Construction Proposal August 7, 2O15 By the Contractor: Betteroads Asphalt Corporation For the Project: LSJ_Added Aggregate Base Little St. James Island VI SCOPE OF WORK: Place and compact 3 inches aggregates base as per plan TOTAL BASE PRICE: Project Totals: $90,712.00 Name Aggregate Quantity Unit Cost Unit Total Cost Crushed stone Aggregate Base 1360 530.00 Ton 540.800.00 Materials Transport Trucking and Hauling 68 $400.00 Each $27.200.00 Excavation and Fill Loading and/or Spreading Base Structural Compaction 1360 $3.00 $5.00 Ton Ton 54.080AX) 1360 S6.800.00 Company Overhead Company Overhead Percentage 15.00% I $0.00 Percent of Costs SI 1.832.00 Grand Total $90,712.00 Page 1 of 2 L.1.1 Added Aggregate Proposal EFTA00608342