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 630 Of 748 Camp Systems EFTA00618921 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0350 NO.2 ENGINE - ENGINE - NIGH PRESSURE TURBINE NOZZLE - INTRODUCTION OF FIELD REWORK FOR HPT AIR MANIFOLD. SERVICE BULLETIN MOS HRSIASC - ENC SB 72-0350121 NO 2 ENGINE - INTRODUCE A FIELD REWORKED AIR HPT STATOR MANIFOLD PIN 20711-129G02. SERVICE BULLETIN 30-JAN-2009 MOS HRSIASC - ENC SB 72-0351 R1 NO 2 ENGINE - INTRODUCTION OF HIGH PRESSURE TURBINE BLADE KIT 737L325G03 AND HPT BLADE 1957M10P01. SERVICE BULLETIN SB 72-0352 SB 72-0352121 SB 72-0353 SB 72-0354 SB 72-0355 SB 72-0355121 04-AUG-2C05 SB 72-0356 MOS HRSIASC ENC NO 2 ENGINE - INTRODUCTION OF NEW NO. 4 ROLLER BEARINGS WITH NEW OUTER RACE MATERIALS. SERVICE BULLETIN MOS HRSIASC - ENC NO 2 ENGINE - INTRODUCTION OF NEW NO. 4 ROLLER BEARINGS WITH NEW OUTER RACE MATERIALS. SERVICE BULLETIN MOS HRSIASC - ENC NO 2 ENGINE - FAN AND BOOSTER (12-21-O0) - INTRODUCTION OF A NEW FAN BLADE PLATFORM DESIGN 340-001414-0. SERVICE BULLETIN MOS HRSIASC - ENC NO.2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSIASC - ENC NO 2 ENGINE - INTRODUCTION OF NEW BRACKETS ASSY ON THE AIR COOLING MANIFOLD ASSY UP AND DOWN. SERVICE BULLETIN MOS HRSIASC ENC NO 2 ENGINE - INTRODUCTION OF NEW BRACKETS ASSY ON THE AIR COOLING MANIFOLD ASSY UP AND DOWN. SERVICE BULLETIN MOS HRSIASC ENC NO.2 ENGINE - . SERVICE BULLETIN MOS HRSIASC ENC CANCELLED ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective C/W (EBT)-Estimated Base Time 631 Of 748 1' Camp Systems EFTA00618922 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0357 R1 NO.2 ENGINE - INTRODUCTION OF NO. 4 STRUT FAIRING WITH NEW MATERIAL ( STEEL VERSION). SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0358 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY WITH AN OBLONG HOLE AND REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0359 NO.2 ENGINE - INTRODUCTION OF NEW LPT REAR FRAME AND NEW OIL COLLECTOR WITH DELETION OF 16 HOLES AND BOLTS OUT OF 32, SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0360 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED MOS HRS/MSC ENC SB 72-0361 NO.2 ENGINE - INTRODUCTION OF A NEW IDENTIFICATION PLATE WITH A 2D BARRED MANUFACTURER CODE. SERVICE BULLETIN MOS HRS1MSC ENC SB 72-0362 NO.2 ENGINE - INTRODUCTION OF NEW AFT ACOUSTICAL PANEL ASSEMBLY AT IDG AIR / OIL COOLER LOCATION. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0363 NO.2 ENGINE - INTRODUCTION OF NEW STAGE 4 LOCKING BLADES. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0363 RI NO.2 ENGINE - INTRODUCTION OF NEW STAGE 4 LOCKING BLADES. SERVICE BULLETIN MOS 22-APR-2005 HRS/MSC - ENC SB 72-0364 NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM513-7B IPC. SERVICE BULLETIN MOS HRS1MSC - ENC SB 72-0365 NO.2 ENGINE - REPLACEMENT OF BRACKETS BY NEW ONES WITH ERROR PROOFING DEVICE INSTALLATION. SERVICE BULLETIN MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 632 Of 748 @ Camp Systems EFTA00618923 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0365 R1 NO.2 ENGINE - REPLACEMENT OF BRACKETS BY NEW ONES WITH ERROR PROOFING DEVICE INSTALLATION. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0366 NO.2 ENGINE - REPLACEMENT OF FAN RETAINING FLANGE OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0366 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - REPLACEMENT OF THE FAN RETAINING FLANGE OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0367 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0368 RI NO.2 ENGINE -ENGINE-ACCESSORY GEARBOX (72-63-00) - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS MRS/P.1SC ENC SB 72-0368 R2 NO.2 ENGINE -ENGINE-ACCESSORY GEARBOX ASSEMBLY (7263-00)- REPLACEMENT OF BALL BEARING 340-052-602-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS 25-SEP-2006 HRS1MSC - ENC SB 72-0368 R3 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (7243-00) - REPLACEMENT OF BALL BEARING SUPERSEDED 340-052-602-0 IN A SUSPECT LOT (SUPERSEDED BY SB 72-0368 R4), SERVICE BULLETIN MOS HRS1PASC - ENC SB 72-0368 R4 NO.2 ENGINE - ACCESSORY GEARBOX ASSEMBLY (7243-00) - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS I8-OCT-2013 HRS1PASC ENC SB 72-0369 NO.2 ENGINE - VGB GUIDE PAD INSPECTION. SERVICE BULLETIN MOS HRS1PASC - ENC SB 72-0371 RI NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM-7B IPC. SERVICE BULLETIN MOS HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 633 Of 748 @ Camp Systems EFTA00618924 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0372 NO.2 ENGINE - OIL TEMP PROBE SAFETYWIRE. SERVICE BULLETIN COMPUED WITH MOS 22-AUG-2008 HRSAISC - 3260:48 ENC 746 SB 72-0374 NO.2 ENGINE - FAN AND BOOSTER - TIGHTENING OF BOOSTER SPOOL FOWARD PINS. SERVICE BULLETIN MOS HRSAISC ENC 1500 (s) SB 72-0375 NO.2 ENGINE - HPT REAR SHAFT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0376 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0379 NO.2 ENGINE - ENGINE-HIGH PRESSURE TURBINE NOZZLE ( 72-51-00 ) - REAR SUPPORT NUT SHIELD MATERIAL CHANGE. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0380 NO.2 ENGINE-SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0381 NO.2 ENGINE - INTRO HPC STG 4 BLADE KIT. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0381 RI NO.2 ENGINE - INTRODUCTION OF STAGE 4 BLADE KIT TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0382 NO.2 ENGINE - REPLACEMENT OF NEW NO.5 ROLLER BEARING WITH AN OUTER RACE MODIFIED TO INCREASE THE THICKNESS OF THE OIL FILM OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0382 RI NO.2 ENGINE - INTRODUCTION OF NEW NO.5 ROLLER BEARING WITH AN OUTER RACE MODIFIED TO INCREASE THE THICKNESS OF THE OIL FILM OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS MRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 634 Of 748 @ Camp Systems EFTA00618925 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SS 72-0383 NO.2 ENGINE - TURBINE LOW PRESSURE - BORESCOPE INSPECTION FOR STAGE 1 LPT BLADE POSITION. SERVICE BULLETIN MOS HRS/MSC ENC 800(s) SB 72-0384 NO.2 ENGINE - FAN AND BOOSTER - ONE TIME INSPECTION FOR RETAINING FLANGE THREADED PIN PRESENCE. SERVICE BULLETIN MOS HRS/MSC 5000 (s) ENC 3000 SB 72-0385 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0386 NO.2 ENGINE -FAN AND BOOSTER -ONE TIME TIGHTENING OF FOWARD BOOSTER SPOOL PINS. SERVICE BULLETIN SUPERSEDED MOS HRS/MSC - (s) ENC SB 72-0386 R1 NO.2 ENGINE -FAN AND BOOSTER -ONE TIME TIGHTENING OF FOWARD BOOSTER SPOOL PINS. SERVICE BULLETIN MOS HRSfMSC ENC 1500 (s) SB 72-0388 NO.2 ENGINE - HPTR FRT DAMPER SLEEVE INSPECT. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0389 NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR (72-52-00)- INTRODUCTION OF HIGH PRESSURE TURBINE BLADE PM 1957M72P01 AND PM 1957M72P02 THROUGH FIELD REWORK. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0390 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0391 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - DRAIN TUBE REDUCER ELIMINATION, SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0392 NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE (72-00-02) - FUEL NOZZLE BOLT LENGTH. SERVICE BULLETIN MOS MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 635 Of 748 @ Camp Systems EFTA00618926 COMP Mianistfre• thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0392 R1 NO.2 ENGINE - FUEL NOZZLE BOLT LENGTH OPTIMIZATION. SERVICE BULLETIN MOS I I -JAN-2007 HRS/MSC - ENC SB 72-0392 R2 NO.2 ENGINE - FUEL NOZZLE BOLT LENGTH OPTIMIZATION. SERVICE BULLETIN I3-JUN-2007 MOS HRS/MSC - ENC SB 72-0393 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF A NEW CFM56-7627A ACCESSORY GEARBOX ASSY. SERVICE BULLETIN MOS HRS'MSC ENC SB 72-0393 R1 SB 72-0394 SB 72-0395 SB 72-0395 R1 SB 72-0396 SB 72-0396 R1 SB 72-0396 R2 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF A NEW CFM56-7627A ACCESSORY GEARBOX ASSY. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE - BRACKET HARDWARE ELIMINATION. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - REMOVAL AND REPLACEMENT OF NO.4 ROLLER BEARING 340-167-901-0. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - REMOVAL AND REPLACEMENT OF NO.4 ROLLER BEARING 340-167-901-0. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR (72-31-00) - FLOURESCENT-PENETRANT-INSPECTION OF HIGH PRESSURE COMPRESSOR STAGE 1-2 SPOOL STAGE 1 DOVETAIL SLOT BOTTOMS. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 636 Of 748 @ Camp Systems EFTA00618927 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0398 NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0399 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0399 R1 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0000 NO.2 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARING IN FIELD. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0000 R1 NO.2 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARING IN FIELD. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0000 R2 NO.2 ENGINE - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARINGS IN SUPERSEDED FIELD (SUPERSEDED BY 72-0000 R3). SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0000 R3 NO.2 ENGINE - LPT SHAFT ASSEMBLY (72-55-00) - REPLACEMENT OF OUTER RACE BY A NEW OUTER RACE MATERIAL FOR NO.0 ROLLER BEARINGS IN FIELD. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0001 NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS MRS/MSC - ENC SB 72-0002 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0003 NO.2 ENGINE -HIGH PRESSURE TURBINE ROTOR REAR SHAFT WITH IMPROVED DAMPING. SERVICE BULLETIN MOS FIRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 637 Of 748 @ Camp Systems EFTA00618928 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0404 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSiliSC - ENC SB 72-0411 NO. 2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSUMSC - ENC SB 72-0414 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 07-JUL-2008 HRSUMSC - ENC SB 72-0415 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CF56-76 IPC. SERVICE BULLETIN MOS 20-DEC-2002 HRSUMSC - ENC SB 72-0417 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFNI56-7(3 IPC. SERVICE BULLETIN MOS HRSUMSC - ENC SB 72-0419 NO 2 ENGINE - SPARE PARTS FOR CFm56-7B IPC. SERVICE BULLETIN MOS HRSUMSC - ENC SB 72-0420 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HRSUMSC - ENC SB 72-0421 NO 2 ENGINE - INTRODUCTION OF HPC REAR STATOR 18871.117601. SERVICE BULLETIN MOS HRSUMSC - ENC SB 72-O422 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CF80156-7B CMM. SERVICE BULLETIN MOS 23-NOv-2809 HRSUMSC - ENC SB 72-0423 NO 2 ENGINE - TURBINE LOW PRESSURE (72-54-00) - REPLACEMENT OF BROKEN STUD OF T49.5 EGT SENSOR RETAINING PLATE. SERVICE BULLETIN MOS HRSmSC ENC SB 72-0423 R1 NO 2 ENGINE - ENGINE - LPT ROTOFuSTATOR ASSEMBLY (72-54-00) - REPLACEMENT OF BROKEN STUD OF 7419.5 EGT SENSOR RETAINING PLATE. SERVICE BULLETIN MOS 02-SEP-2011 HRSUMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time Camp Systems 638 Of 748 EFTA00618929 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0425 NO.2 ENGINE - ENGINE-GENERAL-SPARE PARTS RELEASE FOR CFM56-7 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0427 NO.2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0429 NO.2 ENGINE - ACCESSORY GEARBOX (72-63-00) - INTRODUCTION OF N2 SENSOR ADJUSTMENT SHIM SCREWS. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0431 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00)-INTRODUCTION OF IMPROVED DOUBLE ANNULAR COMBUSTION (DAC) CHAMBER INNER LINER. SERVICE BULLETIN MOS HRS1MSC - ENC SB 72-0432 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56.7B IPC. SERVICE BULLETIN MOS 08-APR-2008 HRS/MSC - ENC SB 72-0433 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0434 NO.2 ENGINE - COMBUSTION CHAMBER (72-42-00) PIN AND MATING SLOT ELIMINATION. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0435 NO.2 ENGINE -CORE ENGINE MAJOR MODULE (72-00-02)- INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0436 NO.2 ENGINE - ENGINE FUEL AND CONTROL ( 73-00-00) - FUEL SPRAY SHIELD MATERIAL IMPROVEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0437 NO.2 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 639 Of 748 @ Camp Systems EFTA00618930 CAMP J~rM~rnM lit AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC 58 72-0438 10-APR-2006 58 72-0439 SB 72-0439 R1 28-APR-2003 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE -FAN FRAME ASSEMBLY ( 72-23-00 ) - MODIFICATION OF HARDWARE FOR THE NEW BOEING FIRE DETECTION ROUTING. SERVICE BULLETIN MOS MRS/61SC ENC NO.2 ENGINE -FAN FRAME ASSEMBLY ( 72-23-00 ) - MODIFICATION OF HARDWARE FOR THE NEW BOEING FIRE DETECTION ROUTING. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0440 R1 NO.2 ENGINE - ENGINE (72-00-00) - IDG AIRFOIL COOL ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP INSPECTION OF FAN FRAME SHROUD.. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0440 R3 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIR/OIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0440 R4 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIR/OIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRS/MSC - ENC 58 72-0440 R6 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - IDG AIRFOIL COOLER ACOUSTICAL PANEL REMOVAL AND ON WING OR IN SHOP INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS 25-SEP-2006 HRS/MSC DUE ENC SB 72-0441 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE SHROUD AND LOW PRESSURE TURBINE NOZZLE STAGE 1 (72-53-00) - INTRODUCTION OF A NEW FRONT FLANGE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0442 NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE SHROUD AND LOW PRESSURE TURBINE NOZZLE STAGE 1 (72-53-00) - INTRODUCTION OF A NEW REAR FLANGE. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 640 Of 748 @ Camp Systems EFTA00618931 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0442 R1 NO 2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW REAR FLANGE ON THE LPT STAGE I NOZZLE. SERVICE BULLETIN MOS HRSitiSC - ENG SB 72-0444 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN 30-NOV-2CC6 MOS HRSi P.ISC - ENG SB 72-0445 NO 2 ENGINE - ENGINE-TRANSFER GEARBOX (72-62-00) - REPLACEMENT OF BALL BEARING 340.052-502-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS HRSitiSC - ENG SB 72-0446 NO.2 ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS.ISC - ENG SB 72-0446 R1 NO.2 ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 30-MAY-2CC6 HRSitiSC - ENG SB 72-0447 NO 2 ENGINE - HIGH PRESSURE COMPRESSOR (72-31.00) - BLADE AND VANE IMPROVEMENT. SERVICE BULLETIN MOS HRSiliSC - ENC SB 72-0447 R1 NO 2 ENGINE - IMPROVE THE DURABILITY OF THE HPC BLADES AND VANES. SERVICE BULLETIN MOS HRSitiSC - ENG SB 72-0448 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HRSitiSC - ENG SB 72-0449 NO 2 ENGINE - SPARE PARTS RELEASE FOR CR156-78 IPC. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0449 R1 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC. SERVICE BULLETIN MOS 26-JUN-2008 HRSitiSC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 641 Of 748 '2 Camp Systems EFTA00618932 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0450 NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FAN RETAINING FLANGE PINS AND FAN DISK MID-FLANGE LOG PINS ON ALL CFM56078 ENGINES. SERVICE BULLETIN MOS HRS/MSC 5000 (s) ENC 3000 SB 72-0450 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FAN RETAINING FLANGE PINS AND FAN DISK MID-FLANGE LUG PINS ON ALL CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC 5000 (s) ENC 3000 SB 72-0451 NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FORWARD BOOSTER SPOOL PINS ON CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC ENC 1500 (s) SB 72-0451 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER (72-21-00) - ONE TIME TIGHTENING WITH INCREASED TORQUE OF FORWARD BOOSTER SPOOL PINS ON CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC ENC 1500 (s) SB 72-0452 NO.2 ENGINE - ENGINE - TURBINE LOW PRESSURE (72-54-00) - IN SHOP VISUAL INSPECTION OF STAGE 2 NOZZLE SEGMENTS FOR AXIAL CRACKS ON AIRFOIL LEADING EDGE. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0452 RI NO.2 ENGINE - IN SHOP VISUAL INSPECTION OF STAGE 2 NOZZLE SEGMENTS FOR AXIAL CRACKS ON AIRFOIL LEADING EDGE. SERVICE BULLETIN MOS HRS/MSC ENC 9000 (s) SB 72-0453 NO.2 ENGINE - ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/S1SC - ENC SB 72-0454 NO.2 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO PREVENT THE CORROSION. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0454 RI NO.2 ENGINE - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO PREVENT THE CORROSION IN FIELD ONLY. SERVICE BULLETIN MOS 06-DEC-2007 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 642 Of 748 @ Camp Systems EFTA00618933 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (Y0006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0454 R2 01-JUL-2039 NO 2 ENGINE - ENGINE - FAN AND BOOSTER (72-21.00) - IMPROVEMENT OF THE FAN AND BOOSTER VANE ASSY TO PREVENT THE CORROSION IN FIELD ONLY. SERVICE BULLETIN MOS HRS.,LISC - ENC SB 72-0455 NO 2 ENGINE - COMBUSTION CHAMBER (72-42-00)- SWIRLERS - THICK FLANGE (SUPERSEDED BY SB 72-0455 RI). SERVICE BULLETIN MOS HRSIASC ENC SB 72-0455 R1 NO 2 ENGINE - COMBUSTION CHAMBER (72-42-00) - SvaRLERS - THICK FLANGE. SERVICE BULLETIN CATEGORY 7 MOS 02-MAY-2014 HRS,LISC - ENC SB 72-0457 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRSImSC - ENC NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRSImSC - ENC NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRSImSC - ENC NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRS,LISC - ENC NO 2 ENGINE - ENGINE - HPT ROTOR (72-52-00) - NEW DISK WITH IMPROVED LIFE DESIGN. SERVICE BULLETIN MOS HRS.4.ISC - ENC SB 72-0459 SB 72-0460 SB 72-0460 R1 SB 72-0461 SB 72-0462 SB 72-0462 R1 27-AUG-2C08 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW MW0312 HARNESS WITH A NEW DP1204 CONNECTOR AND REWORK OF THE OLD HARNESS. SERVICE BULLETIN MOS HRSI.ISC - ENC NO 2 ENGINE - INTRODUCTION OF A NEW MW0312 HARNESS WITH A NEW DP1204 CONNECTOR AND REWORK OF THE OLD HARNESS. SERVICE BULLETIN MOS HRSASC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 643 Of 748 II Camp Systems EFTA00618934 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0463 SB 72-0463 R1 SB 72-0464 SB 72-0465 SB 72-0465 R1 SB 72-0466 SB 72-0466 R1 SB 72-0467 58 72-0468 SB 72-0469 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR MANIFOLD ASSY AND OF NEW BRACKETS. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - GENERAL - INTRODUCTION OF DAMPERS ON THE ACCESSORY GEARBOX AXIAL LINK ENDS. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - GENERAL - INTRODUCTION OF DAMPERS ON THE ACCESSORY GEARBOX AXIAL LINK ENDS. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - ENGINE - HPT (72-51-00) - NEW NOZZLES - ADDITIONAL COOLING HOLES. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - HPT (72-51-00) - NEW NOZZLES - ADDITIONAL COOLING HOLES. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - DELETION OF THE FLAT WASHERS AT THE MAIN OlUFUEL HEAT EXCHANGER AND FUEL RETURN TUBE LOCATION. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - HPC (72-32-00) - STAGES 2 AND 3 SHROUDS - LEADING EDGE CUTBACK. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 644 Of 748 @ Camp Systems EFTA00618935 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0471 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7(3 IPC. SERVICE BULLETIN MOS HRSMSC - ENG SB 72-0474 NO 2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN MOS HRSMSC - ENG SB 72-0475 NO 2 ENGINE - INTRODUCTION OF NEW AIR TUBE. A NEW BRACKET ASSY WITH SAFETY WIRE HOLES AND REWORK OF THE PREVIOUS CONFIGURATION. SERVICE BULLETIN MOS HRSMSC - ENG SB 72-0476 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-713 IPC. SERVICE BULLETIN MOS HRSMSC - ENG SB 72-0477 NO 2 ENGINE - INSPECTION OF NO.5 BEARING SUPPORT NIPPLE WELD. SERVICE BULLETIN MOS HR&MSC - ENG SB 72-0477 R2 NO.2 ENGINE - INSPECTION OF NO.5 BEARING SUPPORT NIPPLE WELD. SERVICE BULLETIN MOS CE-FEB-2008 HRS,LISC - ENG SB 72-0480 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-713 IPC. SERVICE BULLETIN MOS HR&MSC - ENG SB 72-0481 R1 NO 2 ENGINE - IN FIELD INTRODUCTION OF FAN BLADE SHIMS WITH NEW AXIAL STOP. SERVICE BULLETIN DAYS 1 (s) HRSMSC ENC SB 72-0482 NO 2 ENGINE - GENERAL - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSMSC - ENG SB 72-0483 NO 2 ENGINE - ENGINE - HPT (72-51-00) - NEW STATIONARY SEAL. SERVICE BULLETIN MOS HRSMSC - ENG SB 72-0483 Ri NO.2 ENGINE - ENGINE - HPT (72-51-00) - NEW STATIONARY SEAL. SERVICE BULLETIN MOS HRSMSC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 645 Of 748 1, Camp Systems EFTA00618936 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0484 11-MAR-2005 SB 72-0485 SB 72-0485 Ri 13-AUG-2O0-1 SB 72-0486 NO. 2 ENGINE - INTRODUCTION OF A NEW FUEL SUPPLY TUBE. SERVICE BULLETIN MOS HRSimSC - ENG NO. 2 ENGINE - INTRODUCTION OF NEW FAN DISK AND NEw SPACERS AND NEW SHIMS. SERVICE BULLETIN MOS HRSimSC - ENC NO.2 ENGINE - INTRODUCTION OF NEW FAN DISK AND NEw SPACERS AND NEW SHIMS. SERVICE BULLETIN MOS HR&MSC - ENG NO.2 ENGINE - ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS.I.ISC - ENG SB 72-0487 NO 2 ENGINE - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL AND NEW NO.1 BEARING VIBRATION SENSOR ATTACHING PARTS. SERVICE BULLETIN MOS 0-NOV-2W-1 HRS.I.ISC - ENG SB 72-0487 Ri NO.2 ENGINE - INTRODUCTION OF A NEW NO.1 BEARING STATIONARY SEAL AND INTRODUCTION OF A NEw NO.1 BEARING VIBRATION SENSOR ATTACHING PARTS. