arrow_back Search

EFTA00615134

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00615134.pdf description PDF text_fields 268 words · 1.8k chars
open_in_new View original source

November 30, 2012 Brice Gordon Zorro Ranch, NM Integrated Technologies Corporation 4401 Hardware Or. NE • •• c endive LB/CS/ CORPORATE n'e.l?sirci Err,' MEMBER SBA Certified .WOSB Brice. I cant to thank you again for the opportunity to provide you these proposals for the Zorro Ranch. I have four different costs for you as follows: HOER OPTIC: CARI.ING ONION #1 (COMPLETE) This option includes all material and labor to install a 6-strand single:mode fiber cable from the senice provider's point-of-presence to the "General Store". terminating there to provide shatal for the then continuing to the main residence where it will terminate and conned to the existing nemork infrastructure. It also includes 2 runs of 2" HI)PE duct (to allow for future use) and the appropriate number of handholes. Trenching and back-filling to be provided by Zorro Ranch. 'I his quote also cintiains matenal and labor nixessary to install three(3) wireless access points. The netvi ink signal shall originate at the -General Store- utilizing a mesh technology to distribute the signal to both residences nearby. This will not require cabling between the buildings. Fitch building would receive one port for network access. TOTAL COST: $149,216.37 FIBER OPTIC CABLING OPTION #2 (ONE DUCT) This option includes all listed above, but uses only onc(I) 2" duct in the trench. "'DIAL COST: S 117,546.03 FIBER OPTIC CABLING OPTION o(soDULL NOT RECOMMENDED) This option includes all listed in option =1. but provides no HOPE duct. Thus, the fiber is to be buried directly in the trench. TOTAL COST: 575.136.92 Please contact if you have any questions or concerns...and thank you again. Sincerely. EFTA00615134