arrow_back Search

EFTA00568325

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00568325.pdf description PDF text_fields 258 words · 1.6k chars
open_in_new View original source

From: Leo Loking To: Subject: Re: 301 list of work Date: Fri, 26 Jan 2018 01:16:16 +0000 Thanks Sent from my iPhone On Jan 25, 2018, at 1:34 AM, wrote: Hi and Leo, Thank you for your time at 301 today. Please see below the summary of work, that we discussed today. Thank you. 10B: -bedroom closets: install metal poles instead of the existing ones, put new light switch strings -same color/warmth light bulbs in the hallway ceiling near the bathroom -fix the dining table 10N -shower door seal 11P: -cover wires in the linen closet, 814: -put lights on dimmers where possible -Bathroom: reseal the gap around the shower floor; shower door seal 8A: -Entry light dimmer is not working 7J: -fix bedroom art pictures, so that they lay flat against the wall without bending -walk-in bedroom closet: fill the missing cedar panels, cover the phone cables -remove rusted bar on the balcony window -change lights in the fridge -reattach a loose floor molding piece 2G -put up the living room curtains after tailoring is done -fix the dining table -film for all the windows EFTA00568325 -new ac covers for outside -put a plate around the ac outlet in the living room -hang mirrors above the bedroom nightstands (should be at the same level as in 10B bedroom) -seal the gap around the bathtub -shower fixture cover is dirty -hook for the bathroom door -missing light switches in some closets -fix the door handle latch (coat closet) -hide wires in the kitchen cabinets -small fire extinguisher EFTA00568326