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 72-0488 Ri NO 2 ENGINE - REPLACEMENT OF IDENTIFICATION PLATES ON THE TRANSFER GEARBOX ASSEMBLY AND THE ACCESSORY GEARBOX ASSEMBLY. SERVICE BULLETIN MOS HR&MSC - ENG SB 72-0489 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN MOS HR&MSC - ENG SB 72-0489 Ri NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS.I.ISC - ENG SB 72-0490 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSitiSC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 646 Of 748 '2 Camp Systems EFTA00618937 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0491 NO.2 ENGINE - NEW MATERIAL (N5-) TO ELIMINATE YTTRIUM AND REDUCE SULFUR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0493 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0494 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0495 R2 NO.2 ENGINE - REWORK AND REIDENTIFICATION OF FAN FRAME SHROUD WITH AN ALUMINUM DOUBLER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0495 R3 NO.2 ENGINE - REWORK AND REIDENTIFICATION OF FAN FRAME SHROUD WITH AN ALUMINUM DOUBLER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0497 NO.2 ENGINE - INTRODUCTION OF VESPEL NUTS. SERVICE BULLETIN MOS HRS(MSC - ENC 513 72-0498 NO.2 ENGINE - REDUCE INSPECTION INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING SYSTEM. SERVICE BULLETIN MOS HRS/MSC 50 (s) ENC 513 72-0498 R1 NO.2 ENGINE - REDUCE INSPECTION INTERVAL FOR AFT SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING SYSTEM. SERVICE BULLETIN MOS HRS/MSC 50 (s) ENC SB 72-0499 R1 NO.2 ENGINE - INTRODUCTION OF NEW NO.5 BEARING SUPPORT NIPPLE DESIGN OR REWORK OF THE OLD ONE. SERVICE BULLETIN MOS 16-DEC-2006 HRS/MSC ENC SB 72-0500 NO.2 ENGINE - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN SUPERSEDED MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 647 Of 748 @ Camp Systems EFTA00618938 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0500 R2 02-MAR-2011 NO.2 ENGINE - ENGINE - HPC (72-31-00) - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN MOS HRS(MSC - ENC OPTIONAL SB 72-0500 R3 NO.2 ENGINE - ENGINE - HPC (72-31-00) - REWORK PART NUMBERS TO THE IPC. SERVICE BULLETIN OPTIONAL MOS I7-AUG-2011 HRS(MSC - ENC SB 72-0501 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - DELETION OF THE BLANKING PLATE AND INTRODUCTION OF A NEW OIL SUPPLY TUBE WITH ITS NEW ATTACHMENT BRACKETS.. SERVICE BULLETIN MOS I4-OCT-2008 HRS/MSC - ENC SB 72-0502 R1 NO.2 ENGINE - REPLACEMENT OF NO.10 STRUT FAIRING (STEEL VERSION ) 8Y STRUT FAIRING ( ALUMINUM VERSION ). SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0502 R2 NO.2 ENGINE - REPLACEMENT OF NO.10 STRUT FAIRING (STEEL VERSION ) 8Y STRUT FAIRING ( ALUMINUM VERSION ). SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0503 NO.2 ENGINE - FORWARD INNER NOZZLE SUPPORT - FORWARD FLANGE REPLACEMENT AND COATING. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0503 R1 NO.2 ENGINE - FORWARD INNER NOZZLE SUPPORT- FORWARD FLANGE REPLACEMENT AND COATING. SERVICE BULLETIN MOS HRS.0.1SC ENC SB 72-0503 R2 NO.2 ENGINE - 81/65279:ENGINE -HPT (7241-00) -FORWARD INNER NOZZLE SUPPORT -FORWARD FLANGE REPLACEMENT AND COATING . SERVICE BULLETIN MOS 29-JUN-2007 HRS/MSC ENC SB 72-0506 NO.2 ENGINE - INSPECTION OF COMBUSTION CHAMBER OUTER LINER. SERVICE BULLETIN MOS 30-JUL-2004 HRS(MSC - (s) ENC SB 72-0506 R1 NO.2 ENGINE - INSPECTION OF OUTER LINER COOLING HOLES. SERVICE BULLETIN MOS 23-AUG-2006 HRS(MSC - ENC SUPERSEDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time @ Camp Systems 648 Of 748 EFTA00618939 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0507 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSG-78 ENGINES. SERVICE BULLETIN MOS H R m SC E NC SB 72-0509 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSG-78 IPC. SERVICE BULLETIN MOS HRSUMSC - ENG SB 72-0509 Ri NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156,78 IPC. SERVICE BULLETIN MOS 11-APR-2008 HRSUMSC - ENG SB 72-0510 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN MOS HRS.ISC - ENG NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN MOS HRSUMSC - ENG NO 2 ENGINE - INTRODUCTION OF A NEW FAN FRAME SHROUD WITH NEW MG AiRiOIL COOLER PANEL IN TWO PARTS. SERVICE BULLETIN SB 72-0511 SB 72-0512 SB 72-0512 R2 CG-OCT-2030 MOS HRSUMSC - ENG NO 2 ENGINE - INTRODUCTION OF A NEW FAN FRAME SHROUD WITH NEW JOG AiRiOIL COOLER PANEL IN TWO PARTS AND REWORK OF THE PREVIOUS CONFIGURATION. SERVICE BULLETIN MOS HRSistSC - ENG SB 72-0513 NO 2 ENGINE - SPARE PARTS INFORMATION. SERVICE BULLETIN MOS HRSUMSC - ENG SB 72-0514 R1 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B IPC (SUPERSEDED BY SB SUPERSEDED 72-0514 R2). SERVICE BULLETIN MOS HRSUMSC - ENG SB 72-0514 R2 NO 2 ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B IPC. SERVICE BULLETIN MOS 22-NOv-2013 HRSUMSC - ENG CATEGORY 8 ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 649 Of 748 1, Camp Systems EFTA00618940 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0515 NO.2 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS HIRSAISC 24000 (s) ENC SB 72-0515 R1 NO.2 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS HIRSAISC 24000 (s) ENC SB 72-0515 R2 NO.2 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS I8-APR-2006 HRS/MSC 24000 (s) ENC SB 72-0515 R3 NO.2 ENGINE - ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS HRS/MSC 24000 (s) ENC SB 72-0515 R4 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00)- ON WING BORESCOPE INSPECTION FOR HPC STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS I2-FEB-2009 HRS/MSC 24000 (s) ENC SB 72-0515 R5 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS MRS/MSC 24000 (s) ENC SB 72-0515 R6 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS 03-OCT-2011 HRS/MSC 24000 (s) ENC SB 72-0515 R7 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00)- ON WING BORESCOPE INSPECTION FOR HPC RECOMMENDED STATOR-TO-ROTOR CONTACT. SERVICE BULLETIN MOS 21-OCT-2011 HIRS/MSC 24000 (s) ENC SB 72-0520 NO.2 ENGINE - INSPECTION OF THE FORWARD LPT SHAFT FOR MISSING PAINT. SERVICE BULLETIN MOS 08-FEB-2006 HRS(MSC - ENC SB 72-0521 NO.2 ENGINE - INSPECTION OF INNER AND OUTER LINER NUGGET THICKNESS. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 650 Of 748 @ Camp Systems EFTA00618941 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0521 R1 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INSPECTION OF INNER AND OUTER LINER NUGGET THICKNESS. SERVICE BULLETIN RECOMMENDED MOS 13-JUN-2012 HRS.11.1SC ENC SB 72-0522 NO.2 ENGINE - INTRODUCTION OF AN IDENTIFICATION PLATE COMPLYING WITH THE NEW EUROPEAN REGULATION. SERVICE BULLETIN MOS HRS.11.1SC ENC SB 72-0523 NO.2 ENGINE - INTRODUCTION OF A NEW CONNECTING TUBE WITH A NEW COATING. SERVICE BULLETIN MOS HRS.11.1SC - ENC SB 72-0523 RI NO.2 ENGINE - INTRODUCTION OF A NEW CONNECTING TUBE WITH A NEW COATING. SERVICE BULLETIN MOS 29-NOV-2006 MRS/MSC - ENC SB 72-0524 NO.2 ENGINE - ENGINE - COMBUSTOR (7242-00) - NEW DOME. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0525 NO.2 ENGINE -FAN DISK DOVETAIL FACES WEAR DEPTH INSPECTION. SERVICE BULLETIN MOS 25-MAR-2005 HRS1MSC ENC 3000 (s) SB 72-0525 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - FAN DISK PRESSURE FACES INSPECTION. SERVICE BULLETIN RECOMMENDED MOS HRS1MSC - ENC SB 72-0525 R2 PARA D (1) NO.2 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000410-0) MOS HRS.11.1SC ENC 2000 (s) SB 72-0525 R2 PARA D (2) NO.2 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-420-0) MOS HRS1MSC ENC 7000 (s) SB 72-0525 R2 PARA D (3) NO.2 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. RECOMMENDED SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-471/472/473/474) MOS HRS1MSC ENC 7000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 651 Of 748 @ Camp Systems EFTA00618942 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 58 72-0525 R2 PARA D (4) NO.2 ENGINE - WEAR INSPECTION ENGINE - GENERAL (72-00-00) - FAN DISK PRESSURE FACES INSPECTION. SERVICE BULLETIN FAN DISK DOVETAIL PRESSURE FACES (340-000-485/486/490-0) MOS HRS/MSC ENC 7000 (s) 72-0527 NO.2 ENGINE - INTRODUCTION OF NEW LOW PRESSURE TURBINE (LPT) REAR FRAMES WITH A NEW OIL SCAVENGE TUBE. SERVICE BULLETIN RECOMMENDED MOS HRS/MSC ENC SB 72-0527 RI NO.2 ENGINE - INTRODUCTION OF NEW LOW PRESSURE TURBINE (LPT) REAR FRAMES WITH A NEW OIL SCAVENGE TUBE. SERVICE BULLETIN MOS 29-SEP-2005 HRS/P.1SC ENC SB 72-0527 R2 NO.2 ENGINE - INTRODUCTION OF THE NEW OR REWORKED LPT REAR FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN MOS 2I-JAN-2008 MRS/P.1SC ENC SB 72-0527 R3 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF THE NEW OR REWORKED LPT REAR FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN MOS 22-DEC-2009 HRSfMSC - ENC SB 72-0527 R4 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF THE NEW OR REWORKED LPT REAR CUSTOMER FRAME WITH NEW OIL SCAVENGE TUBE. SERVICE BULLETIN CONVENIENCE MOS 04-JUL-2013 HRS/MSC - ENC SB 72-0528 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 72-0529 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/P.1SC - ENC SB 72-0530 NO.2 ENGINE - BELLCRANK SUPPORT NUT LENGTH. SERVICE BULLETIN MOS HRS/PASC - ENC SB 72-0531 RI NO.2 ENGINE-NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS 26-SEP-2006 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 652 Of 748 @ Camp Systems EFTA00618943 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0531 R2 10-APR-2008 SB 72-0531 R3 254.1RJ-2609 SB 72-0531 R4 18-APR-2013 SB 72-0533 SB 72-0536 SB 72-0539 NO 2 ENGINE - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRSMSC -(s) ENC NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - NEW INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - NEw INSPECTION OF FAN FRAME SHROUD. SERVICE BULLETIN MOS HRS.4.1SC ESV ENC NO 2 ENGINE - ENGINE - COMBUSTOR (72-41-00) - SWIRLER. SERVICE BULLETIN MOS HRSI.ISC - ENC NO 2 ENGINE - INNER LINER EXTENSION FOR REPAIR. SERVICE BULLETIN MOS HRS,IISC - ENC NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0540 NO 2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0540 RI NO 2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS 18-APR-2005 HRSMSC - ENC SB 72-0540 R2 N0.2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS 29-AUG-2C07 HRSI.ISC - ENC SB 72-0541 NO 2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HR&P.ISC - ENC SB 72-0542 NO 2 ENGINE - HPT NOZZLE FORWARD INNER NOZZLE SUPPORT (FINS) WITH IMPROVED EROSION COATING. SERVICE BULLETIN MOS HRSMSC ENC ?-Insufficient Information +-Task exists in Inspection Manual (5)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 653 Of 748 Camp Systems EFTA00618944 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0543 SB 72-0545 SB 72-0547 NO.2 ENGINE - INTRODUCTION OF A NEW OIL INLET COVER 0-RING. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE -FAN DISK LIFE LIMIT INCREASE. SERVICE BULLETIN MOS HRSAISC ENC 16000 (s) NO.2 ENGINE - ON WING INSPECTION AND SHOP LEVEL ACTION FOT INNER AND OUTER LINERS. SERVICE BULLETIN MOS HRSAISC ENC 1600 (s) SB 72-0547 RI NO.2 ENGINE - ON WING INSPECTION AND SHOP LEVEL ACTION FOR INNER AND OUTER LINERS. SERVICE BULLETIN MOS 08-MAR-2006 HRS/MSC ENC 1600 (s) SB 72-0548 NO.2 ENGINE - INTRODUCTION OF A NEW ELASTOMER SPACER. SERVICE BULLETIN MOS 17-FEB-2006 HRS/MSC 5000 (s) ENC 3000 SB 72-0548 RI NO.2 ENGINE - INTRODUCTION OF A NEW ELASTOMER SPACER. SERVICE BULLETIN MOS 25-OCT-2006 HRSAISC 5000 (s) ENC 3000 SB 72-0550 NO.2 ENGINE - INTRODUCTION OF A NEW REAR VENT TUBE. SERVICE BULLETIN MOS 16-FEB-2007 HRSAISC - ENC SB 72-0552 NO.2 ENGINE -LOW PRESSURE TURBINE ROTOR/STATOR ASSEMBLY (72-54-00) - REIDENTIFICATION OF LPT CASE IN FIELD. SERVICE BULLETIN 27,JAN-2006 MOS HRSAISC ENC SB 72-0552 RI NO.2 ENGINE -LOW PRESSURE TURBINE ROTOR/STATOR ASSEMBLY (72-54-00) - REIDENTIFICATION OF LPT CASE IN FIELD. SERVICE BULLETIN 16-FEB-2012 SB 72-0553 20-OCT-2006 MOS HRSAISC ENC NO.2 ENGINE - INTRODUCTION OF AN ANTI-EROSION PAINT ON THE FAN FRAME ASSEMBLY. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 654 Of 748 @ Camp Systems EFTA00618945 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0553 RI S8 72-0554 SB 72-0554 RI SB 72-0555 SB 72-0556 SB 72-0557 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF AN ANTI-EROSION PAINT ON THE FAN FRAME ASSEMBLY. SERVICE BULLETIN MOS HRSAISC ENC NO.2 ENGINE - REDUCED INSPECTION INTERVAL FOR FORWARD SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING SYSTEM. SERVICE BULLETIN MOS HRSAISC 50 (s) ENC NO.2 ENGINE - REDUCED INSPECTION INTERVAL FOR FORWARD SUMP MAGNETIC CHIP DETECTOR OR DEBRIS MONITORING SYSTEM. SERVICE BULLETIN MOS HRSAISC 50 (s) ENC NO.2 ENGINE - ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS‘MSC - ENC NO.2 ENGINE - FORWARD INNER NOZZLE SUPPORT (FINS) - WITH IMPROVED EROSION COATING. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0558 NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS 18-JAN-2006 HRSfMSC - ENC SB 72-0558 RI NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS 21-SEP-2007 HRSAISC ENC 16350 (s) SB 72-0558 R2 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS 02-DEC-2008 HRS1MSC ENC 16350 (s) SB 72-0558 R3 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS HRSfMSC ENC 16350 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 655 Of 748 @ Camp Systems EFTA00618946 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0558 R4 21-MAY-2013 SB 72-0559 NO.2 ENGINE - INTRODUCTION OF NEW MW0316 FIRE DETECTION HARNESS. SERVICE BULLETIN MOS MRS/P.1SC - ENC NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON DAC ENGINES. SERVICE BULLETIN MOS HRS1MSC - ENC 06-JUN-2007 SB 72-0560 NO.2 ENGINE - INTRODUCTION OF A NEW MW0301 HARNESS WITH A NEW ROUTING. SERVICE BULLETIN MOS OI -MAR-2007 HRSAISC - ENC SB 72-0561 NO.2 ENGINE - INTRODUCTION OF OLD NO.1 BEARING VIBRATION SENSOR ATTACHING PARTS WITH NEW STATIONARY SEAL. SERVICE BULLETIN MOS HRS(MSC ENC SB 72-0562 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS I7-JAN-2006 HRS(MSC - ENC SB 72-0563 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 22-MAY-2006 HRSAISC - ENC SB 72-0564 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION IN PRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW STARTER DRIVE PAD AND NEW HANDCRANCKING COVER. SERVICE BULLETIN MOS 13-OCT-2009 HRS(MSC - ENC SB 72-0564 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0564 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN MOS 16-NOV-2010 HRS1MSC - ENC S8 72-0564 R3 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A SUPERSEDED NEW STARTER DRIVE PAD AND REWORK OF THE OLD AG8 TO THE NEW ONE (SUPERSEDED BY S8 72-0564 R4). SERVICE BULLETIN CUSTOMER CONVENIENCE MOS HRS(MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 656 Of 748 @ Camp Systems EFTA00618947 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0564 R4 SB 72-0564 R5 14-JAN-2014 NO 2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE (SUPERSEDED BY SB 72-0564 R5). SERVICE BULLETIN MOS HRSIASC ENC NO 2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH A CATEGORY 3 NEW STARTER DRIVE PAD AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN MOS HRSMSC ESV ENC SB 72-0565 RI NO 2 ENGINE - ENGINE - LPT ROTOR ?STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE. SERVICE BULLETIN MOS 04-MAY-2CO9 HRS,IISC ENC SB 72-0566 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS 23-MAY-2C06 HRSIASC - ENC SB 72-0567 NO 2 ENGINE - INTRODUCTION OF A NEW OR REWORKED STAGE 1 SEAL SEGMENT. SERVICE BULLETIN MOS 10-MAY-2C07 HRSMSC - ENC SB 72-0567 RI NO 2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW OR REWORKED STAGE 1 SEAL SEGMENT. SERVICE BULLETIN MOS 12-MAY-2C09 HRSMSC - ENC SB 72-0568 NO 2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 20-MAR-2006 HRS4.ISC - ENC SB 72-0568 RI NO 2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 21-SEP-2007 HRSMSC ENC 17400 (s) SB 72-0568 R2 NO 2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR CUSTOMER FRAME ON SAC ENGINES. SERVICE BULLETIN CONVENIENCE MOS HRSI.ISC ENC 17400 (s) SB 72-0569 NO 2 ENGINE - INTRODUCTION OF NEW SPACERS ON THE B6 FRONT FLANGE OF THE FAN FRAME. SERVICE BULLETIN 23-VAR.2337 - MOS HRSMSC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 657 Of 748 Camp Systems EFTA00618948 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0569 R1 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF NEW SPACERS ON THE 86 FRONT FLANGE OF THE FAN FRAME. SERVICE BULLETIN MOS 14-OCT-2008 HRS9,1SC - ENC SB 72-0570 RI NO.2 ENGINE - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD. SERVICE BULLETIN MOS 03-JUL-2008 HRS9(1SC ENC SB 72-0570 R2 NO.2 ENGINE - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD, SERVICE BULLETIN MOS 02-SEP-2008 HRSOASC ENC SB 72-0570 R3 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND FAN FRAME SHROUD (SUPERSEDED BY SB 72-0570 R4). SERVICE BULLETIN MOS I3-JUN-2012 HRSAISC - ENC SB 72-0570 R4 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - IMPROVEMENT OF SUPPORTING HARDWARE ON FAN CASE AND CATEGORY 7 FAN FRAME SHROUD. SERVICE BULLETIN MOS 26-JUN-20I4 HRSO4SC ENC SB 72-0571 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN 23-MAR-2007 SB 72-0572 SB 72-0573 24-JAN-2008 SB 72-0574 I0-APR-2066 SB 72-0574 RI 24-JUL-2006 MOS HRSOASC - ENC NO.2 ENGINE - HPT OUTER STATIONARY SEAL WITH INTEGRAL NUT SHIELD. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - NEW NO.3 BEARING REAR STATIONARY AlFUOIL SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRSO4SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 658 Of 748 @ Camp Systems EFTA00618949 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0574 R2 20-SEP-2006 SB 72-0574 R3 24-OCT-2006 SB 72-0574 R4 31-AUG-2007 SB 72-0575 SB 72-0576 20-JUL-2006 SB 72-0578 SB 72-0579 04-JUL-2006 SB 72-0579 R1 NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 27-OCT-2006 HRS,MSC ENC 19000 (s) SB 72-0579 R2 NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS HRS‘MSC ENC 19000 (s) SB 72-0579 R3 NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES, SERVICE BULLETIN MOS 09-APR-2008 HRSAISC ENC 19000 (s) SB 72-0579 R4 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN NO.2 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRSfMSC - ENC NO.2 ENGINE - NO.3 BEARING (72-00-01)- NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRSfMSC - ENC 01-DEC-2008 NO.2 ENGINE - NEW STATIONARY SEAL WITH IMPROVED ADHESIVE. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - REPAIR PARTS. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS HRSfMSC - ENC MOS HRSIMSC ENC 19000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 659 Of 748 @ Camp Systems EFTA00618950 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0579 R5 SB 72-0579 R6 15-DEC-2009 SB 72-0579 R7 I9-FEB-2010 SB 72-0579 Re NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS HRSAISC ENC 19000 (s) NO.2 ENGINE - ENGINE -LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00)- INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES, SERVICE BULLETIN MOS HRS1MSC ENC 19000 (s) NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE FRAME ASSEMBLY (72-56-00)- INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS HRSAISC ENC 19000 (s) NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 25-JAN-2012 HRS1MSC ENC 19000 (s) SB 72-0580 NO.2 ENGINE - REWORK FOR FAN CONTAINMENT CASE BI FLANGE AT FIRE DETECTOR LOCATION. SERVICE BULLETIN 25-MAY-2007 MOS HRSfMSC ENC SB 72-0580 R1 NO.2 ENGINE - REWORK FOR FAN CONTAINMENT CASE B1 FLANGE AT FIRE DETECTOR LOCATION. SERVICE BULLETIN 25-MAY-2008 MOS HRSNSC - ENC SB 72-0580 R2 NO.2 ENGINE - REWORK FOR FAN CONTAINMENT CASE B1 FLANGE AT FIRE DETECTOR LOCATION. SERVICE BULLETIN 27-APR-2009 SB 72-0580 R3 MOS HRSAISC - ENC NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - REWORK FOR FAN CONTAINMENT CASE 81 FLANGE AT FIRE DETECTOR LOCATION. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0581 NO.2 ENGINE -STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE BULLETIN 26-JUL-2006 MOS HRS1MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 660 Of 748 @ Camp Systems EFTA00618951 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0581 Ri 12-JAN-2007 SB 72-0581 R2 14-AUG-2009 NO 2 ENGINE - STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE BULLETIN MOS HRSitISC ENC NO 2 ENGINE - ENGINE - HPC STATOR FORWARD ASSEMBLY t72-32-00)- STAGE 2 AND STAGE 3 IMPROVED INNER BUSHINGS. VANES. SEALS AND SHROUDS. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 72-0582 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 07-AUG-2C06 HR&MSC - ENC SB 72-0582 RI NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 25-SEP-2006 HRSitISC - ENC SB 72-0584 RI NO 2 ENGINE - INTRODUCTION OF NEW ENHANCED DURABILITY HPT BLADES. SERVICE BULLETIN MOS 04-JUN-2007 HRSilISC - ENC SB 72-0584 R2 NO 2 ENGINE - INTRODUCTION OF NEW ENHANCED DURABILITY HPT BLADES. SERVICE BULLETIN MOS 31-AUG-2C07 HRSiliSC - ENC SB 72-0585 NO 2 ENGINE - FIELD INTRODUCTION OF REWORKED FAN DISK. SPACERS AND SHIMS. SERVICE BULLETIN MOS 04-SEP-2006 HRSI.ISC - ENC SB 72-0585 RI NO. 2 ENGINE - FIELD INTRODUCTION OF REWORKED FAN DISK. SPACERS AND SHIMS. SERVICE BULLETIN OPTIONAL MOS 25-APR-2008 HR&MSC - ENC SB 72-0585 R2 NO 2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - FIELD INTRODUCTION OF REWORKED FAN DISK. OPTIONAL SPACERS AND SHIMS. SERVICE BULLETIN MOS 03-JAN-2012 HRSI.ISC ENC SB 72-0586 NO 2 ENGINE - INTRODUCTION OF A NEW FAN BLADE PLATFORM WITH A NEW ELASTOMER SEAL. SERVICE BULLETIN 24-NOV-2CC6 MOS HR&MSC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 661 Of 748 1, Camp Systems EFTA00618952 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0586 R1 02-JAN-2007 SB 72-0587 04-JUL-2008 SB 72-0588 NO.2 ENGINE - INTRODUCTION OF A NEW FAN BLADE PLATFORM WITH A NEW ELASTOMER SEAL. SERVICE BULLETIN MOS HRSAISC ENC NO.2 ENGINE - LPT FRAME ASSEMBLY (72-56-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7618/3. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0589 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0589 RI NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN MOS 24-OCT-2007 HRSAISC - ENC SB 72-0589 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-7B ENGINE CONVERSION TO CFM56-7620/3. SERVICE BULLETIN MOS 04-MAY-2009 HRSAISC - ENC SB 72-0590 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/3. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0591 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/381. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0591 RI NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7622/381. SERVICE BULLETIN MOS 24-OCT-2007 HRSAISC - ENC SB 72-0593 NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7624/3. SERVICE BULLETIN MOS I3-APR-2007 HRS1MSC - ENC SB 72-0593 RI NO.2 ENGINE - CONVERSION OF ANY AFFECTED CFM56-7/3 MODEL ENGINE TO ALLOWABLE DERIVATIVE MODEL DESIGNATIONS. SERVICE BULLETIN MOS I3-APR-2007 HRS1MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 662 Of 748 @ Camp Systems EFTA00618953 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0593 R2 24-OCT-2007 SB 72-0594 NO. 