arrow_back Search

EFTA00595262

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00595262.pdf description PDF text_fields 258 words · 1.6k chars
open_in_new View original source

Sep 24 08 12:38p 3Bs LLC 505 255 2533 p.2 3 B's LLC 532 Jefferson NE Albuquerque NM 87108 Pb. 505-232-9494 Fax 255-2533 September 24, 2008 Brice Gordon do Zorro Ranch Stanley, NM Brice, Here is a price for the stucco repairs for the Main House and Ranch central Main House Clean areas as necessary to receive new stucco Patch holes and cracks Apply western one coat concentrate with fiber Finish coat will be completed with Sto synthetic color, skip towel applied to match existing finish 550 square yards at $ 42.00 per yard $23,100.00 plus tax Ranch Central Prep area as need to accept new stucco Patch and repair holes and cracks Apply new cement stucco 1,540.00 plus tax Total price for both sites is 24,640.00" plus tax (Dated 5/5/08) "After our site visit on 9/10/08 it was determined that more of the stucco had been .damaged due to exposure to the elements. There were several areas where water had accumulated during the recent rains. The additional amount for those areas would be $1,800. W&CI also need approximately 2 feet of clearance to do the repairs, mainly around the walls. The repairs do not have to be painted immediately and can wait until Spring. Total price as of 9/12J08 $26,440 plus tax ($48.07 price per yard) Two year labor and material warranty Prices include material, labor, equipment and insurance to complete project Excludes; tax, painting If you have any questions please call me at 450-3654. As always thank you very much for your business. .11 Bien EFTA00595262