arrow_back Search

EFTA00610262

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00610262.pdf description PDF text_fields 161 words · 1.1k chars
open_in_new View original source

Subbase Drydock T: Fax:l Box 304429 St. Thomas, USVI 00803 Name /Address LSJ,LLC "Big N" Anna: Estimate Date Estimate # 8/31 2017 915 Terms Project Upon Comple... Description Qty Cost Total Sandsweep cargo bay, cargo bay walls, and aft deck. Prime and paint with a non-skid two part epoxy paint. Includes Labor and Materials. I 12,340.00 12,340.00 Fabricate and weld splash guards into place to minimize water intrusion through the front ramp. I 7,500.00 7,500.00 Prime and paint for increased longevity. Prep and grind cracks throughout vessel. Includes Labor and Materials. Both cutless bearings are worn and not within tolerance. We recommend changing these while hauled out. We also recommend checking the engine alignment while hauled out to ensure there are no issues with the drive train. Includes Labor and Materials. I 3,750.00 3,750.00 Degrease engine room, remove, clean and dispose of all waste oil. Approximately 200 gallons of waste oil after clean up. I 3,750.00 3,750.00 Total s.27.34ii.lio Signature EFTA00610262