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7624:3. SERVICE BULLETIN MOS HRSiliSC - ENG NO. 2 ENGINE - CW56-7E: ENGINE CONVERSION TO CW56-7824:381. SERVICE BULLETIN MOS HRSUMSC - ENC SB 72-0594 R1 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CF6156-7624:381. SERVICE BULLETIN MOS 24-OCT-2007 HRSUMSC - ENG SB 72-0595 NO.2 ENGINE - CRIS6-78 ENGINE CONVERSION TO CFm56-7626:3. SERVICE BULLETIN MOS 13-APR-2007 HRS.I.ISC - ENG SB 72-0595 Ri NO 2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFM56-762&3. SERVICE BULLETIN MOS 13-AUG-2C07 HRSUMSC - ENG SB 72-0595 R2 NO 2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFM56-762&3. SERVICE BULLETIN MOS 24-OCT-2007 HRSUMSC - ENC SB 72-0596 NO.2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFSI56-7826:3F. SERVICE BULLETIN MOS 17-APR-2007 HRSUMSC - ENC SB 72-0596 Ri NO.2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFSI56-7826:3F. SERVICE BULLETIN MOS 24-OCT-2007 HRSUMSC - ENG SB 72-0597 NO.2 ENGINE - CW56-7E: ENGINE CONVERSION TO CFP.I56-7826:381. SERVICE BULLETIN MOS HRSUMSC - ENG SB 72-0597 Ri NO.2 ENGINE - CFNIS6-78 ENGINE CONVERSION TO CFM56-7626:381. SERVICE BULLETIN MOS 24-OCT-2007 HRSUMSC - ENG SB 72-0600 NO 2 ENGINE - CFNIS6-76 ENGINE CONVERSION TO CFM56-7827t3. SERVICE BULLETIN MOS 17-APR-2007 HRSUMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 663 Of 748 1' Camp Systems EFTA00618954 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0601 F21 24-OC-1-20)7 SB 72-0602 SB 72-0603 SB 72-0603 Ri SB 72-0604 NO 2 ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7627/381. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t383. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t3F. SERVICE BULLETIN MOS HR&MSC - ENC NO 2 ENGINE - CRIS6-78 ENGINE CONVERSION TO CFNI56-7827t3F. SERVICE BULLETIN MOS HRS.ISC - ENC NO 2 ENGINE - CFm56-78 ENGINE CONVERSION TO CFm56-7827/381F. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0604 R1 NO 2 ENGINE - CFNI56-78 ENGINE CONVERSION TO CFNI56-7827t3Bi F. SERVICE BULLETIN MOS 24-OCT-2007 HRSMSC - ENC SB 72-0605 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 07-NOV-2C06 HR&MSC - ENC SB 72-0606 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 31-MAY-2C07 HRSMSC - ENC SB 72-0607 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 01-SEP-2006 HR&P.ISC - ENC SB 72-0608 NO 2 ENGINE - INSPECTION OF THE LOw PRESSURE TURBINE (LPT) CASE. SERVICE BULLETIN MOS 23-AUG-2C07 HR&MSC - ENC SB 72-0608 Ri NO 2 ENGINE - ENGINE - GENERAL (72-00-03) - INSPECTION OF THE LOW PRESSURE TURBINE (LPT) CASE ON ASSEMBLED LPT MODULE. SERVICE BULLETIN I2-MAY-2CO9 MOS HRSMSC ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time Camp Systems 664 Of 748 EFTA00618955 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0609 NO.2 ENGINE - INTRODUCTION OF N5 HPT SHROUDS WITH HEAT TRANSFER ENHANCEMENT (I-ITE) BUMPS. SERVICE BULLETIN 25-SEP-2006 SB 72-0610 I5-NOV-2006 SB 72-0611 31-OCT-2006 SB 72-0612 I2-OCT-2006 SB 72-0613 25-SEP-2006 SB 72-0611 09-NOV-2006 SB 72-0615 08-FEB-2007 SB 72-0616 MOS HRS11.1SC ENC NO.2 ENGINE - INTRODUCTION OF 8 MIL THICK HPC GUIDE SECTORS. SERVICE BULLETIN MOS MRS/P.1SC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS MRS/P.1SC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS11.1SC - ENC NO.2 ENGINE-SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS11.1SC - ENC NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0617 NO.2 ENGINE - CLEANING OF THE CONTROL ALTERNATOR AND CHANGE OF THE NUTS ATTACHING THE LINE NO. I BEARING OUTER RACE ON THE AGB HOUSING. SERVICE BULLETIN MOS 03-JUL-2007 HRSAISC 10000 (s) ENC 5000 SB 72-0617 R2 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (726100)-f FAKING OF THE CONTROL ALTERNATOR RECOMMENDED AND INSPECTION OF THE KEY-LOCKED STUDS ATTACHING THE LINE NO. 1 BEARING OUTER RACE ON THE AGB HOUSING, SERVICE BULLETIN MOS MRS/P.1SC 10000 (s) ENC 5000 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 665 Of 748 @ Camp Systems EFTA00618956 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0618 25-JAN-2007 SB 72-0618 RI SB 72-0618 R2 09-OCT-2008 SB 72-0619 27-SEP-2007 SB 72-0619 RI NO.2 ENGINE - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW DESIGN OF LPT STAGE 1 NOZZLE SEGMENT. SERVICE BULLETIN MOS FIRS1MSC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW STAGE 3 ROTATING RING. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW STAGE 3 ROTATING RING. SERVICE BULLETIN MOS 02-DEC-2008 HRSAISC - ENC SB 72-0619 R2 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW STAGE 3 ROTATING RING. SERVICE BULLETIN MOS 04-MAY-2009 FIRS1MSC - ENC SB 72-0620 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFMS6-7B ENGINES. SERVICE BULLETIN MOS I9-DEC-2006 HRS/MSC - ENC SB 72-0621 NO.2 ENGINE -FIELD INTRODUCTION OF A NEW PLATE WITH TECH INSERTION KITS INSTALLED AND NI TRIM INFORMATION. SERVICE BULLETIN MOS I6-JUL-2007 HRS1MSC ENC SB 72-0621 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00)- FIELD INTRODUCTION OF A NEW PLATE WITH TECH INSERTION KITS INSTALLED AND NI TRIM INFORMATION. SERVICE BULLETIN MOS Of-DEC-2011 HRS1MSC - ENC SB 72-0622 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 20-SEP-2007 HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 666 Of 748 @ Camp Systems EFTA00618957 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0623 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 20-JUN-2007 MRS/MSC - ENC SB SB 72-0626 28-SEP-2007 72-0626 RI 21-APR-2008 NO.2 ENGINE - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN MOS HRS/hISC - ENC SB 72-0626 R2 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE AND NEW STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN MOS 04-MAY-2009 HRS/MSC - ENC 58 72-0626 R3 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT CASE AND NEW CUSTOMER STAGE 1 SEAL SEGMENTS. SERVICE BULLETIN CONVENIENCE MOS 30-MAR-2012 FIRSAISC - ENC SB 72-0627 NO.2 ENGINE - DELETION IN PRODUCTION OF THE ALTERNATE STAGE 3 ROTATING AIR SEAL RING. SERVICE BULLETIN MOS 28-SEP-2007 FIRSAISC - ENC SB 72-0627 RI NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - DELETION IN PRODUCTION OF THE ALTERNATE STAGE 3 ROTATING AIR SEAL RING. SERVICE BULLETIN 02-DEC-2008 SB 72-0630 07-MAR-2008 SB 72-0631 13-OCT-2008 SB 72-0632 22-JUN-2007 MOS HRS/MSC ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - BOOSTER SPOOL FORWARD FLANGE INSPECTION, SERVICE BULLETIN MOS HRS/MSC ENC 15000 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 667 Of 748 @ Camp Systems EFTA00618958 CAMMictheaP fra the nand •O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0634 22-JUN-2007 SB 72-0634 RI 30-JUL-2007 SB 72-0634 R2 SB 72-0635 I6-FEB-2007 NO.2 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN MOS HIRSAISC - ENC NO.2 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - BOOSTER SPOOL LIFE LIMIT INCREASE AND REIDENTIFICATION IN FIELD. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCTION OF LOW PRESSURE TURBINE AIR COOLING TUBES. SERVICE BULLETIN MOS FIRS1MSC - ENC SB 72-0636 NO.2 ENGINE - INSPECTION FOR ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION. SERVICE BULLETIN MOS HRSOASC ENC 4800 (s) SB 72-0636 R1 NO.2 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR RECOMMENDED ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND NORTH AFRICA SERVICE BULLETIN MOS 09-FEB-2012 HIRSAISC ENC 800(s) SB 72-0636 R2 NO.2 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR SUPERSEDED ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND NORTH AFRICA (SUPERSEDED BY 72-0636 R3). SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0636 R3 NO.2 ENGINE - ENGINE - HP COMPRESSOR AND HP TURBINE BLADES (72-31-01 AND 72-52-01) - INSPECTION FOR RECOMMENDED ENGINE HARDWARE DISTRESS DUE TO CONTINUOUS SAND. DUST AND DIRT INGESTION IN THE MIDDLE EAST AND NORTH AFRICA SERVICE BULLETIN MOS HIRSAISC ENC SB 72-0637 NO.2 ENGINE - INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 668 Of 748 @ Camp Systems EFTA00618959 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0637 PART I SB 72-0637 PART 2 SB 72-0637 RI 16-AUG-2C07 NO 2 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS HRSIASC ENC 9600 (5) NO 2 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE I HPT NOZZLES AND STAGE I LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES MOS HRSIISC ENC 6400 (s) NO 2 ENGINE - INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN MOS HRSIISC ENC SB 72-0637 RI PART I NO 2 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS HRSIASC ENC 9600(s) SB 72-0637 RI PART 2 NO 2 ENGINE - BORESCOPE INSPECTION INSPECTION OF STAGE I HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES MOS HRSIISC ENC 6400 (s) SB 72-0637 R2 NO 2 ENGINE - STAGE I NOZZLES. SERVICE BULLETIN MOS OS-SEP-2007 HRSIASC - ENC SB 72-0637 R2 PART I NO 2 ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN HPT MOS HRSIISC ENC 9600 (5) SB 72-0637 R2 PART 2 NO 2 ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN LPT MOS HRSIISC ENC 6400 (s) SB 72-0637 R3 NO 2 ENGINE - STAGE I NOZZLES. SERVICE BULLETIN MOS 04-APR-2008 HRSIASC - ENC SB 72-0637 R3 PART I NO 2 ENGINE - BORESCOPE INSPECTION STAGE I NOZZLES. SERVICE BULLETIN HPT MOS HRSIASC ENC 4600 (s) ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 669 Of 748 '2 Camp Systems EFTA00618960 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0637 R3 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 NOZZLES. SERVICE BULLETIN LPT MOS HRS(MSC ENC 6400 (s) SB 72-0637 R5 NO.2 ENGINE - ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT RECOMMENDED NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN MOS 24-JUN-2011 MRS/81SC ENC SB 72-0637 R5 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION ENGINE - STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - RECOMMENDED INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN HPT MOS 24-JUN-2011 HRS(MSC -(s) ENC SB 72-0637 R5 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - RECOMMENDED INSPECTION OF STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R6). SERVICE BULLETIN !PT MOS 24-JUN-2011 MRS/81SC -(s) ENC SB 72-0637 R6 NO.2 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED AND STAGE .% LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R7). SERVICE BULLETIN MOS MRS/81SC - ENC SB 72-0637 R6 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 I-PT AND !PT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF RECOMMENDED STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R7). SERVICE BULLETIN HPT MOS HRS(MSC ENC 800(s) SB 72-0637 R6 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 I-PT AND LPT NOZZLES (7241-01 AND 72-53-01)- INSPECTION OF RECOMMENDED STAGE 1 HPT NOZZLES AND STAGE 1 (PT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY 72-0637 R7). SERVICE BULLETIN LPT MOS MRS/81SC ENC 800(s) 58 72-0637 R7 NO.2 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R8). SERVICE BULLETIN MOS MRS(AISC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 670 Of 748 @ Camp Systems EFTA00618961 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0637 R7 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF SUPERSEDED STAGE 1 HPT NOZZLES AND STAGE 1 (PT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R8). SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS HRS/MSC - ENC SB 72-0637 R7 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF SUPERSEDED STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R8). SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES MOS HRS/MSC - ENC SB 72-0637 R8 NO.2 ENGINE - STAGE I HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE I HPT NOZZLES SUPERSEDED AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R9). SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0637 R8 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF SUPERSEDED STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R9). SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS HRS/MSC - ENC SB 72-0637 R8 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF SUPERSEDED STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS (SUPERSEDED BY SB 72-0637 R9). SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES MOS HRS/MSC - ENC SB 72-0637 R9 NO.2 ENGINE - STAGE 1 HPT AND LPT NOZZLES (72-51-01 AND 72-53-01) - INSPECTION OF STAGE 1 HPT NOZZLES CATEGORY 7 AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN MOS 31-MAR-2014 I-ROO/1SC - ENC SB 72-0637 R9 PART 1 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF CATEGORY 7 STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 HPT NOZZLES MOS 31-MAR-2014 HRS/MSC ENC SB 72-0637 R9 PART 2 NO.2 ENGINE - BORESCOPE INSPECTION STAGE 1 HPT AND LPT NOZZLES (7241-01 AND 72-53-01) - INSPECTION OF CATEGORY 7 STAGE 1 HPT NOZZLES AND STAGE 1 LPT NOZZLES DUE TO ENVIRONMENTAL DISTRESS. SERVICE BULLETIN OF THE STAGE 1 LPT NOZZLES 31-MAR-2014 MOS MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 671 Of 748 @ Camp Systems EFTA00618962 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0638 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0639 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN 09-APR-2007 MOS HRS/MSC - ENC SB 72-0640 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 27-JUN-2007 HRS/MSC - ENC SB 72-0640 RI NO.2 ENGINE - INTRODUCTION OF PRE-GROUND HPT BLADE KIT (SPD). SERVICE BULLETIN MOS I8-FEB-2008 HRS/MSC - ENC SB 72-0643 NO.2 ENGINE - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS. SERVICE BULLETIN MOS 28-JUN-2007 HRS/MSC - ENC SB 72-0643 RI NO.2 ENGINE - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0643 R3 NO.2 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING RECOMMENDED PARTS. SERVICE BULLETIN MOS 24-JUN-2011 HRS/MSC ENC SB 72-0645 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 17-APR-2007 HRS/MSC - ENC SB 72-0646 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 17-APR-2007 HRS(MSC - ENC SB 72-0647 NO.2 ENGINE - COMBUSTION CHAMBER OUTER LINER REWORK. SERVICE BULLETIN MOS IS-JUN-2007 HRS/MSC - ENC SB 72-0647 RI NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK. SERVICE BULLETIN 05-JUN-2009 MOS MRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 672 Of 748 @ Camp Systems EFTA00618963 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0647 R2 20-NOV-2009 SB 72-0647 R3 30-MAY-20I4 SB 72-0648 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-751 ENGINES. SERVICE BULLETIN MOS I4-JUN-2007 HRS./MSC - ENC SB 72-0649 NO.2 ENGINE - INTRODUCTION OF NEW FAN BLADE SHIM ASSY. SERVICE BULLETIN MOS 08-FEB-2008 HRSAISC - (s) ENC SB 72-0649 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE SHIM RECOMMENDED ASSY. SERVICE BULLETIN MOS I8-JAN-2011 HRS.O.1SC ESV ENC SB 72-0650 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 25-JUN-2007 HRSAISC - ENC SB 72-0652 NO.2 ENGINE - INTRODUCTION OF NEW MAGNETIC SEAL AND NEW SEALOL SEAL WITH NEW 0-RING MATERIAL AND REWORK OF OLD MAGNETIC SEAL AND OLD SEALOL SEAL TO THE NEW ONE. SERVICE BULLETIN MOS 29-JUL-2008 MRS/MSC 8000 (s) ENC SB 72-0652 R2 NO.2 ENGINE - ACCESSORY GEARBOX ASSEMBLY (72423-00) - INTRODUCTION OF NEW MAGNETIC SEAL AND NEW SEALOL SEAL WITH NEW 0 -RING MATERIAL AND REWORK OF OLD SEALOL SEAL TO THE NEW ONE. SERVICE BULLETIN NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK. SERVICE BULLETIN MOS HRS.O.1SC - ENC NO.2 ENGINE - COMBUSTION CHAMBER (72-42-00) - OUTER COMBUSTION CHAMBER LINER REWORK SERVICE BULLETIN CATEGORY 7 MOS HRS.O.1SC - ENC I2-JAN-2011 SB 72-0653 MOS HRS.O.1SC 8000 8000 ENC NO.2 ENGINE - ENGINE - NO.1 AND NO.2 BEARING SUPPORT ASSEMBLY (72-22-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 02-OCT-2008 HRS.O.1SC - ENC SB 72-0655 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS I I -SEP-2007 HRS.O.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 673 Of 748 @ Camp Systems EFTA00618964 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0656 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMSS-7B IPC. SERVICE BULLETIN MOS 11-SEP-2007 HRS7ASC - ENC SB 72-0657 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN 11-SEP-2007 MOS HRS(MSC - ENC SB 72-0658 NO 2 ENGINE - INTRODUCTION OF NEW ALTERNATE LOOP CLAMP. SERVICE BULLETIN 24-JAN-2008 MOS HRS4.1SC - ENC SB 72-0659 NO 2 ENGINE - DELETION OF THE ALTERNATE TRIM BALANCE BOLTS IN PRODUCTION ONLY. SERVICE BULLETIN 13-DEC-2007 MOS HRS.1SC - ENC SB 72-0661 NO 2 ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM MD OIL FILTER DUE TO N 4 ROLLER BEARING SUSPECTED BATCH. SERVICE BULLETIN MOS 23-AUG-2C07 HRS1ISC 5C0 (s) ENC SB 72-0661 RI NO 2 ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM MD OIL FILTER DUE TO NO a ROLLER BEARING SUSPECTED BATCH.. SERVICE BULLETIN MOS HRS(MSC 500(s) ENC SB 72-0661 R2 NO 2 ENGINE - ONE TIME INSPECTION OF MAGNETIC DEBRIS MONITORING SYSTEM MD OIL FILTER DUE TO NO.4 ROLLER BEARING SUSPECTED BATCH. SERVICE BULLETIN MOS 21-JAN-2008 HRS(MSC 500(s) ENC SB 72-0662 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 29-APR-2008 HRS,MSC - ENC SB 72-0663 NO .2 ENGINE - SPARE PARTS RELEASE FOR CFP(156-78 ENGINES. SERVICE BULLETIN MOS 26-FEB-2008 HRS4.1SC - ENC SB 72-0663 RI NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 12-JAN-2009 HRS7ASC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 674 Of 748 Camp Systems EFTA00618965 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0665 27-SEP-2007 SB 72-0665 R1 10-DEC-2007 SB 72-0666 15-JAN-2008 SB 72-0667 09-OCT-2007 SB 72-0667 R1 11-MAY-2012 NO 2 ENGINE - INTRODUCTION OF NEW METALLIC-COMPOSITE VSV BUSHING. SERVICE BULLETIN MOS HRSimSC - ENC NO 2 ENGINE - INTRODUCTION OF NEW METALLIC-COMPOSITE VSV BUSHING. SERVICE BULLETIN MOS HRSNSC - ENC NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HRSuSC - ENC NO.2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-7B IPC. SERVICE BULLETIN MOS HRSuSC - ENC NO 2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFm56-78 IPC. SERVICE BULLETIN MOS HRS,IISC - ENC SB 72-0668 NO.2 ENGINE - ENGINE - GENERAL (72-00-01) - INTRODUCTION OF A NEW FLAT WASHER AT THE JUNCTION OF RADIAL DRIVE SHAFT SLEEVE AND THE FAN FRAME SHROUD. SERVICE BULLETIN MOS 11-JUN-2008 HRSAISC - ENC SB 72-0669 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 16-JAN-2008 HRSI.ISC - ENC SB 72-0670 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 25-JAN-2008 HRSUMSC - ENC SB 72-0670 R1 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS 09-JAN-2009 HRS,IISC - ENC SB 72-0671 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMS6-78 IPC. SERVICE BULLETIN MOS 04-DEC-2007 HRSIISC - ENC SB 72-0673 NO 2 ENGINE - INTRODUCTION OF A NEW ANTI-ROTATION STRAIGHT HEADED PIN. SERVICE BULLETIN MOS 02-NOV-2007 HRSimSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time Camp Systems 675 Of 748 EFTA00618966 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0673 R1 IS-MAY-2009 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR (72-32-00) - NEW VSV SHROUD HEADED ANTI- ROTATION PIN - INTRODUCTION. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0674 NO.2 ENGINE - ELIMINATION OF HPT STATOR MIDDLE HEAT SHIELD (SUPERSEDED BY 72-0674 RI), SERVICE SUPERSEDED BULLETIN MOS HRSAISC ENC SB 72-0674 RI NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE SHROUD AND STAGE 1 LOW PRESSURE TURBINE NOZZLE ASSEMBLY (72-53-00) - ELIMINATION OF HPT STATOR MIDDLE HEAT SHIELD. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0676 NO.2 ENGINE - INTRODUCTION OF A NEW LOW PRESSURE TURBINE (LPT) REM FRAME AND OF A NEW RANGE ASSEMBLY. SERVICE BULLETIN MOS 30-JUN-2008 HRSAISC ENC SB 72-0676 RI NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (7256-00)- INTRODUCTION OF A NEW LOW PRESSURE TURBINE (LPT) REM FRAME AND OF A NEW FLANGE ASSEMBLY. SERVICE BULLETIN MOS I7-NOV-2008 HRSAISC - ENC SB 72-0676 R2 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF A NEW LOW PRESSURE TURBINE (LPT) REM FRAME AND OF A NEW FLANGE ASSEMBLY. SERVICE BULLETIN MOS I6-JUN-2009 HRSAISC - ENC SB 72-0677 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B IPC AND CMM. SERVICE BULLETIN MOS 31 -JAN-2008 HRSAISC - ENC SB 72-0678 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF A NEW AXIAL STOP PIN. SERVICE BULLETIN C6-JAN-2008 MOS HRSAISC - ENC SB 72-0679 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY. SERVICE BULLETIN 29-AUG-2008 MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 676 Of 748 @ Camp Systems EFTA00618967 CAMP fra tAtinand AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0680 29-JAN-2008 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HIRS(MSC - ENC SB 72-0680 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 09-JUL-2008 HRS(MSC - ENC SB 72-0681 NO.2 ENGINE - CONVERSION OF ANY AFFECTED ENGINE MODELS TO CFM56-7818.CFM.56-7820.CFM.56-7/322.CFM56-7/324.CFM.56-7/326 OR CFM56-7827. SERVICE BULLETIN MOS I4-MAY-2008 HRS/MSC - ENC SB 72-0682 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS I7-JAN-2008 HRS/MSC - ENC SB 72-0683 NO.2 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - REWORK OF HPT NOZZLES TO DOUBLE VERTICAL SEAL SLOT CONFIGURATION. SERVICE BULLETIN MOS 25-FEB-2008 HRS(MSC - ENC SB 72-0683 R1 NO.2 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - REWORK OF HPT NOZZLES TO DOUBLE SUPERSEDED VERTICAL SEAL SLOT CONFIGURATION (SUPERSEDED BY SB 72-0683 R2). SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0683 R2 NO.2 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - SPLIT VANE REPAIR AND REWORK TO CATEGORY 7 DOUBLE VERTICAL SEAL SLOT CONFIGURATION. SERVICE BULLETIN MOS 2I-JAN-2014 HRS(MSC - ENC SB 72-0684 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 19-DEC-2007 HRS/MSC - ENC SB 72-0685 NO.2 ENGINE - DELETION OF SOME ALTERNATE NO.4 ROLLER BEARINGS. SERVICE BULLETIN MOS 0I-APR-2008 HRS(MSC - ENC SB 72-0686 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 05-MAR-2008 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 677 Of 748 @ Camp Systems EFTA00618968 CAMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0687 06-FEB-2008 SB 72-0689 I9-AUG-2008 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF NEW ACCESSORY GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0689 RI NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72423-00) - INTRODUCTION OF NEW ACCESSORY GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN MOS 04-DEC-2009 MRS/51SC - ENC SB 72-0689 R2 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - INTRODUCTION OF NEW ACCESSORY GEARBOX WITH NEW ROLLER BEARING AND REWORK OF OLD ACCESSORY GEARBOX TO THE NEW ONE. SERVICE BULLETIN MOS 22-DEC-2011 HRS/MSC ENC SB 72-0690 NO.2 ENGINE - BOLTS COMMONALITY FOR AIR LPT COOLING TUBE RETAINING STRAPS. SERVICE BULLETIN MOS 20-MAR-2008 HRS/MSC - ENC SB 72-0694 RI NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF THE INNER COMBUSTION RECOMMENDED CHAMBER LINER. SERVICE BULLETIN 21-OCT-2011 SB 72-0696 21-MAR-2008 SB 72-0696 RI 28-MAR-2008 SB 72-0696 R2 02-SEP-2011 MOS FIRS/MSC ENC NO.2 ENGINE - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN MOS HRS/MSC - ENC RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 678 Of 748 @ Camp Systems EFTA00618969 CAMP Ael...imp.