Kitchen #1007 Budget Adjustment 23 July 2010 Code Description Budget Adjustment Revised / 02-005 Layout / Survey $0.00 3,000.00 3.000.00 02-071 Disposal $1,600.00 (1.600.00) $0.00 03-111 Footings $1,500.00 6,000.00 $7,500.00 _ 03-130 4000# Concrete $6,800.00 ./ 3,000.00 / $9,800.00 03-172 Retaining Walls $9,600.00 5,400.00 $15,000.00 03-173 Slab on Grade $2,500.00 1.281.00 $3,781.00 03-301 Admixtures $320.00 (320.00) $0.00 03-370 Curing - Protection $261.00 (261.00) $0.00 07-412 Metal Roofing - L $7,680.00 (5,000.00) $2,680.00 07-413 Metal Roofing - M $16,360.00 (10500.00 $6,360.00 07-623 Copper Flashing - L $3,840.00 (2,000.00) $1,840.00 07-624 Copper Flashing - M $6,400.00 (4.000.00) $2,400.00 07-632 Downspout Roush $2,500.00 2,500.00 i $5,000.00 07-900 Joint Sealants - $1,000.00 2,000.00 / $3,000.00 $60,361.00 0.00 $60,361.00 Increase in bBud et ... $0.00 Approved: EFTA00600556