= taken...lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0698 23-MAR-2009 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INTRODUCTION OF ALTERNATE LPT REAR FRAMES ON SAC ENGINES IN FIELD. SERVICE BULLETIN MOS HRS(MSC ENC SB 72-0699 NO.2 ENGINE - CONVERSION OF ANY AFFECTED ENGINE MODELS TO FCM.56-78/3 TI ENGINE MODEL. SERVICE BULLETIN 14-MAY-2008 MOS HRSPASC ENC SB 72-0699 R2 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CONVERSION OF CFM56-78 (SAC) TO CFM56-78/3 (TI). SERVICE BULLETIN MOS 03-NOV-2009 HRS(MSC ENC SB 72-0700 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - IMPROVEMENT OF THE FUEL SUPPLY TUBE WITH NEW INSERTS. SERVICE BULLETIN MOS 24-FEB-2009 HRS(MSC ENC SB 72-0701 NO.2 ENGINE - NEW SPARE PARTS THAT ARE INTERCHANGABLE WITH THE OLD PARTS THEY REPLACE. SERVICE BULLETIN MOS 13-MAY-2008 HRS(MSC ENC SB 72-0702 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 06-JUN-2008 HRS(MSC - ENC SB 72-0704 NO.2 ENGINE - INSPECTION OF OIL SCAVENGE FILTER TO DETECT NO. 3 BEARING DETERIORATION. SERVICE BULLETIN MOS 23-JUN-2008 HRS(MSC 1000 (s) ENC SB 72-0704 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) INSPECTION OF OIL SCAVENGE FILTER TO DETECT NO. 3 BEARING DETERIORATION. SERVICE BULLETIN MOS HRSOASC 500(s) ENC SB 72-0706 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7626432. SERVICE BULLETIN 11-JUN-2009 MOS HRS(MSC - ENC RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 679 Of 748 @ Camp Systems EFTA00618970 CAMP Asicitiomfra AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0707 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFP.156-78 ENGINE CONVERSION TO CR156-7826/382. SERVICE BULLETIN I I -JUN-2009 SB 72-0707 RI NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382. SERVICE BULLETIN 22-FEB-2011 SB 72-0708 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382F. SERVICE BULLETIN MOS II-JUN-2009 HRS/MSC - ENC SB 72-0708 RI NO.2 ENGINE - CFM56-78 ENGINE CONVERSION TO CFM56-7626/382F. SERVICE BULLETIN RECOMMENDED MOS 22-FEB-2011 HRSAISC - ENC SB 72-0709 RI NO.2 ENGINE - INTRODUCTION OF NEW BOLT FOR RECOMMENDED COMPLIED WITH HPTACC MANIFOLD ASSEMBLY. SERVICE BULLETIN MOS 28-SEP-2009 29-OCT-2008 HRSAISC - (s) 3378:01 ENC 776 SB 72-0711 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS I6-OCT-2008 HRS/MSC ENC SB 72-0712 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 06-NOV-2008 MRS/P.1SC - ENC SB 72-0713 RI NO.2 ENGINE - FUEL NOZZLE COUPLING NUT INSPECTION. SERVICE BULLETIN NOT APPLICABLE - BY EFFECTIVITY MOS 28-SEP-2009 25-JUL-2008 HRS,MSC - 3378:04 ENC 776 SB 72-0716 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC MOS MRS/P.1SC - ENC RECOMMENDED 20-OCT-2008 SB 72-0718 RI 04-JUN-2013 MOS HRSAISC ENC NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - REWORK OF THE LPT CALF RAIL "0° SUPPORT RING AND REIDENTIFICATION OF THE LPT CASE. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 680 Of 748 @ Camp Systems EFTA00618971 CANIP Asiatic, film Ow imam, up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0720 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF A NEW FAN BLADE SPACER. SERVICE BULLETIN 28-APR-2009 MOS HRS/MSC ENC SB 72-0720 RI NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- INTRODUCTION OF A NEW FAN BLADE SPACER. SERVICE BULLETIN I 1 -JAN-2010 SB 72-0722 I0-DEC-2008 SB 72-0724 I0-AUG-2009 SB 72-0725 29-JAN-2009 MOS HRS/MSC ENC NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF TWO NEW BRACKETS ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0726 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF TWO BRACKETS ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS 26-FEB-2009 HRS/MSC - ENC SB 72-0727 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW SILVER PLATED NUT FOR THE LPT ROTOR SUPPORT I LPT SHAFT ATTACHMENT FLANGE JUNCTION. SERVICE BULLETIN MOS 28-MAY-2009 MRS/P.1SC - ENC SB 72-0728 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS. SERVICE BULLETIN 06-MAR-2009 MOS 12 (s) HRSfMSC ENC SB 72-0728 RI NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS. SERVICE BULLETIN MOS 12 (s) HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 681 Of 748 @ Camp Systems EFTA00618972 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0728 R2 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS. SERVICE BULLETIN MOS 12 (s) 09-FEB-2010 HRS/MSC ENC SB 72-0730 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - REIDENTIFICATION OF THE CONTAINMENT CASE 340-059-813-0 AND 340-059-814-0. SERVICE BULLETIN MOS HRS1MSC ENC SB 72-0731 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - REPLACEMENT OF BALL BEARING 301-480-320-0 IN A SUSPECT LOT. SERVICE BULLETIN MOS 26-FEB-2009 HRSAISC - ENC 13-FEB-2009 SB 72-0732 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC ENGINES. SERVICE BULLETIN MOS 02-JUN-2009 HRS1MSC ENC 19000 (s) SB 72-0732 RI NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - INSPECTION OF TURBINE REAR FRAME ON SAC RECOMMENDED ENGINES. SERVICE BULLETIN MOS HRSAISC ENC 19000 (s) SB 72-0733 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 14-APR-2009 HRS/MSC - ENC SB 72-0734 NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00)- INTRODUCTION OF NEW LPT STAGE 1 NOZZLE SEGMENTS. SERVICE BULLETIN MOS 13-AUG-2009 HRS1MSC ENC SB 72-0734 RI NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF NEW LPT STAGE 1 NOZZLE SEGMENTS. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0735 NO.2 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY - (72-53-00) - MODIFICATION OF HPT STATOR SHROUD- ENHANCED DURABILITY PUCK REPAIR. SERVICE BULLETIN 26-JUN-2009 MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 682 Of 748 @ Camp Systems EFTA00618973 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0735 RI 04-DEC-2009 NO.2 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY - (72-53-00) - MODIFICATION OF HPT STATOR SHROUD - ENHANCED DURABILITY PUCK REPAIR. SERVICE BULLETIN MOS HRSOASC - ENC SB 72-0737 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - INTRODUCTION OF IMPROVED HPC AND HPT ROTATING PARTS TO CFM56-7827A ENGINES. SERVICE BULLETIN MOS HRS/MSC ENC 15-MAY-2009 SB 72-0738 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC, SERVICE BULLETIN 28-JAN-2009 MOS HRS/MSC ENC SB 72-0738 RI NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 30-JUN-2011 HRS/MSC ENC SB 72-0739 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - PRECAUTIONS TO BE FOLLOWED CONCERNING INSULATION BLANKETS CONTAINING RCF. SERVICE BULLETIN MOS 08-FEB-20I3 HRS/MSC - ENC SB 72-0740 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN INFORMATIONAL MOS 17-FEB-2009 HRSOASC - ENC SB 72-0742 NO.2 ENGINE - ENGINE - CORE ENGINE MAJOR MODULE ASSEMBLY (72-00-02) - HPC FRONT CASE BLEED PORT REMOVAL AND SIMPLIFICATION. SERVICE BULLETIN MOS 30-JUN-2009 HRS/MSC - ENC SB 72-0743 NO.2 ENGINE - ENGINE - LPT ROTOR I STATOR ASSEMBLY (72-54-00) - REPLACEMENT OF SUSPECT STAGE 3 LPT DISK 336-002-006-0. SERVICE BULLETIN 26-OCT-2009 SB 72-0743 RI 09-NOV-20I0 MOS HRS/MSC ENC 9500 (s) NO.2 ENGINE - ENGINE - LPT ROTOR/ STATOR ASSEMBLY (72-54-00) - REPLACEMENT OF SUSPECT STAGE 3 LPT RECOMMENDED DISK 336-002-006-0, SERVICE BULLETIN MOS HRS/MSC ENC 9500 (s) 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 683 Of 748 @ Camp Systems EFTA00618974 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0744 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF THREE BRACKETS ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS 12-MAY-2009 HRS/MSC - ENC SB 72-0745 NO.2 ENGINE - ENGINE - GENERAL (72-00-00)- INTRODUCTION OF AN ALTERNATE PROVISIONING SOURCE FOR THE NO. 1.2 AND 5 BEARINGS. SERVICE BULLETIN 26-AUG-2009 MOS HRS.0.1SC ENC SB 72-0747 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE SERIALIZATION-MANUFACTURING SEQUENCE. SERVICE BULLETIN 04-JUN-2009 MOS HRSfMSC ENC SB 72-0747 R1 NO.2 ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE SERIALIZATION-MANUFACTURING SEQUENCE. SERVICE CATEGORY 9 BULLETIN MOS 03-MAR-2014 HRS/MSC ENC S8 72-0748 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 30-JUN-2009 HRSfMSC - ENC SB 72-0749 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW RETAINING PLATE. SERVICE BULLETIN MOS 01-FEB-2011 HRS/MSC - ENC SB 72-0750 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 08-OCT-2009 HRS/P.1SC - ENC S8 72-0751 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 08-OCT-2009 HRS/MSC - ENC SB 72-0752 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 02-JUL-2009 HRS/MSC - ENC SB 72-0753 NO.2 ENGINE - ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00)- REWORK IN FIELD OF THE FAN BLADE REAR SHANK FOR WEAR. SERVICE BULLETIN 14-OCT-2009 MOS HRSfMSC - ENC 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 684 Of 748 @ Camp Systems EFTA00618975 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0753 R1 03-DEC-2012 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - REWORK IN FIELD OF THE FAN BLADE REAR SHANK FOR WEAR. SERVICE BULLETIN MOS HRS‘MSC ENC SB 72-0750 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF ONE BRACKET ON THE FLANGE Al RECOMMENDED AND THREE BRACKETS ASSY ON THE FLANGE 86 WITH A NEW DESIGN. SERVICE BULLETIN MOS I0-NOV-2010 HRS1MSC - ENC SB 72-0756 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY WITH A NEW DESIGN. SERVICE BULLETIN MOS HRSfMSC ENC SB 72-0757 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 28-AUG-2009 HRSfMSC - ENC SB 72-0758 NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR BLADES. SERVICE BULLETIN 22-SEP-2009 MOS HRSfMSC ENC SB 72-0759 NO.2 ENGINE - ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION OPTIONAL HARNESSES. SERVICE BULLETIN 27-OCT-2010 MOS HRS/MSC ENC SB 72-0759 R1 NO.2 ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION HARNESSES SUPERSEDED (SUPERSEDED BY SB 72-0759 R2). SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0759 R2 NO.2 ENGINE - FIRE DETECTION (26-11-02) - INTRODUCTION OF NEW SEMI-RIGID FIRE DETECTION HARNESSES. CUSTOMER SERVICE BULLETIN CONVENIENCE MOS 22-OCT-2013 HRS1MSC ENC SB 72-0760 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) -SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS 03-SEP-2009 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 685 Of 748 @ Camp Systems EFTA00618976 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0761 NO.2 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - INTRODUCTION OF NEW COMBUSTION CASE. SERVICE BULLETIN 08-OCT-2009 MOS HR&MSC - ENC SB 72-0762 NO 2 ENGINE - ENGINE - TRANSFER GEARBOX ASSEMBLY (72-62-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN 29-SEP-2009 SB 72-0763 SB 72-0764 121 SB 72-0764 R2 25-JUL -2012 MOS HR&MSC ENC NO 2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HR&MSC ENC NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - REPLACEMENT OF PREFORMED PACKING O-RINGS IN THE LPT ROTOR r STATOR ASSEMBLY. SERVICE BULLETIN MOS HRSMSC - ENC NO.2 ENGINE - GENERAL (72-00-00) - REPLACEMENT OF PREFORMED PACKING O-RINGS IN THE LPT ROTOR 1 OPTIONAL STATOR ASSEMBLY. SERVICE BULLETIN MOS HRSI.ISC ENC SB 72-0767 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 28-OCT-2009 HRSMSC - ENC SB 72-0768 NO 2 ENGINE - NOT ISSUED. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0769 NO 2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-12-00) - INTRODUCTION OF INNER AND OUTER SEGMENT LINER SPARE PARTS. SERVICE BULLETIN MOS CE-FEB-2010 HRSMSC - ENC SB 72-0772 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP01.56-78 ENGINES. SERVICE BULLETIN MOS 04-DEC-2009 HRSMSC - ENC SB 72-0773 NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-78 ENGINES. SERVICE BULLETIN MOS 25-NOV-2009 HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 686 Of 748 1' Camp Systems EFTA00618977 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0774 20-JAN-2010 SB 72-0775 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS MRS/MSC - ENC NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0776 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0777 NO.2 ENGINE - ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00)- FAN DISK MIDDLE LUG REWORK IN FIELD. SERVICE BULLETIN MOS HRSAISC ENC SB 72-0778 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0779 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW MW0311 ELECTRICAL HARNESS AND IN FIELD REWORK OF THE OLD MW0311 ELECTRICAL HARNESS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0780 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-23-00)- REWORK IN FIELD OF FAN CONTAINMENT CASE B1 FLANGE AT HOLES NO. 84 AND 85. SERVICE BULLETIN MOS I8-JAN-2011 HRS/MSC - ENC SB 72-0780 RI NO.2 ENGINE - FAN AND BOOSTER ASSEMBLY (72-23-00) - REWORK IN FIELD OF FAN CONTAINMENT CASE BI FLANGE AT HOLES NO. 84 AND 85. SERVICE BULLETIN MOS II-MAY-2012 HRS/MSC - ENC SB 72-0781 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF NEW LPT COOLING MANIFOLDS. SERVICE BULLETIN CUSTOMER CONVENIENCE MOS 26-JUN-2073 HRSAISC - ENC SB 72-0783 NO.2 ENGINE - ENGINE - HPT ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR BLADES. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 687 Of 748 @ Camp Systems EFTA00618978 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0784 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PART RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0785 NO.2 ENGINE - ENGINE - ENGINE (72-00-00) - DAC FUEL NOZZLE INDUCED STAGES 1. 2. AND 3 LPT NOZZLE DISTRESS. SERVICE BULLETIN MOS MRS/51SC - ENC SB 72-0786 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW OUTER LINER FOR HARSH ENVIRONMENT OPERATORS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0787 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0789 NO.2 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - ENGINE OPERATION IN THE ENHANCED PROCEDURES ZONE FROM VOLCANO EYJAFJALLAJOKULL. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0789 R1 NO.2 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - ENGINE OPERATION IN THE ENHANCED PROCEDURES ZONE RECOMMENDED FROM VOLCANO EYJAFJALLAJOKULL. SERVICE BULLETIN MOS 21 -JUL-2011 MRS/51SC - ENC SB 72-0789 R2 NO.2 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - INTRODUCTION OF A LEADING INDICATOR PROGRAM FOR RECOMMENDED ENGINE OPERATION IN LOW CONCENTRATIONS OF VOLCANIC ASH, SERVICE BULLETIN MOS I4-DEC-2011 MRS/51SC - ENC SB 72-0790 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0791 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) -SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0792 NO.2 ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (7261-00)- NEW BALL THRUST NO.3 BEARING OPTIONAL WITH NITRIDE HARDENING . SERVICE BULLETIN 30-JUL-2010 MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 688 Of 748 @ Camp Systems EFTA00618979 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 72-0794 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (72-56-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN MOS 15-OCT-2010 HRSAISC ENC SB 72-0795 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY OPTIONAL FOR HARSH ENVIRONMENT OPERATORS . SERVICE BULLETIN 03-NOV-2010 SB 72-0795 R2 16-APR-2012 MOS HRS1MSC ENC NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY RECOMMENDED FOR HARSH ENVIRONMENT OPERATORS. SERVICE BULLETIN MOS HRSfMSC - ENC SB 72-0795 R3 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - NEW COMBUSTION CHAMBER ASSEMBLY FOR HARSH RECOMMENDED ENVIRONMENT OPERATORS. SERVICE BULLETIN MOS 18-JUN-2012 HRSAISC - ENC SB 72-0796 NO.2 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - FAN BLADE INTERCHANGEABILITY LIMITATIONS ( SUPERSEDED SUPERSEDED BY SB 72-0796 R1). SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0796 R1 NO.2 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - FAN BLADE INTERCHANGEABILITY LIMITATIONS. SERVICE CATEGORY 4 BULLETIN 18-FEB-2013 MOS HRS1MSC ENC SB 72-0797 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- FAN BLADE MOMENT-WEIGHT MISMARKING. SERVICE BULLETIN 27-JAN-2011 MOS HRS1MSC ENC SB 72-0798 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00)- REWORK OF HPC STAGE I THROUGH STAGE RECOMMENDED 9 BLADES. SERVICE BULLETIN 24-JAN-2011 MOS HRS1MSC ENC SB 72-0799 NO.2 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - REWORK OF HPC TECH INSERTION HPC BLADES. RECOMMENDED SERVICE BULLETIN 20-JAN-2011 MOS HRSfMSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 689 Of 748 @ Camp Systems EFTA00618980 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0801 NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - INTRODUCTION OF A NEW FRONT FLANGE WITH 6 VENTILATION HOLES AND REWORK OF THE OLD PART. SERVICE BULLETIN MOS 30-JUN-2011 HRS/MSC - ENC SB 72-0802 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0803 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN 12-OCT-2010 MOS HRS/MSC - ENC 513 72-0801 NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED BULLETIN 09-NOV-2010 SS 72-0804 RI MOS HRSAISC - ENC NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED BULLETIN MOS 24-MAR-2011 HRS/MSC - ENC SS 72-0805 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 02-NOV-2010 MRS/MSC - ENC 513 72-0806 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF NEW SUPPORT WITH CAPTNE NUT. SERVICE BULLETIN 18-JUL-2011 MOS HRS/MSC - ENC SS 72-0807 NO.2 ENGINE - ENGINE - LPT FRAME ASSEMBLY (7256-00)- INSPECTION OF TURBINE REAR FRAME ON CFM56-7827A OPTIONAL ENGINES. SERVICE BULLETIN MOS 19-JAN-2012 HRS/MSC ENC 11200 (s) SS 72-0808 NO.2 ENGINE - ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00)- INSPECTION OF STAGE 1 CUSTOMER LPT NOZZLES DUE TO INDIA ENVIRONMENTAL DISTRESS. SERVICE BULLETIN CONVENIENCE 27-SEP-2013 MOS HRS/MSC - ENC SB 72-0809 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF CFM56-7BE LPT HARDWARE ON CFM56-76. SERVICE BULLETIN MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 690 Of 748 @ Camp Systems EFTA00618981 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0810 09-JUN-2011 SB 72-0811 20-JAN-2011 NO 2 ENGINE - SPARE PARTS RELEASE FOR CFMGS-7B IPC. SERVICE BULLETIN MOS HRSiliSC - ENG NO 2 ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ACTUATION COMPRESSOR STATOR INLET RECOMMENDED GUIDE VANE RING ASSEMBLY DURABILITY IMPROVEMENT. SERVICE BULLETIN MOS HRSitiSC - ENG SB 72-0811 R1 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ACTUATION COMPRESSOR STATOR RECOMMENDED INLET GUIDE VANE RING ASSEMBLY DURABILITY IMPROVEMENT. SERVICE BULLETIN MOS 29-NOV-2011 HRS,IISC - ENG SB 72-0812 NO.2 ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (72-61-00)- NEW BALL THRUST NO 3 BEARING RECOMMENDED WITH NITRIDE HARDENING. SERVICE BULLETIN MOS 26-SEP-2011 HRS.I.1SC - ENG SB 72-0812 R1 NO 2 ENGINE - ENGINE - INLET NO.3 BEARING ASSEMBLY GEARBOX (72-61-00)- NEW BALL THRUST NO 3 BEARING RECOMMENDED WITH NITRIDE HARDENING. SERVICE BULLETIN MOS 06-FEB-2012 HRS.I.1SC - ENG SB 72-0813 NO.2 ENGINE - ENGINE - NIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - INTRODUCTION OF HPT BLADE INFORMATIONAL PIN 2403M91P02. SERVICE BULLETIN MOS 30-JAN-2012 HR&P.ISC - ENG SB 72-0814 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-7B ENGINES. SERVICE BULLETIN MOS 11-APR-2011 HR&P.ISC - ENG SB 72-0815 20-DEC-2011 SB 72-0816 NO 2 ENGINE - HPTILPT NOZZLE SHROUD ASSEMBLY (72-53-00) - NEW SHROUD HPT STATOR HANGER WITH RECOMMENDED MODIFIED AIR FILTER. SERVICE BULLETIN MOS 19-JAN-2011 HRS.I.1SC - ENG SB 72-0817 NO 2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-12-00) - REWORK OF COMBUSTION CHAMBER RECOMMENDED OUTER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS 03-OCT-2011 HRS/LISC - ENG NO 2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFP0156-76 ENGINES. SERVICE BULLETIN MOS HRS.,LISC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 691 Of 748 Camp Systems EFTA00618982 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0817 R1 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF COMBUSTION CHAMBER OUTER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0818 RI NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF NEW HPT ROTOR. RECOMMENDED SERVICE BULLETIN 24-MAR-2011 SB 72-0819 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN 03-N0V-2011 SB 72-0820 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - REPLACEMENT OF NO. 4 MIRING STEEL VERSION. SERVICE BULLETIN CUSTOMER CONVENIENCE MOS 31 -JUL-2012 HRS/MSC ENC SB 72-0821 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN MOS 04-JUL-2011 HRSOASC ENC SB 72-0821 RI NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. SERVICE BULLETIN 610S 26-MAR-2013 HRSOASC ENC SB 72-0822 NO.2 ENGINE - ENGINE - GENERAL (72-00-00)- INTRODUCTION OF NEW BOLT TO ATTACH THE MW0325 HARNESS. SERVICE BULLETIN MOS HRS/MSC ENC MOS HRS/MSC - ENC I8-AUG-2011 MOS HRS/MSC ENC SB 72-0822 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF NEW BOLTS TO ATTACH THE MW0325 HARNESS. SERVICE BULLETIN 26-APR-20I2 MOS HRSIMSC ENC RECOMMENDED RECOMMENDED SB 72-0823 NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE P/N 2080M35G05 SUPERSEDED (SUPERSEDED BY 72-0823 R1). SERVICE BULLETIN MOS 11-APR-2011 HRSIMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 692 Of 748 @ Camp Systems EFTA00618983 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0823 R1 NO.2 ENGINE - ENGINE - I-IPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE P/N 2080M35G05. INFORMATIONAL SERVICE BULLETIN I 1 -MAY-20I1 MOS HRS/MSC ENC SB 72-0823 R2 NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT STATOR NOZZLE PM 2080M35G05. INFORMATIONAL SERVICE BULLETIN MOS 23-JUN-20I1 HRS/MSC ENC SB 72-0824 NO.2 ENGINE - CORE ENGINE MAJOR MODULE (72-00-02)- MANIFOLD HPT CLEARANCE CONTROL BRACKET OPTIONAL CHANGE. SERVICE BULLETIN 2I -NOV-20I 1 MOS HRS/MSC ENC SB 72-0825 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF RECOMMENDED PRE-CFM56-78 SIB 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE BULLETIN MOS I-IRS/NISC ENC 25000 (s) SB 72-0825 R1 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF RECOMMENDED PRE-CFM56-7B SiB 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE BULLETIN MOS 29-NOV-2011 HRS/MSC ENC 15000 (s) SB 72-0825 R2 NO.2 ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (7232-00)- ON WING INSPECTION OF PRE-CFM56-7B SB SUPERSEDED 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES (SUPERSEDED BY SB 72-0825 R3). SERVICE BULLETIN MOS HIRSAISC - (s) ENC SB 72-0825 R3 NO.2 ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON WING INSPECTION OF PRE-CFM56-7B SB CATEGORY 2 72-0811 ACTUATION COMPRESSOR STATOR INLET GUIDE VANE RING ASSEMBLIES. SERVICE BULLETIN MOS 30-APR-2014 HIRSAISC - ENC SB 72-0826 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) -SPARE PARTS RELEASE FOR CFM56-76 IPC. SERVICE BULLETIN MOS HRSMSC - ENC SB 72-0827 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REWORK OF THE BOOSTER SPOOL. SERVICE CUSTOMER BULLETIN CONVENIENCE MOS 27-MAY-20I3 HRSO4SC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 693 Of 748 @ Camp Systems EFTA00618984 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0829 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - RELEASE OF CFM56-78E HPT ROTOR HARDWARE TO EARLIER CFM56-78 ENGINE MODELS. SERVICE BULLETIN MOS HRSO.ISC - ENC SB 72-0830 NO.2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - RELEASE OF CFM56-7BE COMBUSTION CASE TO RECOMMENDED EARLIER CFM56-7B ENGINE MODELS. SERVICE BULLETIN MOS 10-JAN-2012 HRSO.ISC - ENC SB 72-0831 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN MOS 02-DEC-2011 HRS(MSC - ENC SB 72-0832 NO.2 ENGINE - ENGINE -FAN FRAME ASSEMBLY (72-23-00) -SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN 30-JAN-2012 05-JUL-2011 MOS HRS(MSC - ENC SB 72-0833 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B TURBOFAN ENGINES. SERVICE BULLETIN 31-AUG-2011 MOS HRSOASC - ENC SB 72-0833 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 TURBOFAN ENGINES. SERVICE BULLETIN MOS 28-N0V-2011 HRSOASC - ENC SB 72-0834 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE PART CUSTOMER NUMBERS AND CONVENIENCE REIDENTIFICATION OF OLD FAN BLADES IN FIELD. SERVICE BULLETIN MOS 08-JUN-2011 HIRSAISC - ENC SB 72-0834 RI NO.2 ENGINE -FAN AND BOOSTER ASSEMBLY (72-21-00) - INTRODUCTION OF NEW FAN BLADE PART NUMBERS AND CUSTOMER REIDENT1FICATION OF OLD FAN BLADES IN FIELD. SERVICE BULLETIN CONVENIENCE MOS 20-JUL-2012 HRSOASC - ENC SB 72-0835 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION RECOMMENDED COMBUSTION CHAMBER INNER LINER WITH THIN TBC. SERVICE BULLETIN MOS 01-DEC-2011 HRS/1,1SC - ENC RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 694 Of 748 @ Camp Systems EFTA00618985 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0836 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF COMBUSTION CHAMBER RECOMMENDED INNER LINER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS 23-SEP-2011 HRSAISC - ENC SB 72-0837 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B20E, SERVICE BULLETIN OPTIONAL MOS I6-JUN-2011 HRSOASC - ENC SB 72-0838 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7622E. SERVICE BULLETIN OPTIONAL MOS 76-JUN-2011 HRS/MSC - ENC SB 72-0839 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B228B1. SERVICE OPTIONAL BULLETIN MOS I6-JUN-2011 HRS/MSC - ENC SB 72-0840 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B24E, SERVICE BULLETIN OPTIONAL MOS I5-JUN-2011 HRS/MSC - ENC SB 72-0841 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B24E/B1. SERVICE OPTIONAL BULLETIN 15-JUN-20 1 MOS HRS/MSC - ENC SB 72-0842 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7626E. SERVICE BULLETIN RECOMMENDED MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0843 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-78 ENGINE CONVERSION TO CFM56-7B26E/B1. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0844 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B268B2. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0845 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFM56-78 ENGINE CONVERSION TO CFM56-7B26E/F. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRSOASC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 695 Of 748 @ Camp Systems EFTA00618986 COMP Astant.frn• thernand up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0846 R1 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFP.156-7B ENGINE CONVERSION TO CFP.156-7826E62F. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0848 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFMS6-7B ENGINE CONVERSION TO CFM56-7B27E431, SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0850 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - CFMS6-7B ENGINE CONVERSION TO CFM56-7B27E/F. SERVICE RECOMMENDED BULLETIN MOS 25-JUL-2011 HRS/MSC - ENC SB 72-0852 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF A NEW LPT ROTOR CUSTOMER SUPPORT. SERVICE BULLETIN CONVENIENCE MOS 16-OCT-2012 HRS/MSC ENC SB 72-0853 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE MATE FACE RECOMMENDED SURFACE INSPECTION. SERVICE BULLETIN MOS 12-SEP-2011 HRS/MSC ENC SB 72-0854 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY ON THE FILTER SUPPORT. SERVICE BULLETIN 15-N0V-2011 MOS HRS/MSC - ENC SB 72-0856 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW BRACKET ASSY. SERVICE BULLETIN MOS 28-FEB-2012 HRS/MSC ENC SB 72-0857 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) -SPARE PARTS RELEASE FOR CFM56-7B IPC. SERVICE BULLETIN MOS 21-DEC-2011 HRSfMSC - ENC SB 72-0858 NO.2 ENGINE - ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INSPECTION OF SUSPECT FAN CONTAINMENT CASE FOR MISSING OR MISLOCATED ANODIZATION. SERVICE BULLETIN MOS 12-SEP-2011 HRS/L1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 696 Of 748 @ Camp Systems EFTA00618987 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0859 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00)-INTRODUCTION OF COMBUSTION CHAMBER RECOMMENDED DOME WITH RETAINERLESS SWIRL NOZZLES. SERVICE BULLETIN 21 -SEP-2011 MOS HRS/MSC - ENC SB 72-0859 RI NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF COMBUSTION CHAMBER RECOMMENDED DOME WITH RETAINERLESS SWIRL NOZZLES. SERVICE BULLETIN MOS 28-JAN-2013 HRS/MSC - ENC SB 72-0861 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION OUTER RECOMMENDED COMBUSTION CHAMBER UNER WITH MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS 09-JAN-2012 HRS/PASC - ENC SB SB 72-0862 I2-JAN-2012 72-0863 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF PRE-TECH INSERTION OUTER COMBUSTION CHAMBER UNER WITHOUT MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD EROSION COATING (SUPERSEDED BY 72-0863 RI). SERVICE BULLETIN MOS RECOMMENDED SUPERSEDED HRS/MSC - ENC SB 72-0863 RI NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD SUPERSEDED EROSION COATING (SUPERSEDED BY 72-0863 R2). SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0863 R2 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF HPC TI KITS WITH PVD RECOMMENDED EROSION COATING. SERVICE BULLETIN MOS 22-MAY-2012 HRS/MSC ENC SB 72-0864 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - INTRODUCTION OF NEW STAGE 2 RECOMMENDED AND STAGE 3 SHROUDS AND STAGE 4 THROUGH 8 VANE ASSEMBLIES AND SECTORS. SERVICE BULLETIN MOS 25-AUG-2011 HRS/MSC - ENC SB 72-0865 NO.2 ENGINE - ENGINE - LPT ROTORISTATOR ASSEMLY (72-54-00) - SPARE PARTS RELEASE FOR CFM56-78 IPC. SERVICE BULLETIN 08-DEC-2011 MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 697 Of 748 @ Camp Systems EFTA00618988 COMP Atant.fre• therrnit4 up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0866 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW BRACKET ASSY FOR ATTACHMENT OF J5 HARNESS. CUSTOMER SERVICE BULLETIN CONVENIENCE 14-FEB-2012 MOS HRS1MSC ENC SB 72-0867 NO.2 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-53-00) - RELEASE OF NEW HPT STATOR SHROUD. RECOMMENDED SERVICE BULLETIN 20-APR-2072 SB 72-0868 07-FEB-2012 MOS HRS1MSC ENC NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF TECH INSERTION OUTER RECOMMENDED COMBUSTION CHAMBER LINER WITHOUT MULTI-HOLE COOLING PATCH. SERVICE BULLETIN MOS HRS1MSC - ENC SB 72-0869 NO.2 ENGINE - ENGINE - ENGINE ASSEMBLY (72-00-00) - RELEASE OF SPD AIR DUCT SLEEVE PIN 1812M68G02. SERVICE BULLETIN MOS 02-NOV-2011 MRS/P.1SC - ENC SB 72-0871 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - HPC STAGE 4 THROUGH STAGE 9 BLADE RECOMMENDED LOCK ON-WING INSPECTION. SERVICE BULLETIN MOS 6 (s) 19-OCT-2011 HRSAISC ENC SB 72-0871 R1 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - HPC STAGE 4 THROUGH STAGE 9 BLADE RECOMMENDED LOCK ON-WING INSPECTION. SERVICE BULLETIN MOS 11-APR-2012 HRSOISC DUE (s) ENC SB 72-0872 NO.2 ENGINE - ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 3 BLADES. CUSTOMER SERVICE BULLETIN CONVENIENCE MOS 12-DEC-2012 HRSAISC ENC SB 72-0873 NO.2 ENGINE - LPT SHAFT ASSEMBLY (72-55-00) - INTRODUCTION OF A NEW SEAL ON THE CENTER VENT TUBE. SERVICE BULLETIN 27-FEB-20I2 MOS HRS(MSC ENC SB 72-0874 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS. RECOMMENDED SERVICE BULLETIN 20-OCT-2011 MOS HRS1MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 698 Of 748 @ Camp Systems EFTA00618989 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0874 R1 08-FEB-2012 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS RECOMMENDED (SUPERSEDED BY S8 72-0874 R2). SERVICE BULLETIN MOS HRSAISC - ENC SB 72-0870 R2 NO.2 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - SUSPECT HPC STAGE 8 AND 9 BLADE LOCKS, SERVICE CATEGORY 4 BULLETIN 14-JUL-2014 MOS HRS11.1SC ENC SB 72-0875 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 23-APR-2072 HRS/MSC - ENC SB 72-0876 NO.2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-03-02) - INSPECTION OF FUEL NOZZLE SUPPLY TUBE NO. 7 RECOMMENDED FOR WEAR OR CLOSE CLEARANCE, SERVICE BULLETIN MOS 12 (s) 27-DEC-2011 HRS11.1SC ENC SB 72-0877 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN MOS 18-007-2012 HRS/MSC - ENC SB 72-0878 NO.2 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - FUEL MANIFOLD SUPPORT BRACKETS AND IGNITER CABLE OPTIONAL BRACKET ASSEMBLY REDESIGN. SERVICE BULLETIN MOS 21-NOV-2011 HRS/MSC - ENC SB 72-0879 RI NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW HOUSING ASSEMBLY AND NEW STARTER DRIVE PAD ASSEMBLY AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN 12-APR-2012 SB 72-0879 R3 MOS MRS/P.1SC ENC NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW ACCESSORY GEARBOX ASSEMBLY (AGB) WITH NEW CATEGORY 6 HOUSING ASSEMBLY AND NEW STARTER DRIVE PAD ASSEMBLY AND REWORK OF THE OLD AGB TO THE NEW ONE. SERVICE BULLETIN MOS 15-JAN-2014 HRSAISC ENC SB 72-0880 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - REWORK OF TECH INSERTION INNER RECOMMENDED COMBUSTION CHAMBER LINER INTO MULTI-HOLE COOLING PATCH WITH THIN TBC CONFIGURATION. SERVICE BULLETIN 22-FEB-2012 MOS MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 699 Of 748 @ Camp Systems EFTA00618990 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0881 NO.2 ENGINE - ENGINE - CORE ASSEMBLY (72-00-02) - HPT STATOR AIR IMPINGEMENT MANIFOLD REWORK. SERVICE RECOMMENDED BULLETIN II-APR-2012 SB 72-0882 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS HRS(MSC - ENC SB 72-0884 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- REPETITIVE ON-WING INSPECTION OF THE FAN RECOMMENDED BLADE PLATFORMS. SERVICE BULLETIN MOS 12 (s) 24-JAN-2012 HRS/MSC ENC SB 72-0885 NO.2 ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 2 BLADES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0886 NO.2 ENGINE - ENGINE - HPT BLADES (7242-01) - INSPECTION OF HPT BLADES - INDIA REGION. SERVICE BULLETIN RECOMMENDED MOS 27-FEB-20I2 HRS/MSC ENC 400(s) SB 72-0886 R1 NO.2 ENGINE - ENGINE - HPT BLADES (7242-01) - INSPECTION OF HPT BLADES - INDIA REGION. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0888 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER WITH A RECOMMENDED MORE DURABLE AFT OUTER SUPPORT AND THICK TBC. SERVICE BULLETIN MOS 30-AUG-2012 HRS(MSC - ENC SB 72-0888 R1 NO.2 ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF NEW OUTER LINERS WITH A CUSTOMER MORE DURABLE AFT OUTER SUPPORT AND THICK TBC. SERVICE BULLETIN CONVENIENCE MOS 03-JAN-2013 HRS/MSC - ENC SB 72-0889 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER RECOMMENDED WITH A MORE DURABLE AFT OUTER SUPPORT AND THIN TBC. SERVICE BULLETIN MOS 23-AUG-2012 HRS/MSC - ENC SB 72-0889 R1 NO.2 ENGINE - ENGINE - COMBUSTION CHAMBER ASSEMBLY (72-42-00) - INTRODUCTION OF A NEW OUTER LINER CUSTOMER WITH A MORE DURABLE AFT OUTER SUPPORT AND THIN TBC. SERVICE BULLETIN CONVENIENCE MOS I7-OCT-2012 HRS/MSC - ENC 26-SEP-2012 MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 700 Of 748 @ Camp Systems EFTA00618991 CAMP Aviation/nem the ernit4 up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0890 23-AUG-20I2 SB 72-0892 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 13-FEB-20 I 2 HRSOASC - ENC SB 72-0893 NO.2 ENGINE - INTRODUCTION OF A NEW BOLT-WASHER ASSEMBLY TO IMPROVE THE FLANGE ASSEMBLY ATTACHMENT. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0894 NO.2 ENGINE - ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF A NEW COMPRESSOR RECOMMENDED ROTOR STAGES 4 THROUGH 9 SPOOL ASSEMBLY. SERVICE BULLETIN MOS Id-MAR-2012 HRS/MSC - ENC SB 72-0894 R1 NO.2 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION Of A NEW COMPRESSOR ROTOR RECOMMENDED STAGES 4 THROUGH 9 SPOOL ASSEMBLY. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0895 NO.2 ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF 76 BLADE HPT RECOMMENDED ROTOR KIT. SERVICE BULLETIN NO.2 ENGINE - COMBUSTION ASSEMBLY (72-41-00) - INTRODUCTION OF A NEW COMBUSTION CHAMBER ASSEMBLY. RECOMMENDED SERVICE BULLETIN MOS HRS/MSC ENC 10-MAY-2012 MOS HRS/MSC ENC 58 72-0895 R1 NO.2 ENGINE - ENGINE -HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - RELEASE OF 76 BLADE HPT ROTOR KIT. SERVICE BULLETIN MOS HRS/MSC ENC 58 72-0897 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT ASSEMBLY (72-55-00) - REPETITIVE REPAIR OF THE AIR/OIL SEPARATOR IN SHOP. SERVICE BULLETIN MOS 20-MAR-2012 HRS(MSC - ENC 58 72-0897 R1 NO.2 ENGINE - ENGINE - LOW PRESSURE TURBINE SHAFT ASSEMBLY (72-55-00) - REPETITIVE REPAIR OF THE AIR/OIL SEPARATOR IN SHOP. SERVICE BULLETIN MOS 28-MAR-2013 HRS(MSC - ENC SB 72-0898 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS 12-MAR-2012 HRS(MSC - ENC 74nsufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 701 Of 748 @ Camp Systems EFTA00618992 CAMP fin. thermiewlqi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0899 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE SPLIT VANE RECOMMENDED REPAIR. SERVICE BULLETIN 17-OCT-2012 SB 72-0900 MOS HRS/MSC - ENC NO.2 ENGINE - LPT ROTOR/STATOR ASSEMBLY (72-54-00) - INTRODUCTION OF NEW LPT STAGE 1 BLADES. SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0902 NO.2 ENGINE - ENGINE - COMBUSTION ASSEMBLY (72-41-00) - DELETION OF ALTERNATE COMBUSTION CHAMBER RECOMMENDED ASSEMBLY. SERVICE BULLETIN MOS 20-APR-2012 HRS/MSC ENC SB 72-0903 NO.2 ENGINE - ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-5340) - REWORK OF N500 MATERIAL HPT STATOR RECOMMENDED SHROUDS. SERVICE BULLETIN MOS 12-APR-20I3 HRSOASC ENC SB 72-0904 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW AIR/OIL SEPARATOR AND REWORK OF THE OLD ONE. SERVICE BULLETIN 17-OCT-2012 MOS HRS/MSC - ENC SB 72-0907 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - CFM56-7BE BASELINE CONFIGURATION HARDWARE RELEASED TO INFORMATIONAL EARLIER CFM56-76 SAC ENGINE MODELS. SERVICE BULLETIN MOS 04-JUN-2013 HRSOJSC - ENC SB 72-0909 NO.2 ENGINE - ENGINE - FAN AND BOOSTER ASSEMBLY (72-21-00)- INTRODUCTION OF A NEW FAN BLADE PLATFORM. SERVICE BULLETIN MOS 20-NOV-2012 HRS/PASC ENC SB 72-0911 NO.2 ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN MOS 17-JUL-2012 HRSfMSC - ENC SB 72-0912 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) -SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN MOS 27-SEP-2012 HRSOASC - ENC SB 72-0913 NO.2 ENGINE - ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - RELEASE OF NEW HPT STATOR NOZZLE. SERVICE RECOMMENDED BULLETIN CUSTOMER CONVENIENCE OS-NOV-2012 MOS HRSfMSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 702 Of 748 @ Camp Systems EFTA00618993 CAMP /al/thaw/ma tAtinand AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0914 25-MAR-2013 SB 72-0914 RI NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN 12-APR-20I3 SB 72-0915 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 ENGINES. SERVICE BULLETIN 30-NOV-20 I 2 SB 72-0916 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - HPT STATOR NOZZLE SPLIT VANE REPAIR. SERVICE BULLETIN 15-JAN-2013 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS(MSC - ENC MOS HRS(MSC - ENC MOS MRS/MSC - ENC MOS HRS(MSC - ENC SB 72-0917 NO.2 ENGINE - ENGINE - GENERAL (72-00-03) - INTRODUCTION OF A NEW OIL SCAVENGE TUBE CLAMP. SERVICE RECOMMENDED BULLETIN MOS 16-OCT-2012 HRS(MSC - ENC SB 72-0918 NO.2 ENGINE - ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00)- HPT ROTOR BLADE MANAGEMENT SUPERSEDED (SUPERSEDED BY S8 72-0918 R1). SERVICE BULLETIN SB 72-0918 RI 1 1 -JUN-20I4 MOS MRS/MSC - ENC NO.2 ENGINE - HIGH PRESSURE TURBINE ROTOR ASSEMBLY (72-52-00) - HPT ROTOR BLADE MANAGEMENT. CATEGORY 4 SERVICE BULLETIN MOS HRSOASC ENC SB 72-0920 NO.2 ENGINE - HIGH PRESSURE TURBINE NOZZLE ASSEMBLY (72-51-00) - RELEASE OF HPT NOZZLE KIT. SERVICE LIMITED BULLETIN DISTRIBUTION MOS 15-NOV-20 I 3 HRS(MSC ENC SB 72-0921 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE (SUPERSEDED BY SUPERSEDED 72-0921 RI). SERVICE BULLETIN SB 72-0921 RI MOS HRS(MSC - ENC NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE (SUPERSEDED BY SB 72-0921 SUPERSEDED R2). SERVICE BULLETIN MOS HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 703 Of 748 @ Camp Systems EFTA00618994 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0921 R2 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF A NEW CENTER VENT TUBE. SERVICE BULLETIN MOS 09-DEC-2013 HRS/MSC - ENC SB 72-0922 NO.2 ENGINE - ENGINE - GENERAL (72-00-00) - SPARE PARTS RELEASE FOR CFM56-76 CMM. SERVICE BULLETIN 25-FEB-2013 MOS HRS/MSC - ENC CATEGORY 5 SB 72-0924 NO.2 ENGINE - GENERAL (72-00-00) - INTRODUCTION OF NEW BRACKET ASSEMBLIES, SERVICE BULLETIN CATEGORY 7 23-JUL-2014 MOS HRS/MSC - ENC SB 72-0926 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON-WING INSPECTION OF VSV STAGE SUPERSEDED 3 OUTER BUSHINGS (SUPERSEDED BY SB 72-0926 R1). SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0926 R1 NO.2 ENGINE - ENGINE - COMPRESSOR FRONT STATOR ASSEMBLY (72-32-00) - ON-WING INSPECTION OF VSV STAGE 3 OUTER BUSHINGS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-0927 NO.2 ENGINE - ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - DELETION OF BALL BEARING 335-304-401-0 ALTERNATIVE FOR THE liANDCRANKING LINE (SUPERSEDED BY SB 72-0927 R1). SERVICE BULLETIN MOS 03-JUL-2013 HRS/MSC - ENC SB 72-0927 R1 NO.2 ENGINE - ACCESSORY GEARBOX ASSEMBLY (72-63-00) - DELETION OF BALL BEARING 335-304-401-0 CATEGORY 3 ALTERNATIVE FOR THE liANDCRANKING LINE. SERVICE BULLETIN MOS I4-APR-2014 HRS/MSC ESV ENC SB 72-0928 NO.2 ENGINE - HPT SHROUD AND STAGE 1 LPT NOZZLE ASSEMBLY (72-53-00) - REPLACEMENT OF LPT STAGE 1 NOZZLE SEGMENTS DUE TO ENVIRONMENTAL DISTRESS, SERVICE BULLETIN MOS 22-JUL-2013 HRSIMSC - ENC SB 72-0929 NO.2 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00)- HPT ROTOR DISK AIR SLOT REDESIGN. SERVICE CUSTOMER BULLETIN CONVENIENCE MOS 06-AUG-2013 HRS/MSC - ENC SB 72-0930 NO.2 ENGINE - ENGINE - HPT/LPT SHROUD NOZZLE ASSEMBLY (72-53-00)- FORWARD FLANGE WEAR GROOVE CUSTOMER HPT/LPT SHROUD NOZZLE SUPPORT REWORK. SERVICE BULLETIN CONVENIENCE MOS 02-OCT-2013 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 704 Of 748 @ Camp Systems EFTA00618995 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0931 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW THICKER FAN CONTAINMENT CASE SUPERSEDED (SUPERSEDED BY SI3 72-0931 RH. SERVICE BULLETIN MOS FIRS/MSC - ENC SB 72-0931 RI NO.2 ENGINE -FAN FRAME ASSEMBLY (72-23-00) - INTRODUCTION OF A NEW THICKER FAN CONTAINMENT CASE. CATEGORY 7 SERVICE BULLETIN MOS 10-JAN-2014 MRS/51SC ENC SB 72-0933 NO.2 ENGINE - FAN FRAME ASSEMBLY (72-23-00)- INTRODUCTION OF A NEW CUP TO ATTACH THE OUTER CATEGORY 7 PLATFORM OF THE OGV TO THE CONTAINMENT CASE. SERVICE BULLETIN MOS 20-FEB-2014 HRS/MSC - ENC SB 72-0934 NO.2 ENGINE - COMBUSTION ASSEMBLY (72-41-00) - REWORK OF THE COMBUSTION CASE PM 2002MMG09. SERVICE CATEGORY 7 BULLETIN 14-FEB-2014 MOS FIRS/MSC ENC SB 72-0935 NO.2 ENGINE - 1-PT ROTOR ASSEMBLY (72-52-00) - INTRODUCTION OF HPT ROTOR BLADE P/N 2403M91P03 AND CUSTOMER 76-BLADE HPT ROTOR KIT. SERVICE BULLETIN CONVENIENCE MOS 03-SEP-2013 HRSfMSC - ENC SB 72-0938 NO.2 ENGINE - CORE ENGINE MAJOR MODULE (72-00-02)- INTRODUCTION OF A NEW METALLIC C-SEAL TO THE RECOMMENDED SPARE PARTS LIST. SERVICE BULLETIN MOS 04-SEP-2013 MRS/MSC ENC 58 72-0939 NO.2 ENGINE - HPT/LPT NOZZLE SHROUD ASSEMBLY (72-53-00) - INTRODUCTION OF HPT STATOR SHROUD P/N CATEGORY 7 2080M28P06. SERVICE BULLETIN MOS 21-NOV-2013 HRS/MSC ENC SB 72-0910 NO.2 ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - FORWARD INNER NOZZLE SUPPORT REWORK BY FORWARD SUPERSEDED FLANGE REPLACEMENT AND APPLICATION OF EROSION COATING (SUPERSEDED BY SB 72-0940 R1). SERVICE BULLETIN MOS HRS/MSC ENC SB 72-0940 RI NO.2 ENGINE - HPT NOZZLE ASSEMBLY (72-51-00) - FORWARD INNER NOZZLE SUPPORT REWORK BY FORWARD CATEGORY 7 FLANGE REPLACEMENT AND APPLICATION OF EROSION COATING. SERVICE BULLETIN MOS 04-FEB-2014 HRSfMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 705 Of 748 @ Camp Systems EFTA00618996 CAMP fin. thermiewlqi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 72-0946 NO.2 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00) - REPLACEMENT OF FORWARD DAMPER SLEEVE FOR THE CATEGORY 4 HPT ROTOR FRONT SHAFTS P/N 2048M21P01 AND PM 2048M21P03 (SUPERSEDED BY SB 72-0946 R1). SERVICE BULLETIN 29-JAN-2014 MOS HRS/MSC ENC SB 72-0946 R1 NO.2 ENGINE - HP TURBINE ROTOR ASSEMBLY (72-52-00)- REPLACEMENT OF FORWARD DAMPER SLEEVE FOR THE CATEGORY 4 HPT ROTOR FRONT SHAFTS P/N 2048M21P01 AND P/N 2048M21P03. SERVICE BULLETIN MOS 06-KWY-2014 HRS/MSC - ENC SB 72-0952 NO.2 ENGINE - COMPRESSOR ROTOR ASSEMBLY (72-31-00) - INTRODUCTION OF IMPROVED CAST INCO 718 BLADE CATEGORY 7 LOCKS FOR STAGES 4 THROUGH 9. SERVICE BULLETIN MOS 14-JUL-2014 HRSO4SC - ENC SB SB 72-223 02-FEB-2000 72-A0140 R1 25-JUN-1999 NO.2 ENGINE - INTRODUCTION OF A NEW OUTER LINER LUG RING TO THE SPARE PARTS LIST. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF A BONDED CAUTION PLATE ON HANDCRANKING COVER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 72-A0336 NO.2 ENGINE - INSTALLATION OF SAFETY WIRE OVER THE OIL TEMPERATURE PROBE AND HOUSING. SERVICE SB 72-A0368 BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - ACCESSORY GEARBOX - REPLACEMENT OF BALL BEARING 340-052-602-0 IN A DEFECTIVE BATCH. SERVICE BULLETIN MOS HRS/MSC ENC SB 73-0001 NO.2 ENGINE - INTRODUCTION OF NEW IGNITER PLUG. SERVICE BULLETIN NOT APPLICABLE MOS HRS/MSC - ENC SB 73-0002 NO.2 ENGINE - EEC-SOFTWARE VERSION 7.B.D. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 73-0008R1 MOS HRS/MSC - ENC SB 73-0003 NO.2 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 73-0007 MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 706 Of 748 @ Camp Systems EFTA00618997 CORP Mianistfrn• therrantulqi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0003 R1 NO.2 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0003 R2 NO.2 ENGINE - SPEED SERVO SLEEVE OF THE SPEED SERVO VALVE AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0004 NO.2 ENGINE - HMU 1853M56P05(VIN 442026). SERVICE BULLETIN NOT APPLICABLE- SUPERSEDED 73-0020 MOS HRSAISC - ENC SB 73-0005 NO.2 ENGINE - ELECTRONIC CONTROL UNIT (73-00-00) PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0005 R1 NO.2 ENGINE - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL MANIFOLDS (SUPERSEDED BY SB SUPERSEDED NOT APPLICABLE 73-0005 R2). SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0005 R2 NO.2 ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL CATEGORY 3 MANIFOLDS. SERVICE BULLETIN MOS 29-OCT-2013 HRSAISC - ENC SB 73-0005 R3 NO.2 ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL SUPERSEDED MANIFOLDS (SUPERSEDED BY SB 73-0005 R4). SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0005 R4 NO.2 ENGINE - COMBUSTION ASSEMBLY (72-42-00) - INTRODUCTION AND REWORK OF SAC INNER AND OUTER FUEL CATEGORY 3 MANIFOLDS. SERVICE BULLETIN MOS I4-JUL-2014 HRS/MSC ESV ENC SB 73-0006 R1 NO.2 ENGINE - TRANSFER OF THE COOLING AIR ORIFICE PLATE TO THE EEC COMPONENT ASSEMBLY LEVEL. COMPLIED WITH - AT MANUFACTURE SERVICE BULLETIN MOS I6-DEC-1998 HRS/MSC - 0 ENC 0 SB 73-0007 NO.2 ENGINE - INTRODUCTION OF NEW MAIN FUEL PUMP WITH A NEW STATIONARY SHAFT SEAL. SERVICE COMPLIED WITH - AT MANUFACTURE BULLETIN MOS I6-DEC-1998 HRSAISC 0 ENC 0 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 707 Of 748 @ Camp Systems EFTA00618998 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0008 Ri NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.E.. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0009 MOS HRSIASC - ENC SB 73-0009 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 B.F (782B). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0012 MOS HRSuSC - ENC SB 73-0010 NO 2 ENGINE - DRAIN TUBE AND FUEL MANIFOLD REPLACEMENT. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRS4.ISC 0 ENC 0 SB 73-0011 NO 2 ENGINE - INTRODUCTION OF A SERVO FUEL HEATER. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS.ISC 0 ENC 0 SB 73-O011 R1 NO 2 ENGINE - INTRODUCTION OF A SERVO FUEL HEATER. SERVICE BULLETIN MOS HRS7.ISC - ENC SB 73-0012 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.F3 (782E). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0015 MOS HRSuSC - ENC SB 73-0013 NO 2 ENGINE - OPERATE CFM USING CIS TS-1 FUELS. SERVICE BULLETIN MOS HRSuSC - ENC SB 73-0014 R2 NO 2 ENGINE - INTRODUCTION OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN COMPLIED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRSI.ISC 0 ENC 0 SB 73-0015 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.F4 (7831). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0018R1 MOS HRS.ISC - ENC SB 73-0017 NO 2 ENGINE - INTRODUCTION OF ECUIEEC HARDWARE/SOFTWARE KITS. SERVICE BULLETIN NOT APPLICABLE MOS HRS7.ISC - ENC SB 73-O018R1 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.G (7B30). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0021R1 MOS HRSuSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 708 Of 748 Camp Systems EFTA00618999 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0019 NO 2 ENGINE - NEW FUEL TRANSIENT BLEED VALVE MANIFOLD AND SUPPORTING BRACKET. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC - 0 ENC 0 SB 73-0020 NO 2 ENGINE - INTRODUCTION OF HMU VIN 442098 (GE 1853:056P06). SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC - 0 ENC 0 SB 73-0021 R1 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.H2 (7B36). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0023R1 MOS HRS.,MSC - ENC SB 73-0022 NO 2 ENGINE - MODIFICATION OF FUEL NOZZLE FILTER. SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS,MSC 0 ENC 0 SB 73-0023 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7 Si (7B37). SERVICE BULLETIN MOS HRS1MSC - ENC SB 73-0023 R1 NO 2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.I(7837). SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 73.0024 MOS HRSMSC - ENC SB 73-0024 NO. 2 ENGINE - EEC-SOFTWARE VERSION 7.8.11 (7B38). SERVICE BULLETIN COMPLIED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSMSC - 0 ENC SB 73-0025 NO. 2 ENGINE - MODIFICATION OF THE FUEL NOZZLE FILTER. SERVICE BULLETIN MOS HRSMSC - ENC SB 73-0026 NO. 2 ENGINE - INTRODUCTION OF EEC- SOFTWARE VERSION 7.B.J(783A). SERVICE BULLETIN MOS HRSMSC ENC SB 73-0027 NO 2 ENGINE - . SERVICE BULLETIN CANCELLED MOS HRSMSC ENC SB 73-0028 NO 2 ENGINE - INTRODUCTION TO HMU 18535156KM WIN 442124). SERVICE BULLETIN MOS HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 709 Of 748 11 Camp Systems EFTA00619000 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0028 R1 NO.2 ENGINE - INTRODUCTION TO HMU 1853M56P07 (VIN 442124). SERVICE BULLETIN MOS MRS/MSC - ENC SB 73-0029 NO.2 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN MOS MRS/MSC - ENC SB 73-0029 R1 NO.2 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0029 R2 NO.2 ENGINE - HMU UPGRADE TO 1853M56P07, SERVICE BULLETIN MOS MRS/51SC - ENC SB 73-0030 NO.2 ENGINE - ECU/EECS WITH DPM-3 CONVERSION. SERVICE BULLETIN MOS MRS/51SC - ENC SB 73-0030 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC ENGINE CONTROL (73-00-00) - INTRODUCTION OF NEW OPTIONAL ECU/EECS WITH NEW DPM-3 AND CONVERSION, SERVICE BULLETIN MOS 22-FEB-20 I 1 MRS/51SC ENC SB 73-0031 NO.2 ENGINE -. SERVICE BULLETIN CANCELLED MOS MRS/51SC ENC SB 73-0032 NO.2 ENGINE - REPLACEMENT OF VESPEL BALL PM 1419-240. SERVICE BULLETIN MOS FIRSAISC - ENC SB 73-0033 NO.2 ENGINE - CONVERSION NON-PMUX ENGINE AND PMUX TO NON-PMUX ENGINE. SERVICE BULLETIN MOS MRS/MSC - ENC SB 73-0034 NO.2 ENGINE - INTRODUCTION OF NEW FIEL PUMP WITH NEW FILTER COVER. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0035 NO.2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.B.J1 (7820). SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 710 Of 748 @ Camp Systems EFTA00619001 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0036 NO 2 ENGINE - . SERVICE BULLETIN CANCELLED MOS HRSI.ISC - ENC SB 73-0037 NO 2 ENGINE - ENGINE FUEL CONTROL (73-00.00) HMU HPSOV SWITCH. SERVICE BULLETIN MOS HRSI.ISC - ENC SB 73-0037 Ri NO 2 ENGINE - ENGINE FUEL CONTROL (73-00-C0) HMU HPSOV SWITCH. SERVICE BULLETIN MOS HRSitISC - ENG SB 73-0037 R2 NO. 2 ENGINE - ENGINE FUEL CONTROL (73-00-W) HMU HPSOV SWITCH. SERVICE BULLETIN MOS HRS.ISC - ENG SB 73-0037 R3 NO 2 ENGINE - HPSOV SWITCH. SERVICE BULLETIN MOS 19-DEC-2001 HR&MSC - ENG SB 73-0037 R4 NO 2 ENGINE - HYDROMECHANICAL UNIT - HPSOV SWITCH. SERVICE BULLETIN MOS HRSisiSC - ENG SB 73-0037 RS NO 2 ENGINE - HYDROMECHANICAL UNIT - HPSOV SWITCH. SERVICE BULLETIN MOS HRSI.ISC - ENG SB 73-0038 NO 2 ENGINE - INTRODUCTION OF NEW FUEL FLOW TRANSMITTER. SERVICE BULLETIN MOS HRSitISC - ENG SB 73-0039 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFP0156-78 IPC. SERVICE BULLETIN MOS HR&MSC - ENG SB 73-0040 NO 2 ENGINE - ENGINE FUEL CONTROL INTRODUCTION OF SOFTWARE 1853M78P16 (7641). SERVICE BULLETIN MOS HRSLISC - ENG SB 73-0041 NO 2 ENGINE - INTRODUCTION OF A NEW VSV RIGHT SIDE DRAIN MANIFOLD. SERVICE BULLETIN MOS HRSisiSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective C/W (EBT)-Estimated Base Time 711 Of 748 Camp Systems EFTA00619002 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0042 SB 73-0042 RI SB 73-0043 SB 73-0043 RI SB 73-0043 R2 SB 73-0044 SB 73-0044 RI SB 73-0044 R2 SB 73-0045 SB 73-0046 NO.2 ENGINE - NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - NEW FUEL DIFFERNTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - ELECTRONIC CONTROL UNIT - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN MOS HRSAISC ENC NO.2 ENGINE - ELECTRONIC FUEL CONTROL - PRESSURE SUBSYSTEM BUFFER MATERIAL MODIFICATION. SERVICE BULLETIN MOS HRSAISC ENC NO.2 ENGINE - BURNER STAGING VALVE SYSTEM DELETION. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - BURNER STAGING VALVE SYSTEM DELETION. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - BURNER STAGING VALVE SYSTEM DELETION, SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - NEW HPTCC VALVE FUEL MANIFOLD INTRODUCTION. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - ENGINE FUEL CONTROL INTRODUCTION OF SOFTWARE 1853M78P17 (7842). SERVICE BULLETIN MOS HRS,MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 712 Of 748 @ Camp Systems EFTA00619003 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0047 SB 73-0047 RI SB 73-0049 SB 73-0050 SB 73-0050 F21 SB 73-0051 SB 73-0052 SB 73-0052 R2 SB 73-0053 NO.2 ENGINE - LOWER DRAIN MANIFOLD IDENTIFICATION PLATE FIELD REPLACEMENT AND NEW LOWER DRAIN MANIFOLD INTRODUCTION. SERVICE BULLETIN MOS HRS.?.ISC - ENG NO 2 ENGINE - LOWER DRAIN MANIFOLD IDENTIFICATION PLATE FIELD REPLACEMENT AND NEW LOWER DRAIN MANIFOLD INTRODUCTION. SERVICE BULLETIN MOS HRSI.ISC - ENG NO 2 ENGINE - INSPECTION OF HMU MAIN BODY FOR HPT2 THIN WALL CASTING. SERVICE BULLETIN MOS HRSMSC - ENG NO 2 ENGINE - ELECTRONIC ENGINE CONTROL INTRODUCTION OF SOFTWARE 1853M781518 (7846). SERVICE BULLETIN MOS HR&MSC - ENG NO 2 ENGINE - ELECTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 1853s178P18 (7946). SERVICE BULLETIN MOS - ENG NO 2 ENGINE - SPARE PARTS RELEASE. SERVICE BULLETIN MOS HR&MSC - ENG NO 2 ENGINE - INTRODUCTION OF A NEW IMPELLER DRIVE SHAFT AND IMPELLER DRIVE SHAFT PREFORMED PACKING. SERVICE BULLETIN MOS HR&MSC ENC NO 2 ENGINE - ENGINE FUEL CONTROL (73-00-C0) - MAIN FUEL PUMP - INTRODUCTION OF A NEW IMPELLER DRIVE SHAFT AND IMPELLER DRIVE SHAFT PREFORMED PACKING. SERVICE BULLETIN MOS - ENG NO.2 ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN MOS - ENG SB 73-0053 RI NO 2 ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN MOS 19-DEC-2001 HRSisiSC - ENG ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 713 Of 748 Camp Systems EFTA00619004 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YO006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0053 R2 SB 73-0053 R3 SB 73-0054 SB 73-0054 RI SB 73-0055 SB 73-0055 R1 SB 73-0056 SB 73-0057 SB 73-0058 SB 73-0058 Fei NO 2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN MOS HRSIASC ENC NO .2 ENGINE - HYDROMECHANICAL UNIT - IMPROVED ELECTRICAL WIRE RETENTION. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - FIELD DELETION BURN STAGE VALVE. SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - CORE ENGINE MAJOR MODULE - FIELD DELETION OF THE BURNER STAGING VALVE SYSTEM. SERVICE BULLETIN MOS HRSI.ISC ENC NO 2 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P19 (7B4A). SERVICE BULLETIN MOS HRSMSC - ENC NO 2 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P19 (7B4A). SERVICE BULLETIN MOS HRSI.ISC ENC NO.2 ENGINE - . SERVICE BULLETIN MOS HR&LISC ENC NO 2 ENGINE - SPARE PARTS RELEASE FOR BAE SYSTEMS CONTROLS. SERVICE BULLETIN MOS HR&P.ISC - ENC NO 2 ENGINE - ENGINE FUEL AND CONTROL - CFm56-78 SAC ENGINE CONFIGURATIONS J9 AND Ji 0 HARNESS WITH IMPROVED OR REWORKED DESIGN. SERVICE BULLETIN MOS HRS.I.ISC - ENC NO 2 ENGINE - CFNI56-78 SAC ENGINE CONFIGURATIONS Jr9 AND Ji 0 HARNESSES WITH IMPROVED OR REWORKED DESIGN. SERVICE BULLETIN MOS HR&P.ISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CAN (EBT)-Estimated Base Time 714 Of 748 Camp Systems EFTA00619005 CORP Miantstinne the enand AD/SI Status Report 737.72UBJ REVISION 21 Silk! 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0059 SB 73-0060 SB 73-0061 SB 73-O061R1 19-DEC-2001 NO.2 ENGINE - ECU DPM INSPECTION. SERVICE BULLETIN MOS FIRS/MSC - ENC NO.2 ENGINE - ENGINE FUEL CONTROL - INTRODUCTION OF A NEW SERVO FUEL HEATER. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM INSTALLED. SERVICE BULLETIN MOS MRS/MSC - ENC SB 73-0061 R2 NO.2 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM INSTALLED. SERVICE BULLETIN SB 73-0061 R3 SB 73-0062 SB 73-O062R1 SB 73-0063 SB 73-0064 MOS FIRS/MSC - ENC NO.2 ENGINE - ON-WING AFSO SWITCH ASSEMBLY REPLACEMENT ON HMU WITH WIRE RETENTION SYSTEM INSTALLED. SERVICE BULLETIN MOS FIRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF NEW/REWORKED ECU WITH LOCKWIRE CAPABILITY. SERVICE BULLETIN MOS HRS(MSC - ENC NO.2 ENGINE - INTRODUCTION OF NEW OR REWORKED ELECTRONIC CONTROL UNIT WITH LOCKWIRE CAPABILITY. SERVICE BULLETIN MOS FIRS/MSC ENC NO.2 ENGINE - INTRODUCTION OF FUEL MANIFOLDS WITH INTERNAL DRAIN PLUGS. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - INTRODUCTION OF SOFTWARE 1853M78P20. SERVICE BULLETIN MOS HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 715 Of 748 @Camp Systems EFTA00619006 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0064 R1 SB 73-0065 SB 73-0066 19-DEC-2001 SB 73-0066 R1 SB 73-0067 SB 73-0067 R1 SB 73-0067 R2 SB 73-0067 R3 SB 73-0068 SB 73-0069 NO.2 ENGINE - ELCTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 1853M78P20. SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - ELECTRONIC ENGINE CONTROL - PRESSURE SUBSYSTEM. SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - REMOVAL AND REPLACEMENT OF SPEED SERVO (MATCHED) VALVE AND SLEEVE ASSEMBLY AND THRUST WASHER.. SERVICE BULLETIN MOS HRSIMSC ENC NO.2 ENGINE - REMOVAL AND REPLACEMENT OF SPEED SERVO (MATCHED) VALVE AND SLEEVE ASSEMBLY AND THRUST WASHER. SERVICE BULLETIN MOS HRSIMSC ENC NO.2 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN MOS MRS/51SC - ENC NO.2 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN MOS MRS/51SC - ENC NO.2 ENGINE - INTRODUCTION OF HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) WITH NEW HIGH PRESSURE SHUTOFF VALVE (HPSOV) SWITCH ASSEMBLY. SERVICE BULLETIN MOS MRS/51SC - ENC NO.2 ENGINE - REWORK OF THE HYDROMECHANICAL UNIT VIN 442238 (GE 1853M56P08) TO HYDROMECHANICAL UNIT VIN 442124 ( GE 1853M56P07). SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRSIMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 716 Of 748 @ Camp Systems EFTA00619007 CAMAsiont.P inn• Ad-tilting:KY AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0069 R1 SB 73-0069 R2 SB 73-0070 SB 73-0071 R2 SB 73-0073 SB 73-0074 SB 73-0074 R1 SB 73-0074 R2 SB 73-0074 R3 SB 73-0075 NO. 2 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRSIASC ENC NO. 2 ENGINE - REMOVAL AND REPLACEMENT OF SHUTTLE VALVE. PISTON. AND SLEEVE ASSEMBLY. SERVICE BULLETIN MOS HRS4ISC ENC NO. 2 ENGINE - ELECTRONIC CONTROL UNIT - PRESSURE SUBSYSTEM CONVERSION. SERVICE BULLETIN MOS HRSIISC - ENC NO. 2 ENGINE - INTRODUCTION OF SOFTWARE 7. B. 01 1853m78P23. SERVICE BULLETIN MOS HRSiliSC - ENC NO 2 ENGINE - ENGINE FUEL CONTROL - ENGINE FUEL CONTROL (73-00-00) - RESISTOR MODIFICATION FOR PSS TRANSDUCER INCOMPATIBILITY. SERVICE BULLETIN MOS HRSi MSC - ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - INSPECTION OF SHUTOFF SPACER FOR PROPER INSTALLATION. SERVICE BULLETIN MOS HRSI.ISC - ENC NO 2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT - INSPECTION OF SHUTOFF SPACER FOR PROPER INSTALLATION. SERVICE BULLETIN MOS HRSI.ISC - ENC NO 2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) INSPECTION OF SHUTOFF SPACER PIN 2687048 FOR PROPER INSTALLATION. SERVICE BULLETIN MOS HRSP.ISC - ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) INSPECTION OF SHUTOFF SPACER PIN 2687048 FOR PROPER INSTALLATION. SERVICE BULLETIN MOS HRSi MSC - ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00.00) - HYDROMECHANICAL UNIT - INTRODUCTION OF IMPROVED VALVE EXTENSION AND FEEDBACK DRIVERS. SERVICE BULLETIN MOS HRSi MSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time Camp Systems 717 Of 748 EFTA00619008 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0075 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00-00) - HYDROMECHANICAL UNIT - INTRODUCTION OF IMPROVED VALVE EXTENSION AND FEEDBACK DRIVERS. SERVICE BULLETIN MOS HRSIMSC - ENC SB 73-0076 NO.2 ENGINE - MEC SERVO FUEL HTR LEAKS. SERVICE BULLETIN MOS HRSIMSC - ENC SB 73-0077 NO.2 ENGINE - FIELD REWORK OF SINGLE ANNULAR COMBUSTOR (SAC) FUEL MANIFOLDS TO ELIMINATE DEAD-END ZONE. SERVICE BULLETIN MOS HRSIMSC ENC SB 73-0078 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ENGINE FUEL CONTROL (73-00-00) - INTRODUCTION OF A NEW FUEL COMPLIED WITH FILTER ELEMENT. SERVICE BULLETIN MOS 0I-MAR-2007 HRSIMSC - 2871:05 ENC 646 SB 73-0079 NO.2 ENGINE - REPLACEMENT OF THE CURRENT DEFECTIVE SIXTH ATTACHMENT OF THE FUEL FILTER COVER OF THE MAIN FUEL PUMP EQUIPPED WITH 0-HEAD BOLT. SERVICE BULLETIN MOS HRSIMSC - ENC SB 73-0080 NO.2 ENGINE - ENGINE AND FUEL CONTROL - HYDROMECHANICAL UNIT (73-21-10) - REPLACEMENT OF SHUTOFF SPACER 2687048 WITH NEW DESIGN. SERVICE BULLETIN MOS HRSIMSC - ENC SB 73-0081 NO.2 ENGINE - HYDROMECHANICAL UNIT (HMU) (73-21-10) - INTRODUCTION OF HONEYWELL HMU VIN 442317 (GE 1853M56P09). SERVICE BULLETIN MOS HRSIMSC ENC SB 73-0082 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC ENGINE CONTROL - INTRODUCTION OF SOFTWARE 7.B.N 1853M78P21. SERVICE BULLETIN MOS HRSIMSC ENC SB 73-0083 NO.2 ENGINE - REMOVAL AND TEST OF ELECTROHYDRAULIC SERVO VALVE FOR TEMPERATURE SENSITIVITY. SERVICE BULLETIN MOS HRSIMSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 718 Of 748 @ Camp Systems EFTA00619009 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0083 R1 SB 73-0084 SB 73-0084 R1 SB 73-0085 RI SB 73-0086 SB 73-0088 SB 73-0089 SB 73-0090 SB 73-0090 R1 SB 73-0093 NO.2 ENGINE - REMOVAL AND TEST OF ELECTROHYDRAULIC SERVO VALVE FOR TEMPERATURE SENSITIVITY. SERVICE BULLETIN MOS HRS1MSC ENC NO.2 ENGINE - INTRODUCTION OF SOFTWARE 7.8.0 1853M78P22. SERVICE BULLETIN MOS 6 (s) FIRSAISC ENC NO.2 ENGINE - INTRODUCTION OF SOFTWARE 7.8.0 1853M78P22. SERVICE BULLETIN MOS 6 (s) HRSAISC ENC NO.2 ENGINE - INTRODUCTION OF NEW J10 HARNESSES OR REWORK OF THE OLD ONES. SERVICE BULLETIN MOS HRS1MSC - ENC NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B. SERVICE BULLETIN MOS HRS1MSC - ENC NO.2 ENGINE - IMPROVED FUEL FLOW TRANSMITTER, SERVICE BULLETIN MOS FIRS/MSC - ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL - ENGINE HARNESSES CJ9. CJIO (73-24-05) - INTRODUCTION OF A NEW CS HARNESS OR REWORK OF THE OLD ONE AND DELETION OF THE DUMMY RECEPTACLE BRACKET. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL ( 73-00-00) - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL ( 73-00-00) - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN MOS HRSAISC - ENC NO.2 ENGINE - HYDROMECHANICAL UNIT ( 73-21-10) -INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE ELECTROHYDRAULIC SERVO VALVE. SERVICE BULLETIN MOS HRSfMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 719 Of 748 @ Camp Systems EFTA00619010 Cli tagiren Meg' nehip. AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BB.1): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC 52‘ 73-0094 SB 73-0094 RI SB 73-0094 R2 SB 73-0095 SB 73Ø96R1 NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10)- INTRODUCTION OF NEW METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN MOS HRSPASC - ENC NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF NEW METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN MOS FIRS,MSC - ENC NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF NEW METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN MOS I-IRS/MSC - ENC NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED BURNER STAGING VALVE (BSV) SOLENOID AND VALVE ASSEMBLY. SERVICE BULLETIN MOS FIRS/MSC - ENC NO.2 ENGINE - REPLACEMENT OF FLUOROSILICONE PREFORMED PACKINGS WITH FLUOROCARBON PREFORMED SUPERSEDED PACKINGS (SUPERSEDED BY 73-0096 R2). SERVICE BULLETIN MOS FIRSAISC - ENC SB 73-0096 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HMU (73-21-79) - REPLACEMENT OF FLUOROSILICONE PREFORMED RECOMMENDED PACKINGS WITH FLUOROCARBON PREFORMED PACKINGS. SERVICE BULLETIN MOS 05-JAN-2012 FIRS/MSC - ENC SB 73-0097 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-00-03) - NEW 7.B.P SOFTWARE, SERVICE BULLETIN MOS 6 (s) HRS(MSC ENC SB 73-0097 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-00-03) - NEW 7.B.P SOFTWARE, SERVICE BULLETIN MOS 6 (s) 08-MAR-2005 FIRS/MSC ENC SB 73-0098 NO.2 ENGINE - ECU CHASSIS MODIFICATION (SUPERSEDED BY SB 73-0098 RI). SERVICE BULLETIN MOS FIRSAISC - ENC SB 73-0098 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU CHASSIS MODIFICATION. CATEGORY 7 SERVICE BULLETIN MOS O1-APR-2014 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 720 Of 748 @Camp Systems EFTA00619011 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0099 NO.2 ENGINE - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED ADJUSTMENT SCREW (PN 2689127). SERVICE BULLETIN MOS HRS/h1SC ENC SB 73-01 NO.2 ENGINE - FUEL FLOW TRANSMITTER CAUBRATION IMPROVEMENT. SERVICE BULLETIN MOS HRS(MSC - ENC SB 73-0100 NO.2 ENGINE - ENGINE FUEL AND CONTROL - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0102 NO.2 ENGINE - BUCK POWER SUPPLY ROBUSTNESS MODIFICATION FOR 115V 400HZ DISCONNECTS. SERVICE BULLETIN MOS HRS(MSC ENC SB 73-0102 R1 NO.2 ENGINE - ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY ROBUSTNESS MODIFICATION FOR 115V 400HZ DISCONNECTS. SERVICE BULLETIN MOS 07-MAR-2006 HRS(MSC - ENC SB 73-0102 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY RECOMMENDED ROBUSTNESS MODIFICATION FOR 115V 400 HZ DISCONNECTS (SUPERSEDED BY SB 73-0102 R3). SERVICE BULLETIN MOS 10-N0V-2010 HRS/MSC - ENC SB 73-0102 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - BUCK POWER SUPPLY CATEGORY 7 ROBUSTNESS MODIFICATION FOR 11W 400 HZ DISCONNECTS. SERVICE BULLETIN MOS 20-JUN-2014 HRS/h1SC - ENC SB 73-0103 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT(73-21-10) - LOW PRESSURE LEAK CHECK, SERVICE BULLETIN MOS HRS/MSC ENC SB 73-0104 NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - ONE TIME INSPECTION OF 3 FUEL SUPPLY COMPUED WITH - IAW THE SB TUBES FOR WEAR AND INTRODUCTION OF KEVLAR CUSHION CLAMPS. SERVICE BULLETIN MOS 22-AUG-2008 HRS/MSC - 3260:48 ENC 746 SB 73-0106 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU PMUX (73-00-00) - PRESSURE SUBSYSTEM REDESIGN. SERVICE BULLETIN MOS HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 721 Of 748 @ Camp Systems EFTA00619012 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2O14 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0106 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU PMUX (73-00-00) - PRESSURE SUBSYSTEM REDESIGN. SERVICE BULLETIN MOS HRSAISC ENC SB 73-0107 NO.2 ENGINE - INSPECTION OF PUMP COVER. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0108 RI NO.2 ENGINE - BURNER STAGING VALVE SOLENOID REMOVAL FROM HMU. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0108 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- HMU (73-21-79) - BURNER STAGING VALVE SOLENOID REMOVAL FROM RECOMMENDED HMU. SERVICE BULLETIN MOS I6-FEB-2012 HRSAISC ENC SB 73-0109 RI NO.2 ENGINE - NEW SOLENOID AND VALVE. SERVICE BULLETIN MOS 07-MAR-2006 HRSfMSC - ENC SB 73-0111 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU/EEC (73-00-00) - INTRODUCTION OF FADEC3 HARDWARE AND SOFTWARE. SERVICE BULLETIN MOS HRSfMSC - ENC SB 73-0113 NO.2 ENGINE - INSPECTION OF MAIN-STAGE CHECK VALVE SPRING (SUPERSEDED BY 73-0113 RI). SERVICE SUPERSEDED BULLETIN MOS HRSAISC - ENC SB 73-0113 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - FUEL NOZZLES (73-00-00) - INSPECTION OF MAIN-STAGE CHECK RECOMMENDED VALVE SPRING. SERVICE BULLETIN MOS I3-JAN-2012 HRSAISC - ENC SB 73-0115 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW 713.O SOFTWARE. SERVICE BULLETIN MOS 6 (s) 06-JUN-2005 HRSAISC ENC SB 73-0115 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW 7.8.O SOFTWARE. SERVICE BULLETIN MOS 6 (s) 30-MAY-2008 HRSAISC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 722 Of 748 @ Camp Systems EFTA00619013 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0116 NO.2 ENGINE - INTRODUCTION OF NEW ELECTRONIC CONTROL UNIT WITH SAFETYWIRE CAPABILITY TO THE I PC. SERVICE BULLETIN SB 73-0116 R1 I3-NOV-2009 MOS HRS1MSC ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-2140) - INTRODUCTION OF NEW ELECTRONIC CONTROL UNIT WITH SAFETYWIRE CAPABILITY TO THE IPC. SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0117 NO.2 ENGINE -SPARE PARTS RELEASE. SERVICE BULLETIN MOS HRS1MSC - ENC SB 73-0118 RI NO.2 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH A NEW COVER. SERVICE BULLETIN MOS 23-FEB-2006 HRSAISC - ENC SB 73-0120 NO.2 ENGINE - NEW SOFTWARE VERSION 7.8.01F3. SERVICE BULLETIN MOS HRSfMSC - ENC SB 73-0120 RI NO.2 ENGINE -NEW SOFTWARE VERSION 7.8.01F3. SERVICE BULLETIN MOS 30-MAY-2008 HRS1MSC - ENC SB 73-0121 NO.2 ENGINE - FRONT PANEL ASSEMBLY ALIGNMENT PIN MODIFICATION PROCEDURE. SERVICE BULLETIN MOS 27-JUN-2007 HRSAISC - ENC SB 73-0122 NO.2 ENGINE - FADEC3 -SIA CONNECTOR HARDWARE RETENTION, SERVICE BULLETIN MOS 27-JUN-2007 HRSAISC - ENC SB 73-0123 NO.2 ENGINE - VSV SYSTEM (72-00-02) - NEW FUEL MANIFOLDS. SERVICE BULLETIN MOS I2-APR-2006 HRSAISC - ENC SB 73-0124 NO.2 ENGINE -SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS 21-APR-2008 HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 723 Of 748 @ Camp Systems EFTA00619014 CAMP Aticieteafra theireandge AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0126 NO.2 ENGINE - ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS . SERVICE BULLETIN 17-JUL-2006 MOS MRS/51SC ENC SB 73-0126 RI NO.2 ENGINE - ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS. SERVICE BULLETIN MOS I4-AUG-2007 HRS/MSC ENC SB 73-0126 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU MODIFICATION. ADDITION OF SIDE TRANSIENT PROTECTION BOARD (STPB) PROTECTION CIRCUITS. SERVICE BULLETIN MOS 02-OCT-2009 MRS/MSC - ENC SB 73-0127 NO.2 ENGINE - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN SB 17-JUL-2006 73-0127 RI 26-FEB-2008 MOS MRS/51SC - ENC NO.2 ENGINE - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN MOS MRS/51SC - ENC SB 73-0127 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - ECU MODIFICATION - SUPERSEDED REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS 9SUPERSEDED BY 73-0127 R3). SERVICE BULLETIN MOS HRS/hISC - ENC SB 73-0127 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC ENGINE CONTROL (73-00-00) - ECU/EEC MODIFICATION - REPLACEMENT OF ZENER DIODES AND TANTALUM CAPACITORS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0128 RI NO.2 ENGINE - INTRODUCTION OF FADEC3 HARDWARE FOR DAC ENGINES. SERVICE BULLETIN MOS 02-APR-2007 MRS/51SC - ENC SB 73-0130 NO.2 ENGINE - INSPECTION OF HYDROMECHANICAL UNIT FOR NON-HYDROCARBON CONTAMINATION. SERVICE RECOMMENDED BULLETIN 07-MAY-2007 MOS 6 (s) MRS/51SC 1500 ENC SB 73-0132 NO.2 ENGINE - INTRODUCTION OF FUEL NOZZLE WITH REVISED 0 -RING MATERIAL FOR HIGHER TEMPERATURE CAPABILITY. SERVICE BULLETIN MOS 13-JUN-2007 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 724 Of 748 @ Camp Systems EFTA00619015 COMP Astant.fran Aetna/4pp AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0132 R2 13-JUN-20I2 SB 73-0133 12-APR-2007 58 73-0134 08-JUN-2007 SB 73-0134 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - INTRODUCTION OF FUEL NOZZLE WITH REVISED RECOMMENDED 0 -RING MATERIAL FOR HIGHER TEMPERATURE CAPABILITY. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - REPLACEMENT OF SUSPECT T12 SENSOR. SERVICE BULLETIN MOS HRS/MSC 1200 (s)/DUE 08-NOV-2007 ENC NO.2 ENGINE - INTRODUCTION OF NEW UNISON ALTERNATOR STATOR VIN 506569-1 (2123M63P02) AND ALTERNATOR ROTOR VIN 505344-1 (2123M62P01). SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL - POWERPLANT - ALTERNATOR (73-00-00) - INTRODUCTION OF NEW UNISON ALTERNATOR STATOR VIN 506569-1 (2123M63P02) AND ALTERNATOR ROTOR VIN 505344-1 (2123M62P01). SERVICE BULLETIN MOS 04-MAY-2009 HRS/MSC - ENC SB 73-0135 NO.2 ENGINE -NEW SOFTWARE VERSION 7.B.R3. SERVICE BULLETIN MOS 22-AUG-2008 30-MAR-2007 HRS/MSC - 3260:48 ENC 746 SB 73-0135 RI NO.2 ENGINE -NEW SOFTWARE VERSION 7.B.R3. SERVICE BULLETIN MOS 30-MAY-2008 HRS/MSC - ENC SB 73-0136 NO.2 ENGINE - INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE ELECTROHYDRAULIC SERVOVALVE. SERVICE BULLETIN 20-JUN-2007 MOS HRS/MSC - ENC SB 73-0136 RI NO.2 ENGINE - INTRODUCTION OF IMPROVED TRANSIENT BLEED VALVE ELECTROHYDRAULIC SERVOVALVE. SERVICE BULLETIN MOS I8-FEB-2008 HRS/MSC - ENC SB 73-0137 NO.2 ENGINE - HMU OVER-FUEL THRESHOLD MARGIN INCREASE. SERVICE BULLETIN MOS 20-JUN-2007 HRS,MSC - ENC RECOMMENDED NOT APPLICABLE - BY SERIAL NUMBER S/N 874438 N/A COMPLIED WITH - IAW THE SB 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 725 Of 748 @ Camp Systems EFTA00619016 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0137 R1 I8-FEB-2008 SB 73-0138 NO.2 ENGINE - HMU OVER-FUEL THRESHOLD MARGIN INCREASE. SERVICE BULLETIN MOS HRS(MSC - ENC NO.2 ENGINE - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN MOS HRS(MSC - ENC SB 73-0138 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - (73-00-00) - USE OF CIS FUELS IN CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/AISC ENC SB 73-0138 R1 PARA 3.A NO.2 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL - (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. (2) SERVICE BULLETIN AND CLEAN HMU MOS HRS(MSC ENC 10000 (s) SB 73-0138 R1 PARA 3.A NO.2 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL - (73-00.00) - USE OF CIS FUELS IN (3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS MOS HRS/MSC 3000 (s) ENC SB 73-0138 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL (73-00-03) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN 20-DEC-2010 MOS HRS/MSC ENC SB 73-0138 R2 PARA 3.A NO.2 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL (73-00.00)- USE OF CIS FUELS IN CFM58-78 ENGINES. (2) SERVICE BULLETIN AND ('I FANHMU MOS 20-DEC-2010 HRS/MSC 10000 (s) ENC SB 73-0138 R2 PARA 3.A NO.2 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN (3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS MOS 20-DEC-2010 HRS/MSC 3000 (s) ENC SB 73-0138 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN I2-SEP-2011 MOS HRS/MSC ENC SB 73-0138 R3 PARA 3.A NO.2 ENGINE - OVERHAUL ENGINE FUEL AND CONTROL (73-00.00)- USE OF CIS FUELS IN CFM56-78 ENGINES. (2) SERVICE BULLETIN AND CLEAN HMU MOS HRS/MSC 10000 (s) ENC SUPERSEDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED RECOMMENDED 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 726 Of 748 @ Camp Systems EFTA00619017 C O Atiant.fran MP Meowed lip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB (3) 73-0138 R3 PARA 3.A NO.2 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS MOS HRS/MSC 3000 (s) ENC RECOMMENDED SB 73-0138 R4 NO.2 ENGINE - ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFM56-78 ENGINES, SERVICE RECOMMENDED BULLETIN 25-SEP-2012 MOS HRS/MSC ENC SB 73-0138 R4 PARA 3.A NO.2 ENGINE -FLOW ENGINE FUEL AND CONTROL (73-00-00)- USE OF CIS FUELS IN CFMSG-7B ENGINES. SERVICE RECOMMENDED (1) BULLETIN CHECK OF ALL FUEL NOZZLES MOS 25-SEP-2012 HRS/MSC ESV (s) ENC SB 73-0138 R4 PARA 3.A NO.2 ENGINE - CLEAN ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN CFM56-78 ENGINES. SERVICE RECOMMENDED (2) BULLETIN AND OVERHAUL HMU 25-SEP-2012 MOS MRS/P.1SC 10000 (syESV ENC SB 73-0138 R4 PARA 3.A NO.2 ENGINE - GENERAL VISUAL INSPECTION ENGINE FUEL AND CONTROL (73-00-00) - USE OF CIS FUELS IN RECOMMENDED (3) CFM56-78 ENGINES. SERVICE BULLETIN OF ALL FUEL SYSTEM COMPONENTS FOR LEAKS MOS 25-SEP-2012 MRS/P.1SC 3000 (s) ENC SB 73-0139 NO.2 ENGINE - NEW SOFTWARE VERSION 7.8.S. SERVICE BULLETIN COMPLIED WITH MOS 22-AUG-2008 12-OCT-2007 HRS/MSC - 3260:48 ENC 746 SB 73-0140 NO.2 ENGINE - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS 28-NOV-2007 MRS/P.1SC - ENC SB 73-0140 RI NO.2 ENGINE - REPLACEMENT OF K1 AND K2 RELAY ON FADEC3 FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 12-FEB-2008 HRS/MSC - ENC SB 73-0140 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU/EEC (73-21-60) - REPLACEMENT OF K1 AND K2 RELAY ON FADEC3 FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS I3-APR-2009 HRS/MSC - ENC SB 73-0140 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU1EEC (73-21-60) - REPLACEMENT OF KI AND K2 RELAY ON FADEC3 RECOMMENDED FOR CFM56-78 ENGINES. SERVICE BULLETIN MOS 23-FEB-20 I 2 HRS(MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 727 Of 748 @ Camp Systems EFTA00619018 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0141 NO 2 ENGINE - FRONT TRANSIENT PROTECTION BOARD FUSE INSPECTION AND REWORK ON FADEC3 FOR CFM56-78 RECOMMENDED ENGINES. SERVICE BULLETIN 28-NOV-2007 SB 73-0142 R1 MOS 4 (5) HRSASC ENC NO 2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRICAL HARNESS CJ9. CJ10 (73-24-05) - DELETION OF CJ9 WIRING HARNESS TS BRANCH FOR NON-PMUX ENGINE IN THE FIELD. SERVICE BULLETIN MOS HRSi MSC - ENC SB 73-0143 N0.2 ENGINE - PRESSURE SUBSYSTEM (PSS) TRANSDUCER RELIABILITY IMPROVEMENT. SERVICE BULLETIN MOS 21-FEB-2008 HRS/MSC - ENC SB 73-0144 NO. 2 ENGINE - SPARE PARTS RELEASE FOR CFNIS6-78 CMM. SERVICE BULLETIN MOS 04-APR-2008 HR&MSC ENC SB 73-0145 NO 2 ENGINE - ENGINE FUEL AND CONTROL SYSTEM (73-00-00) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN MOS 25-AUG-2008 HRSMSC ENC SB 73-0146 NO 2 ENGINE - REPLACEMENT OF SUSPECTED J7 WIRING HARNESS. SERVICE BULLETIN MOS 08-APR-2008 HRSIISC ENC 5(s) SB 73-0151 R1 NO 2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW 7.8.T SOFTWARE VERSION. SERVICE BULLETIN MOS 27-FEB-2009 HRSilISC ENC SB 73-0152 NO 2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - SPARE PARTS RELEASE FOR CFMSG-7B CMM. SERVICE BULLETIN 08-OCT-2009 MOS HRSMSC ENC SB 73-0153 NO 2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INSPECTION OF MAIN BODY ASSEMBLY. SERVICE BULLETIN MOS HRSIISC - ENC SB 73-0154 N0.2 ENGINE - FADEC3 - CFMS6-78 - EEGECU CONVERSION FROM PIN 2042M67P02 TO PIN 2042M67PO4. SERVICE BULLETIN MOS 01.MAY.2CC-9 HRSLISC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CNV (EBT)-Estimated Base Time 728 Of 748 '2 Camp Systems EFTA00619019 flP Megnand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0154 R1 NO.2 ENGINE - ENGINE FUEL AND CONTROL - FADEC3 - CFM56-78 - EEC/ECU CONVERSION FROM PIN 2042M67P02 TO P/N 2042M67PO4. SERVICE BULLETIN MOS HRS/MSC - ENC S8 73-0156 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ENGINE HARNESSES CJ9. CJ10 (73-24-05)- SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN MOS 16-NOV-2011 HRS/MSC - ENC S8 73-0157 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.UI. SERVICE BULLETIN RECOMMENDED MOS 6 (s) 27 -JUL-2009 HRS/MSC ENC S8 73-0157 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.U1. SERVICE BULLETIN MOS 6 (s) 14-AUG-2009 HRS/MSC ENC S8 73-0157 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.U1. SERVICE BULLETIN MOS 6 (s) 02-FEB-2010 HRS/MSC ENC S8 73-0158 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF MODIFIED METERING VALVE RESOLVER BODY ASSEMBLY. SERVICE BULLETIN MOS 15-MAY-2009 HRS/MSC - ENC S8 73-0159 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - INTRODUCTION OF FADEC3 ECLYEEC WITH NEW MAIN CHANNEL BOARD. SERVICE BULLETIN MOS 09-DEC-2009 HRS/MSC - ENC S8 73-016 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-00-00) - SCHEDULED INSPECTION. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0161 NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 27 -JUL-2009 HRS/MSC - ENC S8 73-0163 NO.2 ENGINE - ENGINE FUEL AND CONTROL - GENERAL (73-00-00) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN 05-OCT-2009 MOS HIRSAISC - ENC NOT APPLICABLE - BASED ON THE HYDROMECHANICAL UNIT (HMU) PART NUMBER 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 729 Of 748 @Camp Systems EFTA00619020 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0167 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - ECU MODIFICATION -REPLACEMENT OF CR1 AND CR14 RECTIFIERS ON THE PSM (SUPERSEDED BY 73-0167 RI). SERVICE BULLETIN MOS SUPERSEDED HRSAISC - ENC SB 73-0167 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - ECU MODIFICATION - RECOMMENDED REPLACEMENT OF CR1 AND CR14 RECTIFIERS ON THE PSM. SERVICE BULLETIN MOS 04-JAN-2012 HRS1MSC - ENC SB 73-0169 NO.2 ENGINE - ENGINE FUEL AND CONTROL-ELECTRONIC CONTROL UNIT (73-00-00)-DIGITAL INTERFACE UNIT MODIFICATION. SERVICE BULLETIN MOS HRS1MSC ENC SB 73-0169 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT OPTIONAL MODIFICATION. SERVICE BULLETIN MOS I3-JUL-2011 HRSAISC ENC SB 73-0169 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT RECOMMENDED MODIFICATION (SUPERSEDED BY SB 73-0169 R3). SERVICE BULLETIN MOS 22-SEP-2011 HRSfMSC - ENC SB 73-0169 R3 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-00-00) - DIGITAL INTERFACE UNIT CATEGORY 7 MODIFICATION. SERVICE BULLETIN MOS 17-APR-2014 HRSMSC ENC SB 73-0170 NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT BODY SUPERSEDED NON-FERROUS RING CHIP CONTAMINATION (SUPERSEDED BY 73-0170 RI). SERVICE BULLETIN MOS HRSAISC - ENC SB 73-0170 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT BODY RECOMMENDED NON-FERROUS RING CHIP CONTAMINATION. SERVICE BULLETIN MOS 16-MAY-2011 HRSAISC - ENC SB 73-0171 NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT OPTIONAL MANUFACTURABILITY IMPROVEMENTS. SERVICE BULLETIN MOS 24-SEP-2010 HRSAISC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 730 Of 748 @ Camp Systems EFTA00619021 COMP Asiatimfra the nand up' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0172 NO.2 ENGINE - ENGINE AND FUEL CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF FUEL METERING VALVE RESOLVER MODIFICATION . SERVICE BULLETIN MOS 17-DEC-2010 HRSPASC ENC SB 73-0172 RI NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF FUEL RECOMMENDED METERING VALVE RESOLVER MODIFICATION. SERVICE BULLETIN MOS 15-FEB-2012 HRSPASC - ENC SB 73-0173 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - CFM56-7B ECU INSPECTION - RECOMMENDED IOM SOLDER JOINT CRACKING (SUPERSEDED BY SB 73-0173 R1). SERVICE BULLETIN MOS 20-JAN-2011 HRS04SC - ENC SB 73-0173 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - CFM56-7B ECU INSPECTION - CATEGORY 5 IOM SOLDER JOINT CRACKING. SERVICE BULLETIN MOS 17-APR-2014 HRSPASC - ENC SB 73-0174 NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-W-00) - INCORPORATION OF NEW RECOMMENDED INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN MOS 23-NOV-2010 HRSPASC - ENC SB 73-0174 RI NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-03-00) - INCORPORATION OF NEW CUSTOMER INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN CONVENIENCE MOS I9-JUL-2011 HRSPASC - ENC SB 73-0174 R2 NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-03-00) - INCORPORATION OF NEW SUPERSEDED INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE (SUPERSEDED BY SB 73-0193). SERVICE BULLETIN MOS Of-MAY-2013 HRS/MSC - ENC SB 73-0175 NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT SUPERSEDED BYPASS VALVE ROTATION (SUPERSEDED BY 73-0175 R1) . SERVICE BULLETIN OPTIONAL SB 73-0175 RI I6-MAY-2011 MOS HRSPASC - ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT RECOMMENDED BYPASS VALVE ROTATION. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 731 Of 748 @ Camp Systems EFTA00619022 C O Atiant.fran MP Meowed up AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0175 R2 Of-MAY-2013 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT BYPASS VALVE ROTATION (SUPERSEDED BY SB 73-0194). SERVICE BULLETIN MOS HRS/MSC - ENC SUPERSEDED SB 73-0178 07-JUN-2011 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V2. SERVICE BULLETIN MOS HRSAISC - ENC RECOMMENDED SB 73-0178 R2 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V2. SERVICE BULLETIN RECOMMENDED COMPLIED WITH- ENGINE #2 ECU SOFTWARE PIN 1853M78P33, VERSION 7898 (7.B.V2 F2) MOS 28-AUG-20I3 17-AUG-2011 HRS/MSC - 3728:53 ENC 875 SB 73-0180 NO.2 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - INTRODUCTION SUPERSEDED OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY 73-0180 IR). SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0180 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) -INTRODUCTION OF A NEW FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS 23-MAY-2012 HRS/MSC - ENC SB 73-0181 NO.2 ENGINE - ENGINE FUEL AND CONTROL-IDENTIFICATION PLUG (73-21.83) - INTRODUCTION OF NEW CODING COMBINATIONS FOR -7BE LPT HARDWARE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0182 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MN76 SUPERSEDED BRIDGE BGA ON ASELEC MANUFACTURED MAIN CHANNEL BOARDS (SUPERSEDED BY SB 73-0182 R1). SERVICE BULLETIN MOS HRS(MSC - (s) ENC SB 73-0182 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MN76 BRIDGE BGA ON ASELEC MANUFACTURED MAIN CHANNEL BOARDS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 73-0184 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF T2 AND T4 RECOMMENDED TRANSFORMER ON THE PSM. SERVICE BULLETIN MOS I6-FEB-2012 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 732 Of 748 @ Camp Systems EFTA00619023 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0185 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - BUCK POWER SUPPLY U540 RECOMMENDED MODIFICATION. SERVICE BULLETIN 18-OCT-2011 MOS HRSAISC ENC SB 73-0186 NO.2 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - REPETITIVE SUPERSEDED INSPECTION OF THE FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY SB 73-0192). SERVICE BULLETIN MOS 28-N0V-2011 HRSAISC 15000 (s) ENC SB 73-0186 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - REPETITIVE INSPECTION OF THE FUEL DIFFERENTIAL PRESSURE SWITCH (SUPERSEDED BY SB 73-0192). SERVICE BULLETIN MOS 29-MAR-2013 MRS/MSC - ENC SB 73-0188 NO.2 ENGINE - ENGINE FUEL AND CONTROL - HYDROMECHANICAL UNIT (73-21-10) - INTRODUCTION OF IMPROVED RECOMMENDED TRANSIENT BLEED VALVE THREE WAY TWO STAGE ELECTROHYDAULIC SERVO VALVE WITH VENTED SLEEVE. SERVICE BULLETIN 14-FEB-2012 SB 73-0189 MOS HRSAISC ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL - IDENTIFICATION PLUG (73-24-06)- SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN MOS I8-JUN-2012 HRSAISC ENC SB 73-0190 NO.2 ENGINE - ENGINE FUEL AND CONTROL- FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - REPLACEMENT Of SUPERSEDED THE FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS 20-JUL-2012 HRS/MSC - (s) ENC SB 73-0190 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-10) - REPLACEMENT OF THE FUEL DIFFERENTIAL PRESSURE SWITCH. SERVICE BULLETIN MOS HRS1MSC - ENC SB 73-0191 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V3, SERVICE BULLETIN CUSTOMER CONVENIENCE 1 1 -DEC-2012 SB 73-0191 RI 72-APR-2073 MOS HRS1MSC ENC NO.2 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.B.V3. SERVICE BULLETIN RECOMMENDED MOS HRS1MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 733 Of 748 @ Camp Systems EFTA00619024 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: O5-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 73-0192 NO.2 ENGINE - ENGINE FUEL AND CONTROL - FUEL DIFFERENTIAL PRESSURE SWITCH (73-34-11) - FUEL DIFFERENTIAL PRESSURE SWITCH MANAGEMENT. SERVICE BULLETIN MOS MRS/51SC - ENC SB 73-0193 NO.2 ENGINE - ENGINE AND FUEL CONTROL- HYDROMECHANICAL UNIT (73-21-10) - INCORPORATION OF NEW CUSTOMER INTEGRATOR SPRING ASSEMBLY FOR ANTI-ROTATION OF BYPASS INTEGRATOR VALVE. SERVICE BULLETIN CONVENIENCE MOS Of-MAY-2013 MRS/51SC - ENC SB 73-0194 NO.2 ENGINE - ENGINE FUEL AND CONTROL- HYDROMECHANICAL UNIT (73-21-10) - HYDROMECHANICAL UNIT RECOMMENDED BYPASS VALVE IMPROVEMENT. SERVICE BULLETIN MOS 01-MAY-2013 MRS/51SC ESV ENC SB 73-0195 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - ADDMON OF ARINC SERIES OPTIONAL RESISTORS ON TX3 LINES TO ACCOMMODATE NEWER MCB MN52 DEVICE. SERVICE BULLETIN MOS 14-JUN-2013 MRS/51SC - ENC SB 73-0196 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ELECTRONIC CONTROL UNIT (73-21-60) - REPLACEMENT OF MNS2 RECOMMENDED ARINCICCDUIMS8 CONTROLLER ON TRONICO MANUFACTURED MAIN CHANNEL BOARDS. SERVICE BULLETIN MOS 25-JUL-2013 HRSO4SC - ENC SB 73-0198 20-FEB-2014 NO.2 ENGINE - ENGINE FUEL AND CONTROL- GENERAL (73-00-00) - INTRODUCTION OF NEW CONNECTORS FOR ELECTRICAL HARNESSES. SERVICE BULLETIN MOS HRS/MSC - ENC CATEGORY 6 SB 73-0199 NO.2 ENGINE - ENGINE FUEL AND CONTROL- ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V4 (SUPERSEDED BY SUPERSEDED SB 73-0199 RI). SERVICE BULLETIN MOS HRSO4SC ENC SB 73-0199 RI NO.2 ENGINE - ENGINE FUEL AND CONTROL - ECU (73-21-60) - NEW SOFTWARE VERSION 7.8.V4. SERVICE BULLETIN CATEGORY 7 MOS 28-JAN-2014 HRSfMSC - ENC SB 73-0203 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - NEW SOFTWARE VERSION CATEGORY 2 7.B.WF2 FOR DAC ENGINES. SERVICE BULLETIN MOS 12(s) 09-JUN-2014 HRSO4SC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 734 Of 748 @ Camp Systems EFTA00619025 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB SS 73-0204 09-JUN-2014 73-A002 NO.2 ENGINE - ENGINE FUEL AND CONTROL - ELECTRONIC CONTROL UNIT (73-21-60) - NEW SOFTWARE VERSIONS 7.B.WF3 FOR SAC AND DAC ENGINES AND 7.B.WF2 FOR SAC ENGINES. SERVICE BULLETIN MOS 12 (s) HRS/MSC ENC NO.2 ENGINE - SERCK AVIATION SERVO FUEL HEATERS - IDENTIFICATION OF POTENTIAL LEAKING UNITS. SERVICE BULLETIN CATEGORY 2 MOS HRS/MSC ENC SB 73-A0024 NO.2 ENGINE - INTRODUCTION OF SOFTWARE VERSION 7.8.11 (7838), SERVICE BULLETIN MOS 02-SEP-1998 HRS/MSC - ENC SB 73-A0034 NO.2 ENGINE - INTRODUCTION OF A NEW FUEL PUMP WITH NEW FILTER COVER. SERVICE BULLETIN MOS 23-JUL-1999 HRS/MSC - ENC SB 73-A0076 NO.2 ENGINE -SERVO FUEL HEATERS - IDENTIFICATION OF POTENTIAL LEAKING UNITS. SERVICE BULLETIN DAYS 30 (s) MRS/P.1SC ENC SS 73-A0091 NO.2 ENGINE - INSPECTION OF 3 FUEL SUPPLY TUBES FOR WEAR AT CLAMP LOCATIONS. SERVICE BULLETIN CANCELLED NOT APPLICABLE MOS 22-AUG-2008 HRS/MSC - (s) 3260:48 ENC 746 SS 73-A0091 R1 NO.2 ENGINE - INSPECTION OF 3 FUEL SUPPLY TUBES FOR WEAR AT CLAMP LOCATIONS. SERVICE BULLETIN MOS HRS/MSC - ENC SS 74-0001 NO.2 ENGINE - INTRODUCTION OF NEW IGNITER PLUG. SERVICE BULLETIN MOS HRS,MSC - ENC SB 74-0002 NO.2 ENGINE - INTRODUCTION OF A NEW UNISON IGNITER PLUG. SERVICE BULLETIN MOS HRS(MSC - ENC 58 74-0003 NO.2 ENGINE - IGNITION - IGNITION SYSTEM (74-00-00) - SCREENING OF IGNITION UNIT EXCITER VIN 10-631045-2 (P/N 9238M66P08) FOR SUSPECT DIODES. SERVICE BULLETIN MOS 18 (s) MRS/P.1SC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 735 Of 748 @ Camp Systems EFTA00619026 CORP Asmant sre the enand AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC S8 74-0004 NO. 2 ENGINE - IGNITION - IGNITION SYSTEM (74-00-00) - INTRODUCTION OF NEW IGNITION UNIT EXCITER VIN 10-631045-3 (PIN 92381066P11). SERVICE BULLETIN MOS FiRS11,1SC - ENC SB 75-0001 R1 NO. 2 ENGINE - LPT ACC FUEL MANIFOLD BOLT REPLACEMENT. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRS(MSC - 0 ENC 0 SB 75-0002 NO. 2 ENGINE - INTRODUCTION OF HPTC VALVE VIN 3291186-6 (CFMI 1821M59P06). SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-0003 NO. 2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE ASSEMBLIES. SERVICE BULLETIN MOS HRS/MSC ENC SB 75-0003 R1 NO. 2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE ASSEMBLIES. SERVICE BULLETIN MOS HRS/MSC ENC SB 75-0003 R2 NO. 2 ENGINE - INTRODUCTION OF NEW LPT COOLING AIR TUBE AND TCC AIR MANIFOLD CHECK VALVE FLANGE ASSEMBLIES. SERVICE BULLETIN MOS MRS/1,1SC ENC SB 75-0004 NO. 2 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN MOS HRSAISC - ENC SB 75-0004 R1 NO. 2 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-0004 R2 NO. 2 ENGINE - INTRODUCTION OF A NEW VBV ACTUATOR. SERVICE BULLETIN MOS HRS1MSC - ENC SB 75-0005 NO. 2 ENGINE - INSPECTION OF PS3 LINE FITTING. SERVICE BULLETIN MANDATORY SCRAP MOS 14-NOV-2001 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Taska *-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 736 Of 748 @Camp Systems EFTA00619027 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 75-0025 R1 NO.2 ENGINE - INTRODUCTION OF REWORKED VBV ACUTATOR. SERVICE BULLETIN MOS HRSIMSC - ENC SB 75-0027 NO.2 ENGINE - MODIFICATION OF THE PS3 LINE FITTING CONNECTIONS TORQUE SEQUENCE AND ADDITION OF PERMANENT BONDING TO THE CAP. SERVICE BULLETIN MOS HRSIMSC - ENC SB 75-0027 RI NO.2 ENGINE - AIR - COOLING AIR - MODIFICATION OF PS3 LINE FITTING CONNECTIONS TORQUE SEQUENCE AND ADDITION OF PERMANENT BONDING OF THE CAP. SERVICE BULLETIN MOS HRSMISC - ENC SB 75-0030 NO.2 ENGINE - ENGINE AIR-TRANSIENT BLEED VALVE (72-00-02)- REWORK TRANSIENT BLEED VALVE PN 3291390-1 TO PN 3291390-3, SERVICE BULLETIN MOS HRS/MSC ENC SB 75-0030 RI NO.2 ENGINE - AIR - AIR TRANSIENT BLEED VALVE (75-21-10) - REWORK OF TRANSIENT BLEED VALVE VIN 3291390-1 (PIN 1821M60P02) TO VIN 3291390-3 (PM 1821M60P04). SERVICE BULLETIN MOS 14-JUL-2009 HRS/LISC - ENC SB 75-0032 NO.2 ENGINE - REPLACEMENT OF VBV TURNBUCKLE (STEEL VERSION) BY NEW ONES WITH NEW MATERIAL (ALUMINIUM VERSION). SERVICE BULLETIN MOS 21 -JUN-2005 HRS/MSC - ENC SB 75-0033 NO.2 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION ON THE FAN MAJOR MODULE. SERVICE BULLETIN SB 75-0033 RI SB 75-0033 R2 SB 75-0035 MOS HRS/MSC - ENC NO.2 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION ON THE FAN MAJOR MODULE. SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - REPLACEMENT OF CLAMPS WITH METALLIC FOAM CUSHION BY CLAMPS WITH KEVLAR CUSHION. SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - INTRODUCTION OF A NEW AIR SUPPLY DUCT. SERVICE BULLETIN MOS HRSIMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 737 Of 748 @ Camp Systems EFTA00619028 CAMP fin. thermiewlqi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC 58 75-0036 NO.2 ENGINE - REWORK TURBINE CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186.6 (1821M59PC6) TO REDUCE FUEL LEAKAGE (SUPERSEDED BY SB 75-0036 RI) . SERVICE BULLETIN MOS HRS/MSC ENC SB 75-0036 RI NO.2 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVES (75-22-10) - REWORK TURBINE CATEGORY 7 CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186-6 (1821M59P06) TO REDUCE FUEL LEAKAGE (SUPERSEDED BY SB 75-0036 R2). SERVICE BULLETIN MOS 25-APR-2014 HRS/MSC - ENC SB 75-0036 R2 NO.2 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVES (75-22-10) - REWORK TURBINE CATEGORY 7 CLEARANCE CONTROL VALVES. VIN 3291186-5 (1821M59P05) AND VIN 3291186-6 (1821M59P06) TO REDUCE FUEL LEAKAGE. SERVICE BULLETIN MOS 09-JUN-2014 HRS/MSC - ENC SB 75-0037 NO.2 ENGINE - INTRODUCTION OF NEW VBV TURNBUCKLE. SERVICE BULLETIN MOS 08-SEP-2006 HRS/MSC - ENC SB 75-0037 RI NO.2 ENGINE - INTRODUCTION OF NEW VBV TURNBUCKLE. SERVICE BULLETIN MOS 13-FEB-2007 HRS/MSC - ENC SB 75-0038 NO.2 ENGINE - INTRODUCTION OF PS3 SIGNAL TUBE BRACKET. SERVICE BULLETIN MOS 14-DEC-2006 HRS/MSC - ENC SB 75-0039 NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) -INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN MOS 15-DEC-2008 HRSfMSC - ENC SB 75-0041 NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN MOS 05-FEB-2009 MRS/P.1SC - ENC SB 75-0041 RI NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF THE NEW LPTACC VALVE. SERVICE BULLETIN MOS 15-JUN-2009 HRS/MSC - ENC SB 75-0042 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFMS6-7B IPC. SERVICE BULLETIN MOS 20-FEB-2008 MRS/P.1SC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 738 Of 748 @ Camp Systems EFTA00619029 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 75-0043 NO.2 ENGINE - REWORK OF THE AIR MANIFOLD AND THE BRACKET OF THE COOLING MANIFOLD IN FIELD. SERVICE BULLETIN 05-SEP-2008 SB 75-0044 C6-FEB-2010 MOS HRS/MSC ENC NO.2 ENGINE - MR-ACTUATOR VBV (75-32-14) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-0045 NO.2 ENGINE - AIR - ACTUATOR VBV (75-32-14) - INTRODUCTION OF THE LVDT SENSOR VIN 8070287(325-500-002-0). SERVICE BULLETIN 09-JAN-2009 MOS HRS/MSC ENC SB 75-0047 NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) - IN FIELD REIDENTIFICATION OF LPTACC VALVE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-0048 NO.2 ENGINE - AIR - LPTACC VALVE (75-23-15) - INTRODUCTION OF A NEW LPTACC VALVE WITH A NEW OPTIONAL IDENTIFICATION PLATE. SERVICE BULLETIN MOS I9-JAN-2012 HRS/MSC ENC SB 75-0050 NO.2 ENGINE - AIR - COOLING (75-22-10) - REWORK OF TURBINE CLEARANCE CONTROL VALVES VIN 3291186-5 (P/N RECOMMENDED 1821M59P05) AND VIN 3291186-6 (P/N 1821M59P06), SERVICE BULLETIN MOS 23-FEB-20I2 HRS/MSC - ENC SB 75-0051 NO.2 ENGINE - AIR - GENERAL - INTRODUCTION OF NEW TBV TUBE AND BRACKET. SERVICE BULLETIN RECOMMENDED MOS 03-SEP-2012 HRS/MSC - ENC SB 75-0052 NO.2 ENGINE - AIR - VARIABLE STATOR ACTUATOR (75-32-10) - REPLACEMENT OF LVDT FOR FAULTY VSV ACTUATORS. SERVICE BULLETIN MOS HRS/MSC - ENC SB 75-1040 NO.2 ENGINE - REWORK HIGH PRESSURE TURBINE CLEARANCE VALVE. PN 3291186-5. TO PN 3291186-6. SERVICE BULLETIN MOS HRS/MSC - ENC SB 77-0001 NO.2 ENGINE - CONTROL UNIT ALTERNATOR - REPLACEMENT OF CONNECTOR SF41 C. SERVICE BULLETIN MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 739 Of 748 @ Camp Systems EFTA00619030 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 77-0002 NO.2 ENGINE - SPARE PARTS RELEASE FOR ENGINE CFM56-78 I PC. SERVICE BULLETIN MOS HRS(MSC - ENC SB 77-0003 NO.2 ENGINE - ENGINE INDICATING - T49.5 THERMOCOUPLE LEAD ASSY (77-21-10) - INTRODUCTION OF NEW OR REWORKED T49.5 PROBE. SERVICE BULLETIN MOS MRS/51SC - ENC SB 77-0004 NO.2 ENGINE - ENGINE INDICATING- T5 SENSOR REMOVAL (77-22-10) - INTRODUCTION OF NEW TEMPERATURE SENSOR. SERVICE BULLETIN SB 77-0004 RI 04-MAR-2005 SB 77-0005 MOS FIRS/51SC - ENC NO.2 ENGINE - INTRODUCTION OF NEW TEMPERATURE SENSOR. SERVICE BULLETIN MOS HRS(MSC - ENC NO.2 ENGINE - ELIMINATE CHAFING OF BOEING ECS TUBE. SERVICE BULLETIN MOS HRS(MSC - ENC SB 77-0007 NO.2 ENGINE - INTRODUCTION OF A NEW NI SPEED SENSOR. SERVICE BULLETIN MOS OI -DEC-2006 HRS/MSC - ENC SB 77-0008 NO.2 ENGINE - INTRODUCTION OF A NEW N2 SPEED SENSOR. SERVICE BULLETIN MOS 20-OCT-2006 HRS/MSC - ENC SB 77-0008 RI NO.2 ENGINE - INTRODUCTION OF A NEW N2 SPEED SENSOR. SERVICE BULLETIN MOS 27-FEB-2008 MRS/51SC - ENC SB 77-0009 NO.2 ENGINE - ENGINE INDICATING - (77-00-00) - SPARES PARTS RELEASE FOR CFM56-78. SERVICE BULLETIN MOS I2-JAN-2009 HRS(MSC - ENC SB 77-0010 NO.2 ENGINE - ENGINE INDICATING -NI SPEED SENSOR (77-12-19) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN I 7-DEC-2009 MOS HRS/MSC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 740 Of 748 @ Camp Systems EFTA00619031 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0001 NO.2 ENGINE - APPROVED OILS FOR CFM56-78 ENGINES. SERVICE BULLETIN - INFORMATION ONLY MOS HRSAISC - ENC SB 79-0001 RI NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC SB 79-0001 RIO NO.2 ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-76 ENGINES. SERVICE BULLETIN CATEGORY 9 MOS 14-APR-2014 FIRSAISC - ENC SB 79-0001 R2 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0001 R3 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0001 R4 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC SB 79-0001 R5 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSAISC - ENC SB 79-0001 R6 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 07-JUL-2006 HRSAISC - ENC SB 79-0001 R7 NO.2 ENGINE - APPROVED OILS FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS 10-JUL-2008 FIRSAISC - ENC SB 79-0001 R8 NO.2 ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-761 ENGINES. SERVICE BULLETIN MOS 14-MAY-2009 HRS/MSC - ENC SB 79-0001 R9 NO.2 ENGINE - OIL - GENERAL (79-00-00) - APPROVED OILS FOR CFM56-7B ENGINES (SUPERSEDED BY SB 79-0001 INFORMATIONAL R10). SERVICE BULLETIN MOS 19-AUG-2011 FIRSAISC ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 741 Of 748 @ Camp Systems EFTA00619032 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0002 RI NO.2 ENGINE - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN COMPUED WITH -AT MANUFACTURE MOS 16-DEC-1998 HRS/USC - 0 ENC 0 SB 79-0002 R2 NO.2 ENGINE - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0002 R3 NO.2 ENGINE - OIL - LUBRICATION UNIT (79-00-00) - INTRODUCTION OF THE DEBRIS MONITORING SYSTEM OPTIONAL KIT. SERVICE BULLETIN MOS 14-MAY-2009 HRSAISC ENC SB 79-0003 NO.2 ENGINE - INTRODUCTION OF A NEW OIL CLOGGING INDICATOR. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0004 RI NO.2 ENGINE - ADDITION OF A CAUTION LABEL ON OIL SCAVENGE FILTER BOWL. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0005 NO.2 ENGINE - SPARE PARTS RELEASE FOR CFM56-7B CMM, SERVICE BULLETIN COMPUED WITH - NO REWORK REQUIRED MOS 22-AUG-2008 HRS/MSC - 3260:48 ENC 746 SB 79-0006 NO.2 ENGINE - OIL - OIL SYSTEM (79-00-00) - INTRODUCTION OF AN IMPROVED OIL SCAVENGE FILTER ASSY WITH MODIFIED BOWL AND HEAD. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0008 NO.2 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL HEATER. SERVICE BULLETIN MOS HRS/MSC 1500 (s) ENC SB 79-0008 RI NO.2 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL HEATER. SERVICE BULLETIN MOS HRSAISC - ENC SB 79-0008 R2 NO.2 ENGINE - INTRODUCTION OF NEW GASKET SEAL BETWEEN THE HEAT EXCHANGER AND THE SERVO FUEL HEATER. SERVICE BULLETIN MOS HRSAISC 1500 (s) ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 742 Of 748 @ Camp Systems EFTA00619033 CAMAsiont.P inn• Megnsind•fs' AD/SI Status Report 737-72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS. 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: OS-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0009 SB 79-0009 R1 SB 79-0009 R2 SB 79-0010 SB 79-0010 R1 NO 2 ENGINE - LUBRICATION UNIT REMOVAL (79.21-10) - INTRODUCTION OF NEW PACKING PREFORMED O-RINGS AND REWORK OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRIFICATION UNIT.. SERVICE BULLETIN MOS HRS/MSC - ENC NO 2 ENGINE - LUBRICATION UNIT (79-21-10)-INTRODUCTION OF NEW PACKING PERFORMED O-RINGS AND REWORK OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRICATION UNIT. SERVICE BULLETIN MOS HRS,P.ISC - ENC NO 2 ENGINE - LUBRICATION UNIT (79-21-10)-INTRODUCTION OF NEW PACKING PERFORMED O-RINGS AND REWORK OR INTRODUCTION OF NEW INNER SEALING SPOOL TO THE LUBRIFICATION UNIT. SERVICE BULLETIN MOS HRS,P.ISC - ENC NO 2 ENGINE - INTRODUCTION OF NEW FLUOROCARBONE O-RINGS ON OIL FUEL HEAT EXCHANGER. SERVICE BULLETIN MOS HRSI.ISC ENC NO 2 ENGINE - OILIFUEL HEAT EXCHANGER ( 79-21-20) - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RINGS. SERVICE BULLETIN MOS HRSIASC - ENC SB 79-0010 R2 NO 2 ENGINE - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RINGS. SERVICE BULLETIN MOS 20-DEC-2000 HRSMSC - ENC SB 79-0011 NO.2 ENGINE - OlUFUEL HEAT EXCHANGER (79-21-20) - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RINGS. SERVICE BULLETIN SB 79-0011 R1 20-DEC-2000 SB 79-0012 MOS HRSMSC - ENC NO 2 ENGINE - REPLACEMENT OF FLUOROSILICONE BY FLUOROCARBONE O-RING. SERVICE BULLETIN MOS HRS,P.ISC - ENC NO.2 ENGINE - REWORK OF A SPECIFIC BATCH OF OIL LEVEL SENSORS. SERVICE BULLETIN MOS HRSMSC - ENC SB 79-0013 NO 2 ENGINE - INTRODUCTION OF A NEW OIL BYPASS VALVE. SERVICE BULLETIN MOS HRSMSC - ENC ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CIW (EBT)-Estimated Base Time 743 Of 748 1, Camp Systems EFTA00619034 C O MP Megnsind AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0014 NO.2 ENGINE - OIL - OIL SYSTEM ( 79-00-00 ) - DELETION OF THE OIL BYPASS VALVE AND ITS HARDWARE. SERVICE BULLETIN MOS MRS/P.1SC - ENC SB 79-0017 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES, SERVICE BULLETIN MOS 6 (s) HRS/MSC ENC SB 79-0017 RI NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES, SERVICE BULLETIN MOS 6 (s) MRS/P.1SC ENC SB 79-0017 R2 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES. SERVICE BULLETIN MOS 6 (s) MRS/P.1SC ENC SB 79-0017 R3 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES (SUPERSEDED RECOMMENDED BY SB 79-0017 R4). SERVICE BULLETIN MOS 6 (s) 16-FEB-2007 HRS/MSC ENC SB 79-0017 R4 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INSPECTION AND CLEANING OF THE AFT SUMP OIL TUBES. SERVICE BULLETIN MOS 14-APR-2014 HRS/MSC - ENC SB 79-0018 NO.2 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING. SERVICE BULLETIN DAYS 30 (s) HRSfMSC ENC SB 79-0018 RI NO.2 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING (SUPERSEDED BY SB 79-0018 R2). SERVICE BULLETIN DAYS 30 (s) MRS/P.1SC ENC SB 79-0018 R2 NO.2 ENGINE - OIL - GENERAL (79-00-00) - TREND MONITORING. SERVICE BULLETIN MOS 14-APR-2014 HRS/P.1SC - ENC SB 79-0020 NO.2 ENGINE - OIL - DEBRIS MONITORING SYSTEM (DMS) (79-21-S4) - INTRODUCTION OF NEW OMS DETECTOR AND REWORK OF THE OLD ONE. SERVICE BULLETIN MOS HRSfMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 744 Of 748 @ Camp Systems EFTA00619035 COMP Atant.fre• therrnewhip' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0020 R1 NO.2 ENGINE - INTRODUCTION OF NEW DMS DETECTOR AND REWORK OF THE OLD ONE. SERVICE BULLETIN MOS I6-JAN-2006 HRS/MSC - ENC SB 79-0021 R2 NO.2 ENGINE - INTRODUCTION OF A NEW OIL SCAVENGE HOSE TUBE WITH A NEW ROUTING AND A NEW BRACKET. SERVICE BULLETIN MOS -MAR-2005 HRS/MSC - ENC SB 79-0022 NO.2 ENGINE - OIL - DMS JUNCTION BOX (79-21-53) - SPARE PARTS RELEASE FOR CFM56-78 CMM. SERVICE BULLETIN 26-NOV-2008 MOS HRS/MSC - ENC SB 79-0023 NO.2 ENGINE - OIL/FUEL HEAT EXCHANGER (79-21-25) - INTRODUCTION OF A NEW MAIN OlUFUEL HEAT EXCHANGER WITH KEY LOCKED INSERTS. SERVICE BULLETIN MOS HRS,MSC - ENC SB 79-0023 RI NO.2 ENGINE - INTRODUCTION OF A NEW MAIN OIL/FUEL HEAT EXCHANGER WITH KEY LOCKED INSERTS. SERVICE BULLETIN MOS 20-DEC-2006 HRS/MSC - ENC SB 79-0024 NO.2 ENGINE - INTRODUCTION OF NEW PACKING PREFORMED 0 -RINGS IN FLUOROCARBONE WITH BETTER PERFORMANCE AT LOW TEMPERATURE. SERVICE BULLETIN MOS HRS/MSC 500(s) ENC SB 79-0025 NO.2 ENGINE - NEW FORWARD TUBE. SERVICE BULLETIN MOS HRS/MSC - ENC SB 79-0026 NO.2 ENGINE - INTRODUCTION OF NEW OUTER SEALING SPOOL. SERVICE BULLETIN MOS 25-OCT-2007 HRS/MSC - ENC SB 79-0027 NO.2 ENGINE - OIL CONSUMPTION MONITORING. SERVICE BULLETIN DAYS 30 (s) 10-JUL-2008 HRS/MSC ENC SB 79-0029 NO.2 ENGINE - OIL - OIL SCAVENGE FILTER ASSEMBLY (79-21-42) - INTRODUCTION OF A NEW BYPASS VALVE SPRING. SERVICE BULLETIN 08-OCT-2009 MOS HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 745 Of 748 @ Camp Systems EFTA00619036 CAMP Ael...imp.= taken...lop' AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 79-0030 05-N0V-2010 SB 79-0031 IO-DEC-2010 NO.2 ENGINE - OIL - GENERAL (79-00-00) - INTRODUCTION OF AN OIL SUPPLY TUBE WITH A NEW DESIGN. SERVICE RECOMMENDED BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - OIL - LUBRICATION UNIT (79-21-16) - SPARE PARTS RELEASE FOR CFM56-7B CMM. SERVICE BULLETIN INFORMATIONAL MOS HRSIMSC - ENC SB SB 79-0032 22-JAN-2013 79-0069 NO.2 ENGINE - OIL - GENERAL (79-0000) - SPARE PARTS RELEASE FOR CFM56-7B ENGINES. SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - DELETION OF ELECTRICAL CHIP DETECTOR KIT. SERVICE BULLETIN MOS HRSIMSC - ENC SB 80-0001 NO.2 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN MOS HRSIMSC - ENC SB 80-0001 R1 NO.2 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN NOT APPLICABLE - SUPERSEDED 80-0003R1 MOS HRSIMSC - ENC SB 80-0001 R3 NO.2 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN MOS HRSIMSC - ENC SB 80-0001 R4 NO.2 ENGINE - NEW AIR TURBINE STARTER DESIGN. SERVICE BULLETIN MOS 13-AUG-1999 HRSIMSC - ENC SB 80-0002 NO.2 ENGINE - AIR TURBINE STARTER CLAMP ROTATION, SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 26-MAR-1998 HRSIMSC - 0 ENC 0 SB 80-0003 R1 NO.2 ENGINE - INTRODUCTION OF A NEW MR TURBINE STARTER. SERVICE BULLETIN COMPUED WITH - AT MANUFACTURE MOS 16-DEC-1998 HRSIMSC - 0 ENC 0 SB 80-0004 NO.2 ENGINE - REPLACE THE GEAR SHAFT P/N 3507167-1 WITH P/N 3507167-2. SERVICE BULLETIN MOS HRSIMSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 746 Of 748 @ Camp Systems EFTA00619037 COMP Jm. thernanditfi AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 80-0004 R1 SB 80-0005 SB 80-0006 SB 80-0006 R1 -MAR-2004 NO.2 ENGINE - REPLACE THE GEAR SHAFT P/N 3507167-1 WITH P/N 3507167-2. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - AIR TURBINE STARTER. SERVICE BULLETIN MOS HRS/MSC - ENC NO.2 ENGINE - STARTING - INTRODUCTION OF NEW TURBINE AIR STARTER VIN 3505945-9 (GE 1851M36P09) FIELD UPGRADE. SERVICE BULLETIN MOS HRS/MSC ENC NO.2 ENGINE - STARTING - INTRODUCTION OF NEW TURBINE AIR STARTER VIN 3505945-9 (GE 1851M36P09) FIELD UPGRADE. SERVICE BULLETIN MOS HRS/MSC ENC SB 80-0007 NO.2 ENGINE - INTRODUCTION OF AIR TURBINE STARTER VIN 3505945-10 (GE 1851M36P10). SERVICE BULLETIN MOS HRS/MSC - ENC SB 80-0008 NO.2 ENGINE - INSPECTION AND REPLACEMENT OF NONCONFORMING MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN 06-AUG-2002 MOS 22-AUG-2008 HRS/MSC - (s) 326048 ENC 746 SB 80-0009 NO.2 ENGINE - STARTING - STARTING (80-00-00) - AIR TURBINE STARTER VIN 3505945-9 (GE 1851M36P09) TO VIN 3505945-10 (GE 1851M36P10) REWORK. SERVICE BULLETIN MOS HRSAISC - ENC SB 80-0010 NO.2 ENGINE - PACKINGS FOR HTS OILS. SERVICE BULLETIN MOS HRS/MSC DUE ENC SB 80-0010 RI NO.2 ENGINE - PACKINGS FOR HTS OILS AND NEW MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN MOS HRSAISC - ENC SB 80-0010 R2 NO.2 ENGINE - PACKINGS FOR HTS OILS AND NEW MAGNETIC DRAIN PLUG ASSEMBLY. SERVICE BULLETIN MOS 25-JUL-2006 HRS,MSC - (s) ENC COMPUED WITH 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 747 Of 748 @ Camp Systems EFTA00619038 COMP Jm. tMrrnM•O AD/SI Status Report 737.72UBJ REVISION 21 SIN 29273 (YG006) (VP-BBJ): 3753:19HRS, 922 AFL as of 30-Jun-2014 AIRCRAFT Service Information Report Date: 05-Aug-2014 Task No. Description Unit Interval Compliance Next Due Disposition MOC SB 80-0011 SB 80-0012 SB 80-0013 14-FEB-2012 NO.2 ENGINE - MAGNETIC DRAIN PLUG WITH LARGER KNOB TO EASE REMOVAL. SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - REPLACEMENT OF THE SPRING WASHER IN AIR TURBINE STARTERS VIN 3505945-9 (1851M36P09) AND VIN 3505945-10 (1851M36P10). SERVICE BULLETIN MOS HRSIMSC - ENC NO.2 ENGINE - STARTING - GENERAL (80-00-00)-ALLOW THE CHANGE IN THE FIELD OF THE AIR TURBINE STARTER SUPERSEDED DECOUPLER ASSEMBLY VIN 3504835-1 (SUPERSEDED BY 80-0013 RI). SERVICE BULLETIN MOS HRS/MSC - ENC SB 80-0013 RI NO.2 ENGINE - STARTING - GENERAL (80-00-00)- ALLOW THE CHANGE IN THE FIELD OF THE AIR TURBINE STARTER RECOMMENDED DECOUPLER ASSEMBLY VIN 3504835-1. SERVICE BULLETIN MOS 28-MAR-2012 HRS/MSC - ENC SB 80-0014 NO.2 ENGINE - STARTING - STARTER (80-11-00) - INTRODUCTION OF NEW AIR TURBINE STARTERS VIN 3505945-11 OPTIONAL (P/N 1851M36P11) AND VIN 3505945-12 (PIN 1851M36P12). SERVICE BULLETIN MOS 17-APR-2013 HRS/MSC - ENC SB 80-0015 NO.2 ENGINE - STARTING - STARTER (80-11-00) - RETURN SUSPECT AIR TURBINE STARTERS. P/N 3505945-10. FOR SUPERSEDED INSPECTION AND EVALUATION (SUPERSEDED BY SB 80-0015 RI). SERVICE BULLETIN MOS HRS/MSC - ENC SB 80-0015 RI NO.2 ENGINE - STARTING - STARTER (80-11-00) - RETURN SUSPECT AIR TURBINE STARTERS. P/N 3505945-10. FOR CATEGORY 2 INSPECTION AND EVALUATION. SERVICE BULLETIN MOS 09-JAN-2014 HRS/MSC - ENC SB 80-1709 NO.2 ENGINE - REWORK THE AIR TURBINE ENGINE STARTER. PN 3505945-5/-6 TO PN 3505945-7/-8. SERVICE BULLETIN MOS HRS/MSC - ENC SI SER 79-0001 NO.2 ENGINE - SERVICE EVALUATION REQUEST OF FLIGHT EVALUATION OF OILS. SERVICE INSTRUCTIONS MOS HRS/MSC ENC 5000 (s) VSB 3291186-75-1074 RI NO.2 ENGINE - ENGINE AIR - HIGH PRESSURE TURBINE CLEARANCE VALVE- REWORK HIGH PRESSURE TURBINE RECOMMENDED CLEARANCE VALVES. PN 3291186-5 AND PN 3291186-6 TO REDUCE FUEL LEAKAGE. VENDOR SERVICE BULLETIN MOS 19-FEB-2014 HRS/MSC - ENC 7-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (ex)-Excluded Tasks '-Estimated Due (New Requirement) (EFF)-Effective CM (EBT)-Estimated Base Time 748 Of 748 @ Camp Systems EFTA00619039
